Home / Suncorp Group / Determination 747864

Determination 747864

Storm roof and water damage claim, excluded pre-existing damage, mould claim and claim handling

FirmSuncorp Group
Decided2021-08-17
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$24,736
Non-financial loss$2,000
Amount claimed$539,666
SourceAFCA PDF

Summary

The complainant claimed for storm damage to her roof, mould and related costs after the insurer's make-safe and handling. AFCA ordered a cash settlement of $24,735.85 for the accepted storm damage with interest, $2,000 non-financial loss compensation, and rejected the claims for pre-existing roof damage, mould and expert and legal costs.

Under the policy the insurer may cash settle covered loss, and the complainant must prove that damage was caused by the insured storm event rather than by pre-existing wear and maintenance issues.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 747864 Financial firm AAI Limited Determination | Case number: 747864 Page 1 of 11 Case number: 747864 10 August 2021 1 Determination overview 1.1 Complaint The complainant holds a home building and contents policy (policy) with the financial firm (insurer) and lodged a claim for damage sustained to her property following a storm on 19 January 2020. The insurer accepted the claim. It appointed assessors/contractors to inspect the property and determine the cause and extent of damage. It also appointed a remediation company to assess the extent of any mould remediation required after the complainants provided a mould report saying mould remained an issue in the home. A dispute remains about the cause and extent of damage and reported mould. The insurer has sought to limit its liability to roof damage/repairs while the complainant says extensive repairs or replacement is needed to the roof because of the storm event. The complainant also seeks cover for mould remediation, the cost of obtaining her own expert reports and compensation for the insurer‟s handling of the claim which she considers incompetent. The complainant is represented by solicitors (MB) in this complaint. Any reference to the complainant in this determination includes MB. 1.2 Issues and key findings What is the insurer’s liability for roof and internal water damage? The insurer is not liable for the repair/replacement of the building‟s entire roof as claimed by the complainant because the available information does not support a conclusion that the entire roof was damaged during the storm. The insurer is to cash settle this aspect of the claim by paying a total of to $24,735.85. This is based on B‟s quotes of $2 1,509.44 plus a contingency of 15% of the quote amount ($3,226.41). The insurer should also pay interest on this amount, in accordance with the Insurance Contracts Act 1984 (the Act), from 23 September 2020, until the amount is paid. Is the insurer liable for any mould damage? The complainant has not provided sufficient evidence to establish there is mould present. The panel accepts the evidence of insurer‟s experts that the presence of mould has not been established. The panel notes that the insurer offered to undertake further testing, but the complainant declined the offer. The insurer is entitled to decline the complainant‟s claim for mould remediation. Is the insurer required to compensate the complainant? Yes. The insurer is required to pay the complainant $2,000 for non-financial loss compensation. Determination | Case number: 747864 Page 2 of 11 Is the insurer required to pay any other costs? If the insurer is paying for on-going temporary accommodation, it is entitled to cease that payment. On the information provided, the panel is not satisfied the complainant is entitled to legal or any other professional costs. 1.3 Determination This determination is substantially in favour of the insurer. The complaint is to be settled as set out in section 2 below. Determination | Case number: 747864 Page 3 of 11 2 Reasons for determination There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues in dispute. Due to the complexity of this dispute it has been referred to a panel for determination. The panel comprises an ombudsman, a panel member with significant industry experience and a panel member with significant experience as a consumer representative. This determination follows consideration of all relevant information. The panel has decided this case based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous AFCA decisions where applicable. 2.1 What is the insurer’s liability for roof and internal water damage? Circumstances of complaint Following lodgement of the claim on 19 January 2020, the insurer arranged for make-safe at the premises. The available information shows an initial make-safe to roof and the placement of dehumidifiers within the premises on 20 and 24 January 2020 respectively. The insurer‟s builder (A) provided a report dated 30 January 2020. The report includes:  damage observed to solar matting and some roof tiles throughout the roof  roof report reviewed and shows: > roof tiles broken by hail stone and that water ingress occurred into the home from the damaged tiles > minor resultant internal damage to d in n ing, master bedroom, ensuite, kitchen, lounge and guest bedroom > external damage to “roof, pergola roof, lights, solar matting hip tiles and various external items” In summary, the report writer identified storm related damage as well as maintenance related issues with the roof including pre-exiting damage to some