Dispute over sum insured settlement after fire, including temporary accommodation, contents and non-financial loss claims
Text of the determination
Determination
Case number 742314
Financial firm Defence Service Homes Insurance Scheme
Determination | Case number: 742314 Page 2 of 10
Case number: 742314 14 April 2021
1 Determination overview
1.1 Complaint
The complainant held a home building insurance policy covering his property with a
sum insured of $559,000. He lodged a claim with the financial firm (insurer) for fire
damage to his property. The insurer assessed the damage at the property and
accepted the claim.
The complainant opted for a cash settlement due to the breakdown in relationship
with the insurer and its subcontractors. The insurer declared the property as a total
loss and paid $579,800 to the complainant. The complainant is seeking the following:
$111,800 for temporary accommodation
$20,000 for transfer of risk and $9,049 for the removal of contents
$50,000 for contents damage due to the insurer’s negligence
$5,000 for managing the claim and $10,000 for non-financial loss
1.2 Issues and key findings
Is the insurer required to pay for temporary accommodation?
The panel is satisfied the insurer has correctly settled the claim for temporary
accommodation. The insurer is not required to pay anything further.
Is the insurer required to pay for the transfer of risk?
As the insurer has paid the sum insured, the panel is satisfied the insurer has fulfilled
its obligation and is not required to pay for the transfer of risk.
Is the insurer required to pay for the removal of contents?
The policy covers the building and not the contents. Accordingly, the panel is satisfied
the insurer is not required to pay for the removal of contents.
Is the insurer required to pay for the contents damage?
The panel is satisfied the insurer’s actions did not result i n the contents damage.
Accordingly, the insurer is not required to pay for the contents damage.
Is the complainant entitled to compensation for non-financial loss?
The panel accepts the claim would have caused stress and inconvenience to the
complainant and his family. However, the panel is satisfied the insurer handled the
claim reasonably. Accordingly, the insurer is not required to pay any compensation.
Determination | Case number: 742314 Page 3 of 10
1.3 Determination
This determination is in favour of the insurer.
The insurer has met its obligations under the terms of the policy and is not required to
take any further action.
Determination | Case number: 742314 Page 4 of 10
2 Reasons for determination
2.1 Is the insurer required to pay for temporary accommodation?
Insurer not required to increase payment for temporary accommodation.
Policy provides cover for temporary accommodation
The policy includes a range of additional expenses which includes temporary
accommodation. Costs incurred towards temporary accommodation are payable if the
property becomes uninhabitable. There is no dispute the property became
uninhabitable after the fire.
The policy states the sum insured is made up of the amount the insurer estimates to
rebuild the property plus the additional expenses.
The policy covers temporary accommodation costs which is a lesser of:
for the reasonable time it takes to rebuild or repair the home
up to 12 months from the date of the insured event.
The policy also states the additional expenses are part of the sum insured and are
covered up to a maximum of 20% of the sum insured.
The complainant states the policy wording is ambiguous in terms of the additional
expenses it covers. He says it gives an impression that the additional expenses are in
addition of the sum insured. Accordingly, the complainant is seeking a further
$111,800 for the temporary accommodation which is 20% of the sum insured.
Insurer has paid the sum insured
The complainant lodged a claim on 14 March 2019 after his property was damaged
by fire. The entire top floor including the garage, kitchen, dining room and two
bedrooms were damaged by the fire.
The insurer appointed AA to assess and manage the claim. AA deemed the house as
uninhabitable and reported the repairs will take longer than six months. Accordingly,
the insurer approved six months of temporary accommodation and paid the
complainant $20,800. Subsequently, the complainant and his family moved to the
temporary accommodation.
The insurer appointed a contractor (HI) to undertake a make safe. HI undertook
emergency make safe works which included part demolition and clean-up of the
double garage, installation of a tarp over the main roof, electrical make safe, water
extraction, structural drying and mould remediation.
The insurer appointed a building consultant (MS). MS inspected the property on 27
March 2019 to determine the scope o f works. Following the receipt of MS’s report, AA
Determination | Case number: 742314 Page 5 of 10
appointed two builders (AB and HI) to attend the property and prepare a quotation for
the repairs. AA acknowledged there will be several variations which will be revealed in
the future due to the nature of the repairs.
Both AB and HI provided a repair quotation of $327,062.92 and $398,880.69
respectively. The insurer approved AB’s quotation and authorised it to undertake the
repairs. On 30 April 2019, the complainant requested the insurer to appoint a
hygienist before the start of any repairs, as he said there was lots of mould in the
property.
On 8 July 2019, the complainant said the relationship between him and AA had been
tarnished. He said he could not engage the insurer’s builder as he did not trust it and
requested for a cash settlement. The complainant submitted his builder’s quotation
($427,467.09) and a remediation quotation ($23,078).
