Text of the determination
Determination
Case number 744280
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 744280 Page 2 of 13
Case number: 744280 8 July 2021
1 Determination overview
1.1 Complaint
The complainants held a building and contents policy with the financial firm (insurer) covering
their home from 2015 until 2019. In 2020, they lodged a claim after noticing cracking and
other damage.
The insurer declined the claim saying the cause of damage did not occur during the period of
insurance. It also says had the loss occurred during the period of insurance, damage caused
by earth movement more than 72 hours after a leak is not covered.
The complainants want the insurer to repair the damage to the home.
The case analyst provided the parties with a recommendation on the issues in dispute. The
recommendation was in favour of the insurer.
As the complainants have not accepted the recommendation, the complaint has been
referred to me for determination .
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
The available evidence establishes on the balance of probabilities there has been damage to
the home caused by earth movement resulting from escaping liquid from crushed stormwater
pipes, but the damage occurred after 72 hours after the event and the damage occurred
because of the faulty workmanship of the original builder. As these causes of damage are
excluded from cover, the insurer is entitled to decline the claim.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action in relation to the claim or the complaint.
Determination | Case number: 744280 Page 3 of 13
2 Reasons for determination
I have decided this complaint based on what is fair in all the circumstances, having regard to
legal principles, applicable industry codes or guidance, good industry practice and previous
relevant determinations of AFCA or predecessor schemes (which are not binding). I have
considered all the material submitted by the parties, both before and after the
recommendation. I am satisfied that the documentation I have relied on has been provided to
both parties.
The parties have raised numerous issues in their submissions to AFCA. However,
commentary in this determination is restricted to those issues considered relevant to the
outcome.
New material provided after the recommendation reviewed and considered
After the recommendation was rejected, the complainant provided a further report.
A summary of the reports provided by the parties is set out in supporting section 3.3 of this
determination.
2.1 Is the insurer entitled to decline the claim?
Some accidental damage probably occurred between 2015 and 2019
The complainants must establish on the balance of probabilities that they have suffered a loss
caused by an event to which the policy responds. This is known as a prima facie or valid
claim.
In May 2020, the complainants lodged a claim with the insurer. They said they had they had
noticed a small crack on the kitchen wall in October 2018 but lately it was progressing and
there was also other damage.
It is not in dispute the insurer‟s policy with the complainants commenced on 22 April 2015 and
they remained insured with the insurer until 2019.
It is also not in dispute there is cracking and other damage to the property.
The policy provides:
You are insured against accidental loss or damage (including the Specified Events
listed below) to your home, contents or both at the site during the period of insurance….
Accident al damage is not defined in the policy. Courts have defined “accidental” in an
insurance context to mean something that is unintended and unexpected.
I am satisfied the cracking damage is unintended and unexpected. I am satisfied the
complainants have established a valid claim for any damage to the home which occurred
between 22 April 2015 and 22 April 2019.
Material and submissions considered in relation to policy exclusions
Once so established, the onus shifts to the insurer to prove on the balance of probabilities
that an exclusion applies if it seeks to deny or limit its liability for the loss.
The policy exclusions relied on by the insurer are set out in supporting section 3.2 of this
determination.
Determination | Case number: 744280 Page 4 of 13
Relying on expert reports the insurer says it is entitled to decline the claim because, while the
damage worsened while it was on risk, the cause of and resultant damage commenced
before the policy commenced.
The insurer says the cause of the damage is two crushed sections of the stormwater pipe
which it says occurred during construction before the policy commenced. The insurer relies
on its engineer who says it is probable the pipes were crushed at the time of construction
from earthworks machinery preparing the fill prior to installing the slab.
The engineer also says any escape of liquid from the pipe into the ground encouraged tree
root growth towards the source of moisture. During dry periods, the engineer says the tree
roots absorb the moisture causing shrinkage and subsequent settlement of the foot ings.
Relying on its engineer‟s opinion, the insurer says the crushing effect is not consistent with
long-term ground movement and that the footings are deformed at the rear left corner of the
home coinciding with the location of the two crushed pipes.
