Storm roof and water damage claim, excluded pre-existing damage, mould claim and claim handling
Text of the determination
Determination
Case number 747864
Financial firm AAI Limited
Determination | Case number: 747864 Page 1 of 11
Case number: 747864 10 August 2021
1 Determination overview
1.1 Complaint
The complainant holds a home building and contents policy (policy) with the financial firm
(insurer) and lodged a claim for damage sustained to her property following a storm on 19
January 2020.
The insurer accepted the claim. It appointed assessors/contractors to inspect the property
and determine the cause and extent of damage. It also appointed a remediation company to
assess the extent of any mould remediation required after the complainants provided a mould
report saying mould remained an issue in the home.
A dispute remains about the cause and extent of damage and reported mould.
The insurer has sought to limit its liability to roof damage/repairs while the complainant says
extensive repairs or replacement is needed to the roof because of the storm event. The
complainant also seeks cover for mould remediation, the cost of obtaining her own expert
reports and compensation for the insurer‟s handling of the claim which she considers
incompetent.
The complainant is represented by solicitors (MB) in this complaint. Any reference to the
complainant in this determination includes MB.
1.2 Issues and key findings
What is the insurer’s liability for roof and internal water damage?
The insurer is not liable for the repair/replacement of the building‟s entire roof as claimed by
the complainant because the available information does not support a conclusion that the
entire roof was damaged during the storm.
The insurer is to cash settle this aspect of the claim by paying a total of to $24,735.85. This is
based on B‟s quotes of $2 1,509.44 plus a contingency of 15% of the quote amount
($3,226.41). The insurer should also pay interest on this amount, in accordance with the
Insurance Contracts Act 1984 (the Act), from 23 September 2020, until the amount is paid.
Is the insurer liable for any mould damage?
The complainant has not provided sufficient evidence to establish there is mould present. The
panel accepts the evidence of insurer‟s experts that the presence of mould has not been
established. The panel notes that the insurer offered to undertake further testing, but the
complainant declined the offer.
The insurer is entitled to decline the complainant‟s claim for mould remediation.
Is the insurer required to compensate the complainant?
Yes. The insurer is required to pay the complainant $2,000 for non-financial loss
compensation.
Determination | Case number: 747864 Page 2 of 11
Is the insurer required to pay any other costs?
If the insurer is paying for on-going temporary accommodation, it is entitled to cease that
payment.
On the information provided, the panel is not satisfied the complainant is entitled to legal or
any other professional costs.
1.3 Determination
This determination is substantially in favour of the insurer.
The complaint is to be settled as set out in section 2 below.
Determination | Case number: 747864 Page 3 of 11
2 Reasons for determination
There has been a full exchange of material between the parties and each party has had the
opportunity of addressing the issues in dispute.
Due to the complexity of this dispute it has been referred to a panel for determination. The
panel comprises an ombudsman, a panel member with significant industry experience and a
panel member with significant experience as a consumer representative.
This determination follows consideration of all relevant information. The panel has decided
this case based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and previous
AFCA decisions where applicable.
2.1 What is the insurer’s liability for roof and internal water
damage?
Circumstances of complaint
Following lodgement of the claim on 19 January 2020, the insurer arranged for make-safe at
the premises. The available information shows an initial make-safe to roof and the placement
of dehumidifiers within the premises on 20 and 24 January 2020 respectively.
The insurer‟s builder (A) provided a report dated 30 January 2020. The report includes:
damage observed to solar matting and some roof tiles throughout the roof
roof report reviewed and shows:
> roof tiles broken by hail stone and that water ingress occurred into the home from the
damaged tiles
> minor resultant internal damage to d in n ing, master bedroom, ensuite, kitchen, lounge
and guest bedroom
> external damage to “roof, pergola roof, lights, solar matting hip tiles and various external
items”
In summary, the report writer identified storm related damage as well as maintenance related
issues with the roof including pre-exiting damage to some tiles, deteriorated pointing on most
ridge capping requiring re-bed and repoint, split lead flashing, damaged gutter along study
and gutters requiring cleaning. „ A ‟ listed the following storm related damage:
replace a total of 55 roof tiles and 1 ridge cap
repoint
The complainant says „A‟ replaced 40 roof tiles , however, water continued to enter the home
after several attendances by the insurer‟s trades. She says the property was not properly
secured until 28 April 2020, when make safe involving placement of tarpaulins over the roof
occurred. The complainant later reported water ingress continued into the laundry because
the corner of the roof shoulder had not been covered with the tarpaulin; this was after the
dehumidifiers had been removed.
