Text of the determination
Determination
Case number 743490
Financial firm AAI Limited
Determination | Case number: 743490 Page 2 of 21
Case number: 743490 22 April 2021
1 Determination overview
1.1 Complaint
The complainants hold a landlord insured events insurance policy with the financial
firm (insurer) for their rental property. The property was damaged by water ingress
through the roof during the Townsville flood event in January 2019. The property was
vacant at the time but tenanted shortly after, following an initial clean up.
The complainants lodged a claim in August 2019 after their tenant complained about
cracks apppearing at the property. The claim was accepted, however the scope of
repairs relating to the event is in dispute. The parties also disagree on what is a fair
and reasonable settlement for the accepted repairs. The property was insured for
$330,000 at the time of the loss.
The complainants are seeking a cash settlement of at least $315,317 for the accepted
repairs and loss of rent, along with reimbursement of their engineering report costs.
The insurer has offered a cash settlement of $180,656.22 for the building repairs
(based on it‟s builder‟s quote of $157,092.37 , plus a 15% uplift).
1.2 Issues and key findings
Is the settlement offered by the insurer fair?
Yes. The available information establishes the settlement offer is fair save that the
insurer is also to pay interest on the amount offered.
How should the claim be settled?
The claim should be settled as outlined in section 2.2 below.
1.3 Determination
This determination is partly in favour of the complainants.
Should the complainants accept this determination then within seven days of
notification of acceptance the insurer is to make the following payments to the
complainants:
$180,656.22 for the building repairs
interest on $180,656.22 pursuant to section 57 of the Insurance Contracts Act
1984 (Cth) (the Act) from 7 August 2020 until 4 November 2020
$12,740 loss of rent
Determination | Case number: 743490 Page 3 of 21
interest on the loss of rent pursuant to section 57 of the Act on $12,740 from
4 November 2020 until the date of payment
$3,245 for the reports from the complainants‟ engineer LT
If the complainants have paid LT, then interest pursuant to section 57 of the Act on
LT‟s fees from the date o f payment until settlement
$1,000 compensation for non-financial loss.
Otherwise, the insurer is not required to take any further action in relation to the claim
or the complaint.
Determination | Case number: 743490 Page 4 of 21
2 Reasons for determination
2.1 Is the settlement offered by the insurer fair?
Policy provides cover for insured events subject to exclusions
The complainants must establish on the balance of probabilities that they have
suffered a loss caused by an event to which the policy responds. This is known as a
prima facie or valid claim.
The complainants‟ policy provides cover for d amage caused by flood and storm as an
insured event. It is not in dispute a significant weather event occurred at the insured
property in January/February 2019 (the event).
The dispute relates to the extent of damage caused by the event. The complainants
must establish all the claimed damage was caused by the event.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
The policy excludes cover for damage caused by earth movement, unless loss or
damage caused by a landslide or subsidence occurs within 72 hours of, and directly
because of, a storm and not because of erosion over time, structural fault, or design
fault.
The policy also excludes damage caused by wear, tear, and gradual deterioration.
Extracts from the policy terms are set out in supporting section 3.2 of this
determination.
Works in issue
It is not in dispute a significant weather event occurred in late January/February 2019
at the site.
Tenants broke the lease on 13 March 2019. A new tenancy started 5 April 2019, but
the tenants left the property on 5 February 2020 saying there was cracking damage
and mould caused by the event.
A claim was not made until 29 August 2019 when the tenants told the complainants
there was damage to the house.
The insurer‟s builder (AB) provided a report in September 2019.
The insurer‟s engineer (MC) inspected the property in September 2019.
The claim was initially declined but accepted on 30 March 2020.
Determination | Case number: 743490 Page 5 of 21
AB re-attended to prepare a scope of works and costings.
The complainant engaged an engineer (LC) because the parties could not agree on a
scope of works.
Extracts from the material relied on by the parties is set out in supporting section 3.3
this determination.
After review, on 4 November 2020 the insurer accepted some items but continued to
refuse to cover the following items:
timber ramp to laundry
bathroom tiles, fittings, and fixtures
two front verandas
western carport including slab
The insurer maintains these items were damaged by wear and tear prior to the event
and as they were not damaged in the event, liability for repairing these items is not
accepted.