tiles, deteriorated pointing on most ridge capping requiring re-bed and repoint, split lead flashing, damaged gutter along study and gutters requiring cleaning. „ A ‟ listed the following storm related damage:  replace a total of 55 roof tiles and 1 ridge cap  repoint The complainant says „A‟ replaced 40 roof tiles , however, water continued to enter the home after several attendances by the insurer‟s trades. She says the property was not properly secured until 28 April 2020, when make safe involving placement of tarpaulins over the roof occurred. The complainant later reported water ingress continued into the laundry because the corner of the roof shoulder had not been covered with the tarpaulin; this was after the dehumidifiers had been removed. The insurer subsequently obtained a repair quote from builder B that provides for repairs/replacement of 100 roof tiles in total. The insurer advised the complainant on 26 June 2020, that B was unable to complete repairs until the pre-existing and maintenance related work listed below are completed by the complainant:  repoint ridge capping to entire roof Determination | Case number: 747864 Page 4 of 11  repair mortar which had broken away from ridge and hip capping  repair overflow provisions in concealed roof gutter which are insufficient. The complainant maintains the (above) disputed damage was caused by the storm and should be covered. The complainant also says failure to adequately address ongoing water ingress and the time taken to respond throughout the claim has resulted in mould damage. She seeks indemnity for all damage and has provided a quotation of $467,500 for mould related repairs and/or remediation throughout the home. Onus on complainant to establish a valid claim The complainant is required to show, on the balance of probabilities, she suffered a loss caused by an event insured against under the policy. This is known as a valid claim. If the complainant can establish a valid claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny the claim. The comp lainant‟ s policy provides cover for damage caused by the insured events listed in the policy. The terms and conditions of cover under the complainant‟s policy is set out in the applicable policy schedule and product disclosure statement (PDS). The insurer does not dispute the complainant‟s home was subject to a storm event on 19 January 2020, resulting in damage due to hail impact and water ingress. However, it declined some of the claimed damage saying:  the complainant has not shown all roof damage claimed was caused by the storm,  its evidence does not support the claim of elevated levels of mould within the home as claimed  there is evidence the damage it excluded is pre-existing, due to wear, tear, deterioration and maintenance issues. In addition to its position that additional damage claimed was not caused by the storm, the insurer also says the following policy exclusions for loss or damage caused by, arising from or which involves: wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as but not limited to: ‒ tiles and their adhesive or grouting breaking down ‒ weathering of roof tiles or roof ridge capping ‒ gradual weathering and breakdown of bricks, mortar or concrete. applies to the additional damage claimed. The insurer says the complainant has a responsibility to keep the property well maintained which means (among other things) ensuring there is no fault or defects that may cause loss or damage such as roof leak or rusted. Parties provided supporting information about the disputed damage The insurer provided numerous reports including those from its assessor (RD) and builder (B) following a joint inspection of the property on 4 June 2020. It also provided roof reports obtained by B from IR and PP, dated 30 May and 9 June 2020, respectively. Determination | Case number: 747864 Page 5 of 11 IR‟s report details that the complainant‟s roof was in poor condition. IR reported deteriorated ridge pointing, weep holes in ridge caps, debris in gutter and poor valleys noting “[s] iliconed tiles and flashed over damaged tiles and ridge caps”. PP also confirmed maintenance related mortar deterioration on roof ridge and capping, as well as issues with the gutter‟s overflow provision. In its report (having reviewed the roof reports) B accepted there was damage to the roof tiles, ridge capping and sewer vent cowl consistent with hail/storm, and accepted resultant water damage “ to the central living area and most of the other rooms in the house has occurr ed following the hailstorm” however, it notes both the “hail damage to the roof tiles as well as the mortar and ridge tiles being loose are the causes of water ingress” Whilst the insurer‟s assessment indicated there was existing deterioration to some parts of the roof that caused or contributed to the water entry, the insurer agreed to accept the resultant damage. The insurer asked the complainant to complete maintenance works before internal repairs could proceed. The complainant disagreed with B and in turn the insurer‟s assessment of damage it was liable for. She provided a quote (including statement) from builder AR dated 16 July 2020 and more recently, a report from roofer PB. The panel has carefully considered the roof inspection report from PB and notes PB:  conducted a visual inspection from which it found the roof, flashings, guttering, silicon, penetration and lead flashing to be „serviceable‟.  