Home / Strata Community Insurance Agencies Pty Ltd / Determination 749715

Determination 749715

Handling and disposal of fire-damaged contents after death in fire

FirmStrata Community Insurance Agencies Pty Ltd
Decided2021-06-17
ProductGeneral Insurance · Strata
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$30,000
SourceAFCA PDF

Summary

The complainant sought return of her late father's fire-damaged studio contents or $30,000 from the strata insurer, which provided no contents cover. AFCA found the insurer did not mismanage the disposal and ordered no action, though the offer to assess funeral expenses up to $5,000 remains open.

The policy covered no contents, the disposal was agreed in correspondence, and the material was asbestos-contaminated and could not lawfully be retrieved from landfill.

Issues

Subjects and remedies

deceased estatehome or building damageno remedy

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 749715 Financial firm Strata Community Insurance Agencies Pty Ltd Determination | Case number: 749715 Page 2 of 8 Case number: 749715 16 June 2021 1 Determination overview 1.1 Complaint The complainant’s representative’s father’s art studio was part of a strata building. The subject policy covers the strata building and does not cover contents. The representative and her sister lodged a claim with the financial firm (insurer) about the father’s contents after the father’s studio in the building was damaged by fire on 20 October 2019. The father died in the fire in his studio. The representative says she was provided limited access and insufficient time to retrieve his contents and was unable to collect the remaining items before they were sent to the tip. The insurer says the actions it took were with her consent, the contents were asbestos contaminated, and legislation prevents it retrieving them from the tip. The insurer contacted the waste management facility to try to resolve the dispute, but it was confirmed the contents cannot be legally retrieved. To resolve the dispute, the complainant is seeking the return of the father’s contents or $30,000. The case manager provided the parties with a preliminary assessment on the issues in dispute. The preliminary assessment was in favour of the insurer. As the complainant did not accept the preliminary assessment, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the complainant entitled to compensation because of the insurer’s management of her father’s contents ? No. The available material does not establish the insurer mismanaged the claim and it is not required to retrieve the contents or pay compensation. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or complaint about the father’s contents. Subject to proof, the insurer has offered to consider and assess funeral expenses up to $5,000. If the complainant has not already done so, the complainant may consider taking up this proposal. Determination | Case number: 749715 Page 3 of 8 2 Reasons for determination I have decided this complaint based on what is fair in all the circumstances, ha ving regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have considered all the material submitted by the parties, both before and after the preliminary assessment. I am satisfied that the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. The complainant has been assisted by a representative in this matter. Reference to the complainant includes references to and submissions made on behalf of the complainant by the representative. No new material provided after preliminary assessment After the preliminary assessment was rejected, the parties made further submissions in which they essentially reiterated their positions. No new material was provided. Where relevant, the submissions will be referred to in the determination. 2.1 Is the complainant entitled to compensation because of the insur er’s management of her father’s contents? Contents were not insured It is not in dispute the father’s policy with the insurer provided no cover for his contents. The dispute relates to the insurer’s management of the handling of the father’s contents after the fire. Submissions and material considered After the fire the insurer arranged for the building damage to be assessed. Its assessment included technical specification details for asbestos removal. A summary is set out in supporting section 3.2 of this determination. Also summarised in section 3.2 is material relied on by the complainant. After the fire, the site was managed by UB. In late November 2019, UB confirmed with the strata manager it would proceed with the make safe works. It was aware the c omplainant wanted to salvage her father’s paintings and writings in his studio upstairs. Due to the condition of the site upstairs, UB said it would not allow the complainant upstairs but would arrange other alternatives. Determination | Case number: 749715 Page 4 of 8 Arrangements were confirmed on 11 December 2019. The complainant was advised that on 20 December 2019 UB would commence the remaining demolition works and so no further access would be provided. On 18 and 19 December 2019 the complainant and her contractors attended to remove her father’s contents. In view of the amount involved she says this was insufficient time and she told UB she needed more time. A screenshot on 23 December 2019 indicates the complainant’s contractor found more sketchbooks, letters and artworks. The complainant asked