Home / Allianz Australia / Determination 742897
Determination 742897
Earthquake cracking damage claim declined
Summary
A body corporate claimed for earthquake cracking damage to units after the insurer declined under workmanship and design exclusions. AFCA found the earthquake was the proximate cause and ordered repairs or cash settlement with a 10% uplift, statutory interest and reimbursement of the engineer's report cost.
The earthquake was the dominant proximate cause and the insurer did not establish that any cited exclusion applied.
Issues
- Claim denial primary · upheld“The insurer has not established an exclusion applies to entitle it to decline the claim.”
Subjects and remedies
home or building damagenatural disasterpay claimpay compensationpay interest
Related
All Allianz Australia determinations · Find similar determinations
Text of the determination
Determination
Case number 742897
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 742897 Page 2 of 8
Case number: 742897 19 January 2021
1 Determination overview
1.1 Complaint
The complainant is a body corporate and holds a residential strata insurance policy
with the financial firm (insurer).
Following an earthquake on 24 June 2019 the complainant made a claim for cracking
damage to various units at the property. The insurer declined the claim as it says the
damage would not have occurred without faulty workmanship and design at the
property.
The complainant says the damage is directly attributable to the earthquake event and
seeks cover under the policy for the damage claimed.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
The complainant established a valid claim for unexpected physical damage to the
property following the earthquake.
The insurer has not established an exclusion applies to entitle it to decline the claim.
Even if the poor workmanship or design was a contributing factor, the proximate
cause of the damage (that is, the effective, dominant or operative cause) was, on
balance, the earthquake. The insurer is not entitled to decline the claim.
1.3 Determination
This determination is in favour of the complainant.
The insurer is required to complete the repairs.
The insurer may choose to cash settle by paying the complainant $52,425.45 plus an
uplift of 10%, to cover contingencies, within seven days of acceptance of this
determination by the complainant.
If the matter is cash settled, i nterest is to be paid on the total settlement, less the
policy excess, in accordance with section 57 of the Insurance Contracts Act 1984
(Cth), calculated from 12 June 2020 until payment is made.
The insurer is to refund the cost of the report from the complainant’s engineer .
Determination | Case number: 742897 Page 3 of 8
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Complainant has established a claim for unexpected damage
The complainant’s policy provides broad cover for sudden and unexpected physical
damage to the property, subject to the exclusions in the policy. When lodging a claim,
the complainant is required to establish the claimed damage arose from
circumstances covered by the policy.
The complainant lodged a claim for light cracking damage to various units which
emerged during an earthquake impacting the area on 24 June 2019. The earthquake
registered a magnitude of 7.2 at its source. It is not in dispute an earthquake occurred
at this time , and the insurer’s assessor acknowledged resulting tremors were felt in
the Darwin region and widely reported in the media. It is also not in dispute that the
units suffered sudden and unexpected damage at the time of the event. On this basis,
I am satisfied the complainant has established a claim for cover under the policy.
The onus then shifts to the insurer to show, on the balance of probabilities, it is
entitled to rely on a policy exclusion or is otherwise entitled to decline the claim.
Insurer says earthquake unlikely to have caused damage
The insurer does not accept the cause of the cracking damage was the earthquake.
The insurer notes the property was 700km from the epicentre of the earthquake and
while tremors would be felt up to 1583km from the epicentre, the intensity rating in
this area was light and not expected to cause damage based on the Modified Mercali
Intensity Scale.
The complainant notes the Modified Mercali Intensity Scale (unlike the Richter
Magnitude Scale) does not have any mathematical basis but is a ranking based on
observed effects of the event (how people experience the event and impacts on
structures), accounting for the varied recordings across the Darwin area. This is
consistent with the ‘did you feel it’ map provided by the complainant for the event,
which shows varying impacts from light to medium intensity across the Darwin area,
including in closely located areas. The disclaimers accompanying the map note that it
is based on user input, and more or less damage may occur within the same intensity
area depending on the type of structure and ground motion at that site.
Insurer relies on exclusions to decline the claim
The insurer says it is entitled to decline the claim as the policy does not cover loss or
damage caused directly or indirectly by:
normal settling, seepage, shrinkage or expansion in buildings or foundations, walls
and other structural improvements
Determination | Case number: 742897 Page 4 of 8
creeping, heaving or vibration
error or omission in design, plan or specification or failure of design
faulty materials or faulty workmanship.