also found deteriorated bedding affecting the ridge and hip but says this was not allowing water ingress to occur as a result of this.  says it did not find any debris causing blockage to flow of water and concludes water ingress did not occur as a result of debris.  says approximately 80 roof tiles and ridge tiles have been hail damaged in total, 40 of which had already been changed prior to its attendance. It says approximately 15 tiles had been sealed and/or patched and the rest (25 tiles) have make-safe tarpaulin over them. PB concluded:  deteriorated bedding is present throughout the entire roofing system hip and ridges and is a result of impact from hail because is it “consistent throughout the roofing system”,  there is “no long -term water damages to the rafters underneath these deteriorations to indicate that these were leaking prior to the hail storm event”, and  damages to the roofing system (and resultant water ingress) are a result of the above damage caused by the hail storm. The statement in AR‟s quote (provided by the complainant) is to the effect that the storm caused all damage to the roof including ridges over the entire home. The complainant also provided statements from contractors she engaged to complete some renovation work prior to the storm, in support of her position that all roof damage was caused by the storm. The statements from the com plainant‟s contractors includes one from a painter who says no evidence of internal water ingress was observed when he painted the interior and exterior of the home in late 2017. The panel reviewed the statements from past contractors who conducted work at the premises in 2017 and 2019. These writers say they accessed the roof cavity and did not observe any water markings or evidence of water ingress at the time. While the panel Determination | Case number: 747864 Page 6 of 11 acknowledges these statements, it is the p anel‟s view that observation was, at best, cursory. The statements do not assist because they do not show the areas observed vis-à-vis the actual areas of hail damage to and water ingress from the roof, nor do they assist in establishing the actual condition of the terracotta rooftiles prior to the storm event claimed. The p anel also notes the complainant‟s contention that the roof/roof tiles, ridges, capping mortar etc were not deteriorated prior to the storm because there was no water ingress before the storm. Even if the panel accepted this assertion, lack of internal water ingress is not of itself evidence that the roof did not have pre-existing damage/deterioration or maintenance related issues before 19 January 2020. Information shows pre-existing deterioration There is no dispute some roof tiles, ridge cap, and a sewer vent cowl suffered damage consistent with hail impact. The panel accepts the storm did cause some roof tiles to crack and/or chip. However, after careful review, particularly the reports and photographs, the panel accepts they show the roof tiles were in average to poor condition with bedding and pointing of the ridge capping in a deteriorated condition and that this was most likely due to general wear, tear and deterioration over time. The panel is not persuaded by the report from PB. While PB suggests there is hail/storm damage to roof tiles over the entire roof, photos in its report:  do not support this conclusion. Other than some cracked/chipped roof tiles there is insufficient explanation or analysis of what the photos show and how it evidences hail/storm damage across the entire roof,  clearly shows wear, tear and deterioration to some roof tiles as well as the bedding and pointing of the ridge capping,  mainly show build-up of what appears organic on roof tiles, there is no visible scuff or hail marking/indentation The p anel is not satisfied statements provided from the complainant‟s contractors about their observations in 2017 and 2019, considered along with evidence of expert roofer/plumber, supports a conclusion that there was no pre-existing deterioration to the roof tiles, capping and ridges. The reports provided by the insurer followed inspections which mainly occurred in the months after the claimed storm event. In the p anel‟s view these more accurately reflect the condition of the roof at the time compared to PB‟s photos/report following an inspection on 28 February 2021 (over a year after the claimed storm event). Consequ ently, t he p anel prefers the assessment and associated findings from the insurer‟s roofing experts („A‟ , „IR‟, and „PP‟). It considers them more detailed, compelling and consistent with the physical evidence. The panel is satisfied, on balance, the roof showed obvious signs of deterioration and it needed significant maintenance works before the storm event. The panel is therefore not satisfied in this instance that the hail incident caused the deteriorated condition of roof tiles (more than the chipped tiles accepted by the insurer), ridge capping and bedding, or gutter issues:  which were not already present before 19 January 2020, or  caused further damage which would have occurred irrespective of their condition. Determination | Case number: 747864 Page 7 of 11 How the claim for roof and internal water damage is to be settled The policy provides the insurer with a discretion whether to repair, rebuild or cash settle the cost of the loss covered under the terms of the policy. The complainant has requested cash settlement of the claim. The insurer has not opposed this. The panel has considered the various quotes provided against the damage accepted as