Home / Westpac / Determination 747447

Determination 747447

Incomplete storm claim repairs and cash settlement of accepted items

FirmWestpac
Decided2021-06-03
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$3,090
Non-financial loss$400
Amount claimed—
SourceAFCA PDF

Summary

After a storm and hail claim, the insurer accepted the claim in part but left repairs and settlements incomplete. AFCA ordered cash settlement of specified amounts, completion of the remaining repairs, and $400 non-financial loss, but refused the replacement of an old air-conditioning unit and other claimed costs.

An insurer that accepts a claim must promptly cash settle or repair the accepted damage, and it is not liable for pre-existing or maintenance-related damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial lossrepair or rectify

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 747447 Financial firm Westpac General Insurance Limited Determination | Case number: 747447 Page 2 of 6 Case number: 747447 27 April 2021 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (insurer). The lodged a claim for storm/hail damage in January 2020. The insurer accepted the claim in part and attended to certain repairs. However, the complainants are unhappy some of the repairs are incomplete and not all the claim-related damage has been dealt with. They are also dissatisfied with the way the insurer has handled the claim. 1.2 Issues and key findings Has the insurer met its liability for all claim-related repairs? On the currently available evidence, it appears there are certain claim-related issues which have not yet been finalised by the insurer, either by way of cash settlement or repair. If it has not already done so, the insurer is required to attend to cash settlement or repair of the issues identified in sections 1.3 and 2.1 of this Determination (as well as all other issues previously accepted under the claim). Why is the outcome fair? The outcome is fair in the circumstances, as it is based on the available evidence which shows, on balance, the insurer has not yet completed all of the remaining repairs raised by the complainant and already accepted as falling within the claim-related damage. 1.3 Determination This determination is partly in favour of the complainants. If it has not already done so, the insurer is required to promptly cash settle or repair (as appropriate):  cash settle $850 for the roof rendering  cash settle $2,240 for the cost of repairing the extractor fan/electrical work  cash settle the cost of repairing the storm-related casing damage to the EmailAir unit  cash settle/finalise the accepted repairs to the other two air-conditioning units  re-attach the shade sail, and cover related damage for that re-installation  finalise installation of the carpet  complete remaining front rendering  complete claim-related painting in the living area  pay $400 as compensation for non-financial loss. Determination | Case number: 747447 Page 3 of 6 2 Reasons for determination 2.1 Has the insurer met its liability for all claim-related repairs? The insurer has indicated, in its most recent correspondence since the preliminary assessment was issued, that a new scope of work (SOW) was being prepared to capture the outstanding issues. The insurer says that includes repair of the front rendering, re-attachment of the shade sail and painting of the open plan living area. No new SOW has been provided to AFCA, and it is not clear what the current status of the SOW or the outstanding work is. This Determination can only be based on the information currently available to me. However, if it is the case that the new SOW identifies/has already identified further work/expense beyond what is specified in this Determination as being the responsibility of the insurer, then I would expect the insurer to act fairly and in good faith by settling the complainant for any such further repair work/expense. The following are the issues which I understand, on the currently available information, still need to be clarified and finalised: Air conditioning The insurer’s expert, CBH, identified cosmetic damage to three air -conditioning units, and recommended replacement of the casings and that the fins be combed. The complainant wants the insurer to fully replace the EmailAir unit, but CBH noted the unit was old and no longer in a serviceable condition (and that was not attributable to the storm event). The available evidence shows that unit had been serviced in December 2018 (that is, just over a year before the storm event). The complainant has said it was working before the storm, although it is not possible to otherwise confirm that was the case. She has also said the unit is not as old as the expert indicated. Regardless, the evidence does not show there was any further storm damage to that unit which would have rendered it unserviceable. I am satisfied the insurer is not required to replace the EmailAir unit, but it is required to cash settle the complainant for the reasonable cost of the repairs/replacement of the damaged casing. The insurer is also required to promptly cash settle or attend to the repairs of the other two units – being the replacement of the damaged casings and combing of the condenser fins. Guttering After the claim was made and the damage first assessed, the insurer identified certain maintenance issues for which the complainant was responsible and which needed to be attended to before other repairs could be carried out. That included work to the