The insurer subsequently obtained a repair quote from builder B that provides for
repairs/replacement of 100 roof tiles in total. The insurer advised the complainant on 26 June
2020, that B was unable to complete repairs until the pre-existing and maintenance related
work listed below are completed by the complainant:
repoint ridge capping to entire roof
Determination | Case number: 747864 Page 4 of 11
repair mortar which had broken away from ridge and hip capping
repair overflow provisions in concealed roof gutter which are insufficient.
The complainant maintains the (above) disputed damage was caused by the storm and
should be covered. The complainant also says failure to adequately address ongoing water
ingress and the time taken to respond throughout the claim has resulted in mould damage.
She seeks indemnity for all damage and has provided a quotation of $467,500 for mould
related repairs and/or remediation throughout the home.
Onus on complainant to establish a valid claim
The complainant is required to show, on the balance of probabilities, she suffered a loss
caused by an event insured against under the policy. This is known as a valid claim.
If the complainant can establish a valid claim, then the onus shifts to the insurer to show that,
on the balance of probabilities, it is entitled to rely on a policy exclusion or is otherwise
entitled to deny the claim.
The comp lainant‟ s policy provides cover for damage caused by the insured events listed in
the policy. The terms and conditions of cover under the complainant‟s policy is set out in the
applicable policy schedule and product disclosure statement (PDS).
The insurer does not dispute the complainant‟s home was subject to a storm event on 19
January 2020, resulting in damage due to hail impact and water ingress. However, it declined
some of the claimed damage saying:
the complainant has not shown all roof damage claimed was caused by the storm,
its evidence does not support the claim of elevated levels of mould within the home as
claimed
there is evidence the damage it excluded is pre-existing, due to wear, tear, deterioration
and maintenance issues.
In addition to its position that additional damage claimed was not caused by the storm, the
insurer also says the following policy exclusions for loss or damage caused by, arising from or
which involves:
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as but not limited
to:
‒ tiles and their adhesive or grouting breaking down
‒ weathering of roof tiles or roof ridge capping
‒ gradual weathering and breakdown of bricks, mortar or concrete.
applies to the additional damage claimed.
The insurer says the complainant has a responsibility to keep the property well maintained
which means (among other things) ensuring there is no fault or defects that may cause loss
or damage such as roof leak or rusted.
Parties provided supporting information about the disputed damage
The insurer provided numerous reports including those from its assessor (RD) and builder (B)
following a joint inspection of the property on 4 June 2020. It also provided roof reports
obtained by B from IR and PP, dated 30 May and 9 June 2020, respectively.
Determination | Case number: 747864 Page 5 of 11
IR‟s report details that the complainant‟s roof was in poor condition. IR reported deteriorated
ridge pointing, weep holes in ridge caps, debris in gutter and poor valleys noting “[s] iliconed
tiles and flashed over damaged tiles and ridge caps”.
PP also confirmed maintenance related mortar deterioration on roof ridge and capping, as
well as issues with the gutter‟s overflow provision.
In its report (having reviewed the roof reports) B accepted there was damage to the roof tiles,
ridge capping and sewer vent cowl consistent with hail/storm, and accepted resultant water
damage “ to the central living area and most of the other rooms in the house has occurr ed
following the hailstorm” however, it notes both the “hail damage to the roof tiles as well as the
mortar and ridge tiles being loose are the causes of water ingress”
Whilst the insurer‟s assessment indicated there was existing deterioration to some parts of
the roof that caused or contributed to the water entry, the insurer agreed to accept the
resultant damage.
The insurer asked the complainant to complete maintenance works before internal repairs
could proceed.
The complainant disagreed with B and in turn the insurer‟s assessment of damage it was
liable for. She provided a quote (including statement) from builder AR dated 16 July 2020 and
more recently, a report from roofer PB.
The panel has carefully considered the roof inspection report from PB and notes PB:
conducted a visual inspection from which it found the roof, flashings, guttering, silicon,
penetration and lead flashing to be „serviceable‟.
also found deteriorated bedding affecting the ridge and hip but says this was not allowing
water ingress to occur as a result of this.
says it did not find any debris causing blockage to flow of water and concludes water
ingress did not occur as a result of debris.
says approximately 80 roof tiles and ridge tiles have been hail damaged in total, 40 of
which had already been changed prior to its attendance. It says approximately 15 tiles had
been sealed and/or patched and the rest (25 tiles) have make-safe tarpaulin over them.