Available evidence does not establish application of an exclusion
The insurer appointed engineer ‘TC’ to provide a n opinion on causation. TC made
observations of various damage throughout the property without reference to
particular unit numbers.
TC refers to cracking in a master bedroom and says it is caused by differential
movement causing stress in the junction of the wall and says it should have been
appropriately articulated to prevent stress at this location. TC does not say what
caused the differential movement, how the junction was not appropriately articulated
or what building standard was not complied with in this regard. The insurer later
referred to clause 3.3.1.8 of volume two of the Building Code of Australia, which says
when vertical articulation joints should be provided and the required specifications.
The insurer says no art iculation joint was provided but this is not clear from TC’s
report, only that it was not articulated appropriately. No detail has been provided
regarding what requirements were not complied with or when or how damage would
be expected to present without the intervening earthquake event.
TC did not attribute the separation of control joints to any defect. Rather, TC said the
control joints are functioning as intended and the separation of sealant at the joints is
normal building maintenance. TC also said there was evidence of remediation to the
sealant, indicating similar issues had previously occurred. This does not however
account for the separation reoccurring during the earthquake event as indicated by
the available evidence.
TC said the remaining wall c racking and joinery/cornice separation is ‘normal damage
from expected building movement for residential structures’. While discounting the
impact of the earthquake, TC does not provide any other basis for the building
movement or the degree or period over which this occurred. TC says ‘consistent
damage to cabinetry is likely due to poor workmanship of the installation and/or poor-
quality cabinets’. TC does not say how the damage is consistent across the units or
whether TC attributes the damage to installation or product defect. The lack of specify
in this finding is unpersuasive.
TC says the external render has been finished across a construction joint, with no
allowance for different thermal expansion/contraction betwee n the concrete
foundation and masonry wall. TC says this is poor workmanship and refers to
provision 12.4.16 of Australian standard AS3700 Masonry structures, which says any
render finish shall not be allowed to bridge a damp-proof course. The attached photos
do not appear to show render continuing onto the concrete foundation however.
Determination | Case number: 742897 Page 5 of 8
TC concluded it did not attribute any of the damage to a single seismic event due to
the positioning/type of defects and relatively low intensity of the 24 June 2019 event.
TC later said that while the property has underlying workmanship issues that have
failed to allow for normal seasonal building movement, the cracking present could be
triggered by the earthquake as claimed. TC said stresses building up over time prior
to the earthquake due to normal building movement was the dominant cause of
damage, and if the property had the appropriate allowance for movement such as wall
control/articulation joints then there would not be built up stress in the building and an
earthquake of the location and magnitude experienced in June . This is contrary to
TC’s earlier opinion that control joints were operating as intended at the property.
For the reasons outlined, I am not satisfied on consideration of the available evidence
the exclusions relied on by the insurer have been sufficiently established.
Damage consistent with earthquake event
The complainant appointed engineer ‘ NT ’ to comment on the cause of damage. NT
inspected the property on 9 November 2020 and said the cracking/delamination
observed in the walls and ceiling appears to be relatively recent and is consistent with
earthquake damage. NT said it was highly likely and most probable the damage was
caused by the earthquake event on 24 June 2019. NT noted there is no applicable
requirement to design a residential building of this type to withstand earthquake
forces but did not otherwise comment on the standard of workmanship at the
property.
No evidence of prior damage
The complainant has provided minutes from the its annual general meeting on 19
November 2018, seven months prior to the loss. The meeting was attended by the
owners of units 2, 8 and 9. There was no mention of any existing damage to the units
at that time.
A statutory declaration provided by the owner-occupier of unit 9 states he was home
when the earthquake occurred and witnessed and heard the linen and iron cupboard
getting dislodged from the wall during the event. He also said the earthquake caused
large cracks in the walls through the unit.
The owner of unit 4 has also provided a statutory declaration accompanied by pre and
post event inspection reports for the unit. The pre-event inspection report dated
27 November 2018 does not identify any damage and says no maintenance is
required. The post-event inspection report dated 31 July 2019 identifies a crack in the
corner of the lounge room going up to and along the cornice, confirmed by photos.
