Determination 741337
Cash settlement amount for water damage to commercial property
Summary
The insurer accepted a water damage claim for a commercial property after a car hit a water hydrant, but the parties disputed the cash settlement. AFCA ordered further settlement payments including a 20% uplift on repair costs and $2,000 for non-financial loss.
The cash settlement must reflect the risk of repairs passing to the insured, so a 20% uplift on repair components applies, and the insurer must include the bar fit-out and pay compensation for claims-handling delays.
Issues
- Claim amount dispute primary · upheld“The insurer is to increase its proposed settlement of $649,213 by paying a further $136,250.”
- Delay secondary · upheld“The available evidence shows, and the insurer has acknowledged, considerable delays in progressing the claim.”
- Repairs or contractors secondary · upheld“The damage was a result of the insurer's initial builders removing the floorboards; the insurer is liable for the sub-floor replacement.”
Subjects and remedies
home or building damagemotor vehicle collisionpay claimpay non financial loss
Related
Text of the determination
Determination
Case number 741337
Financial firm Lloyd's Australia Limited
Determination | Case number: 741337 Page 2 of 11
Case number: 741337 25 June 2021
1 Determination overview
1.1 Complaint
The complainant holds an industrial special risk insurance policy with the financial firm
(insurer) for his commercial property.
On 18 March 2018, a car drove into the water hydrant in front of the insured property.
The burst hydrant caused extensive damage to the premises, including to plaster
ceilings, walls, timber floors, bar fit-out and footings. The complainant lodged a claim
with the insurer on 22 March 2018. The insurer accepted the claim for water damage
and, following mould remediation, it offered to cash settle for the remaining work.
However, the parties do not agree on the cash settlement amount.
While the complainant has accepted some components of the insurer’s settlement
proposal, he remains unhappy regarding the bar fit-out, sub-floor replacement,
builder ’ s margin on certain items, delays causing additional loss of rent, and an
allowance for the transfer of risk.
1.2 Issues and key findings
Is the insurer required to increase its cash settlement offer?
The insurer ’s cash settlement offer does not allow for all areas of damage or take
appropriate account of the transfer of risk to the complainant. The proposed
settlement amount needs to include the bar fit-out; but as the offer already caters for
the sub-floor, it does not need to be increased for that work.
A 20% uplift should also apply to that component of the settlement amount which is
attributable to repairs/rectification work. That uplift is to reflect the transfer of risk from
the insurer to the complainant, and possible future or unexpected damage related to
the claim. In addition, it is fair in the circumstances that the insurer pays $2,000 as
compensation for non-financial loss, in recognition of the delays in the insu rer’s
handling of the claim, and significant upset and inconvenience caused.
1.3 Determination
This determination is partially in favour of the complainant. The insurer is to increase
its proposed settlement of $649,213 by paying a further $136,250, comprised of:
$27,225 (including GST) for bar fit-out as quoted by complainant’s builder, ID
$107,025 (20% uplift on $535,127 portion of settlement relating to repairs)
$2,000 as compensation for non-financial loss.
Determination | Case number: 741337 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer required to increase its cash settlement offer?
Complainant is entitled to cover for loss arising from the insured event
The complainant has the onus to establish, on balance, the loss or damage claimed
falls within the scope of cover offered under the policy. This is commonly called a
valid (or prima facie ) claim. Once that is established, the onus shifts to the insurer to
show, on the balance of probabilities, that an exclusion applies or it is otherwise
entitled to decline the claim.
It is not in dispute the complainant has established a valid claim, which the insurer
accepted and offered to cash settle. However, the insurer did not accept all
components of the claim, and the parties do not agree on the settlement amount that
should be paid.
The insurer offered a cash settlement of $649,213 . When that was rejected by the
complainant, an interim part-payment of $600,000 was made in November 2019.
Since then, a further $3,000 was also offered and paid in recognition of delays and
shortfalls in the service provided during the assessment and management of the
claim, but the complainant did not believe that was sufficient.
The insurer has also confirmed to the complainant that it will continue to deal with
ongoing claims preparation costs up to the policy limit, by making payments directly to
the claim preparer. That is fair and appropriate.
While a number of items have been settled, the complainant is also claiming the
following, which remain in dispute:
bar-fit out rectification ($24,750 + GST)
sub-floor replacement ($40,520)
builder ’ s margin on certain items ($14,084)
additional loss of rent caused by insurer’s d elays ($104,119)
a percentage uplift on the settlement amount for repairs/rectification to cater for the
transfer of risk to the complainant.
Insurer is liable for bar fit-out
The issue in relation to the ‘bar fit - out’ re lates to the damaged flooring and cabinetry
around the bar.
The insurer maintains the bar is excluded from cover as the tenant made a claim for
the damaged bar under his own policy and was settled accordingly.
Determination | Case number: 741337 Page 4 of 11
However, the area in dispute is not the actual bar top itself (for which the insurer’s
latest assessment report did make an allowance of $5,000), but the flooring, tiles and
cabinetry behind the bar area, which the complainant maintains is his property.
