Home / IAG / Determination 746308

Determination 746308

Insurer declined to reinstate pergola to current building standards and cash settled roof sheet replacement

FirmIAG
Decided2021-03-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$4,280
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After hail damaged her pergola roof, the complainant wanted the pergola rebuilt to current building standards. AFCA found the structure was not damaged by the insured event, the insurer could cash settle the roof sheets, and the insurer must pay $4,280.45 with the excess waived.

Building-regulation cover responds only to damaged property that met the standards at original construction, and an insurer's discretion to cash settle must be exercised fairly and reasonably.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All IAG determinations · Find similar determinations

Text of the determination

Determination Case number 746308 Financial firm Insurance Australia Limited Determination | Case number: 746308 Page 2 of 7 Case number: 746308 19 February 2021 1 Determination overview 1.1 Complaint The complainant’s pergola roof was damaged by a hailstorm on around 16 December 2018. Her home was insured with the financial firm (insurer) at the time. The complainant claimed for the damage and the insurer accepted the claim. The insurer sought to cash settle the cost of replacing the damaged pergola roof sheets . It says it is not liable to repair or replace the pergola because:  the pergola’s structure was undamaged  it was not constructed according to building standards existing at the time of its original construction. The insurer says the pergola was constructed with a 3.6 degree roof pitch when it should have been constructed with a minimum 5 degree roof pitch. The complainant maintains the pergola was constructed according to building standards in place at the time of its construction. Accordingly, the insurer must reinstate her pergola to meet current building standards. The complainant also says she is entitled to compensation for the way her claim was handled. 1.2 Issues and key findings Must the insurer reinstate the pergola to current building standards? The insurer is not required to reinstate the pergola to meet current building standards. While the pergola’s roof pitch does not appear to meet current building standards, the re is no evidence the pergola’s structure was damaged by hail . Given this, the insurer is not required to repair or replace the pergola structure. Is the insurer entitled to cash settle the complainant’s claim? Given issues with the pergola’s r oof pitch, it is fair for the insurer to cash settle the claim for the cost of replacing the damaged roof sheets. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to cash settle the complainant’s claim . The insurer is not required to take any further action in relation to the complainant’s claim or complaint, other than to pay her $4,280.45 within seven days of this determination. Determination | Case number: 746308 Page 3 of 7 2 Reasons for determination 2.1 Must the insurer reinstate the pergola to current building standards? Policy provides limited cover to meet current building regulations There is no dispute the complainant’s pergola roof sheets were damaged by hail and the insurer has accepted liability for the damage. Following damage caused by an insured event, there is also no dispute the policy covers the cost to repair or reinstate damaged property to meet current building regulations. However, this cover is limited. First, the relevant property – that does not meet current building regulations – must have been damaged by an insured event. The cover does not extend to undamaged property or property that has not been damaged by an insured event. Second, the relevant property must have met building regulations that were in place when it was originally constructed. The cover does not extend to property that did not meet building regulations that were existing at the time of original construction. The relevant policy extracts are set out in section 3.2 of this determination. Pergola’s time of construction and applicable building regulation are unclear The complainant’s pergola was constructed with a 3. 6 degree roof pitch. The insurer says the pergola was constructed in 2015 and building standards applicable then required a 5 degree roof pitch (5 degree requirement). Therefore, the pergola was not constructed according to building standards existing at the time of construction. The complainant denies the pergola was constructed in 2015. The complainant says the pergola was already existing when she bought the property in 2003. She also says she was unable to find any Australian standard or building code relevant to pergola constructions. She was only able to find a polycarbonate roof sheet installation guide that recommends a 5 degree roof pitch. She disputes that the 5 degree requirement was a building standard or code when her pergola was constructed. The insurer has not provided the relevant building standard or code about pergola roof constructions. For her part, the complainant has not provided information showing when the pergola was constructed, nor information showing that the pergola was already existing when she purchased the property in 2003. Determination | Case number: 746308 Page 4 of 7 Given this, it is unclear when the pergola was constructed and what was the actual requirement then. It is also unclear if the requirement was necessarily a building regulation, or merely a construction recommendation. Whatever the case, this does not assist the complainant for the reason below. No evidence pergola’s structure was damaged by an insured event There is no evidence the pergola structure was damaged during the relevant hailstorm. Only the pergola ’s roof sheets were damaged. The pergola’s 3. 