UB to keep aside anything that looked important. By email dated 24 December 2019 UB advised it was to commence disposal of contents but would keep an eye out and store any personal valuables and contact the complainant to arrange for her contractor to bag the items and remove them from the site to be decontaminated. The email ends: Please confirm that UB is authorised to proceed in the removal and disposal of fire damaged contents. A few hours later the complainant emailed UB saying she agreed to the process and indicated the kinds of items she wanted UB to retain. Some items were retained to be collected by the complainant’s hygienist in late January 2021 and some items collected by UB were disposed of. Correspondence confirms the disposed items could not be accessed again particularly as it was hazardous material disposed of some time ago. The complainant says it was unfair she was only allowed 48 hours access to the property particularly as the building was not demolished in December 2019. She says when she agreed to the site being cleared it was after pressure was put on her on the basis that the building was to be demolished in December 2019. In her vulnerable state she says she entrusted the salvage to an asbestos team of 3 to help her remove what she could but says one of this team “decided to sample over 80 items” which were artworks and other personal belongings. Although police later seized these items, she is concerned more were stolen. She says this co uld have been avoided if she was given access and time to remove her father’s contents. She provided photographs of father’s studio saying it was impossible to remove all contents in 48 hours. She said she hoped to salvage over 3,000 artworks but only has 400. She says the insurer should show more empathy and that this should never happen again to another grieving family. She also contends her father’s studio did not have any asbestos in it. Determination | Case number: 749715 Page 5 of 8 The insurer offered sincere condolences and an apology for the c omplainant’s claims experience and says it went above and beyond to accommodate the complainant saying it acted promptly and reasonably and, on the advice provided by professionals. It relies on a report saying asbestos was detected in various parts of the first floor and that its expert said it was prudent to treat the site as asbestos contaminated. It also says it cannot return the contents as it is an offence to exhume waste from landfill site particularly asbestos contaminated contents. It submits the complainant had two full days to remove contents and on the third day her hygienist had another two hours (the complainant says it was 20 minutes) and after this the complainant consented to the removal and disposal of contents as agreed. In later correspondence the insurer says UB stood down trades for the whole of this third day and the hygienist had access for the whole third day (which the complainant refutes). The insurer says it acted as agreed and photographs of salvageable contents were provided to the complainant in mid-January 2020 which were collected by the hygienist a few weeks later. The insurer says the building was to be demolished as it was fire damaged, asbestos affected and unsafe, but the local council would not allow the demolition to proceed without council approval of not only the demolition but also its reconstruction. Approval for the reconstruction took significant time. Should the complainant provide evidence including tax invoices of the funeral expenses incurred the insurer was prepared to consider and assess costs pursuant to the policy term which provided up to $5,000 for funeral expenses. An extract of the policy term is set out in supporting section 3.1 of this determination. Insurer not obliged to return contents or pay compensation Having reviewed the available material, I am satisfied the insurer is not obliged to return contents or pay compensation to the complainant. This is because: 1. Firstly, the policy provides no cover for contents. 2. Secondly, having reviewed the material provided by the parties in relation to asbestos at the site I accept it was prudent to treat stockpiles, material, ground surfaces and machinery as contaminated as recommended by the insurer’s expert. I p refer the insurer’s expert op inion to the complainant’s expert material as it is more comprehensive and supported by photographs and data. Conversely, the complainant’s material refers to only three samples of artwork and the report Determination | Case number: 749715 Page 6 of 8 specifically states its inspections exclude asbestos containing materials that are embedded, buried, concealed or inaccessible. 3. Thirdly, in view of the correspondence between the parties on 24 December 2019 I accept it was reasonable for the insurer to commence the removal and disposal of contents. 4. Fourthly, even if I were to accept two days was insufficient to collect all contents of value, I am satisfied the correspondence set up a mechanism by which UB would keep an eye out and store any valuables. While I acknowledge the amount of material in th e father’s studio, I am satisfied the material provided establishes a mechanism for sorting of the material after the complainant had spent at least two days in the salvage of her father’s contents. Additionally, I accept UB gave the complainant adequate notice to plan to salvage her fath er’s contents in its email of 11 December 2019. 