roof and guttering. The complainant has provided invoices to show she has attended to the required roof maintenance. I am satisfied the complainant was responsible for that work, and the insurer has no liability for that. Determination | Case number: 747447 Page 4 of 6 Rendering As noted above, a new SOW is awaited, which should identify more clearly the rendering work which need to be completed (which includes the shade sail mount, and the front elevation). In the meantime, I understand the complainant has completed some of the rendering work, specifically on the roof (which is an area of rendering already accepted by the insurer). While not providing any specific calculation to explain how it arrived at the figure, the insurer offered $678.13 for that component of the work. Given the lack of clarity around this, and in the absence of any other supporting information, I consider it fair that the insurer pay the complainant $850 for the rendering on the roof area. The insurer is also required to cover all other areas of claim-related front rendering which is identified and agreed with the complainant in the new SOW prepared/being prepared. Electrical work The insurer agreed to cover the cost of replacing the damaged extractor fan. The complainant has provided a quote for $1,635 for that work. The insurer is required to cash settle that part of the claim by paying $1,635. It is also required to pay the further electrician quote of $605 for other claim-related work to wiring around the skylight. Shade sail The insurer has confirmed it is willing to repair the bulkhead and fit a new hook because of the shade sail being ripped from the bulkhead due to the storm. It is fair that it attend to those repairs. Carpet The insurer accepted liability for the damaged carpet, however there have been delays in having that reinstalled. The complainant’s most recent correspondence indicates that arrangements were being made at the time for that work to be completed in March 2021. If it has not already done so, the insurer is to promptly arrange for installation of the new carpets, having regard to the timing/impact of any other remaining repair work in the property. Painting of ceilings I understand there have been differences of opinion about the extent of the insurer’s liability for the internal painting in the living area/lounge room. That is because the insurer found that there was some pre-existing damage and patching on the ceilings, which indicated the storm event was not responsible for all the damage found. The insurer concluded, instead, that the damage was the result of the maintenance-related issues with the roof. I consider it fair that the insurer not be held liable for re-painting areas of pre-existing damage. However, my understanding is that the work for which the insurer had accepted liability is still not satisfactorily completed . That involves at least the ‘ shadow line detail to intersection of 1x wall and ceiling in the open plan living areas ’ . The insurer is required to promptly complete the painting as previously accepted, and otherwise as set out in the new SOW. Determination | Case number: 747447 Page 5 of 6 Additional electricity costs The complainant believes the insurer should be liable for additional electricity costs incurred because of extra lighting used while the skylights were waiting to be repaired; as well as because of the lack of use of the EmailAir unit (and the need to use other units instead). However, I am not persuaded the insurer should reasonably be responsible for these claimed costs. That is because the air-conditioning unit was not, on balance, prevented from being operational as a result of the storm in any case; and in the absence of evidence as to increased lighting costs because of the damaged skylights, I am satisfied it is fair that concern be addressed in the award of compensation considered below. Non-financial loss Under the AFCA Rules we can award compensation for significant stress and inconvenience experienced by a complainant as a result of the insurer’s actions. Compensation is not awarded for the usual inconvenience which is to be expected from having to lodge and deal with a claim. That includes the need to take time off work to be present while repairers attend the property. I appreciate the complainant has said there were occasions when trades arrived without notice, or did not arrive when they said they would. However, that in itself would not necessarily be sufficient to warrant compensation. There were, however, clearly issues and unnecessary delays (of months) in completion of repairs to the skylight. I understand there have also been broader concerns about the insurer’s handling of the claim, and I acknowledge that this will have been an upsetting and disruptive experience for the complainant. I am satisfied it is fair in the circumstances that the insurer pays $400 compensation for non- financial loss. 2.2 Why is the outcome fair? The complainant is entitled to expect the issues arising from the storm event and the claim to be dealt with thoroughly, promptly and professionally by the insurer and its repairers The outcome of this Determination is fair in the circumstances, as even though the complainant is not entitled to all that has been claimed, the evidence shows some of the claim-related work had not been appropriately and promptly finalised (either by cash settlement or repairs), Determination | Case number: 747447 Page 6 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.