Considering all the costs and possible variations, the insurer declared the property as
a total loss and offered to pay the policy sum insured less $20,800 for the temporary
accommodation it had already paid. The complainant disputed the insurer’s decision
of deducting the temporary accommodation costs as he believed the insurer delayed
the claim and asked it to pay the full sum insured.
Based on the circumstances, the insurer paid the policy sum insured of $559,000.
Sum-insured is the maximum the insurer is required to pay
After reviewing the policy wording, the panel is firstly satisfied the policy is clear and
unambiguous. The policy clearly states the additional expenses are part of the sum
insured and the maximum the insurer is required to pay on a claim is the sum insured.
Insurer not required to increase payment for temporary accommodation
The complainant says he had to repeatedly ask the insurer to appoint a hygienist and
question the insurer’s scope of works as he says there were countless examples of
underquoting by AB, which resulted in delays.
On 30 April 2019, the complainant had asked the insurer to appoint a hygienist. The
insurer approved the complainant’s request on 7 May 2019 and authorised a
hygienist. The hygienist attended the property on 16 May 2019.
The hygienist mainly recommended discarding the existing building fixtures such as
tiles, walls, ceilings, carpet cabinetry, chipboards floor, etc. and it recommended
replacing those building items. In relation to the mould remediation, the
recommendations included containing the affected areas and bagging the waste
material.
The insurer says the complainant caused delays as he would not agree with the
scope of works. On 2 July 2019, AA recommended an urgent strip out of linings due
to contamination issues. However, the complainant wanted a full and correct scope of
Determination | Case number: 742314 Page 6 of 10
works before any work could start. The insurer says the scope of works was amended
multiple times to satisfy the complainant.
Given the complainant was in temporary accommodation and the insurer had agreed
to carry out the building repairs, the panel finds the complainant’s requests were not
reasonable. By not allowing the insurer to strip out the linings and determine the
extent of mould in the property, these actions resulted in claim delays.
Had the complainant allowed the insurer to undertake the mould remediation, on
balance, the panel is satisfied the insurer would have remediated the mould properly
as it had appointed qualified restorers.
As the insurer has paid the complainant the sum insured and a further $20,800 for the
temporary accommodation, the panel is satisfied the insurer is not required to pay
anything further in terms of temporary accommodation.
2.2 Is the insurer required to pay for the transfer of risk?
Insurer is not required to pay for the transfer of risk
The complainant says as he has opted for a cash settlement due to the breakdown in
the relationship with the insurer and its subcontractors, the insurer has removed itself
from providing a lifetime warrantee on the repairs which he would have received if the
insurer’s builder undertook the repairs.
Whilst the panel notes the complainant ’s argument regarding the possibility further
costs and the necessity of a contingency allowance, the panel does not consider the
insurer is liable for such contingency.
The policy clearly states the maximum the insurer is required to pay on a claim is the
sum insured. As the insurer has paid the complainant more than the sum insured,
accordingly, the panel is satisfied the insurer is not required to pay for the transfer of
risk.
Further, in settling the claim for the sum insured the insurer has paid the complainant
approximately $130,000 more than the complainants quote for the repairs. In doing so
it has acknowledged the possibility of variations. It has acted fairly in the
circumstances.
2.3 Is the insurer required to pay for the removal of contents?
Insurer is not required to pay for the removal of contents
There is no dispute AA handled both building and contents claim together on behalf of
the insurer and the contents insurer. T he subject policy covers the complainant’s
building component only.
Determination | Case number: 742314 Page 7 of 10
The complainant says the insurer’s restorer did not remove all the contents from his
property after the fire. He says there were damaged carpets, drapes, blinds, freezers,
amongst other items, left at the property which his builder had to re move resulting in
an additional cost of $9,049.92.
The complainant says the fire had damaged the first level of the property and the
ground level had suffered minimal damage. The complainant says he had
approximately $50,000 worth of contents in the ground level which were not damaged
by fire. The complainant says the insurer did not remove the salvageable contents
from the property after the fire.
The insurer says its restorer was authorised to list and dispose all the contents. Even
if the panel accepts the insurer’s subcontractor did not remove all the contents, the
panel is satisfied the insurer is not required to pay for the removal of contents.
The policy is clear, it does not cover contents or the removal of contents. E ven if the
contents removal was covered under the subject policy, it will be considered as
removal of debris which is an additional expense under the policy.
As previously established in this determination, the additional expenses are included
in the sum insured and considering the insurer has paid the full sum insured, the
insurer has fulfilled its obligation. Accordingly, the panel is satisfied the insurer is not
required to pay for the removal of contents.
The exchanged information shows the complainant has lodged a claim with the
contents insurer following the fire. There is no dispute the contents insurer has
appointed a loss adjuster to handle the contents aspect of the claim.
The panel considers it was up to the complainant and his contents insurer to attend to
the contents and mitigate any further loss.
2.4 Is the insurer required to pay for the contents damage?
Complainant says the make safe repairs were not adequate
The complainant believes the insurer’s actions caused additional loss.
