Determination 750013

Declined collapsed ceiling claim after strong winds

FirmSuncorp Group
Decided2021-03-25
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's home insurer declined a ceiling collapse claim, attributing it to glue failure, age and ground movement. AFCA found strong winds the proximate cause, directed the insurer to elect repair to the damaged ceiling, and left quantum to agreement or later AFCA determination.

The complainant established a valid storm claim, and the insurer's engineering reports were not sufficiently compelling to prove an exclusion applied.

Issues

Subjects and remedies

home or building damagenatural disasterrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 750013 Financial firm AAI Limited Determination | Case number: 750013 Page 2 of 11 Case number: 750013 12 March 2021 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (the insurer) and lodged a claim for a collapsed ceiling following strong winds. The insurer assessed the claim and noted the ceiling had collapsed and undertook a make safe. The insurer engaged two engineers to comment on the cause of the damage. Based on the engineers‟ opinion, the insurer denied the claim saying the complainant has not established the claimed damage was caused by a storm event. The complainant says there is no dispute the collapse happened after very strong winds, and this is covered under the policy and seeks for the insurer to pay the claim. The case manager provided the parties with a preliminary assessment on the issues in dispute. The preliminary assessment was in favour of the insurer. The insurer accepted the preliminary assessment, but it was not accepted by the complainant. In the circumstances, the complaint has been referred to me for determination. 1.2 Issues and key findings Is the insurer entitled to decline the claim? No. The available evidence establishes on the balance of probabilities the proximate cause of the claimed damage was the strong winds. In the circumstances the insurer is not entitled to decline the claim. 1.3 Determination This determination is in favour of the complainant. Should the complainant accept this determination then within seven days of notification of acceptance, the claim is to be dealt with in accordance with the mechanism set out in the determina tion under the heading “how claim is to be settled.” Determination | Case number: 750013 Page 3 of 11 2 Reasons for determination This complaint has been determined based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. After the preliminary assessment was rejected, neither party made any further submissions or provided any new material. 2.1 Is the insurer entitled to decline the claim? Complainant has established a valid claim The complainant must establish on the balance of probabilities that he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. In the context of this claim the complainant must establish the claimed damage was caused by the strong winds on 10 January 2020. The relevant policy terms are set out in supporting section 3.2 of this determination. It is not in dispute the ceiling is damaged. The insurer carried out a make safe. Both parties rely on expert reports, photographs and material from the Bureau of Meteorology. Relevant extracts from the material relied on by the parties are set out in supporting section 3.3 of this determination. The complainant challenges the insurer‟s engineers‟ opinions. He has provided reports from the builder who inspected the damage the day after the complainant found the collapsed ceiling and from a contractor who removed the insulation. In response, the insurer says more weight should be lent to the position put by its engineers. The information from the Bureau of Meteorolog y shows there was a maximum wind gust of 76km/ph at 18:47 on 10 January 2020 Wind of this strength is described on the Beaufort Scale as a strong gale capable of blowing tiles off buildings and dislodging roofing Determination | Case number: 750013 Page 4 of 11 The wind gust was in the early evening of 10 January 2020. When the complainant made the claim, he said the damage was discovered when walking upstairs one evening thereafter to get a book from the room which is infrequently used. The complainant‟s builder (AM) attended the home after the damage w as discovered and said he was not surprised the ceiling had a collapsed due to heavy winds. He says he has worked in the insurance industry for many years and seen many properties such as this suffer a ceiling collapse because heavy winds can create a vacuum and ballooning in the ceiling cavity. The roof contractor engaged by the complainant inspected the roof and says it showed stress to the rafter joins in the roof cavity consistent with severe storm. I am satisfied the complainant has established a valid claim. Insurer’s engineers’ reports insufficiently compelling Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. In the context of this claim the insurer must establish the claimed damage was caused by ground movement or wear and tear and gradual deterioration. The insurer says it is not obliged to accept the claim because the complainant has not established the damage to the home was caused by the storm event. Relying on its engineers‟ reports, it says the damage was not caused by a single incident but by multiple factors over time. The factors include ground movement, poor construction methods, age and the increased load applied to the roof from the installation of solar panels. The insurer ‟ s builder (DW) says there is no damage to the roof. DW says the ceiling collapsed because of the failure of the glue used during the installation of the ceiling sheeting. A section of the gang nail plates had collapsed and broken away in this area. DW concedes significant winds contributed to the collapse although he says this would have eventually occurred with or without the wind. The engineer (JH) describes a similar mechanism of damage but also refers to ground movement being a cause of the damage. A second engineer (DK) says it is unlikely that the wind was significant enough to impact on the home‟s structure. He notes solar panels were added to the roof about 10 years prior and says the additional