The complainants say these items were damaged in the event and say AB has not
quoted to carry out the work for a realistic price.
To determine the insurer‟s liability under the policy, it is necessary to identify the
proximate cause of the loss or damage to these items. The proximate cause is not
necessarily the first (or last) or the sole cause of the loss. It is the effective or
dominant or operative cause.
The complainants engaged structural engineer LT to provide a causation report and
scope of works for the repairs.
The in surer‟s engineer MC has also provided reports relating to the external damage
at the property.
Insurer not required to pay for repairs to the ramp
The insurer notes none of the reports obtained mention any damage to the laundry
ramp or its cause. Its engineer identified damage to the concrete post supporting it.
The insurer agreed to pay for the cost to repair the concrete post but not to repair the
ramp.
The complainants question how to repair the concrete post without dismantling the
ramp.
While LT provides for replacement of the ramp in its scope of works, no information is
provided about the cause of damage to the ramp.
Determination | Case number: 743490 Page 6 of 21
Considering the absence of any information regarding any damage to the ramp or the
cause of damage to the laundry ramp, the panel is not satisfied the complainants
have established the insurer is required to replace the ramp due to the insured event.
While the damage to the masonry pier supporting the ramp has been accepted, this
does not establish the wooden ramp itself was damaged i n the event.
Bathroom tiles, fixtures and fittings not damaged in the event
Images provided show tiles have fallen off the side of the bath and a bowed wall in
the bathroom.
AB said tiles are starting to come off the side of the bath due to glue delamination
over time, which is not event related.
No comment was made on the cause of the bowed wall, but a photograph is
annotated noting “previous bowed wall as sealant is aged.”
The insurer says the glue delamination occurred over time due to gradual
deterioration which is excluded by the policy.
MC said the tiles remaining on the face side of the bath indicate they are in
compression, which can be caused by expansion due to increased moisture content
or by loads from the bath being transferred to the top edge of the tile. The insurer
maintains this could mean a variety of things and does not accept the tiles were
damaged by the event, which involved rainwater entry through the roof with no flood
inundation. The insurer says this would not have caused the delamination of the bath
tiles. MC did not comment further as it was not requested to inspect the interior of the
residence.
The complainants say the weight of the bath would bear on the piers under the
bathroom floor. He says because the piers have moved, they no longer support the
floor, resulting in movement of the bath. The insurer notes the appointed experts do
not refer to any movement of the piers beneath the bathroom or its impact on the tiles.
LT attributes mould in the bathroom to the event but does not say this requires full
replacement of the bathroom. When listing areas that require reconstruction due to
the event, LT does not include the bathroom. While LT provides for replacement of
the bathroom tiles, fittings, and fixtures as an event related item in its scope of
repairs, no further comment is made by LT on how the event damaged the bathroom
tiles, fixtures, or fittings.
The complainants say there was no damage to the bathroom prior to the event. The
panel notes there is no mention of any bathroom damage at the routine property
inspection in September 2018. The inspection report recorded the condition of the
bathroom as satisfactory with no issues and included a pho to of the bathroom in
which no tiles appear to be lifting.
Determination | Case number: 743490 Page 7 of 21
Having considered the available information and the annotated photographs taken by
AB, the panel prefers the evidence of AB. Unlike MC, AB was specifically engaged to
comment on damage to the interior of the house.
LT does not comment on the cause of the damage to the tiles, fixtures, or fittings.
The panel acknowledges the inspection report and accepts it is likely the tiles have
not fallen off the bath at the time of the inspection in September 2018. However, this
alone is insufficiently persuasive to establish the complainants‟ claim.
The panel is not satisfied the complainants have established on the balance of
probabilities the bathroom tiles, fixtures and fittings were damaged in the event.
The panel accepts the insurer has sufficiently established the wear and tear exclusion
applies to the damage to the bathroom tiles.
The insurer is not required to increase its offer to consider the bathroom tiles, fixtures,
and fittings.
Pre-existing damage to carport and verandas
LT provides for replacement of the masonry posts and perimeter wall under the house
including the veranda areas, along with replacement of the verandas.
The insurer has accepted replacement of concrete block posts and foundation
damage and replacement of the eastern carport including block wall and slab but
maintained it was not liable for the verandas and western carport.