PB concluded:
deteriorated bedding is present throughout the entire roofing system hip and ridges and is
a result of impact from hail because is it “consistent throughout the roofing system”,
there is “no long -term water damages to the rafters underneath these deteriorations to
indicate that these were leaking prior to the hail storm event”, and
damages to the roofing system (and resultant water ingress) are a result of the above
damage caused by the hail storm.
The statement in AR‟s quote (provided by the complainant) is to the effect that the storm
caused all damage to the roof including ridges over the entire home.
The complainant also provided statements from contractors she engaged to complete some
renovation work prior to the storm, in support of her position that all roof damage was caused
by the storm. The statements from the com plainant‟s contractors includes one from a painter
who says no evidence of internal water ingress was observed when he painted the interior
and exterior of the home in late 2017.
The panel reviewed the statements from past contractors who conducted work at the
premises in 2017 and 2019. These writers say they accessed the roof cavity and did not
observe any water markings or evidence of water ingress at the time. While the panel
Determination | Case number: 747864 Page 6 of 11
acknowledges these statements, it is the p anel‟s view that observation was, at best, cursory.
The statements do not assist because they do not show the areas observed vis-à-vis the
actual areas of hail damage to and water ingress from the roof, nor do they assist in
establishing the actual condition of the terracotta rooftiles prior to the storm event claimed.
The p anel also notes the complainant‟s contention that the roof/roof tiles, ridges, capping
mortar etc were not deteriorated prior to the storm because there was no water ingress before
the storm. Even if the panel accepted this assertion, lack of internal water ingress is not of
itself evidence that the roof did not have pre-existing damage/deterioration or maintenance
related issues before 19 January 2020.
Information shows pre-existing deterioration
There is no dispute some roof tiles, ridge cap, and a sewer vent cowl suffered damage
consistent with hail impact. The panel accepts the storm did cause some roof tiles to crack
and/or chip.
However, after careful review, particularly the reports and photographs, the panel accepts
they show the roof tiles were in average to poor condition with bedding and pointing of the
ridge capping in a deteriorated condition and that this was most likely due to general wear,
tear and deterioration over time.
The panel is not persuaded by the report from PB. While PB suggests there is hail/storm
damage to roof tiles over the entire roof, photos in its report:
do not support this conclusion. Other than some cracked/chipped roof tiles there is
insufficient explanation or analysis of what the photos show and how it evidences
hail/storm damage across the entire roof,
clearly shows wear, tear and deterioration to some roof tiles as well as the bedding and
pointing of the ridge capping,
mainly show build-up of what appears organic on roof tiles, there is no visible scuff or hail
marking/indentation
The p anel is not satisfied statements provided from the complainant‟s contractors about their
observations in 2017 and 2019, considered along with evidence of expert roofer/plumber,
supports a conclusion that there was no pre-existing deterioration to the roof tiles, capping
and ridges.
The reports provided by the insurer followed inspections which mainly occurred in the months
after the claimed storm event. In the p anel‟s view these more accurately reflect the condition
of the roof at the time compared to PB‟s photos/report following an inspection on 28 February
2021 (over a year after the claimed storm event). Consequ ently, t he p anel prefers the
assessment and associated findings from the insurer‟s roofing experts („A‟ , „IR‟, and „PP‟). It
considers them more detailed, compelling and consistent with the physical evidence.
The panel is satisfied, on balance, the roof showed obvious signs of deterioration and it
needed significant maintenance works before the storm event.
The panel is therefore not satisfied in this instance that the hail incident caused the
deteriorated condition of roof tiles (more than the chipped tiles accepted by the insurer), ridge
capping and bedding, or gutter issues:
which were not already present before 19 January 2020, or
caused further damage which would have occurred irrespective of their condition.
Determination | Case number: 747864 Page 7 of 11
How the claim for roof and internal water damage is to be settled
The policy provides the insurer with a discretion whether to repair, rebuild or cash settle the
cost of the loss covered under the terms of the policy.
The complainant has requested cash settlement of the claim. The insurer has not opposed
this.
