Adequacy of cash settlement and scope of hail damage to roof and skylights

FirmSuncorp Group
Decided2021-06-22
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$500
Amount claimed$37,590
SourceAFCA PDF

Summary

The complainant's home insurer accepted a hail claim but offered a cash settlement of about $2,935 for two skylights and internal damage, while she sought full roof replacement at $37,590.30. AFCA found the offer unreasonable because the initial inspection was incomplete, rejected the claim for full roof replacement on the current evidence, and ordered a new independent assessment, a claim decision within 21 days and $500 non-financial loss.

Where the insurer's initial expert report was incomplete, a fair settlement requires a fresh independent assessment of the claimed damage, but the complainant has not yet shown that full roof replacement is required.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial lossreassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 742644 Financial firm AAI Limited Determination | Case number: 742644 Page 2 of 6 Case number: 742644 11 May 2021 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (insurer). She made a claim for damage following a hailstorm. The insurer assessed and accepted the claim and has offered a cash settlement for two skylights and some internal damage. However, the complainant says the settlement offer is still inadequate as it does not take account of all the storm-related damage. In particular, she believes a full roof replacement is required. She is also unhappy with the way the insurer has handled the claim. 1.2 Issues and key findings Is the insurer’s cash settlement offer reasonable? The insurer’s cash settlement offer is not reasonable in the circumstances. That is because it is not yet clear that all storm-related damage has been identified and thoroughly assessed. As there are inconsistencies in the currently available evidence, it is appropriate that the insurer arrange for a new independent assessment of the property (including the claimed roof and internal damage) in order to address the issues raised by the complainant and her expert, and to properly identify all claim-related damage, so that a fair settlement can be made. The settlement should also include an award of compensation for non-financial loss, because of the way the claim has been handled to date. Why is the outcome fair? The insur er’s initial expert report was found to be incomplete and inaccurate. However, the insurer has not yet had the opportunity to properly respond to the new issues raised by the complainant’s expert (in terms of the nature and extent of the claimed damage, an d the recommended resolution). So it is fair that a further inspection and assessment be conducted. In the meantime, it is also fair that the insurer compensates the complainant for the avoidable upset and inconvenience suffered because of the error in it s expert’s initial report, and the delays that has caused. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is required to pay the complainant $500 as compensation for non-financial loss. It is also required to promptly arrange for an inspection and assessment of the property and damage by an independent expert (in the company of the insurer’s assessor). It is required to immediately provide a copy of the expert’s report to the complainant, and to make a claim decision within 21 days of the report being issued. Determination | Case number: 742644 Page 2 of 6 2 Reasons for determination 2.1 Is the insurer’s cash settlement offer reasonable ? Complainant has established a valid claim It is for the complainant to establish, on balance, she has suffered a loss that is covered under the policy. This is known as establishing a valid claim. The policy covers specified insured events, one of which is loss or damage resulting from a storm. I am satisfied, on the available evidence, the complainant has established her home was damaged by hail in a storm. She has established a valid claim. Insurer’s initial assessment was incomplete After the complainant lodged her claim for storm damage to the house and garage, the insurer appointed its builder (AB) to inspect and assess the damage. AB stated the roof was in average/poor condition overall, and identified only one skylight as having been damaged by hail, with no other hail impact damage on the roof or the garage. As well, AB found internal water staining (from the broken skylight). AB also identified some areas of corrosion in the roofing. AB quoted $2,492.05 as a cash settlement for the storm-related repairs. The complainant then arranged for roofer AR to inspect and assess the damage. AR identified hail damage to two skylights (later quoting $3,905 to repair them), as well as impact damage to the roof sheeting and some mild foot traffic damage. On the carport roof, AR reported minor impact marks and some major rust in one small section. In response, the insurer acknowledged its initial assessment had not addressed all the hail- related damage. It accepted the second skylight should also be covered, and so AB increased its estim ate for hail repairs to $2,934.80. Currently available evidence does not show full roof replacement is needed The complainant did not accept that. Although it did not reinspect, but relied on its earlier photographs, AR issued a second report which indicated approximately 50% of the roof had hail damage, stating that had compromised the structural integrity of the roof. Referring to the relevant State building industry regulator (QBCC), AR said that because there was damage to more than 20% of the roof structure, then a full roof replacement was required. AR’s quote for that was $37,590.30. AR also identified roof sheets which were not laid correctly and had not been screwed to current standards; and areas of rust. It is worth noting that if there are building compliance concerns or maintenance needed to the roofing, then those issues may fall outside the scope of cover under the hail claim. AR’s report does not provide persuasive evidence of the difference (if any) between the damage it said was from hail and the damage it says was from foot traffic; nor the proportion attributed to each. Nor does it clearly explain why AR failed to identify the newly identified roof damage in the course of its original physical inspection. Determination | Case number: 742644 Page 3 of 6 So, while AR did correctly identify the second damaged skylight, I am not satisfied that its report is in itself compelling or conclusive as to the nature and full extent of the damage that can be attributed to the hail event. In particular, I am not persuaded the currently available evidence shows the insurer should be liable for a full roof replacement. I acknowledge AR’s reference to other homes in the locality which had suffered less roof damage than the complainant’s, and which had roof replacements as a result. However, that does not mean the same outcome should automatically appl y in the complainant’s case, without appropriate supporting evidence. Reasonable for another assessment to be conducted The currently available evidence from both AR and AB raises questions about the adequacy and reliability of their inspections and conclusions. In the circumstances, I consider it reasonable that a further inspection and assessment be carried out by a new independent expert. I can appreciate the complainant’s reluctance to have that occur, given the extra time and inconvenience it might involve; and given her loss of confidence in the insurer’s original investigations. At the same time, however, I am satisfied that is the appropriate and fair way of establishing the extent of the insurer’s liability for the damage being claimed. In consultation with the complainant, the insurer is required to promptly arrange a full inspection and assessment of the claimed (roof and internal) damage by a new expert, to be conducted together with the insurer’s assessor; and to obtain a report, which should also specifically address AR’s findings and conclusions. The insurer is then required to immediately provide the complainant with a copy of the report of that expert, and to m ake a claims decision within 21 days of the date of the report. To be clear, the new expert is also required to investigate and report on the internal damage being claimed (water staining in the bathroom and passage area, from apparent water ingress from the damaged skylights). Insurer is required to pay $500 as compensation As the insurer has acknowledged, AB’s report and scope of works did not correctly identify all the hail-related dam age. I can appreciate how that has caused the complainant upset and inconvenience, and how it will have shaken her confidence in the insurer. As a result, there have been avoidable delays in finalising the claim. In the circumstances, I consider it fair and appropriate that the insurer pays $500 compensation for non-financial loss. 2.2 Why is the outcome fair? The insurer accepts AB ’s initial inspection and report was incomplete and resulted in an incorrect conclusion about the extent of the claim-related damage. I am not satisfied, however, that the currently available evidence is sufficient to establish the extent of that unidentified hail damage amounts to 50% of the roofing, or that it otherwise shows a full replacement is required. Determination | Case number: 742644 Page 4 of 6 So it is fair in the circumstances that the insurer should have the opportunity to reassess the damage, and particularly the roof (using a different expert) and provide its new expert’s conclusions about the nature and extent of the hail damage, and the required repairs; as well as addressing the issues raised by AR about other damage (such as from foot traffic). Determination | Case number: 742644 Page 5 of 6 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.