MC inspected the property and noted significant movement of the veranda slabs and
supporting perimeter brick base. MC says movement to the brick base of the veranda
was evident in 2016 and most of the movement to the veranda occurred prior to the
event. MC provided a google image photo of the right-hand side veranda in 2016
which it says shows movement of the brick base at that time.
MC observed the veranda slabs to be supported by fill retained by a brick base and
said there did not appear to be any dowels or connections of the veranda slab to the
residence or the supporting perimeter brick base. MC said it is likely the brick base
has deflected due to the loads imposed by the retained slab fill.
Based on the condition of the exposed mortar, bricks, painted surfaces and grout, MC
said it is highly likely the movement has occurred over a significant period and i s not
likely solely a result of the storm event.
MC also noted the steel columns supporting the veranda awning have completely
corroded through at the base, occurring over an extended time frame well before the
event.
Determination | Case number: 743490 Page 8 of 21
MC‟s opinion is supported by the pr e-event routine inspection report which shows a
gap between the entry veranda and the house prior to the event. This report also
shows cracking in the tiles in the western carport. The post-event photos do not show
any notable change in this damage.
While LT says the cracking to carport foundations is event related, it does not appear
LT had access to the pre-event inspection report in forming its opinion. The
complainants acknowledge some cracking to the western carport slab prior to the
event but say any pre-existing movement was exacerbated by the event and has
reduced the lifespan of the structure.
The complainants argue that it is not possible to remove the perimeter wall without
removing the veranda slabs.
They also say the house was built on reactive clay soil which overtime caused
movement and any pre-existing movement has been made worse by the event and
reduced the life span of the claimed structures.
Having carefully reviewed the available information including reports, photographs
and images, the panel is not satisfied that the proximate cause of the damage to the
verandas and western carport was the event.
This is because the images provided show pre -existing damage in these areas before
the event and no notable change following the event. The complainants should
reasonably have been aware of this damage previously identified in the agent‟s
inspection report.
Having considered all the available material, images and photographs, the panel is
not satisfied the complainants have established on the balance of probabilities the
verandas and western carport damage were damaged in the event.
The insurer is not liable for this claimed damage.
Offer for foundation repairs is adequate
A substantial part of the complainant‟s claim is the cost to re -stump the house.
The complainants raise concerns with the extent of the foundation repairs assessed
by the insurer.
AB provides for removal and installation of 25 lineal metres of brick veneer skirting
walls, including propping of the dwelling, and reusing the existing footings for a cost of
$10,750. The complainants say this allowance is insufficient and that no allowance
has been made to replace masonry posts under the house.
LT said the event diminished the life expectancy of the masonry perimeter skirt walls
and several of the foundation posts is due to uneven ground movement. Based on the
visible cracks being “fresh” with no signs of mould or discolouring having occurred
Determination | Case number: 743490 Page 9 of 21
within the cracks, LT said the cracking was caused by the sandy foundation being
undermined by the event causing movement and cracking in the piers.
MC acknowledges AB‟s costings do not include all the items in LT‟s scope and says
the event is likely to have contributed to some foundation movement, but it is not
possible to quantify how much movement occurred before, during or after the event .
LT‟s scope provides for deconstruction and reconstruction of the concrete posts and
masonry infill under the house, including jacking of the house and replacing all
masonry posts with new posts with adequately designed foundations.
The panel considers LT‟s scope of repairs exceeds the damage identified, identifying
damage to only some of the foundation posts, but specifying full replacement.
MC say LT‟s scope is reasonable to rectify the movement to the foundations, but says
LT was unable to confirm the movement was event related or a long -term issue.
Due to the delay in lodging the claim the insurer says it was prejudiced by not being
able to assess the damages immediately following the event, and it says the
complainants contributed to the worsening condition of the property because of the
delay.
The panel is not satisfied be the insurer is required to pay anything further to the
complainants. This is because it considers it is more probable from the available
information that the damage was not caused in the event but was pre-existing and
caused over time.
LT refers to damage caused by uneven ground movement and refers to the reactive
clay soil and the high saturation in the event.
The insurer will cover damage cause by ground mo vement but only if it occurs within
72 hours of the flood or storm. The available evidence does not establish the ground
movement occurred within 72 hours of the event. Rather, the panel considers the
available evidence establishes if there was ground movement, and if it caused
damage, that the damage was caused over time. Further, the insurer‟s ability to
assess this aspect of the damage was prejudiced by the late notification of the claim.