The panel has considered the various quotes provided against the damage accepted as
being related to the claimed event. The insurer obtained a quote of $15357.14 (inc GST) from
„B‟ for roof and internal damage repairs as well as a quote of $6152.30 for removal an d
reinstatement of solar matting. It says the total of these quotes ($21,509.44) sufficiently
covers all claim related repairs.
The complainant provided a repair quote from builder AR for a total of $72,166 (exc GST).
Among other things, the quote allowed for:
Re-bed and repoint entire roof including all damaged roof tiles as per quotation provided at
$17890
Gazebo blinds and shades to be replaced as per quotation provided for $1,847 and $500
Air conditioning fixtures to be replaced as per quotation provided of $2,350
Removal of roof tiles in affected areas to allow full inspection of roof, inspection of wet
insulation, replacing wet insulation including full scaffolding to entire roof at $7,900
As explained above, the panel is satisfied there was pre-existing deterioration to roof tiles,
ridge/capping mortar both of which the insurer is not liable for under the claim. The limited
replacement of roof tiles does not involve any of the above items which are included in the
complainant‟s quotation. Consequen tly, the panel accepts the insurer is entitled to base its
settlement on B‟s quote.
However, the panel notes that when the insurer settles a claim by repairing damage, it
guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional
damage, the insurer is responsible for the cost of rectification. When the insurer settles a
claim by paying the cost of repairs, it transfers this risk to the customer.
To account for the transfer of risk, the panel considers it fair for the insurer to pay a
contingency of 15% ($3,226.41) on B‟s quotation of $21,509.44. This brings the total that is to
be cash settled for repairs to $24,735.85. The insurer should also pay interest pursuant to the
Act on the amount of $24,735.85, from 23 September 2020, until the payment is made.
2.2 Is the insurer liable for any mould damage?
Complainant says the home has mould damage
While the AFCA complaint was on foot, the complainant obtained and provided a mould
report from microbiologist „BH‟ dated 1 December 2020. The complainant says BH found
mould in the home caused by the insurer‟s failure complete timely and adequate make-safe to
the roof. It says the insurer should cover mould related damage and remediation which she
says occurred due to its “incompetent handling of the claim”.
As the complainant reported that the home had become uninhabitable due to mould, and that
she had vacated it aft er receiving BH‟s report, the insurer agreed to cover temporary
accommodation costs while it conducted further assessments/inspection to determine the
cause and extent of any mould in the home. This agreement along with permission for the
Determination | Case number: 747864 Page 8 of 11
insurer to conduct further inspection was reached during a conciliation held by AFCA on 3
February 2021.
The insurer provided reports from its experts following their subsequent inspection. The
reports include that of a hygienist (EH) which conflicted with the findings in the comp lainant‟s
mould report from BH, as EH considered there was normal or acceptable mould ecology
within the home
Conflict in experts ’ opinion about mould at the premises
BH took spore samples and tape lifts on hard surfaces within the home including the ceiling
cavity above the laundry room as well as the study, master bedroom & ensuite, powder room,
formal lounge, dining room, kitchen/family room, rumpus room, laundry, spare room and three
other bedrooms and provided conclusions based on its analysis of the testing/sampling
results and observation.
The p anel has carefully reviewed BH‟s report and notes:
in relation to the rooms within the home, BH says remediation is required due to the mould
levels it concluded were present in the roof cavity in areas of reported water ingress, rather
than mould detected from the samples and tape lift within those rooms themselves.
In analysing its tape lift results, BH says “results for the three (3) sets of tests show that
although most areas of the home show acceptable levels of mould, it needs to be
recognised that the reservoir of mould was found insider the roof vo id.”
BH concludes that the mould in the ceiling void and known water ingress issues
(considered to be ongoing) means mould cross contamination would continue within the
home unless the source (ceiling cavity/material and possibly wall void) is remediated as
prescribed.
In response and following its assessment, EH points out among other things that BH report
includes that it considered mould within rooms in the home was at acceptable levels. EH
question ed BH‟s methodology in determining the level of mould within the ceiling cavity, and
the conclusions BH reached about the level and cause of mould.
EH‟s report/supplementary statement includes that :
it conducted visual, odour and characterisation observation and did not find evidence of
mould in rooms where water ingress reported. However, water staining was observed in
ceiling above the dining and northern wall of the loungeroom, as well as north wall of
rumpus.
air sampling and surface samples were collected from areas of reported water ingress.
