Home / Commonwealth Insurance Limited / Determination 746053

Determination 746053

Storm damage building claim settlement and defective repairs

FirmCommonwealth Insurance Limited
Decided2021-11-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$25,292
Non-financial loss$4,000
Amount claimed$324,090
SourceAFCA PDF

Summary

The complainant claimed storm damage to her home after Cyclone Debbie and disputed the insurer's repairs and settlement. AFCA ordered the insurer to cash settle the building claim at $25,291.79 plus interest for most items, with the roof settled via an independent engineer process, reimburse the complainant's building consultant report fee, and pay $4,000 for non-financial loss.

Claim settlement is determined on a fairness basis, with the roof and window film resolved by an independent engineer process and other items settled on QAT action plans, while pool deck, security, carpet, windows and screens claims were rejected for lack of evidence.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial lossreassess claimrefund fees or charges

Related

All Commonwealth Insurance Limited determinations · Find similar determinations

Text of the determination

Determination Case number 746053 Financial firm Commonwealth Insurance Limited Determination | Case number: 746053 Page 1 of 12 Case number: 746053 20 October 2021 1 Determination overview 1.1 Complaint The complainant is represented by her daughter, AE. For convenience, reference to the complainant will include both unless stated otherwise. The complainant holds a home and contents insurance policy with the financial firm (insurer). The complainant lodged a claim on 29 March 2017 following a storm event (Cyclone Debbie). The insurer accepted the claim and repairs were undertaken. However, the complainant has raised several concerns regarding defective workmanship and damage to items that were missed. The insurer proposed an action plan to remedy the complainant’s concerns . However, the parties have not agreed on a method to resolve the claim. 1.2 Issues and key findings How should the claim be settled? The claim should be settled as set out in section 2.1 of this determination. Should the insurer pay professional costs? The insurer should pay for C’s report as it was reasonably incurred and assisted the complainant’s position. Is the complainant entitled to compensation for non-financial loss? Yes. The insurer ’ s handling of the claim has caused an unusual degree of stress, inconvenience, or delay. The insurer should pay $4,000. 1.3 Determination This determination is partially in favour of the complainant. Should the complainant accept this determination, then the insurer is required to do the following:  settle the claim as set out in section 2.1  reimburse the complainant for C’s report fee  pay $4,000 for non-financial loss. Determination | Case number: 746053 Page 2 of 12 2 Reasons for determination 2.1 How should the claim be settled? There was an accepted insured event and liability was accepted by the insurer The complainant’s home sustained loss and damage in March 2017, following a significant storm. The insurer accepted liability for this claim. The insurer engaged builders QAT to provide a quote on the scope of works and conduct repairs. Insurer ’ s building consultant identified defective building work On 2 April 2019, the insurer appointed building consultant S to attend the property and provide a report. This was after the complainant raised concerns with water ingress, the quality of works carried out by QAT and additional damage caused during repairs. S reported a range of defective works. S also noted that an inspection of the new roof sarking was not possible due to the builder failing to remove the original cyclone damaged sarking from the roof. QAT undertook work required to rectify the faulty workmanship. Following this, the complainant informed the insurer that she was dissatisfied with the quality of repairs. Complainant ’ s building consultant identified further issues The complainant engaged the services of building consultant C. C provided a report dated 20 May 2020 which reported multiple items as building defects and poor workmanship repairs. C concluded the property:  sustained an average quantity of Tropical Cyclone Debbie damage  has been defectively repaired by the insurer and with further damage caused. To review the items identified by C, the insurer re-engaged building consultant S. S re- inspected the property and provided a report dated 17 September 2020. In view of coming to a resolution, the inspect ion was also attended by C, QAT and the complainant’ s builder, MC. The complainant was also present. S’s re-inspection resulted in QAT offering to pay for several items. S disagrees with some of C ’s conclusions about defective or unrepaired items. The report from S also states: QAT requested the opportunity to provide additional information and confirmation for the following issues: Insured to allow access for a Structural Engineer to inspect the roof tile and roof truss works. QAT have indicated that Form 15 and Form 16 certificates can then be provided to the Certifier so that a Form 21 final inspection certificate can be obtained. Although the Insured does not want QAT’s preferred Structural Engineer to attend site, I recommend that this occurs. QAT have the right to certify their works and provide confirmation of the truss remediation. In instances where the QBCC is asked to resolve or direct Builders, the initial course of action Determination | Case number: 746053 Page 3 of 12 is to allow the Builder to remedy any alleged