The insurer submits as the policy excludes gradual settlement and poor workmanship the
damage would be excluded from cover as:
the damage caused by the crushed stormwater pipe would have occurred outside of the 72
hour period of the water leak event, as the escape of liquid would have taken time before
affecting the foundations
the damage to the pipe was caused by faulty workmanship at construction
settlement in the driveway is consistent with settlement in the reactive soils, combined with
the absence of d owel bars restraining the driveway slab into the home‟s footings.
The complainants say:
there is no proof the damage was caused at construction
the works were approved by the council
as the house was built in 2011/2012, they would have noticed movement before 2018.
After the recommendation, the complainants also relied on a report from a building consultant
(RS) who reviewed the engineer‟s opinion and the insurer‟s submissions.
Available evidence establishes two crushed sections of pipework
I have carefully reviewed the available information and photographs. Two plumbers inspected
the property in May 2020 and June 2020. They both made the same finding. After using
CCTV cameras, both plumbers found there were two separate crushed sections of pipework
located on the back left corner of the property.
After the recommendation, the complainant‟s expert appears to agree even if he does not
concede the pipe is crushed. He refers to an in pipe video of February 2021 which he says
confirms the pipe at the rear has been flattened to about one third of its original diameter.
I am satisfied the pipes are the cause of damage because they are proximate to the parts of
the home which first began to display damage. The survey levels undertaken by the engineer
support this view.
Probable damage to pipes caused at time of construction
I have carefully reviewed the engineer‟s report and photographs provided. I am satisfied the
engineer has the relevant expertise to comment.
Having reviewed the engineer‟s report and email I am persuaded that is likely the crushed
pipes occurred at the time of construction from earthworks machinery preparing the fill. The
engineer reviewed the CCTV investigation. He has relevant experience and says he has not
Determination | Case number: 744280 Page 5 of 13
seen pipe deformation of this nature from long-term ground movement before. Rather he says
because of the severe degree of deformation in the pipes, it is consistent with a localised load
from heavy machinery.
I accept the home was inspected by council and approved but I also accept council approval
does not include a CCTV inspection to check on the stormwater pipes and the council
approval process would not have identified the defect.
Further, the engineer explained the damage would not have been seen until 2018 because of
the nature of the footings which were inherently stiff. Because of this, he says the footings
resisted settlement for a long period before the damage was seen.
Report provided after the recommendation does not change the outcome
I have carefully reviewed the complainan ts‟ report from RS provided after the
recommendation. Even if path was not constructed until 2014, I am satisfied the available
evidence is that the damage occurred at the time of construction when preparing fill.
Moreover, RS appears to concede the crushing of the stormwater pipes relates to the
activities of the original builder and is accidental and is not related to constructing the
concrete path. Even if the builder‟s actions were accidental from the point of view of the
complainants, I am satisfied this is faulty workmanship which cause of damage is excluded
from cover.
Alternatively, RS posits if there is any softening of the soils in the area of the pipes and the
damage that it is minor subsidence of uncompacted soils placed there by the builder. If this is
the case, this is also faulty workmanship which cause of damage is excluded from cover.
RS also argues if the pipe was crushed and the water was escaping then the home would
have heaved which is the reverse of what has happened. I am satisfied the insurer‟s engineer
has explained the mechanism of damage which is there has been movement because of the
crushed the stormwater pipe which reduce the bearing capacity of the footings and that there
has also moisture absorption from the trees nearby causing settlement.
Insurer entitled to decline the claim because policy exclusions are made out
Having reviewed all the available information, I find the reports from the plumbers and the
insurer‟s engineer more compelling as they have inspected the property a nd provided a
coherent explanation of their opinions which are supported by photographs, survey levels and
CCTV footage.
Having considered the available material I am satisfied on the balance of probabilities there
has been earth movement which has caused damage resulting from water escaping from the
crushed pipes but that the damage has occurred more than 72 hours after the event. Further,
I am satisfied the available evidence establishes the claimed cracking damage and damage
to the driveway occurred because of the faulty workmanship of the original builder. As these
causes of damage are excluded from cover, I accept the insurer is entitled to decline the
claim.
Section 46 of the Insurance Contracts Act does not provide a remedy
RS argues the complainants had no knowledge of the defect when the policy commenced
and section 46 of the Insurance Contracts Act (the Act) applies to provide a remedy.
Section 46 of the Act prevents an insurer from relying on a policy exclusion which refers to a
defect in a thing, which existed before the policy was taken out.
