Insurer declined to pay for removal of remaining asbestos after malicious damage claim

FirmIAG
Decided2021-05-13
ProductGeneral Insurance · Landlord
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$424,360
SourceAFCA PDF

Summary

The landlord's broker sought cash settlement for asbestos removal across about 20,000 square metres after tenant malicious damage. AFCA found the policy does not cover soil, lawns or plants, and the evidence did not show asbestos contamination beyond the cleared area, so nothing was ordered.

The policy excludes lawns, soil and plants and there was no evidence of asbestos from the building beyond the three-metre clearance area.

Issues

Subjects and remedies

home or building damageno remedy

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 749873 Financial firm Insurance Australia Limited Determination | Case number: 749873 Case number: 749873 13 May 2021 1 Determination overview 1.1 Complaint The complainant (represented by his broker) holds a landlord policy with the financial firm (insurer). The sum insured for the building is $424,360. The broker lodged a claim on 11 February 2019 for malicious damage and loss of rent after the tenant vacated the property. The tenant had damaged the building (including smashing windows and holes in walls) and left large volumes of rubbish in and around the building . Part of the claim description advised ‘there also appears to be landfill dumped in the dam an d around the property’. The claim for the building damage and loss of rent was accepted, as was the cost of asbestos removal (limited to a three-metre area around the building). However, there is a concern there is potential asbestos contamination still present in remaining areas of the property, which is approximately 20,000 square metres. The insurer has declined the claim to remove any remaining asbestos. The insurer says the policy does not cover these areas and the remaining asbestos is likely to be from an external source. The broker says there is no evidence of this and the asbestos could be from damaged parts of the building. The complainant wants to be cash settled up to the limit of the building sum insured ($424,360) minus any payments already received. 1.2 Issues and key findings Is the insurer liable to pay for further asbestos removal? No. This is because:  the available information does not show there has been asbestos contamination beyond the area removed by the insurer, and  even if there was, it is unlikely the asbestos fragments came from the home. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action. Determination | Case number: 749873 2 Reasons for determination This complaint has not been the subject of a recomme ndation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the operational guidelines to the AFCA Rules. The panel consists of an ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint, based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. For simplicity, the submissions made by the complainant’s broker will be treated as though they were made by the complainant. 2.1 Is the insurer liable to accept the claim? Insurer says any remaining asbestos fragments are not covered It is not disputed that an insurable event occurred and that the claim for malicious damage was assessed and accepted by the insurer. However, the extent of the asbestos clean-up was limited to a three-metre radius around the building. The complainant says any asbestos remaining at the property came from the house. As such, the insurer should cover the cost of its removal. Further, the complainant says the product disclosure statement makes no mention of a three-metre radius. The insurer says the complainant has not shown there is remaining asbestos that needs to be cleared which came from the house. Further, the areas where there may be potential asbestos fragments are not considered to be buildings or contents under the policy. Determination | Case number: 749873 Policy does not cover lawns, shrubs, trees or grass The policy wording says: Buildings are not:  Property that a Tenant is liable for under the terms of a Rental Agreement. This does not apply to items listed under ‘What are Buildings’.  Lawns.  Loose or compacted soil, gravel, pebbles, rocks or sand.  Dams.  Plants, shrubs, trees or grass. This clearly explains lawns or soil are not covered for any kind of damage (malicious or otherwise). The policy also says it will not pay claims arising from: Tenant neglect, carelessness, poor housekeeping, or unhygienic living habits. Given this, the panel does not accept any remaining asbestos has caused loss or damage to the building. This is because they would be located on plants, shrubs, trees or grass. This is expressly noted as not being part of the building covered by the policy. Broker says claim for remaining asbestos removal was accepted The broker received an email from the insurer on 20 May 2020 advising him the removal of the rest of the asbestos had been accepted. A quote for the removal of any remaining asbestos on the property had been submitted by restoration company (S) on 21 April 2020 for $361,200 including GST. The insurer re-called the email almost immediately and followed up with a phone call to advise the email had been sent in error. The panel is satisfied the broker cannot rely on this email for acceptance of the claim, as it was an error on the insurer’s part and immediately rectified. Broker says area of clearance around building not defined The broker says the only obvious source of any remaining asbestos contamination is from the building itself. He also says the PDS makes no mention of the three-metre radius which the insurer agreed to clear. Determination | Case number: 749873 The insurer says regulation 474 of the Work Health and Safety Regulations 2011 provides that: 4) The licensed asbestos assessor or competent person must not issue a clearance certificate unless satisfied that: (a) the asbestos removal area, and the area immediately surrounding it, are free from visible asbestos contamination... Further, the insurer says: The asbestos removal area in this case is the building, and the 3 metre radius is the area ‘immediately surrounding’ the asbestos removal area. The 3 metre radius around the building is a question relevant to the license asbestos removalist in compliance with the relevant regulations when providing an asbestos clearance, rather than a policy specific or PDS issue. The panel considers this is reasonable. The insurer was liable to remove the damaged asbestos from the building. The insurer did so based on a three-metre radius to ensure an asbestos clearance was obtained. No evidence to confirm there is asbestos outside of area of clearance The policy provides the following additional benefit that says: We will pay the reasonable costs of demolishing and removing any Building debris when damage or loss occurs. We will pay up to 15 per cent of Your Buildings sum insured. This means that if there is any remaining asbestos around the property that came from the building, then the insurer is likely liable to pay for its removal under this benefit. On this point though, the panel notes the following. The insurer’s consulting hygienist (M) provided a clearance report to the insurer on 4 February 2020. This followed the completion of removal works to the t hree-metre radius from the building. The report includes a laboratory report showing asbestos level results from three areas (garden shed, back of garden shed and water tower), sampled via air monitors, within the three-metre radius. These three areas showed asbestos levels to be less than the detectable limits, being <0.01 fibres / mL. The report also says: Fill soil materials were observed to surround the property and the extent and depth of any potential ACM is unknown. If future excavation works are to be undertaken at the property an environmental investigation should be considered to be undertaken for soils of the property to determine the depth of any potential ACM within the soils. S sent an email to the insurer dated 30 January 2020 after the asbestos removal works were completed. S said there is a chance further asbestos is contained in soil Determination | Case number: 749873 extending past the three-metre radius. However, S noted this was far away from the house and unlikely to be part of the malicious damage event. The quote from S appeared to be a follow up to his and allowed for the removal of any remaining asbestos to a 4,000 square metres radius. Neither S’s email, or its quote, actually confirm there is asbestos contamination beyond the three-metre radius. Further, neither the complainant nor the insurer has provided any test results showing asbestos contamination exists outside the area of clearance. Insurer not liable to make any further settlement Having carefully considered the available information, the panel notes the following: The available information does not show there is asbestos contamination beyond the three- metre radius. Whilst S’s email said ‘there is a chance’ further asbestos in the soil may be evident, this was never confirmed or substantiated. Similarly, M ’s report referred to potential asbestos in fill soil materials (presumably the dumped soil around the property), which was also not verified. Further, the panel considers it unlikely that due to holes being punched in some walls or cladding, this has resulted in asbestos contamination to a 4,000 square metre radius. Instead, it seems the potential contamination from such a large radius is likely referring to the dumped mounds around the property. This is unlikely to have come from the building. Even if th at is incorrect, the panel finds it difficult to accept the tenant’s damage to the building could have contaminated the property to a 4,000 square metre radius. Therefore, the available information does not show the insurer is liable for any further works to the property regarding asbestos removal. Determination | Case number: 749873 3 Supporting information 3.1 Process AFCA’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All of the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.