defects, I believe that this course of action should also be taken in this matter. According to S, the complainant did not agree to QAT’s request. Complainant ’ s roof report The complainant engaged the services of engineer GW to attend the property and inspect the roof. GW provided a report dated 27 November 2020 which says:  screw fixings in the capping tile indicate the capping tiles have been fixed in accordance with current Australian standards  in one location adjacent to the north west capping tile on the hip, a cut tile is misaligned  on the north western dutch gable, the capping tile at the end of the gable has a hole in the end of the pointing  flexible pointing has not been used and cracking can be seen in the capping tiles  some holes can be seen in the pointing at each end of the ridge  it appears a different mixture of the pointing for the ridge capping has been used compared to the gable  misalignment of the top line of tiles can be seen on the south west dutch gable from inside the roof cavity looking out  inside the roof cavity, additional timbers have been batten screwed in a staggered pattern to the top chord of the existing hardwood prefabricated trusses – in some instances scabs or splice timbers have been installed for the full length of the top chord, in other areas short lengths have been installed and in some instances scabs or splice have been installed on both sides of the existing truss top chord  debris from original sarking can be seen throughout the roof cavity GW concludes from its inspection that the inadequacies of the roof batten hold down after splitting of the top chord of the original truss have not been rectified. Issues that remain outstanding The insurer proposed an action plan from QAT to remedy the complainant’s concerns. However, given her experience to date, the complainant does not want QAT to do the works. Further, the parties do not agree to the extent of works required. The complainant provided a quote from MC totalling $324,090.09. She seeks payment of this amount in settlement of the claim. MC’s quote was mostly based on C’s report. Upon reviewing MC’s quote and all available reports, the panel is not satisfied the insurer is required to pay the full cost of the quote. This is because:  the notes from a roofing specialist on the quote are not sufficient to establish the roof requires a complete replacement of the roof tiles and the trusses – neither S nor GW say this is necessary  the quote allows for replacement of ceilings no longer in dispute. It was originally disputed that 13mm plasterboard was used to replace the plasterboard. The insurer has since provided information showing 13mm was used These works form a substantive part of MC’s quote. In reviewing this dispute, the panel has identified the following outstanding items as those contained: Determination | Case number: 746053 Page 4 of 12  in the complainant’s submission dated 18 April 2018 where she identifies the major items in dispute, and  in her submission dated 9 November 2020 where she explains which items she disagrees with in QAT’s action plan dated 3 September 2020. Roof claim should be resolved this way The available information is not clear about the extent of works to the roof. MC ’s scope of works is not consistent with the reports from either S or GW. S explicitly stated the replacement of the tiles and trusses were not necessary. GW did not recommend such extensive works. Given this, the panel considers it is fair in all the circumstances the dispute about the roof be resolved in the following way. The parties are to engage an independent structural engineer to invasively inspect the roof and provide a full scope of works for any and all the required repairs. The engineer should be one agreed to by the parties. The insurer can provide a list of three engineers from which the complainant can choose one. Alternatively, the complainant can provide three choices for the insurer to choose one. The engineer’s costs are to be borne by the insurer. The engineer must be appropriately qualified and certified to do this. Once this engineer has been engaged and has completed the scope of works, each party can obtain at least one, and no more than two, quotes based on that scope of works. If only one quote is obtained, then the insurer is to cash settle the claim based on that quote plus a 10% contingency. If more than one quote is obtained, then the insurer is to cash settle the claim based on the average of those quotations with a 10% contingency. The contingency is to address the fact the risks of the works are passing to the complainant and the likely possibility that there may be variations required during the works. Insurer has agreed to stairs QAT agreed to cash settle the complainant based on MC ’s quote. The panel is satisfied this is a fair and reasonable offer. Pool pump room and deck The complainant says the pool deck lifted during the cyclone causing grouting and sealing to crack. This allowed water to enter the structure and cause subsequent damage to everything below, including the timber framework. As a result, the structure now needs to be demolished and replaced. Upon reviewing the insurer ’ s original reports and scope of works, there is no mention of damage being identified to the pool deck. The first mention of the pool deck is in C’s report where it says the following: TC Debbie damage not rectified and Remains Outstanding . Repairs to the swimming pool deck joint above the under deck storage room is required to be removed and reinstalled without cracks and quite possibly a Determination | Case number: 