Considering all these factors, the panel is satisfied the amount offered by the insurer
for this aspect of the claim is fair and in accordance with the policy terms.
2.2 How should the claim be settled?
Quotations based on different scopes of works
AB has provided an undated quote for the accepted building repairs totalling
$157,092.37, including a 26% builder‟s margin . The quote is detailed and itemised,
with costings listed for each item of work, and provision for reinstallation of
Determination | Case number: 743490 Page 10 of 21
undamaged items. The insurer‟s settlement offer is based on this quote with an uplift
of 15% (totalling $180,656.22).
The complainants say AB‟s costings for the work quoted are inadequate. No
comparison costings were obtained by the insurer.
The complainants have provided two quotes based on the LT scope of works.
On 16 October 2020, builder RG quoted of $131,748 for the internal repairs. The
quote gives a total costing per work area and includes replacement of bathroom tiles
and bathroom/laundry fittings and fixtures ($25,000, not itemised). The quote also
provides for installation of new light switches, power outlets, fans, and down lights,
and recommends replacement of kitchen appliances (cooktop, rangehood and oven)
which were not specified in the LT scope or otherwise identified as damaged by the
event, although it is not clear if the cost o f these items are included in the quote. The
quote does not include sanding the floorboards as specified by the LT scope.
On 26 October 2020, builder MJ quoted $264,653.14 for the external repairs. This
includes $29,848 for replacing the western carport, complete demolition, and
replacement of the eastern carport ($2,8567), two verandas ($14,222 and
$13,734.50), siteworks ($22,408) and water mitigation $4,450 not related to the event.
Both RG and MJ‟s quotes include a builder‟s margin of 20% and are based on the LT
scope of works, which is insufficiently itemised. Accordingly, the quotes provide a
subtotal for each area of work rather than individual costs for each item, making it
difficult to compare with the insurer‟s costings.
Insurer’s offer is fair pl us an allowance for interest
It is difficult to compare the quotes provided as they are based on different scopes of
work and included different descriptions and levels of detail of the work required.
Overall, the panel prefers the scope of works and cos tings prepared by AB, being
individually costed, and quantified for each work item and reusing undamaged items
where possible.
The complainants say they have lost faith in the insurer and prefer a cash settlement.
While the panel generally prefers the insurer to carry out repairs, the panel is satisfied
in the circumstances of this claim that a cash settlement is fair. This is because the
relationship between the parties appears to have broken down and because there is
pre-existing damage which is not covered by the policy.
When a claim is to be cash settled, the panel usually considers it is fair an uplift is
allowed to consider variations and contingencies which may occur once repairs
commence. Not only does AB‟s quote include a substantial builder‟s margin, but the
insurer has also allowed a 15% uplift.
Determination | Case number: 743490 Page 11 of 21
Taking all matters into account, the panel is satisfied the offer of settlement made by
the insurer is fair.
The claim was made on 29 August 2019. The final settlement offer was not made until
4 November 2020. The first settlement offer was made on 7 August 2020. It was
inadequate. At that time the insurer had available information to make a better offer.
The panel considers it is fair the insurer pay interest on $180,656.22 pursuant to
section 57 of the Insurance Contracts Act 1984 (Cth) from 7 August 2020 until 4
November 2020 at which time the offer should have been accepted by the
complainants.
Insurer to pay the complainants $12,740 for loss of rent
The policy provides cover for loss of rent where a claim is accepted for an insured
event and the insurer agrees the property cannot be lived in for the reasonable
amount of time it should take to repair or rebuild the property so it can be lived in.
The policy provides a maximum entitlement of 52 weeks cover for loss of rent.
The policy says the insurer will not cover loss of rent if the property was not occupied
by a paying tenant at the time of the loss, unless there is evidence it would have been
rented during the time taken to repair the property. Noting the property was leased out
a few months after the event, and considering the insurer‟s offer for loss of rent, the
panel is satisfied an entitlement for loss of rent has been established.
The complainants say it is fair for the insurer to pay the loss of rent for the period from
when the tenants moved out because the house became unliveable because of the
event to the date that the claim is settled plus 10 weeks construction period, plus time
for council approval.