5. Fifthly, the available evidence establishes the salvage mechanism agreed by the parties was done by UB as evidenced by the January text messages. 6. Sixthly, if there was still material at the site in May 2020, I am not satisfied this was the fault of the insurer as the complainant’s contractor had attended the site in January 2020. 7. Additionally, I also accept the available information establishes any material which was sent to the tip could not be retrieved because of its hazardous nature. 8. Finally, I am not satisfied the complainant was bullied or treated unfairly in view of the reasonable expectation of the insurer at the time of correspondence on 24 December 2020 that the demolition of the building would take place shortly. In the absence of material to the contrary I accept the demolition was delayed because the local council required not only plans for demolition but plans for reconstruction. Parties to consider and assess funeral expenses up to $5,000 I acknowledge the difficult circumstances the complainant faced but having considered the correspondence between the complainant and the insurer I am not satisfied the insurer mismanaged the issue of the complainant’s father’s contents. On the above information and for the reasons stated, I am satisfied the insurer is not required to retrieve the contents or pay the complainant compensation. Subject to proof, the insurer has offered to consider and assess funeral expenses up to $5,000. If not already done, the complainant may consider taking up this proposal. Otherwise, the insurer is not required to take any further action in relation to the complainant’s comp laint about the handling of the father’s contents. Determination | Case number: 749715 Page 7 of 8 3 Supporting information 3.1 Policy terms referred to by the insurer 2. Funeral expenses When a Lot is occupied by the Lot Owner We will pay up to $5,000 a Lot for funeral expenses if the Lot Owner, or a family member who permanently resides with the Lot Owner, dies as the direct consequence of Loss or Damage to Your Insured Property that is admitted as a claim under Section 1. 3.2 Extracts from material relied on by the parties Date Action Report: a sbe stos removal (AS) to UB 1 November 2019  Technical specification details for asbestos removal requirements for fire damaged building and adjacent areas.  Fire damaged fibrous cement sheet wall cladding present on the external walls of the first floor and asbestos detected here and to vinyl floor tiles and fibrous cement sheet fragments on the floor and ceiling sheeting in the bathroom and loose fibrous cement sheet fragments on the roof.  Asbestos material friable and asbestos removal contractor with a safe work license is required to supervise an d work within the site.  Visual inspection identified that asbestos containing material is in poor condition indicating high disturbance and considerable deterioration and as a prudent measure all stockpiles, material, ground surfaces and machinery will be treated as assessed as asbestos contaminated.  Site visitors not to enter asbestos affected areas without the express permission of project management staff. Building engineer report (SW) 5 November 2019  Fire initiated within office area causing signific ant fire and smoke damage to upper floor.  Upper - level extensive fire smoke and soot damage. Asbestos containing material was detected throughout the wall floor and ceilings within upper - level and during demolition identified asbestos containing materials w hich must be removed and dispos ed of by a properly licensed contractor.  No asbestos detected within the ground floor areas, but the removal of debris cleaning and sanitising of the ground level areas can be undertak en upon sealing and isolating upper level . Determination | Case number: 749715 Page 8 of 8 Date Action  In reconstruction allow for the cleaning and sanitising of the ground level units and common areas inclusive of removal and disposal of all asbestos debris from the fire event.  Receive clearance certificat e to enable ground floor tenants to access tenanc ies to remove stock under provision of full asbestos PPE as per hygienist recommendations Complainant’s clearance certificate for asbe stos removal work (MN) 7 January 2020  Asbestos assessor engaged by complainant to conduct a visual clearance inspection and testing of artworks removed from art studio. Photographs attached of several art works.  Following a risk assessment completed by site principal contractor (UB) granted pe rmission to enter retrieve and decont aminate salvageable artworks from the art studio.  Removed to another location for inspection and testing.  No visible signs of asbestos residue resulting from the decontamination works completed by removal staff.  Artw ork safe to handle and reuse.  Inspections exclude asbestos containing materials that are embedded, buried, or concealed or inaccessible.  Recommended to have an authorised pers on complete testing and analysis by certified laboratory Occupational hygienist report to MN (AS) 7 January 2020  Report presents the results of 3 samples of artwork for analysis for asbestos  No asbestos detected. 3.3 Other relevant material considered and relied on  Parties’ submissions /emails and all attachments to all submissions/emails  Photographs and text messages  Correspondence between the parties and third parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.