Home / IAG / Determination 744716
Determination 744716
Cyclone roof damage claim settlement amount
Summary
The complainant sought a full roof replacement for Cyclone Debbie damage after the insurer offered $19,073.15 on a cash settlement basis. The panel found the damage was only partly caused by the cyclone, increased the cash settlement to $28,806.14, and ordered reimbursement of the engineer report fee with interest.
Expert evidence did not establish the true extent of cyclone damage, so the panel apportioned the settlement at the mid-point of the two assessments.
Issues
- Claim amount dispute primary · upheld“the insurer [is] appropriate to increase its offer of cash settlement to 31.25% (or $28,806.14) of the complainant's Scope of Works”
Subjects and remedies
pay claimpay compensationpay interest
Related
Text of the determination
Determination
Case number 744716
Financial firm Insurance Australia Limited
Determination | Case number: 744716 Page 2 of 10
Case number: 744716 04 May 2021
1 Determination overview
1.1 Complaint
The complainant is represented by (DK). For simplicity, the determination will refer to
the complainant and DK as the ‘complainant’.
The complainant has a home and contents insurance policy with the financial firm (the
insurer). On 6 July 2017, the complainant lodged a claim with the insurer after
Cyclone Debbie caused damage to his property on or about 28 March 2017.
The insurer assessed and accepted the claim, undertook repairs and closed the claim
in March 2018. However, the claim was re-opened in June 2019, after the
complainant advised that water had entered the property causing further damage and
a large section of the roof required replacement.
The insurer has assessed the roof and states that while it does not believe the
damage was caused by Cyclone Debbie, it was willing to accept it was possible.
Therefore, it offered to resolve the claim on an ex gratia basis for $19,073.15, which
assessed its liability based on the complainant ’ s scope of works.
The complainant has rejected the insurer’s offer and is seeking $92,179.66 , for a total
roof replacement.
1.2 Issues and key findings
Is the insurer’s offer fair in all the circumstances?
While the insurer has assessed the claim within the terms and conditions of the
policy, in the circumstances it is appropriate for the insurer to increase its offer of cash
settlement to 31.25% (or $28,806.14) of the complai nant’s Scope of Works.
Is the insurer required to pay the complainant ’ s costs?
The panel is not satisfied that the complainant was required to obtain professional
representation from DK, nor did such representation assist their position. However,
the panel is satisfied the engineer report of GG has helped.
Therefore, the insurer is not required to pay DK’s professional fees however, it is
required to reimburse the complaint the cost of GG’s report fee. The complainant is to
provide the insurer with details and confirmation of the amount paid.
1.3 Determination
The determination is substantially in favour of the insurer.
Determination | Case number: 744716 Page 3 of 10
The insurer is to cash settle the claim in the amount of $28,806.14.
The insurer is required to pay interest on this amount, in accordance with the
Insurance Contracts Act 1984 (the Act), from 31 March 2020, until the amount is paid.
The insurer is to reimburse the complainant the cost of GG’s report and to pay
interest from the date the complainant paid for that report.
The insurer is not required to take any further action.
Determination | Case number: 744716 Page 4 of 10
2 Reasons for determination
There has been a full exchange of information between the parties and each party
has had the opportunity of addressing the issues in dispute.
Due to the nature of the issues involved in this complaint, it has been referred to a
panel for determination. The panel includes an Ombudsman, a representative with
extensive industry experience and a representative with significant experience as a
consumer representative.
This determination follows consideration of all the information exchanged. It is based
on what is fair in all the circumstances having regard to the relevant legal principles,
terms of the policy, good industry practice, codes of practice and prior determinations
where applicable.
While both parties have made numerous submissions, for the purposes of this
determination, commentary has been restricted to those issues which have a direct
bearing on the outcome of the complaint.
2.1 Is the insurer’s offer fair in all the circumstances?
Onus on the complainant to establish a valid claim
Insurance law says the onus is on the complainant to show, on the balance of
probabilities, a loss claimed falls within the cover provided by the policy. This is
known as establishing a valid claim. If the complainant can establish this, the onus
transfers to the insurer to establish it is entitled to decline the claim.
The complainant ’s policy provides cover for accidental loss or damage.
On 6 July 2017, the complainant lodged a claim with the insurer after Cyclone Debbie
caused damage to his property on or about 28 March 2017.
The insurer arranged for loss adjuster TB to assess the claim who noted that there
was damage to downpipes, an air conditioning unit and a window. The insurer
arranged to repair the assessed damage and closed the claim in March 2018.