The complainant says he undertook the first make safe following the fire which
involved him putting a tarp on the roof to prevent the rain entering the property.
HI undertook the second make safe and installed a tarp which was a significant
improvement to the first make safe. However, he says there was still a steady flow of
water which entered the whole house through the tarp.
AA engaged a contractor to install another tarp to minimise the stormwater, however,
the contractor was unable to provide complete waterproofing due to the nature of the
building damage. The hygienist reported the tarps were not appropriately installed as
they were held by sandbags which resulted in the wind blowing the tarps.
Determination | Case number: 742314 Page 8 of 10
The complainant says there was over 400mm of rain which fell after the fire event. A
lot of which entered the property causing further damage to the property and
contents. The complainant says had the make safe been done properly and if the
contents were removed, the salvageable contents would not have been damaged.
The complainant has referred to the AB’s remediation manual which states using the
fans and blowers to dry out the property is quite common after a fire however, it often
makes the situation worse. The complainant says the restorer installing the industrial
fans and blowers resulted in the mould spreading in almost every corner of the
property.
Insurer is not liable for the contents damage
HI reports a mould control was used to remediate the mould from the wall and ceiling
linings. HI states an air scrubber was used to clean the air and remove airborne
mould spore. This was done to keep the structural components of the property in a
restorable condition.
HI also installed dehumidifiers and air movers (fans) to remove the moisture, reduce
the humidity and dry the ground floor. HI says the excerpt f rom AB’s manual is
general in nature and is not specific to the claim.
Based on the available information, the panel is satisfied HI took the necessary
actions to remediate the mould and mitigate the damage. As it was apparent from the
outset the property would need to be stripped, the panel is satisfied HI’s actions were
adequate in the circumstances.
The panel is also satisfied the insurer carried out the make safe in a timely manner.
While the panel accepts there was likely further damage after the heavy rain, the
panel does not consider the make safe was negligent or grossly deficient.
Accordingly, the panel is satisfied neither the insurer n or HI’s actions contribute d to
the complainant’s loss.
2.5 Is the complainant entitled to compensation for non-financial loss?
Compensation payable in some circumstances
AFCA may award compensation (capped at $5,000) if there has been an unusual
degree or extent of physical inconvenience, time taken to resolve a complaint or
interference with the complainant’s expectati on of enjoyment or peace of mind.
AFCA takes a conservative approach to awarding compensation. We do not award
compensation because the complainant has suffered some inconvenience. AFCA
expects the complainant to be moderately robust and to bear the norma l degree of
inconvenience experienced when a problem occurs and to take reasonable steps to
manage the situation.
Determination | Case number: 742314 Page 9 of 10
The complainant says there were unnecessary delays and the insurer’s staff were
negligent and incompetent. The complainant says he had to repeatedly ask the
insurer to appoint a hygienist and had to prove he and his family were vulnerable to
the mould in the property.
The complainant is not entitled to compensation for non-financial loss.
The claim was made on 14 March 2019. The insurer responded quickly by appointing
a builder, a restorer and an assessor to assess the damage and undertake the
remediation works.
The insurer offered to undertake the repairs, but cash settled the claim at the
complainant’s request. The insurer fully settled the claim on 20 September 2019.
There is no dispute that the claim took over six months to settle, nor any dispute that
the claim caused considerable stress for the complainant. However, the panel is
satisfied the insurer has acted reasonably and promptly give n the nature and extent of
the damage. The panel is also satisfied the insurer’s actions were reasonable in the
circumstances.
The information shows the complainant requested a hygienist on 30 April 2019 and
the insurer confirmed on 7 May 2019 that it was willing to consider this request. The
information also shows the insurer was responsive throughout the claim and met with
multiple complainant’s requests.
The panel is not satisfied a compensation is warranted in the circumstances.
Determination | Case number: 742314 Page 10 of 10
3 Supporting information
3.1 AFCA’s approach
A full exchange of the relevant information has taken place between the parties and
each party has had the opportunity of addressing any issue raised.
Due to the complexities in the dispute is has been referred to a panel for
determination. The panel comprises the lead ombudsman, a member with
considerable industry experience and a member with significant experience as a
consumer representative.
All the provided material has been read and considered. The determination is based
on what is fair in all the circumstances having regard to the relevant legal principles,
terms of the policy, good industry practice including codes of practice and prior
determinations where applicable.
The parties have raised numerous issues in their submissions. For this determination,
commentary is restricted to only those issues considered relevant to the outcome.
3.2 Key policy terms
Product Disclosure Statement
Pages Wording
23
Limits on what we pay
The most we will pay for any one claim under Part 1 of this policy
(including any part of that claim that is for additional expenses), is the
sum insured .
The most we will pay for any one claim for all of these additional
expenses is 20% of the sum insured :
temporary accommodation
….
e xtra costs related to building
….
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.