Insurer declined roof storm damage claim as long-term maintenance and construction issue
Summary
A commercial strata unit owner claimed storm damage to the body corporate roof and resultant damage. AFCA upheld the insurer's denial of the roof damage as excluded maintenance and construction issues, but required payment of the resultant damage based on the insurer's cash offer, adjusted for mould remediation and carpets, plus 15 percent and interest.
The roof damage was caused by long-term maintenance and construction issues excluded under the policy, while the resultant damage was accepted and must be costed and paid.
Issues
- Claim denial primary · not upheld
“On balance, the Panel is satisfied the insurer has shown the cause of damage to the roof is excluded.”
- Claim amount dispute secondary · upheld
“the insurer is to add those amounts to its previous offer of $11,201.74 ... to this total the insurer is to add an additional 15%.”
Subjects and remedies
pay claimpay interest
Text of the determination
Determination
Case number 749080
Financial firm QBE Insurance (Australia) Limited
Determination | Case number: 749080 Page 1 of 5
Case number: 749080 23 June 2021
1 Determination overview
1.1 Complaint
The complainant is a unit owner in a commercial strata property and holds a commercial
strata insurance plan with the financial firm (insurer). The body corporate is the insured.
On 21 May 2020, the complainant lodged a claim for storm damage sustained to the roof and
resultant damage which occurred on 7 February 2020.
The insurer accepted the resultant damage. It maintains the damage to the roof was not
covered.
1.2 Issues and key findings
Is the insurer entitled to deny the disputed damage to the roof?
Yes. The exchanged evidence does not support that the damage to the roof was caused or
contributed to by an event covered under the policy.
Is the insurer liable for the resultant damage?
Yes. The insurer accepted the resultant damage and is required to meet its obligations to the
complainant under the provisions of this determination.
Why is the outcome fair?
The outcome is fair because the policy only covers certain events, and the cause of damage
to the roof was excluded from cover.
1.3 Determination
The determination is mainly in favour of insurer.
Upon acceptance of this determination by the complainant the insurer is required to meet its
obligations to the complainant in accordance with the provisions of this determination.
The insurer is entitled to deduct the excess in accordance with the policy provisions.
Determination | Case number: 749080 Page 2 of 5
2 Reasons for determination
There has been a full exchange of all material information relied on for the purposes of this
determination and each party has had the opportunity to address any issues raised by the
other.
This determination follows consideration of all the material exchanged. It is based on what is
fair in all the circumstances having regard to the relevant legal principles, terms of the policy,
good industry practice (including codes of practice) and previous decisions where applicable.
2.1 Is the insurer entitled to deny the disputed damage?
Complainant required to establish a valid claim
The complainant is required to show that, on the balance of probabilities, he has suffered a
loss caused by an event covered by the policy. This is known as establishing a valid claim.
The complainant ’ s policy provides cover for loss or damage caused by storm or rainwater.
There was no dispute there was a storm event and various areas sustained damage.
The panel is satisfied the complainant has shown, on balance, a valid claim within the terms
of the policy.
Therefore, the onus then shifts to the insurer to show it is entitled to deny all or part of the
claim.
Reports and repair invoices indicate pre-existing issues with the roof
Both the insurer’s expert ( ABS) and the maintenance repair invoices provided by the
complainant, noted there were pre-existing issues with the roof.
ABS provided a roof report, which identified various issues. These included:
leak to the left-hand side wall flashing, the flashing is covering the rib of a single roof sheet
only, which is 50mm with the minimum standard being 150mm
various foot traffic dings/creases to the roof sheeting along the box gutter line, the creases
have split the roof sheeting allowing rainwater to leak into the cavity. It also decreases the
pitch of the roof sheeting allowing capillary to occur at the sheet end at the gutter
there are roof leaks around the roof penetrations for the vents and air conditioning services
there is surface rust to some roof sheets from old packing for old AC units
the leaks along the transition apron flashing were found to be due to non-compliant
coverage over the roof sheeting
there is debris trapped under the flashing which allows rainwater to leak over the top of the
roof sheeting.
ABS concluded by saying the damage was due to maintenance-related issues as there was
no storm created opening found to have contributed to the roof leaks.
The complainant provided numerous invoices paid, dating back 2004, showing attempts to
address the maintenance related issues associated with the roof.
However, the 2016 builder’s invoice includes “NB further monitoring may be necessary during
heavy rainfalls to evaluate these areas ”. There is no evidence that monitoring, or assessment
was ever completed.
Determination | Case number: 749080 Page 3 of 5
Insurer entitled to decline the claim
Having reviewed the information provided, the p anel is persuaded by ABS’s report. The report
and photographs provide a logical conclusion of how the damage occurred to the roof.
Based on the information provided, the panel considers the proximate cause of the damage
to be long-term and due to the way the roof was constructed.
The policy coverage exclusions relating to lack of maintenance, wear and tear, rust and
gradual deterioration apply to the roof.
On balance, the Panel is satisfied the insurer has shown the cause of damage to the roof is
excluded. It is therefore entitled to deny that part of the claim.
2.2 Is the insurer liable for the resultant damage?
The insurer has offered (30 June 2020) to repair the resultant damage upon confirmation the
repairs to the roof has been completed by the complainant. Alternatively, it offered a cash
settlement for $11,201.74. This cash payment is based upon the quote from ABS dated 25
June 2020.
The panel notes that the quote includes:
No allowance has been made for any restoration works or mould removal.
After the ABS quote and the insurer’s offer, an occupational hygienist (MP) provided a report
(27 July 2020). As part of several recommendations, MP included:
Remediation works should be considered in all areas were visible mould, visible water
staining and flaking bubbling paint were observed to remove areas that offer a more ideal
environment for mould to proliferate;
The panel notes that MP’s recommendations have not been costed or included within the
AMS quote or the insurer’s offer.
Based upon the exchanged material, the panel is satisfied that the claim related
recommendations of MP should be included within the insurer’s offer.
Further, the panel notes that the quote from ABS does not include an amount for carpets. The
complainant’s quote included replacement of carpet and underlay and the Certificate of
(Policy) Currency confirms cover for common area contents.
The panel is satisfied that it is fair that the insurer arranges for assessment and costing
consistent with the claim covered recommendations of MP and its obligations under the policy
for any claim for carpet or other content damage.
Once the assessment and costings are received, the insurer is to add those amounts to its
previous offer of $11,201.74. The panel is satisfied that it is fair that to this total, the insurer is
to add an additional 15%, to cover contingencies.
The insurer is to pay interest on the $11,201.74 (plus 15%), pursuant to section 57 of the
Insurance Contracts Act 1984, from 7 February 2020 (date of the claim was lodged) until
payment is made . The insurer is not required to pay interest on the additional costings as they
wil l be current assessments.
The policy is subject to an excess which the insurer is entitled to deduct.
Determination | Case number: 749080 Page 4 of 5
Finally, the panel notes that the quote from ABS was inclusive of GST. The insurer is to deal
with the question of GST in accordance with the policy provisions.
2.3 Why is the outcome fair?
The insurer’s obligations to the complainant only extend to the coverage provided by the
policy. It would not be fair in the circumstances to require the insurer to pay for damages
which are excluded under the policy.
Determination | Case number: 749080 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. W e have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive insurance experience.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.