The complainants then claim ed the maximum policy entitlement of one year‟s loss of
rent ($13,520, being 52 weeks at $260) from the time the tenant vacated on
5 February 2020. They say the property was untenantable from this time due to
damage from the event.
The complainants say th e insurer‟s delay in settling the claim has resulted in the
repairs not being completed in a timely way and the property has deteriorated.
The property was leased for about 12 months following the event, during which time
the condition of the property apparently deteriorated. The insurer says the delay in
reporting the damage contributed to the property becoming unlivable. The insurer
says if the claim was lodged when the event first occurred, the damage would have
been repaired before it became unlivable. On this basis, the insurer says its liability
for loss of rent is limited.
Determination | Case number: 743490 Page 12 of 21
The insurer has offered $9,470 for loss of rent covering from when the tenant vacated
(5 February 2020) until 16 October 2020 based on the date the initial cash settlement
was rejected plus the expected repair period of 10 weeks.
The insured event occurred in January/February 2019. The claim was not made 29
August 2019.
The tenants remained in the property for another year after the event. Although the
insurer arranged to assess the damage promptly it initially declined the claim for non-
disclosure. This decision was overturned, and the claim accepted on 30 March 2020.
The settlement offer on 7 August 2020 was inadequate.
In these circumstances, the panel accepts both parties were responsible for some
deterioration in the property until the claim was properly assessed and a fair offer
made.
Noting the original settlement offer of $54,322.60 made in August 2020 was
substantially below the current offer of $180,656.22, the panel consider it was not
unreasonable for the complainants to reject the initial offer.
The complainants could not reasonably start the repairs until after the offer was made
on 4 November 2020.
Considering the terms of the policy and the circumstances of this matter the panel is
satisfied it is fair the insurer pays from when the tenant vacated on 5 February 2020
until 4 November 2020 (273 days) plus a further amount of 10 weeks (70 days) to
allow for repairs.
This is a total of 343 days or 49 weeks; 49 weeks at $260 per week is $12,740.
The insurer is also to pay interest pursuant to section 57 of the Act on $12,740 from
4 November 2020 until payment.
Insurer to pay the complainants’ engineer’s fees
The complainants claim for the cost of reports from LT.
They have provided invoices of ($2,750 and $495) for the causation report, scope of
works and foundation detail prepared by LT.
AFCA Rules provide that we may decide that an insurer is to contribute to the
professional costs incurred by a complainant (capped at $5,000) during the complaint.
The issues involved in the complaint had some level of complexity. The insurer had
engaged an expert engineer. LT‟s information assisted in determination of this matter.
The insurer also revised its settlement offer fol lowing consideration of LT‟s material.
Taking all matters into account, the panel considers it fair the insurer reimburses the
complainants $3,245 for LT‟s fees.
Determination | Case number: 743490 Page 13 of 21
If the complainants have paid LT, then the insurer is also to pay interest pursuant to
section 57 of the Act on LT‟s fees from the date of payment until settlement.
$1,000 compensation for non-financial loss is fair
AFCA will award compensation (capped a t $5,000) if there has been an unusual
degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant‟s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience and
anxiety. AFCA expects complainants to be moderately robust and to bear the normal
degree of inconvenience experienced when a problem occurs and to take reasonable
steps to manage the situation.
The insurer offered the complainant $1,000 compensation in recognition of the delays
involved in the assessment process. The panel accepts there were delays as outlined
earlier in this determination. The panel considers the complainant also contributed to
the complexity of the assessment through the delay in lodging the claim.
The panel is satisfied $1,000 compensation for non-financial loss is fair in the
circumstances.
Determination | Case number: 743490 Page 14 of 21
3 Supporting information
3.1 Our Approach
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the AFCA Rules. The panel consists of an Ombudsman
and two representatives with consumer and insurance experience.