Determination | Case number: 744280 Page 6 of 13
Noting the nature of the damage and the time it took to manifest, I accept the complainants
may not have been aware there was long term damage being caused to the property.
However, the fact the complainants were not aware of the issue does not mean the insurer is
liable for the claimed damage.
The courts confirm section 46 only applies in circumstances where the insurer relies on an
exclusion that references a time at which the relevant defect arose. That is, where the
exclusion expressly refers to a defect having been present before a policy was incepted.
In this instance, section 46 does not apply as there is no such reference in the policy. It
makes no reference in the relevant exclusions to a point in time.
In all the circumstances, on the available information, and for the reasons stated, the insurer
is entitled to decline the claim.
The insurer is not required to take any further action in relation to the claim or the complaint.
Determination | Case number: 744280 Page 7 of 13
3 Supporting information
3.1 AFCA Approach
AFCA’s approach to this complaint
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an event to
which the policy responds. This is known as a prima facie or valid claim. Once so established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies
if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence. When we assess complaints, we consider available
documents, the recollections of the parties, and all relevant circumstances. We give more
weight to documents created at the time the events occurred. If there is no relevant
documentation, we will decide what is most likely to have occurred based on the information
provided to us. If there are conflicting recollections and these are evenly weighted, we may
find that a claim cannot be established.
3.2 Extracts from relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties and in
the insurer‟s Notice of Response. Both the policy document and the Notice have been
exchanged with the complainant.
You are protected against all the events that are covered under our insured
events only policies, such as: accidental breakage (of glass), earthquake and
tsunami, explosion, fire or smoke, impact damage, lightning or thunderbolt,
malicious acts, riot or civil commotion, storm, rainwater, run-off, theft, burglary,
house breaking, water or other liquid damage.
You have also chosen to take up optional flood cover.
Plus, you are covered for any accidental loss or damage to your buildings
and/or contents, unless we state otherwise in your policy.
Section 2: Cover for your Home and Contents – Accidental Damage
What you are insured against and what you are NOT
You are insured against accidental loss or damage (including the Specified
Events listed below) to your home, contents or both at the site during the period of
insurance. Property that belongs to your family or for which you or your family are
legally responsible will be treated as though it is your property.
…
Determination | Case number: 744280 Page 8 of 13
Specified Events
“Specified Events” means loss or damage directly caused by
the following events a. to s.:
…
p.water and/or other liquids and/or substances discharged and/or overflowing
and/or leaking from any apparatus and/or appliance and/or pipes;
…
There are other limits and exclusions that apply. In particular, please read “ How
we will pay”, “When you are not covered” and “General conditions”.
When you are not covered
…
The following general exclusions apply to Parts A and B of this Policy.
…
2.This Policy does not cover:
…
b.loss or damage resulting from or caused by:
…
• erosion, subsidence, landslide or earth movement other than as a direct result of:
…
– escaping liquid, and occurring no more than 72 hours after the event
…
•inherent defects, structural defects, faulty workmanship or faulty design;
•wear, tear, rust, corrosion, depreciation or gradual deterioration;
…
•settling, shrinkage or expansion in buildings, foundations, walls or pavements;
…
•tree roots .
3.3 Extracts from material relied on by the parties
Date Action
Complainants’ plumber
May 2020
Inspected the u nderground stormwater drainage 19
May 2020.
Using CCTV camera found and loc ated a blocked
crushed section of pipework towards the back left -
hand corner of the property which is near the end of
the property line before it enters into the council
pipework.
This has caused the whole underground system on the
left - hand side to fail and collapse.
Determination | Case number: 744280 Page 9 of 13
This also caused fractures to the bends underground
which is causing water to discharge into the ground
along the side of the house.
Insurer’s plumber
16 June 20 20
P lumber inspected and phot ographed sewer and
stormwat er 16 June 2020.
Carried out a CCTV inspection of the stormwater
pipework. Accessed with push camera through holes
cut into the downpipes.
Found two separate crushed sections of pipework
located in the back left corner of the property.
Was unable to inspect out to the outlet of the
stormwat er due to the crushed sections.
Suspect they have been crushed for a long period of
time, due to being under a concrete slab 1m deep.