being related to the claimed event. The insurer obtained a quote of $15357.14 (inc GST) from „B‟ for roof and internal damage repairs as well as a quote of $6152.30 for removal an d reinstatement of solar matting. It says the total of these quotes ($21,509.44) sufficiently covers all claim related repairs. The complainant provided a repair quote from builder AR for a total of $72,166 (exc GST). Among other things, the quote allowed for:  Re-bed and repoint entire roof including all damaged roof tiles as per quotation provided at $17890  Gazebo blinds and shades to be replaced as per quotation provided for $1,847 and $500  Air conditioning fixtures to be replaced as per quotation provided of $2,350  Removal of roof tiles in affected areas to allow full inspection of roof, inspection of wet insulation, replacing wet insulation including full scaffolding to entire roof at $7,900 As explained above, the panel is satisfied there was pre-existing deterioration to roof tiles, ridge/capping mortar both of which the insurer is not liable for under the claim. The limited replacement of roof tiles does not involve any of the above items which are included in the complainant‟s quotation. Consequen tly, the panel accepts the insurer is entitled to base its settlement on B‟s quote. However, the panel notes that when the insurer settles a claim by repairing damage, it guarantees the quality of the repairs. If the repairs are unsuccessful, or cause additional damage, the insurer is responsible for the cost of rectification. When the insurer settles a claim by paying the cost of repairs, it transfers this risk to the customer. To account for the transfer of risk, the panel considers it fair for the insurer to pay a contingency of 15% ($3,226.41) on B‟s quotation of $21,509.44. This brings the total that is to be cash settled for repairs to $24,735.85. The insurer should also pay interest pursuant to the Act on the amount of $24,735.85, from 23 September 2020, until the payment is made. 2.2 Is the insurer liable for any mould damage? Complainant says the home has mould damage While the AFCA complaint was on foot, the complainant obtained and provided a mould report from microbiologist „BH‟ dated 1 December 2020. The complainant says BH found mould in the home caused by the insurer‟s failure complete timely and adequate make-safe to the roof. It says the insurer should cover mould related damage and remediation which she says occurred due to its “incompetent handling of the claim”. As the complainant reported that the home had become uninhabitable due to mould, and that she had vacated it aft er receiving BH‟s report, the insurer agreed to cover temporary accommodation costs while it conducted further assessments/inspection to determine the cause and extent of any mould in the home. This agreement along with permission for the Determination | Case number: 747864 Page 8 of 11 insurer to conduct further inspection was reached during a conciliation held by AFCA on 3 February 2021. The insurer provided reports from its experts following their subsequent inspection. The reports include that of a hygienist (EH) which conflicted with the findings in the comp lainant‟s mould report from BH, as EH considered there was normal or acceptable mould ecology within the home Conflict in experts ’ opinion about mould at the premises BH took spore samples and tape lifts on hard surfaces within the home including the ceiling cavity above the laundry room as well as the study, master bedroom & ensuite, powder room, formal lounge, dining room, kitchen/family room, rumpus room, laundry, spare room and three other bedrooms and provided conclusions based on its analysis of the testing/sampling results and observation. The p anel has carefully reviewed BH‟s report and notes:  in relation to the rooms within the home, BH says remediation is required due to the mould levels it concluded were present in the roof cavity in areas of reported water ingress, rather than mould detected from the samples and tape lift within those rooms themselves.  In analysing its tape lift results, BH says “results for the three (3) sets of tests show that although most areas of the home show acceptable levels of mould, it needs to be recognised that the reservoir of mould was found insider the roof vo id.”  BH concludes that the mould in the ceiling void and known water ingress issues (considered to be ongoing) means mould cross contamination would continue within the home unless the source (ceiling cavity/material and possibly wall void) is remediated as prescribed. In response and following its assessment, EH points out among other things that BH report includes that it considered mould within rooms in the home was at acceptable levels. EH question ed BH‟s methodology in determining the level of mould within the ceiling cavity, and the conclusions BH reached about the level and cause of mould. EH‟s report/supplementary statement includes that :  it conducted visual, odour and characterisation observation and did not find evidence of mould in rooms where water ingress reported. However, water staining was observed in ceiling above the dining and northern wall of the loungeroom, as well as north wall of rumpus.  