The panel has decided this complaint based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all the material provided by the parties. While
the parties have raised numerous issues in their submissions, for the purposes of this
determination the panel has restricted its commentary to those issues that it considers
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie or valid claim.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy terms
Exclusion (to the insured events of flood and storm)
loss or damage caused by erosion, vibration, subsidence, landslip, landslide,
mudslide, collapse, shrinkage or any other earth movement, but we will cover
damage caused by landslide or subsidence that occurs within 72 hours of, and
directly because of, flood and not because of erosion over time, structural fault or
design fault;
General exclusions
You are not covered under any section of this policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
Wear, tear and gradual deterioration
Determination | Case number: 743490 Page 15 of 21
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual deterioration such as, but not
limited to:
– tiles and their adhesive or grouting breaking down;
– weathering of roof tiles or roof ridge capping;
– gradual weathering and breakdown of bricks, mortar or concrete.
Loss of rent following an insured event
We cover
When you have property cover
If we accept your claim for loss or damage to your property due to an insured
event occurring during the period of insurance and we agree it cannot be lived in,
we will pay the weekly rental amount for the reasonable amount of time we decide
it should take to repair or rebuild the property, so it can be lived in again.
…..
The longest period we will provide cover for is 52 weeks and the most we will pay
under the feature is:
– 10% of the property sum insured for a property claim; or
– 10% of the contents sum insured for a contents claim
We do not cover
- loss of rent:
• If you do not intend to repair or replace the property, unit or contents;
• If the tenant still has an obligation to pay the rent;
• Once the insured address can be lived in again;
• If you have made a claim for the same event under „Loss of rent – tenant
default‟;
• If the insured address was not occupied by a paying tenant at the time the
loss or damage occurred. But we will provide cover if we decide it would have
Determination | Case number: 743490 Page 16 of 21
been rented, and you us evidence of this, during the time taken to repair,
replace or rebuild the property or unit;
• any amounts you are able to recover for loss of rent under another insurance
policy including any insurance policy taken out by a body corporate or similar
entity.
3.3 Extracts from material relied on by the parties
Date Action
Condition report
4 September 2018
Most of the photographs are of the inside of the house
which is described as clean and tidy with no issues
Photo shows cracking damage in a carport
Photo shows gap between veranda and house
From a partial photograph of the bath appears tiles are
not broken
Builder’s a sse ssment report
(AB)
6 September 2019
6 September 2019 inspected internal, external and
roof and photographed property with tenant
40 years old and maintained in average condition.
Water damage from rain during tropical low in region
23 January – 8 February 2019
Significant movement to the external of the building
as there are movement cracks throughout the
external property
Water h as entered through the roof cavity causing
damage to the ceiling throughout the property
Tiles to the bathroom are starting to pop off the walls
due to glue delamination as the glue has failed
Roof report and engineers report is required
Primary causation storm creat ed opening
Asbestos undisturbed
Maintenance required before repairs commence
Engineer’s report (MC)
22 September 2019
Inspected and photographed 12 September 2019 with
tenant. Was to investigate movement in subfloor
perimeter walls, stumps and veranda movement.
Saw and photographed the following damage
Significant movement of the veranda slabs and the
supporting perimete r brick base
Google Street View dat ed October 2016 appears to
show the brick base movement
Only the right - hand side veranda was able to be
viewed
One (1) crack was observed to the main residence
brick base at the right - hand side of the residence
Steel colu mns supporting the light awning roofs over
the verandas have corroded significantly and are no
longer capable of supporting loads
Masonry pier supporting the rear entry ramp has
Determination | Case number: 743490 Page 17 of 21
Date Action
significant cracking
Tiles have fallen off the side face of the bath
Water dam age seen to some ceilings, base of wall
panels (laundry) and to the base of the kitchen joinery
Random groove wall panelling has bowed in hallway
Causation
Did not appear to be any dowels or connections of the
veranda slab to either the external residence wall/bas e
nor the supporting perimeter brick base. Veranda slabs
appear to be support ed by fill retained by the brick
base. Brick base to the main residence is generally in
good condition and supports a timber framed floor.
Likely that the brick base to t he perimet er of the
veranda slabs has deflected due to the loads imposed
by the retained slab fill. Top of the brick base is not
restrained.
From observations of the condition of exposed mortar,
bricks, painted surfaces, and grout, it is highly likely
that movement has occurred over a significant period
and not likely to be solely a result of 2019 rain event.
Google Street View, while not high res olution, shows
movement had occurred by October 2016.
Crack observed to the main residence brick base at
the rig ht - hand side of the residence, may or may not
have occurred due to soil moisture changes either side
of the event. It is not possible to determine the exact
time frame for this crack occurring.