Found a blockage on the front left downpipe on a 90
degree bend. Was unable to camera any further due to
blockage.
Carried out a CCTV inspection of the sewer from
multiple points throughout the property. Found no
major defe cts in the pipework .
Insurer’s engineer’s report
(CR)
26 June 2020
Civil engineer inspected and photographed insured
property 11 June 2020 and arranged plumber to
inspect as well.
Leak det ection confirmed that there are 2 x locations of
crushed stormwater pipe to the rear left corner of the
residence, and a blockage to the front left corner.
2 x crushed sections of stormwater pipe occurred at
the time of construction and have had a significant
impact on the footing system of the residence,
occurr ing increment ally over several years since
construction.
Crus h most likely occurred at the time of construction
from earthworks machinery when preparing the fill prior
to installing the pathway slab.
Soil consists of fill material and plausible that long - term
ground movement in the extremely reactive soil may
cause damage to pipe particularly when a slab is
above which usually results in fracture to the pipe not
complete crushing failure. This crushing failure is more
consistent with damage occurring durin g construction
from excessive loading of small machinery.
Footing system of the residence has sustained a
significant settlement type deformation, trending to the
rear left corner of the residence, coinciding wit h the
location of 2 x crushed sections of st ormwater pipe.
Settlement has occurred from the following
contributing factors;
Escape of liquid from the crushed stormwater pipe has
encouraged tree root growt h towards a source of
Determination | Case number: 744280 Page 10 of 13
moisture i.e. towards the rear left corner of the
residence and into the trench containing the
stormwat er pipe along the left elevation. During
periods of dry weather, the tree roots have absorbed
moisture causing shrink age of the „Extremely‟ reactive
foundation soils (as per original soils report supplied by
Insured) and subse quent settlement in the footing
system.
Escape of liquid from the crushed stormwater pipe has
contribut ed to saturation of the foundation soils within
the vicinity of the rear left corner of the residence,
resulting in loss of bearing capacity (softening ) of the
foundation soils and subsequent settlement in the
footing system.
Escape of liquid has also followed the path of the
trench containing the stormwater pipe, towards the
front left corner, resulting in settlement in a similar
manner.
Resultant da mages have occurred as a direct result of
the fractured stormwater pipe i.e. from short term
reductions in bearing capacity, and from secondary
effects i.e. moisture absorption from the vegetation
adjacent to the left elevation.
Settlement within the drive way to the front of the
residence is highly unlikely to be a result of the
fractured stormwater pipe but is consistent with long
term drying settlements in the „Extremely‟ reactive
soils, combined with the absence of dowel bars
restraining the driveway sla b into the footing of the
residence.
Insurer’s engineer’s email
(CR)
2 0 August 2020
In response to the complainant‟s assertion that there is
no proof the damage occurred during construction the
engineer said he was confident damage to the
stormwat er pipes occurred at the time of construction
because of the severe degree of deformation in the
pipes, evident in the CCTV investigation which is
consistent with a (localised) point loads from heavy
machinery.
Also had there been long term ground movement, and
in cremental settlement in the concrete footpath, would
expect little to no deformation in the pipe/s, but
separation/ fracture in the elbow and t - joints of the pipe.
This opinion is based on review of many leak detection
reports containing damaged pipes. Have not seen pipe
deformation of this nature from long term ground
movement before.
A PVC pipe will not deform in this nature i.e. localised
crushing to a severe degree, from long term ground
movement, because of the relatively high compressive
Determination | Case number: 744280 Page 11 of 13
strength a PVC pipe contains which is able to resist
the self - weight of soil and relative lightweight of a
concrete pathway. The capacity of a PVC pipe to resist
compressive stress is particularly high considering its
embedment dept h in the subsoil, bedding layer and
su rrounding backfill. The weight of a concrete footpath
slab is considered to be negligible relative to the
compressive strength of a PVC pipe i.e. the weight of
the slab is distributed over and around the pipe with no
deformation induced into the pipe.
PVC pipes compressive strengt h i.e. ability to transfer
load from soil above and a concrete pathway, is
achieved by correct installation of suitable bedding
material and surrounding backfill material. See pipe
installation pdf attached to this email. Plausibl e that
incorrect bedding/backfill methodology has been
undertaken in installation which has directly
contribut ed to the pipe damage. If so, this poor
workmanship has occurred at the time of construction.