6 degree roof pitch is due to the way the pergola’s structure was constructed. It was not due to its roof sheets. As the pergola structure was not damaged during the relevant storm, the cover for meeting building regulations does not even arise for consideration. The cover does not respond to undamaged property. I am satisfied the insurer is not required to repair or replace t he pergola’s structure. 2.2 Is the insurer entitled to cash settle the complainant’s claim? Policy gives insurer discretion to decide on claims resolution Where a claim has been accepted, the policy gives the insurer discretion to decide how it wishes to resolve it. However, this discretion must be exercised fairly and reasonably. The insurer explained it cannot repair the complainant’s pergola because its builder is unprepared to warrant the repair. Its builder is unprepared to warrant the repair because of the pre- existing issue with the pergola’s roof pitch. I am satisfied the insurer is not responsible for the pergola’s roof pitch issue, so it would not be fair to expect it to repair the pergola. I am satisfied the insurer’s decision to cash settle the cost of replacing the pergola’s roof sheets is fair and reasonable. Insurer’s cash settlement offer is fair The insurer’s builder has quoted $3,567.04 (GST inclusive) to remove and replace the pergola’s polycarbonate roof sheets, flashings and fixings. This quote also includes allocations for preparatory and post-repair clearing work. The insurer offered the complainant the opportunity to submit quotes of her own for these works, but she has not supplied any. Given this, the insurer:  added a further 20% to its builder quote to account for uncertainties and the transference of risk  offered the complainant $3,980.45, net of the policy’s $300 excess. Determination | Case number: 746308 Page 5 of 7 The insurer subsequently waived the policy’s excess, to account for some delays and the complainant’s experience with the claim, bringing its final cash settlement offer to $4,280.45. The information before me shows the insurer took about two months to decide the complainant’s claim. The claim was lodged on 17 December 2018 and the insurer’s initial cash settlement offer was made on 19 February 2019. While there were further delays after 19 February 2019, this was mainly because of the complainant’s dispute over the insurer ’s decision not to cover a reconstruction of the pergola to meet current roof pitch standards . The complainant is not entitled to this for reasons previously outlined, so I am not satisfied the insurer is responsible for most of the delays that occurred after 19 February 2019. Considering this, I am satisfied the insurer’s :  decision to waive the $300 policy excess is fair to compensate the complainant for her claims experience and the insurer’s contribution to the delays that occurred  final cash settlement offer of $4,280.45 is fair. Accordingly, other than paying the complai nant $4,280.45, I am satisfied the insurer is not required to take any further action in relation to her claim or complaint. Determination | Case number: 746308 Page 6 of 7 3 Supporting information 3.1 Process AFCA’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All of the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Relevant policy wordings Meeting building regulations … If a listed event causes loss or damage to your home and you need to meet current building regulations to repair or rebuild the part of your home that was damaged. Covered under Buildings Insurance  the cost to meet current building regulations to repair or rebuild the part of your home that was damaged. Not covered  costs to meet building regulations: - that were already in place when your home was built, renovated or altered - for undamaged parts of your home – for example, installing insulation in ceilings that were not damaged. … Determination | Case number: 746308 Page 7 of 7 General exclusions for all covers and benefits … Maintaining and occupying your home We don’t cover loss, damage, injury or death arising from:  faulty design and workmanship … What we pay for – Buildings Insurance If we agree to cover your claim under Building Insurance, then we will:  pay the cost to repair or rebuild the part of your home that was damaged (whichever is lower)  pay for any extra costs we cover under ‘other benefits’ – see below. … Other benefits We may also pay some costs on top of the Buildings sum insured under ‘other benefits’ for:  Safety net…  Temporary accommodation for home owners…  Loss of rent for landlords…  Mortgagee discharge costs… How we settle your buildings claim We will choose to settle your claim for loss or damage to your home and any ‘other benefits’ in one of the following ways: … 2. Pay you the reasonable cost to repair or rebuild your home

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.