However, the claim was re-opened in June 2019, after the complainant advised that
water had entered the property causing further damage and a large section of the roof
required replacement.
There is no dispute that the damage which occurred during the period of insurance,
was both unintended and unexpected and, the insurer acknowledges that some
damage to the roof was caused by Cyclone Debbie. Therefore, a valid claim has been
established.
However, the issue in dispute is the percentage of damage Cyclone Debbie has
caused to the roof and trusses and whether the roof requires total replacement.
Determination | Case number: 744716 Page 5 of 10
The complainant’s expert s argue the cause of the damage is Cyclone Debbie
In February 2019, the complainant provided the insurer with a plumbing report from
BP who stated that the roof exterior and trusses of the property had been damaged
during Cyclone Debbie.
In addition to this report, the complainant also provided a report and quote from
building consultant GS dated 22 February 2019 and engineer GG dated 1 June 2020.
GG’s report will be addresse d below.
GS reported that there was evidence of batten lift in more than 20% of the main
house roof, as well as water staining in the lounge room wall and evidence of sagging
in the ceiling near the front entry and laundry.
GS concluded that due to the batten lift to more than 20% of the main roof, the roof
required replacement and upgraded tie-downs.
Insurer’s expert indicates not all damage was a result of Cyclone Debbie
Following the request to re-open the claim, the insurer appointed assessor CP and
engineer JM to report on the damage.
CP reported:
the complainant advised since repairs had been carried out water had been
entering the property through the ceiling near the entry
inspection of the roof above the affected area showed repairs of some sort had
been done to the barge intersection and the flat section of the roof
flashing had been scribed into the steep roof sheet and sits on top of the flat roof
barge with fixing that has popped, and the flashing can be lifted
gaps can be seen between the flat barge roof flashing and the flat roof sheet and
this is believed to be the water entry point
finally, the roof consists of new roof sheeting which has been retro fitted to the old
roof sheeting and capping.
CP was of the view that the repairs to the roof may have been a cause of how the
water has entered the property and that the repairs paid for by the complainant are
considered temporary.
Engineer JM was appointed to assess the extent of the batten lift and the extent of
damage to the property relating to Cyclone Debbie.
In his report, JM observed:
no damage to the timber ceiling boards in the TV room was observed however,
minor moisture markings on the walls were present
Determination | Case number: 744716 Page 6 of 10
a 5mm gap between a rafter and the roof baton was observed near the ridge above
the eastern hall and bathroom however, the rafter was set down 55mm below the
top of the ridge rafter which was only 35mm thick which resulted in a discrepancy
between the rafter and the underside of the baton
two other gapes were present betwee n the baton and rafter above the kitchen.
Additional timbers were also present a t this locating which indicate the framework
did not neatly align at the time of construct
small gaps between a roof batten and rafter were also found at six locations above
the TV room
JM concludes the water entry into the TV room is likely due to the low pitch, the gaps
between the baton and trust are because of wind up-lift, however, he does not
consider this to be recent. In addition, JM recommended the ceiling in the laundry be
removed as it is in danger of collapse.
While JM was of the view the damage was not caused by Cyclone Debbie, JM
advised if the benefit of doubt was given to this event causing the damage, then the
affected area is limited to 46m2 (or 17.7% of the total roof area) and not the entire
roof trusses.
JM repeats his position with respect to the extent of the damage in two supplementary
reports dated 10 March 2020 and 10 July 2020.
The complaint’s engineer disputes insurer’s assessment
The complainant engaged engineer (GG) who provided a report in response to JM’s
findings and states that the roof has suffered damage during Cyclone Debbie.
GG states the area which was damaged due to Cyclone Debbie includes the front
area of the TV room, the front area of the roof over the kitchen and the front hip area
over the bathroom.
In his report dated 1 June 2020, GG notes:
evidence of high wind and wind blow rain entering the roof cavity as well as water
staining on the timber ceiling.
roof battens have appeared to have lifted off the supporting timber members and
are misalignment of original roof and prefabricated trusses
separation along the laps of the colouring roof has occurred due to high winds
associated with Cyclone Debbie
the damaged area of the roof is 108m2 or 41% of the total roof area which would
instigate a Council building approval for a full main roof replacement .
While GG agrees with JM’s findings, the main area in dispute is the area which GG
and JM consider to be damage because of Cyclone Debbie.