Corrosion to the bas e of columns has resulted from
poor maintenance over an extended time frame and
would have occurred well before event. Cracking to the
masonry pier supporting the rear entry ramp appears
to be relatively recent as there is little weathering of
the exposed surface wit hin the cracks. An exact time
frame for when this crack occurred cannot be
provided, however it is possible that it occurred as
recently as February 2019. The crack may have been
caused by soil movements.
Tiles remaining to the side face of the bath indicate
that they are in compr ession. This can be caused by
tile expansion due to increased moisture content or by
loads from the bath being trans ferred to the top edge
of the tile. This item was not in the request for
inspection and is provided for information only.
Water damage obser ved to some ceilings, base of wall
panels (laundry) and to the base of the kitchen joinery
was not in the request for inspection and is provided
for information only.
Random groove wall panelling that bowed to the
hallway was not in the request for inspect ion and is
provided for information only.
Determination | Case number: 743490 Page 18 of 21
Date Action
Movement to the veranda slabs and the supporting
brick base has occurred over a significant period and
is not isolated to the event. Very likely that movement
to the veranda slabs and the supporting brick base
was pre - existing prior to the event. Evidence of this is
visible in image 18 Google Street View October 2016.
Roof report (AB) Inspected and photographed roof
Condition of average - owner maintenance required
Water ingress via the roof via sheet laps
Scr ew sitting up and not down tight enough for the
washer to seal the screw correctly
No storm related damage to roof
Water entered through the screws into the ceiling
above the lounge room and throughout the house – no
noticeable damage to the ceiling but s taining on the
timber truss
Described as poor/defective workmanship
Signs of maintenance repairs including silicon on the
ridge capping
Reinspection (AB)
19 June 2020
Property 40 years old and maint ained in poor
condition. Assessed and photographed 12 June 2020
Water damage to the kitchen cabinetry as water has
entered through the roof and has leaked on the
kitchen floor causing damages to the kitchen
Water damage to c eiling throughout the property
due to water ingress through the roof
Wall tiles have come away from the wall linings in
the bathroom - this is due to fair wear and tear and
is not event related
Cracking to the concret e slabs around the property -
this is pr e - existing cracking and is not event related
Front and rear patio moving away from the dwelling -
this is pre - existing damages
On my first attendance a full inspection of the roof
was complet ed, and large amount of roof screws
were found loose (owner mainte nance required)
Damages are consistent with the claimed event but
many pre - existing conc erns
Provided scope of works - costed at $54,322.60.
Reinspection (AB)
1 6 October 2020
Reins pected wit h complainant 16 October 2020
Completed scope for the side carport and external
shed
Have not allowed for roof as these have not been
affected by the event and can stay in situ.
Scope of works and liability quote 157,092.37
Determination | Case number: 743490 Page 19 of 21
Date Action
Causation report (LT)
29 May 2020
Inspected and photographed site 17 April 2020 and
reviewed ins urer‟s reports
Describes soil as highly reactive clay
Hous e 50 years old and constructed on foundations of
masonry posts and masonry perimeter wall with
reinforced concrete posts with timber cladding on the
south. Describes construction of wall s, floors, roof,
carport and shed
Describes and photographed water damage inside the
house and mould, water marks on perimet er skirting
wall, cracking of masonry blocks and perimeter walls,
moisture surrounding concrete posts on perimeter wall,
soil wash o ut/erosion and ground saturation under the
house, cracking of conc rete block post under wooden
ramp and cracking/ground movement in eastern and
western carports and ground movement/crack in shed
Hous e has been properly maintained as it had a new
roof 10 y ears ago and the house has been restumped
Caus ation water entry Due to the significant and
prolonged rainfall ex perienced during the Event, water
has ingressed via the roof and eaves, causing
moisture and mould throughout the house
Caus ation foundation mov ement Appears building has
been re - stumped with its original masonry perimet er
wall and masonry posts are remaining from the original
construction on the north, east and west boundaries.