Samples tak en from “almost every room in the house and compared to external reference
sample” showed normal mould ecology
infra-red thermal imaging conducted to detect moisture within building material, did not
show significant temperature differential that would suggest elevated moisture levels
While EH disagrees with BH‟s conclusion about mould in the ceiling cavity and cross
contamination, it recommended further cautionary inspection (from holes cut in ceiling and
wall cavities) be completed to ascertain whether mould is present within the cavities. The
complainant declined to provide further access to the insurer or its contractors therefore no
additional cautionary inspections have occurred.
The panel is not satisfied the available information establishes on balance that levels of
mould within the living areas of the home was at an unacceptable level.
Determination | Case number: 747864 Page 9 of 11
The panel is also not satisfied BH‟s report sufficiently supports its conclusion about the level
of mould within the ceiling/wall cavities, the ca use or the insurer‟s liability. This is further
compounded by available (conflicting) evidence.
Noting that the insurer offered the complainant further testing, which the complainant
declined, the panel is satisfied that it is fair in the circumstances of this claim and complaint
that the insurer is entitled to deny the complainant‟s claim regarding mould.
2.3 Is the insurer required to compensate the complainant?
AFCA can award compensation for non-financial loss
Under the AFCA Rules, we can award up to $5,000 compensation for non-financial loss if a
complainant suffered an unusual degree of stress, inconvenience, or delay because an
insurer mishandled a claim.
We will not award compensation for the usual amount of inconvenience involved in making a
claim. We will not award compensation for delays caused by the complainant, or other factors
outside the insurer‟s control.
Complainant is entitled to compensation for non-financial loss
The panel has carefully reviewed the available information, including the timeline, email
correspondence between the parties and the insurer‟s file notes.
The p anel has reviewed the complainants‟ position about the number of attendances by the
insurer from lodgement of the claim including to conduct make-safe, which the panel is
satisfied was not satisfactory.
The panel accepts the number of attendances (including for make-safe) and investigation
conducted by its experts when they attended the premises, most recently its hygienist
attending and not taking samples from roof cavities, has been less than ideal.
Whilst the insurer has sought to correct the earlier failings, the panel is satisfied that the
complainant has suffered an unusual degree of stress and time taken to resolve the dispute,
following the earlier failings of its contractors.
The Panel considers it appropriate that the insurer pay the complainant $2,000 for non-
financial loss in the circumstances.
2.4 Is the insurer required to pay any other costs?
The complainant seeks reimbursement of costs for obtaining roof inspection and
microbiologist (mould) report. The complainant says the need to incur these costs arose
because of the insurer‟s incompetent handling of the claim. She contends the costs would not
have been incurred had the insurer conducted adequate make-safe and dealt with the claim
in a timelier manner. She considers these issues resulted in mould and additional cost to
obtain expert reports to support her position.
Under its Rules, AFCA can require an insurer to reimburse a complainant for costs incurred in
making a complaint. This may include legal costs and expert report fees. If a complainant
asks the insurer to contribute to these costs, we will consider whether they were reasonable
and whether they helped resolve the complaint.
Determination | Case number: 747864 Page 10 of 11
Expert report costs
In the present circumstances, the mould and roof reports provided by the complainant did not
assist her position. As such, the insurer is not required to contribute to these costs.
Legal costs
While the complainant has not specified she is seeking reimbursement of legal cost or
provided documents to that effect, the panel will address this for completeness.
AFCA tries to make its service accessible and understandable to complainants, without any
need for legal representation. If a complainant chooses to be legally represented, AFCA will
generally require a complainant to pay for these costs. However, we may still require the
insurer to contribute to some costs if the complaint raises complex legal issues, or if the
complainant could not have reasonably handled the complaint.
There is no evidence the complainant‟s claim and complaint presented complex issues
requiring legal assistance to understand or deal with. The reports and the documents
(including PDS) are reasonably clear and would not reasonably require legal input.
On the available information, the panel notes that w hile it was the complainant‟s prerogative
to engage a solicitor, it is not satisfied it was necessary or that it assisted the claim/complaint.
The insurer is therefore not required to contribute to the legal costs incurred.
Temporary Accommodation
The panel understands that the insurer has made payments for temporary accommodation,
but there is insufficient evidence for the panel to determine if this is on-going. For the sake of
completeness, the panel is satisfied that given its findings regarding the claim, the insurer is
entitled to cease payment of temporary accommodation payments, if they were ongoing.
Determination | Case number: 747864 Page 11 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.