Determination | Case number: 744716 Page 7 of 10
Expert evidence indicates apportionment is warranted to resolve the complaint
Having reviewed the exchanged evidence, the panel accepts Cyclone Debbie was not
entirely the cause of the damage to the roof and associated structure.
However, upon review of the reports and exchanged parties, the panel is not
persuaded either party has adequately established the true amount of damage
caused to the complainant’s roof by Cyclone Debbie.
While both parties agree that there is damage, the amount of damage remains in
dispute.
The insurer has assessed the damage to be approximately 17.7% while the
complainant’s engineer is of the view it is more likely to be 41%. Neither party has
assessed the roof as requiring total replacement. Further, there is no evidence to
establish the roof is required to be replaced because of the damage sustained during
Cyclone Debbie.
In the interest of bringing finality to the complaint, the panel is persuaded the insurer
should increase its settlement to 31.25 % of the complainant’s scope of works. This is
the mid-point of the two assessments. The panel is persuaded this is fair given the
lack of persuasive evidence provided by the parties.
Therefore, the cash settlement for the claim related damage is $28,806.14.
The insurer is required to pay interest upon this amount, in accordance with the Act,
from 31 March 2020, until the date of payment.
2.2 Is the insurer required to pay the complainants professional fees?
The complainant has requested payment of his costs
The complainant engaged the assistance of DK prior to lodging the complaint with
AFCA. The complainant also engaged engineer GG to comment on the condition of
the roof and cyclone damage.
When considering whether a complainant (or its representative) should receive
reimbursement for professional fees AFCA considers:
the complexity of the issues
whether the complainant reasonably needed advice or assistance
whether the complainant incurred costs because they genuinely required expert
assistance and it assisted the compla inant’s position.
The panel has read the submissions of DK as well as the engineer report of GG.
Determination | Case number: 744716 Page 8 of 10
The panel is not satisfied the submissions of DK were reasonably required by the
complainant nor do they assist with the complaint resolution or advance the
complainant ’ s position.
However, the panel is satisfied that GG’s report (which cost $4,840) has assisted to
the extent it provides some commentary of the damage to the roof and detail around
the likely requirement of Council building approval.
Therefore, the insurer is not required to pay DK’s professional fees however, the
insurer is required to reimburse the complainant the cost of GG ’s report.
The complainant is to provide the insurer with proof of payment.
The insurer is to pay interest on the amount, in accordance with the Act, from the date
the complainant paid for the report, until reimbursement is made.
Determination | Case number: 744716 Page 9 of 10
3 Supporting information
3.1 Process
AFCA’s approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to the legal principles, applicable industry codes or guidance, good
industry practice and previous decisions of AFCA or its predecessor schemes (which
are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised. All the
provided information has been reviewed and considered. The parties have raised
numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted to those issues considered relevant to the outcome.
This matter was determined by a panel
Due to the nature of this dispute, it has been referred to a panel for determination.
The panel comprises the lead ombudsman, a member with significant experience in
consumer and small business advocacy and a member with extensive experience in
insurance.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on
oath, or to require third parties to give evidence. When we assess complaints, we
consider available documents, the recollections of the parties, and all relevant
circumstances. We give more weight to documents created at the time the events
occurred. If there is no relevant documentation, we will decide what is most likely to
have occurred based on the information provided to us. If there are conflicting
recollections and these are evenly weighted, we may find that a claim cannot be
established.
3.2 Relevant Policy Terms
Page Product Di sclosure Statement
14 Section 1 – Your Buildings and Contents
Accidental damage cover
What is covered
Your Buildings and/or your Cont ents as set out on your Policy
Schedule are covered if they are accidentally destroyed, accidentally
lost or accidentally damaged. They are covered only if you own
them, or are liable for their destruction, loss or damage .
Determination | Case number: 744716 Page 10 of 10
Page Product Di sclosure Statement
…
We will cover your Buildings and/or your Cont ents as set out on your
Policy Schedule for accidental destruction, accidental loss or
accidental damage
26 How we pay a claim for your Buildings
When destruction, loss or damage occurs to your Buildings, we will
pay the cost of rebuilding your Buildi ngs, or repairing the damage
portions of your Buildings, to the same condition as when they were
new.
We will also pay any additional costs required for your Buildings to
comply with government or loc al authority bylaws. We will not
however pay these addi tional costs if you were required to comply
with these bylaws, and had not done so, before the destruction, loss
or damage occurred. The most that we will pay for costs required