Whilst there is some evidence of existing damage, the
insured has att empt ed maintain and repair these
areas. The new posts, predominantly in the central
area under the house are present and are of concrete
block construction. These are in good condition under
the dwelling, and for the majority display no damage
related to g round movement
When inspected moisture was obs erved at the base of
the posts with concrete colour adjacent to moist
ground a darker colour, indicating moisture may have
ingressed into the concrete the soil was undulating
with saturation in low areas and scour beneath the
bathroom
Clay soils characteristically tend to shrink and swell
with dry and moist conditions respectively. Due to the
underlying natural geology, it is likely t hat the Event
has caused ground movement due to the prolonged
dry period prior to the event and due to the significant
and prolonged soil saturation conditions experienced
because of the Event placing the building at high risk
of ground movement and damage to the foundations
Despite there being evidence of reinforcement
corrosion in the existing perimeter wall, it is not
possible to distinguis h how much of this occurred
Determination | Case number: 743490 Page 20 of 21
Date Action
before the Event, during the Event and subsequently
after.
Event has diminished the lif e expectancy of the
masonry perimeter skirt walls and several of the
foundation posts is due to uneven ground movement
which is to be expected in an area with a reactive clay
subsoil type and high saturation in the event
Scope of works (LT)
28 May 2020
C racking to carports foundations wall and shed and
masonry posts, reinforcement corrosion and some of
the cracking of the masonry perimeter skirting wall
appears consistent with gradual damage
Event has attributed to the majority of the damage
observed and significantly diminished the life of the
masonry posts
Cracking of the newer concrete block post is event
related
Scope includes concrete affected block posts,
masonry posts, ground slabs and masonry block infill
are required to be reconstructed in the lin es of the
original layout with similar materials and prime cost
components unless otherwise agreed.
Mould and int ernal damage event related.
Email (LT)
15 September 2020
Reviewed MC report
Acknowledge evidence of reinforcement corrosion in
the existing p erimeter wall and confirm that having only
inspected this property on 17th April 2020, being over
15 mont hs after the event, it is not possible to
distinguish how muc h of this corrosion had occurred
before the event.
Based on the visible cracks being “fresh” with no signs
of mould of discolouring having occurred within the
cracks, this cracking was caused by the sandy
foundation being undermined by the event waters and
causing movement and cracking in the piers and not
as a direct result of any reinfor c ement corrosion. So,
we attributed 100% of the caus ation to the Event.
Cites sections of the insurers‟ reports saying they
support his position.
Engineer’s report (MC)
2 5 September 20 20
Compared scopes of works and noted AB scope does
not include items 6.8.1, 6.8.2 and 6.8.3 relating to sub -
floor block piers and perimeter wall under the house;
item 6.8.12 relating to the garden shed and only 1
carport.
Items 6.8.1, 6.8.2, 6.8.3, 6.8.12 and part of 6.8. 13
have been included in LC‟s scope of work but omitt ed
from AB scope. We consider this reas onable as it is
not possible to quantify how much movement occurred
Determination | Case number: 743490 Page 21 of 21
Date Action
before, during and after the event to these items
Extent of damage may have increased with time
Flood event likely to have contributed to some
found ation movement but not possible to quantify how
much movement occurred before, during and after the
event. Google Street view images from 2016 are not
high resolution but indicate movement to the brick
base to the veranda areas had occurred.
Majority of t he movement to the veranda brick base
walls had occurred prior to the event. Images from
2016 and 2019 show little differenc e.
Amended scope of work document by AB included
additional costs for items and the amended quote
appears more thorough and detailed than the original
and is consistent with the damage observed (although
internal inspection was only undertaken as an
additional walk through observation while at site).
A carport replac ement has been added to the scope of
works. We were not requested to inspect and report on
the carports or outbuildings, so can‟t comment on this
scope of work.
We weren‟t requested to inspect the interior of the
residence.
Further damage may occur if additional water ingress
was to occur due to leaking roof.
Asse ssment r eport
3 November 2020
Reviewed complainant‟s quotations and revised
quotation from AB.
Eaves added to the scope of works (wit h reservations)
Masonry posts under the house and masonry skirting
wall and timber skirting added to scope of works
Generous allowance for repairs is 10 weeks
Based on all the quotes received AB latest LQ -
$157,092.37 is correct as per several discussions
regarding the SOW
3.4 Other relevant material considered and relied on
Parties‟ submissions/emails and all attachments to all s ubmissions/emails
Parties‟ expert reports.
Photographs and Google Images
Invoices and quotes
Correspondence between the parties
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.