Council approval does not include a CCTV ins pection,
or any type of efficiency check of the stormwater pipes
which could have ot herwise identified a potential
defect at the time of construction.
As for the assertion that as the house was built in
2011/12 the rain over six years would‟ve caused
movement befo re it was seen in 2018 the engineer
says this is not necessarily the case as footing type is
a wafflepod slab which is inherently stiff and able to
withstand a large degree of settlement without
exhibiting signs of distress, in particular flexural
movement .
Highly likely slab has sustained settlement since the
time of construction resulting in settlement, particularly
in a linear manner (which was evident in the floor level
survey).
Only in the past 1 - 2 years that settlement has become
severe enough to in duce some flexural movement
which has induced movement cracking in the internal
wall linings around the Kitchen, which the
complainants have noticed. It is due to the stiffness of
the footing which has resisted settlement for a
prolonged period before beco ming noticeable.
Complainants’ report from
building consultant (RS)
3 March 2021
Reviewed engineer‟s report 26 June 2020 and
assessor‟s report, denial letter and notice of response.
Refers also to several documents which are not
provided.
Hous e completed February 2012. Concrete path on
the north of the house constructed in early 2014. No
heavy equipment used.
Pencil pines also planted in early 2014 and do not
Determination | Case number: 744280 Page 12 of 13
have invasive roots systems.
Notes there has been no damage claimed or detected
to the adjoining property on the north nor to similar
structures at the rear (east) of the property. No
investigation undertaken through the concrete path at
the side of the home to determine if tree roots have
been invasive.
If the crushing of the stormwater pipes allowe d releas e
of water into the sub soils to the north of the house this
would relate to the activities of the original builder and
is accidental and is not related to the homeowner in
constructing the concrete path.
Complainants had no knowledge of any defect in the
house and section 46 ICA applies.
Movement in the house identified around 2016 after
the policy commenced.
Refers to a constructed sanitary drainage plan
prepared in early 2021 and notes t here are two
c rushed or ovalised sections, the first is near the front
section of the home and the second at the extreme
eastern end.
Refers to photographs which show the footing and
waffle pod concrete floor construction and two piles of
excavated soil used in complet ing the works before
handover.
Refers to an in pipe video February 2021 which shows
no difference in the condition of the pipe to that
undertaken by insurer mid 2020. It visually confirms
that towards the rear, the pipe has been flattened to
about one thi rd of its original diameter but not,
squashed flat.
No evidence of tree roots in the pipe from front to back
and the fact that the pipe is holding water along some
of its length confirms that the pipe is not split or
cracked.
Refers to site investigation report and says material in
bore holes notorious for high rates of expansion when
they become wet and shrink age when they are
dehydrated. Subsidence of the concrete pat h along the
side of the home (up to 40mm) is immaterial in this
case. That concrete slab was placed approximately
two years or more after the home was constructed and
is not dowelled or connected to the building structure.
It is the movement that has been recorded inside the
home that is of concern and constitutes damage.
Engineering design extract shows design intended to
stand any dimensional changes in the soils due to
drying or wetting.
Says no evidence PVC stormwater pipe (which the
original plumber had increased wisely from 90mm
stormwat er pipe to 100mm sewerage pipe for strong
wall thi ckness) has been blocked or cracked and
allowed water to escape and no evidence trees along
Determination | Case number: 744280 Page 13 of 13
the north have invaded causing a lost moisture to the
area underneath the home – not the cause of the
damage.
If the stormwater pipe was crushed and water was
esca ping then the clay on which the home is
constructed would have heaved which is the reverse of
what has occurred.
More likely that if there is any softening of the soils in
the north east corner of the property that it is simply
minor subsidenc e of uncompac ted soil placed there by
the builder.
Conc urs with the engineer‟s opinion that the two
crushed sections of the pipe occurred during
construction but says there is no indication of internal
or external settlement at the time the policy
commenced (in April 2 015).
3.4 Other relevant material considered and relied on
Parties‟ submissions /emails and all attachments to all submissions/emails both before and
after the recommendation.
Parties‟ expert reports.
Photographs and level surveys.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.