746053 Page 5 of 12 flashing also to be installed so as to prevent water ingress into the under storage area. C also provides photographs of the pool deck joint noting it is high wind movement damage from the 2017 cyclone event. C does not provide any information to establish on the balance of probabilities that the pool deck was damaged by the 2017 cyclone event. S’s report dated 3 September 2020 did not agree with the extent of damage. S said the damage to the pump room below the deck is likely long-term. S noted the following in support:  the pump room underneath the deck showed widespread and severe corrosion to the metal framing connectors, the bolted framing connections and three steel posts  widespread timber saturation and decay was also noted to the hardwood floor framing members  crack in an FC sheet was due to the installation of steel posts which predates the cyclone event  moisture (from normal rainfall and splashed water from the pool) has been able to seep through the tile bed and deck substrates for a long period of time  the periphery edges of the deck have always been unprotected from the elements – FC flooring and tile edges have never been sealed and always susceptible to water entry  very unlikely a dislodged lattice screen had impacted the deck with such force that it cracked the 16mm thick compressed fibre cement structural flooring but not the tiles S’s report included various photographs in support. These show rainwater can freely enter the pool pump room. The panel finds S’s report to be compelling. It is more detailed, the conclusions drawn are plausible and is supported by photographs. Given this, the panel does not accept the available information shows the damage to the pool deck resulted from the original cyclone event. Therefore, the insurer is entitled to deny the claim for the pool deck and the water damage being claimed to the structure below it. Security system The complainant says the security system had not been reset to clear an alarm and a sensor had been installed incorrectly. S’s 2019 report noted the complainant had raised concerns with the security system. S recommended QAT provide confirmation the security system was tested and that it was found to be in good working order. QAT agreed to this. There is no further mention of this issue in the subsequent reports. No other information, either by an expert or otherwise, has been provided to support the complainant ’s position that the security system currently has an outstanding issue the insurer is required to address. Given the limited information, the panel is not persuaded the insurer is liable for this item. Carpet The complainant says the carpet has been poorly installed. This appears to have been first raised by the complainant in her submission dated 18 April 2021. She provided a report from flooring company F dated 13 April 2021 in support, which states: I have attended at the request of the owner to view the carpet, what I have found is that the joins are not straight in the lounge and dining room and are very Determination | Case number: 746053 Page 6 of 12 obvious. I also found in the master bedroom the finishing is not to a good standard, there is a join an inch away from the tiles at the door, also at the bathroom door they have not trimmed the carpet or tucked it in which can possible be a tripping hazard. The insurer noted this was not raised in the joint inspection organised on 3 September 2020. In response, the complainant said: Whilst the carpet had nothing to do with QAT, it is still a part of this claim, as is the damaged caused by the lift of the pool deck caused by the cyclone and the subsequent damage caused by it not being repaired. The original SOW does not refer to the carpets. Neither does the subsequent reports. The complainant appears to accept the issue with the carpets is not due to QAT’s work. There is no contemporaneous evidence to show the carpet was affected by the cyclone. F’s repo rt indicates issues with its workmanship. F does not say this damage is consistent with the claimed event. Given this, the panel is not persuaded the insurer is liable for this item. Window film It is not disputed that a window was smashed during the cyclone event or that it had to be replaced. The complainant notes the window panel does not match the tinting of the remaining panels surrounding it which form part of a set. The complainant also reports the replaced window to be already peeling. The panel is satisfied photographs provided show which glass panel had been replaced and that this alters the matching appearance of the glass panels. The insurer says QAT could not match the tint and proposed that MC find a matching tint on the complainants’ behalf and provide a quote for its consideration. No information has been provided to show the tint can be matched. The policy contains a matching benefit which states it will cover up to $750 in any one claim for materials required to bring about a matching finish to the area that has been repaired or replaced when it has agreed to pay a claim. The benefit under the policy is only applicable to certain items. This does not include glass and/or windows. Considering this, the panel is satisfied if the complainant or her builder can source a matching tint, it is fair and reasonable that the insurer covers the cost of replacing and installing it. If a matching tint cannot be sourced, the insurer is liable for the full cost of any rectification work required to fix the peeling tint reported by the complainant. Paint quality The complainant says inferior quality paint was used and has a stippled