This crack was not evident in the photos in the pre-event inspection report.
I consider the evidence is clear the ear thquake did at the very least ‘trigger’ the
observed damage at the property, and the question is then whether that damage
would have occurred even without the earthquake.
Determination | Case number: 742897 Page 6 of 8
Proximate cause of damage needs to be identified
While the insurer relies on the exclusions of faulty workmanship/design and ordinary
ground movement to decline the claim, TC acknowledges the earthquake could have
triggered the damage. Despite this, the insurer maintains the earthquake was not of
sufficient intensity to have caused damage at the property, and the damage would not
have occurred without underlying defects being present. On this basis, the insurer
says the earthquake was not the proximate cause of loss.
For the insurer to rely on a policy exclusion to decline the claim, it first needs to
establish the exclusion applies to the circumstances of the claim and must also show
the excluded factor was the proximate cause of the damage.
While I am not satisfied the insurer has sufficiently established the application of the
cited exclusions on the evidence provided, I will consider the issue of proximate
cause for completeness.
Determining the proximate cause of a loss is a question of fact, depending on the
circumstances in the particular case. It is well established law that a proximate cause
is not necessarily the first or the last or the sole cause of the loss. It is the effective or
dominant or operative cause of the loss.
If there are several causes of a loss operating contemporaneously, each must be
examined for the qualities of reality, predominance and efficiency as the active,
efficient cause that sets a relevant chain of events in action. If one cause would have
caused the harm in any case, and the other would not have done so in the absence of
the first, the first is the proximate cause.
If it is not possible to identify which of two or more causes is the proximate cause,
then they will be regarded as concurrent proximate causes. Concurrent causes can
occur where there are two or more events, each of which is independently capable of
causing the loss, or where there are two events each of which, without the other,
could not have caused the loss. In either case they are only concurrent if of equal
efficiency; and if they are equal, and one of those causes was an insured event, and
the other an excluded event, then the excluded event would prevail.
The insurer submits the Wayne Tank principle applies to the circumstances of this
claim. In the Wayne Tank case from which that principle derives, the causes of loss
were interdependent. In other words, one would not have caused the loss without the
other. In that situation, where one of the causes is a policy exclusion, then the
exclusion prevails to entitle the insurer to decline the claim.
Considering the available evidence, and particularly the lack of any damage prior to
the event, its contemporaneous appearance during the eve nt, and the lack of expert
opinion on when or whether the claimed defects would have caused damage, I am
not satisfied any defects were a factor equal to the impact of the earthquake.
Determination | Case number: 742897 Page 7 of 8
Accordingly, I am satisfied, on balance and considering the available evidence, the
proximate cause of the claimed damage was the earthquake.
Insurer required to complete/pay for the repairs
The complainant has provided detailed and itemised quote dated 2 July 2020 for
$52,425.45 for the cost of the repairs. This quote was valid for 45 days. The insurer
has not provided any comment on the scope or cost of the repairs quoted and
accordingly I have no reason to consider the claimed costs unreasonable.
The insurer may elect to complete the quoted repairs or pay the complainant
$52,425.45 plus a 10 % uplift of $5,242.55, to cover contingencies. A total of $57,668.
The insurer is also to pay statutory interest in accordance with the Insurance
Contracts Act 1986 , calculated from 12 June 2020 when it declined the claim, to the
date of settlement.
Insurer to refund the cost of complaint’s engineer
The complainant has provided an engineer’s report by NT. The report assisted in
determination of this matter. The complainant is to provide a copy of the invoice for
the engineer’s report and the insurer is to pay that amount within 7 days of receipt.
Determination | Case number: 742897 Page 8 of 8
3 Supporting information
3.1 AFCA’s approach to this complaint
The complainant has appointed a representative in respect of this complaint. For ease
of reference, both the complainant and its representative are referred to as the
complainant in this determination.
A full exchange of information has taken place between the parties. Each party has
had the opportunity of addressing any issues raised.
This determination follows consideration of all the information provided and is based
on what is fair in all the circumstances, having regard to relevant law, the terms of the
policy, good industry practice (including codes of practice) and prior determinations as
relevant. Commentary in this determination is limited to issues considered relevant to
the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.