load on the roof structure increased the deflection of the timber roof trusses. DK also concedes the strong winds placed additional downward wind pressure on the timber roof trusses. DK says the initial installation method of connecting the plasterboard ceiling to the battens was less than required under Australian Standards. He relies on Australian Standards written in 1983 when the available evidence establishes the home was built before 1983. Because he says there are several contributing factors to the Determination | Case number: 750013 Page 5 of 11 ceiling collapse, he says it still would have collapsed even it had been installed in accordance with the 1983 Standard. The complainant‟s builder says the skill level of the plastering at the property is high. I accept this is likely and that it is likely the home was built in accordance with relevant Australian Standards in view of the evidence from the complainant that the home was built by an owner/builder. The complainant‟s contrac tor inspected the building integrity and found no fault with the support structure. He also heard of no case where the installation of solar panels had caused such a problem. I have considered the material from the complainant‟s builder and contractor in relation to the observations made by JH concerning ground movement being a cause. I do not accept this contention by JH as being sufficiently compelling in view of the photographs provided by the complainant and the fact there was no structural cracking or signs of movement adjacent to the ceiling collapse. Taking all matters into account, I am not persuaded by the insurer‟s experts. They concede the strong winds were a factor in the collapse of the ceiling. Considering the ceiling had remained intact for many decades and for 10 years after the installation of the solar panels, I am persuaded it is probable the proximate cause (or the dominant or effective cause) of the damage to the ceiling was the strong winds on 10 January 2020. Insurer not entitled to decline the claim In all the circumstances, I do not accept the insurer is entitled to decline the claim. Initially, the insurer accepted the claim and authorised its builder to proceed to repair relying on a quotation to repair for $6,766.10. No scope of works is provided. The complainant says the builder expressed uncertainty about the structural safety of the rest of the ceiling and after further inspection the insurer refused the claim. The complainant wants the entire ceiling repaired. The complainant has provided no quotation for the cost of repairs. The available information does not establish whether the quotation for $6 ,766.10 is actionable and includes the cost to repair all the damage. How claim is to be settled The policy provides that if the insurer agrees to pay a claim for damage to the building the insurer will decide if it will repair the damage to the building or pay what it would cost the insurer to repair the building. Whichever option is adopted, the policy says the insurer will do so on a new for old basis or repair to a similar condition to what the building was in before the damage occurred. Determination | Case number: 750013 Page 6 of 11 As the insurer initially elected to repair the damage, I am satisfied it is fair in the circumstances the insurer again elects to repair the damage ensuring the structural safety of the rest of the ceiling. If the parties agree to cash settle the claim, the complainant may provide an actionable quote to repair the damaged ceiling, so the parties can agree on a cash settlement. If the insurer relies on its quotation, any cash settlement should include an uplift to take account of any variations or contingencies which may occur once repairs commence and ensuring the structural safety of the rest of the ceiling. If the parties are unable to agree, they can return to AFCA to deal with the quantum of the claim. Determination | Case number: 750013 Page 7 of 11 3 Supporting information 3.1 Process AFCA’s approach to this complaint It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Storm We cover Loss or damage to the building caused by storm. How to establish your loss Establish an incident took place When making a claim you must be able to prove that an incident covered by your policy actually took place. If you do not do this, we will not be able to pay your claim. What do we mean by that? Event or incident means a single event, accident or occurrence which you did not intend or expect to happen Determination | Case number: 750013 Page 8 of 11 Insured event means the insured events on pages 16 to 25. In addition, an insured event is always a single event, accident or occurrence which you did not intend or expect to happen. What we do not cover - general exclusions You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: • „Storm‟; • „Flood‟ (but only if you have cover for insured event „Flood‟); • „Earthquake and Tsunami‟; • „Explosion‟. Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as, but not limited to: • tiles and their adhesive or grouting breaking down; • weathering of roof tiles or roof ridge capping; • gradual weathering and breakdown of bricks, mortar or concrete.” Dealing with defects If an unknown defect is the cause of the damage If an incident covered by your policy damages the building and an unknown defect was the cause or part of the cause, we will pay for the resulting damage. If the unknown defective part of the building is also damaged by the same incident, we will fix this as well. 3.3 Extracts from material relied on by the parties Date Action Insurer’s builder (DW) Report  Attended 16 J anuary 2020. Section of ceiling had collapsed on the upper level a few days earlier. Had been large winds on 10 January. Tiled roof re - sealed about two years ago. Not noticed any water damage. Determination | Case number: 750013 Page 9 of 11 Date Action January 2020  Co llapse of t he ceiling is the res ult of adhesive glue failure. C ollapse occurred due to failure of glue used durin g the installation of t he ceiling sheeting. While the significant winds that occurred that night may have contribut ed t o the collapse of the area this would have eventually occurred with or without the wind.  