finish rather than smooth as previous. C says: Determination | Case number: 746053 Page 7 of 12 All painting of walls and ceiling has used inferior paint finishes and the texture is very rough stipple single coat heavy roller finish that does not match any of the existing high-quality smooth texture finishes. C goes on to say the brand and type of paint used is of inferior quality and that walls and ceilings throughout did not match that of the existing high quality paint finish. To support this, C provides photographs of the painted walls. S says:  C does not explain why the paint used is of inferior or poor quality  it contacted the manufacturer of the paint used and its technical advisor stated that they do not consider the paint to be inferior and of poor quality, rather it is of an excellent quality and fit for purpose  it observed the finish to the new paint coatings from a normal viewing position in accordance with the Queensland Building and Construction Commission (QBCC) guidelines – they did not appear to have a very rough stipple finish  in comparing the ground floor and first floor internal wall elevations, the new paint coatings were generally more textured that the original coatings  whilst the new paint coatings are generally more textured than the original paint work, S considered them uniform in appearance and with no aforementioned defects.  given the lack of any significant defects to the coatings, it would be unreasonable to have the builder re-paint all wall surfaces  glancing light plays a significant factor in the human eye discerning textural surfaces – consequently, the stairwell wall elevations (which are exposed to significant glancing light from the large windows) are the most susceptible to differential coatings being obvious compared to the ground floor entry foyer wall elevations. S recommended that QAT prepare and paint the stairwell wall elevations, or the ground floor foyer walls, to achieve a compatible finish. S also says it would be unreasonable to expect the painting contractor to achieve an exact texture match to the original coatings considering differential amount of paint coatings and circumstances of application. Having reviewed the above and the photographs provided, the panel is not persuaded the complainant has shown QAT did any defective work that requires rectification except to the stairwell. S provides several compelling points against this. Therefore, the panel does not accept the available information shows the brand used by QAT was inferior or that the painting was not done pursuant to workmanlike standards. QAT agreed to cash settle the complainant for the re-painting of the stairwell wall elevations as recommended by S. QAT was awaiting a quote from MC but was unable to obtain this. QAT provided a quote of $1,531.30. Subject to a contingency and builder’s margin (which will be discussed later), the panel considers the insurer’s position on this point is reasonable. Yard condition should be settled this way The complainant says, during the repair process which took seven months, she was unable to access and maintain the yard. This led the yard to go to weed and has not completely recovered. She also says there are broken stepping stones from the weight of scaffolding and the yard is uneven due to trucks and skips. Determination | Case number: 746053 Page 8 of 12 C says the lawn has been destroyed with many ‘ divert holes ’ and broken paving stones. C provides photographs of the lawn noting it is damage caused by truck deliveries. S says it observed the lawn area was not destroyed and did not have multiple divot holes. Photographs provided in C’s report does show several bare patches. It is not apparent they are holes that require relevelling. MC ’s quote only appears to include the pavers. QAT also noted it top dressed and seeded the front lawn. QAT agreed to pay for the new pavers as included in MC ’s quote. The panel is satisfied the insurer’s position is fair. Ceilings and cornice As stated previously, there is no dispute the ceilings were replaced with 13mm. QAT have agreed to pay for the cost of back-blocking and estimated this to be $1,555.84. The complainant has not provided evidence to show this estimate is unreasonable. Subject to the contingency and builder’s margin set out below, the panel accepts this is fair. For the cornice, C’s report says there is a different style of cornice in the first floor and said all this should be replaced. S noted that, except for the master bedroom, all the other cornices on the first floor were replaced by QAT. S and QAT suggested the replacement should be limited to the master bedroom so all the first floor could be matched. This outcome appears reasonable. QAT have estimated the cost to be $4,761.29. Subject to the contingency and builder’s margin, this is fair. Windows for pool pump room C’s report says the windows were i nstalled incorrectly and no longer operate correctly. The complainant says the windows were operational prior to the cyclone and works done. The complainant notes there was no wood propping to the frame prior to works being done. S and QAT note that QAT were not engaged to remove and replace the windows. S said the fact the windows are not working properly have nothing to do with the weatherboard replacement works. S said the hardwood bearers/frame above the windows have sagged downward over time and are impinging on the aluminium frames of the windows. This is a natural process of hardwood which occurs over a long period of time. The panel does not accept the available information shows the insurer is liable for this