air sampling and surface samples were collected from areas of reported water ingress. Samples tak en from “almost every room in the house and compared to external reference sample” showed normal mould ecology  infra-red thermal imaging conducted to detect moisture within building material, did not show significant temperature differential that would suggest elevated moisture levels While EH disagrees with BH‟s conclusion about mould in the ceiling cavity and cross contamination, it recommended further cautionary inspection (from holes cut in ceiling and wall cavities) be completed to ascertain whether mould is present within the cavities. The complainant declined to provide further access to the insurer or its contractors therefore no additional cautionary inspections have occurred. The panel is not satisfied the available information establishes on balance that levels of mould within the living areas of the home was at an unacceptable level. Determination | Case number: 747864 Page 9 of 11 The panel is also not satisfied BH‟s report sufficiently supports its conclusion about the level of mould within the ceiling/wall cavities, the ca use or the insurer‟s liability. This is further compounded by available (conflicting) evidence. Noting that the insurer offered the complainant further testing, which the complainant declined, the panel is satisfied that it is fair in the circumstances of this claim and complaint that the insurer is entitled to deny the complainant‟s claim regarding mould. 2.3 Is the insurer required to compensate the complainant? AFCA can award compensation for non-financial loss Under the AFCA Rules, we can award up to $5,000 compensation for non-financial loss if a complainant suffered an unusual degree of stress, inconvenience, or delay because an insurer mishandled a claim. We will not award compensation for the usual amount of inconvenience involved in making a claim. We will not award compensation for delays caused by the complainant, or other factors outside the insurer‟s control. Complainant is entitled to compensation for non-financial loss The panel has carefully reviewed the available information, including the timeline, email correspondence between the parties and the insurer‟s file notes. The p anel has reviewed the complainants‟ position about the number of attendances by the insurer from lodgement of the claim including to conduct make-safe, which the panel is satisfied was not satisfactory. The panel accepts the number of attendances (including for make-safe) and investigation conducted by its experts when they attended the premises, most recently its hygienist attending and not taking samples from roof cavities, has been less than ideal. Whilst the insurer has sought to correct the earlier failings, the panel is satisfied that the complainant has suffered an unusual degree of stress and time taken to resolve the dispute, following the earlier failings of its contractors. The Panel considers it appropriate that the insurer pay the complainant $2,000 for non- financial loss in the circumstances. 2.4 Is the insurer required to pay any other costs? The complainant seeks reimbursement of costs for obtaining roof inspection and microbiologist (mould) report. The complainant says the need to incur these costs arose because of the insurer‟s incompetent handling of the claim. She contends the costs would not have been incurred had the insurer conducted adequate make-safe and dealt with the claim in a timelier manner. She considers these issues resulted in mould and additional cost to obtain expert reports to support her position. Under its Rules, AFCA can require an insurer to reimburse a complainant for costs incurred in making a complaint. This may include legal costs and expert report fees. If a complainant asks the insurer to contribute to these costs, we will consider whether they were reasonable and whether they helped resolve the complaint. Determination | Case number: 747864 Page 10 of 11 Expert report costs In the present circumstances, the mould and roof reports provided by the complainant did not assist her position. As such, the insurer is not required to contribute to these costs. Legal costs While the complainant has not specified she is seeking reimbursement of legal cost or provided documents to that effect, the panel will address this for completeness. AFCA tries to make its service accessible and understandable to complainants, without any need for legal representation. If a complainant chooses to be legally represented, AFCA will generally require a complainant to pay for these costs. However, we may still require the insurer to contribute to some costs if the complaint raises complex legal issues, or if the complainant could not have reasonably handled the complaint. There is no evidence the complainant‟s claim and complaint presented complex issues requiring legal assistance to understand or deal with. The reports and the documents (including PDS) are reasonably clear and would not reasonably require legal input. On the available information, the panel notes that w hile it was the complainant‟s prerogative to engage a solicitor, it is not satisfied it was necessary or that it assisted the claim/complaint. The insurer is therefore not required to contribute to the legal costs incurred. Temporary Accommodation The panel understands that the insurer has made payments for temporary accommodation, but there is insufficient evidence for the panel to determine if this is on-going. For the sake of completeness, the panel is satisfied that given its findings regarding the claim, the insurer is entitled to cease payment of temporary accommodation payments, if they were ongoing. Determination | Case number: 747864 Page 11 of 11 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.