Noted sagging to the ceiling throughout the area and completed make safe securing other loose sections of the ceiling noting the area had glue failure throughout.  Confirmed damage visible to the upstairs living room collapsed ceiling.  Photographs show separation of gang nail plates to bottom chord of trusses.  Estimated repair cost $6,766.10 including GST. Insurer’s builder (DW) Report 23 March 2020  Re - attended 23 March 2020. More of the ceiling had collapsed around the original area of damage. Removed the original make safe and g ained access to t he ceiling area.  Al ong wit h the not ed sheeting adhesive failure to the ceiling sheeting a section of gang nail plates along the entire run of the off - roof trusses on the bottom chord of all these trusses in the identical spot has collapsed and broken away from its original set place in the bottom chord. This has occurred in the ex act same spot in all of the trusses in this area.  A ll other sections of t he r oof truss appear to be intact barring the collapsed area in this truss.  F ailure of the gang nail plate has caused a significant shift in this section of the ceiling.  C eiling is currently safe with the previous makesafes making the area safe .  Inspected roof. No damage to roof and no area where the damage could be explained by an event ot her than the collapse of t he area due to a building and construction fault.  Roof did not require maintenance.  No area where wind entered and collapsed the are a.  R esulting damage is a structural issue and will need an engineer to provide a detailed scope and appropriate repair process I nsurer ’ s engineer report (JH) 3 June 2020  Engineer attended and photographed 25 May 2020. Property 45 years old. Complainant owned it for 24 years. Ceiling repainted a year ago.  Photographs show cracked bottom cord and disengaged gang nail plat es extensive throughout ceiling.  Level survey found a difference in levels across the house at 86mm i ndicating differential movement across the site typical of long - term differential settlement. Observed damage and floor level variation is slight.  Main cause of failure in the ceiling dela mination is age as overtime the sheets have failed rely ing on only the screws to support the plaster sheet.  Failure mechanism is lack of adhesion of the adhesive Determination | Case number: 750013 Page 10 of 11 Date Action daubs to the timber ceiling batons. Due to construction methodology and the noted ground movem ent.  Damage not due to a single event but due to long - term soil and construction issues. I nsurer ’ s engineer report (DK) 5 June 2020  Engineer attended and inspected 26 May 2020.  Solar panels added to the roof over the lounge room 2010/2011. This additi onal load on the roof structure would inc rease the immediate deflection of the timber roof trusses and increase long - term deflection of the trusses.  Reviewed daily weat her observations. Maximum wind gust speed 10 January was 76km/hr which is classified as a strong gale which can cause slight structural damage.  Unlikely wind gust speed was significant enough t o have significant impact on the home‟s structure.  Likely strong winds potentially placed additional downwards wind pressure on the timber roof t russ es which may have caus ed some additional instantaneous downwards deflection of the roof trusses.  No one specific cause that has led to the partial collapse of the ceiling but identifies contributing factors including the initial installation, the time related (y ears ) bond failure of t he adhesive and the deflection of the roof trusses under increased l oad of the solar panels and intermittent wind.  Concludes the partial tensile / shear failure of the timber roof truss bottom chord nail plate connections (2 trusses) is related to increased loading on the roof such as from t he installed solar panels and a dditional intermittent wind - loads; whilst the partial collapse of the plasterboard ceiling lining may be due to the increased load / deflection of the trusses and the method of attachment of the ceiling lining being l ess than that required under Australian Standards. I nsurer ’ s email (DK) 27 November 2020  R eiterates the three contributing factors t o the partial ceiling collapse and says it is still likely the ceiling would have collapsed even if it had been installed in accordance with the 1983 Australian S tandard. Complainant’s report (AM) 4 December 2020  Builder attended the day aft er t he wind event and said he was not surprised the collapse had occurred due t o the heavy winds the day before.  Worked in the ins urance industry as repairer for many years and seen many properties wit h tiled roofs suffer ceiling collapse because heavy winds and surges can create a vacuum and ballooning in the ceiling cavity.  Inspection of the glue spacings and plas ter spacings are correct. Glue has stuck to the battens and plaster.  Inspection of all walls to ceilings showed no sign of movement. No structural cracks in the common places. Ornate cornices have no cracks showing on all four walls.  Skill level of the pl astering at the property is high. Determination | Case number: 750013 Page 11 of 11 Date Action  Strongly believe due to the condition of the winds the winds caused the partial collapse to the ceiling. Complainant’s report (GV)  GV Is described as preventive roof maintenance. Inspected the roof and provided a roof report.  Roof showed stress to the rafter joins in the roof cavity consistent with a severe storm.  Brace joints have been loosened causing the ceiling t o break free.  I nspected building integrity and no fault with support structures.  Do not agree the ceiling collapsed because of movement and the solar panels w eight .  C rack refer red to is due to old dyna bolt installation and the area mentioned is under a support lintel that supports the load - bearing of the structure a nd would have no bearing on the roofs integrity.  Heard of no case where the installation of solar panels has caused such a problem. 3.4 Other relevant material considered and relied on  Parties‟ submissions/emails and all attachments to all submissions/emails.  Parties‟ expert reports.  Photographs.  Correspondence between the parties.