item. C does not explain how the agreed works impacted the windows. S’s evidence sets out factors that do not show the issues with the windows were caused by QAT’s works. Insect screen and Lattice screens C said an insect screen and eight lattice screens around the swimming pool had been damaged by the cyclone and have not been replaced. S said that during their 2017 inspection, the insect screen to the area claimed was not identified as being damaged. Given the time that passed, S could not verify this was damaged by the storm. For the lattice screens, S said only one screen had been dislodged during the event and has since been reinstated. S also noted it is common for treated pine lattice screens to deteriorate and for the slats to become loose. S did not identify other lattice screens damaged in its earlier inspection. Determination | Case number: 746053 Page 9 of 12 Given S’s evidence, and the lack of contemporaneous evidence to show the extent of the damages being claimed, the panel is not persuaded it is fair to include these items. Claim should be resolved in this way After careful consideration of all of the above, the panel accepts the claim should be resolved in this way. For the roof and window film, the insurer is to settle those items in the manner set out above. For all the other items, the panel considers it is fair to base it on QAT’s action plans . This is because the amounts were either based on:  MC’s quote or,  QAT’s estimate when such costs could not be verified with MC and no evidence was produced to show these amounts were unfair. Lawn $ 612.92 Clothesline $ 664.70 Fencing post $ 513.59 Front balcony floor tiles $ 234.66 Rubbish within the loft cavity and not cleared out. $ 935.47 Lead flashing $2,340.00 Ceiling light fittings $ 200.00 Back blocking for ceiling $1,555.84 Ceiling cornice not matching $4761.29 Kitchen cornice $ 373.48 Painting $1,531.30 Internal stairs finish $2,340.25 Pool pump room door $ 885.21 Pool pump room flashings $1,378.67 Total $18,327.38 There is a slight discrepancy between this total and the one set out in QAT’s action plan adjusted on 13 May 2021. This is because QAT’s action plan dated 3 September 2020 allowed $513.59 for the fencing post based on MC ’s quote. This was adjusted lower in its plan in 2021. The panel considers it fair to revert to the original figure. The insurer’s offer added a 15% builder’s margin . This is reasonable. This would increase the amount by $2,749.11. The panel also considers that a contingency of 20% ($4,215.30) should be added. This is due to the following:  the insurer’s estimate does not include other costs such as preliminaries, insurance or site supervision  accounts for the possibility that further works may be identified and required Determination | Case number: 746053 Page 10 of 12 This provides a total of $25,291.79. Given this, it is fair in all the circumstances the insurer cash settles the building claim, excluding the roof and window film, by paying $25,291.79 plus interest pursuant to section 57 of the Insurance Contracts Act 1984. Interest is payable from 31 September 2020, being two weeks after S issued its report, until payment is made. 2.2 Should the insurer pay professional costs? The insurer should contribute towards C’s report The complainant is seeking to be reimbursed for the expert report costs she has incurred. AFCA may require the insurer to contribute to the professional costs incurred by a party. Normally, this would be awarded if the professional costs were reasonably incurred and assisted the complainant’s position. The complainant engaged C to support her position about defective building works. The panel agrees that C’s report assist ed the complainant’s position in identifying some issues and was reasonably incurred. The insurer should reimburse C’s fees. The complainant had also engaged GW to inspect the roof. However, the panel does not consider this report substantively assisted her position. Therefore, the panel does not accept the insurer is required to reimburse these costs. 2.3 Should the insurer pay non-financial loss? AFCA may award non-financial loss compensation in certain circumstances AFCA may award compensation up to $5,000 for each claim of non-financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. Insurer to pay $4,000 non-financial loss compensation The claim was lodged in March 2017. It is evident from the information available that defective building works were identified with ongoing multiple site visits required over an extended period. The roof issues remain outstanding and potentially require additional repairs to date despite rectification works already taking place. The panel is satisfied the insurer’s actions have resulted in an unusual degree or extent of physical inconvenience, time taken to resolve the claim and interference with the complainant’s peace of mind. Therefore, the insurer is re quired to pay the complainant $4,000 in recognition of this. Determination | Case number: 746053 Page 11 of 12 3 Supporting information 3.1 Process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. This matter was determined by a panel Due to the nature of this dispute, it has been referred to a panel for determination. The panel comprises the ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience as an insurer. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 746053 Page 12 of 12 3.2 Relevant material considered and relied on  Parties’ submissions /emails and all attachments to all submissions/emails.  Parties’ expert reports.  Photographs.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.