The complainant has provided a quote from his builder (ID) which caters for the repair
of tiling, plumbing and cabinetry around the bar, at a cost of $24,750 plus GST.
ID does not comment on the cause of that damage. The insurer says there is no
reference by any of the appointed experts to any damage to this area, other than the
tenant’s mention that there was minor warping to the bar top. The experts do not
comment on the flooring and cabinetry around the bar.
However, the complainant says the bar fit ‐ out costs were not included in AB ’ s original
quote because these works were not envisaged in the original scope of works straight
after the accident in March 2018. The complainant has explained, however, that the
bar fit-out was removed and subsequently damaged by the make-safe crew in the
course of their work when mould was discovered.
In a report from loss adjuster AR, there is reference to removal of all ceramic flooring
behind the bar counter. It also notes the discovery of ‘ unrelated mould inside the fire
hose in the bar – this is due to the water pipes inside the cabinet. Only the lower
sections of the brick walls were wet which is potentially a rising damp issue ’ . This
information would suggest the flooring should be covered in the settlement. However
there is no information regarding the mould for the other quoted areas.
While some of the mould found may have been from pre-existing issues, the panel is
satisfied, on balance, it is fair and appropriate in the circumstances that the insurer be
liable for the bar fit- out works as identified in ID’s quote.
Insurer is liable for replacement of sub-floor, as already included in final offer
The complainant says the cost of reinstating the flooring which was removed is
$40,520, although it is not clear a specific quote or other clarification of that amount
has been provided.
There is no dispute, however, the timber floor was water-damaged and developed
mould. The adhesi ve used to glue the vinyl tiles to the timber strip flooring boards was
found to have traces of asbestos. It was therefore decided to remove the asbestos,
which in turn necessitated the removal of the floor boards (sub-floor).
The insurer says it has already paid the maximum claimable ($100,000) for ‘ extra
costs of reinstatement ’ provided under the policy. It says the work required is only due
to the need to upgrade to comply with current regulations, and some pre-existing
timber rotting which does not relate to damage caused by the claimed event.
The complainant appointed a civil engineer (AM) to assess the sub-floor. AM
inspected the timber floor joists, bearers and stumps, and reported the extent of the
Determination | Case number: 741337 Page 5 of 11
damage meant that new timber strip flooring boards could not be installed
successfully and the sub-floor would require full replacement.
The insurer says it interpreted this to mean the sub -floor was in poor pre-existing
condition and, on that basis, replacement would amount to an upgrade which the
policy does not cover. However, in his subsequent report, AM explained the damage
referred in his report was the damage caused by the removal of asbestos/floorboards
during the make-safe and subsequent clean up due to the asbestos removal; it was
not to be taken as pre-existing damage.
Having regard to the expert evidence, the panel is satisfied the damage was a result
of the insurer’s initial builders removing the floorboards. The question whether the
sub-floor may or may not meet current code is not relevant, as it was built 170 years
ago and would only have then been subject to the building codes of the time (if any).
In the revised quote provided by the insurer’s builder AB , an amount of $32,147 was
allowed for supply and installation of a replacement sub floor (together with further
related expenses). It is that quote on which the insurer’s settlement offer was based.
The panel is satisfied the insurer is liable for replacement of the sub-floor, given the
damage caused by the make-safe works. However, the settlement is not required to
be increased to take account of that, since it is already catered for in the amount
offered.
Further builder ’ s margin not required to be added
The complainant says a builder ’ s margin should be added to the additional works to
be settled (amounting to $14,084).
A 20% builder’s margin is included in AB ’s quote, which has been accepted by the
parties. The complainant says a 20% builder ’ s margin should also apply to the
following costs:
additional variation items $30,659
extra plastering and painting $9,760
bar rectification $24,750
price escalation $10,000.
The additional variation items have been agreed and settled by the parties, however
no quotes have been provided to ascertain whether a builder’s margin was included.
With respect to the quotations from the complainant’s builder (ID) for extra plastering
and painting and bar rectification, there is also no information to show whether the
builder’s margin is already included in the quoted amounts. As such, there is no
evidence to suggest whether a builder’s margin is required to be added to these
quotations.
Determination | Case number: 741337 Page 6 of 11
The escalation costs are an uplift on the total of the already quoted amounts, and
should not in themselves attract a further builder’s margin component.
The panel is not persuaded any further builder’s margin should be added to the
figures/quotes already provided.
No further payment for loss of rent caused by insurer’s delay s
The complainant says that delays caused by the insurer and its agents to the
commencement of building works ha ve in turn delayed loss of rent payments and
caused the non-payment of estimated future outgoings. The panel notes that in
recognition of the delays experienced in the handling of the claim, the complainant
has already been compensated by the insurer in the amount of $3,000.
The policy provides for loss of rent up to a maximum 24 month period. That would
amount to $237,786 (being monthly rental of $9,907.75 x 24). The insurer’s loss
adjuster MC has provided calculations to show that the remaining outstanding loss of
rent (up to that limit) is $125,498.00.
The insurer has already allowed for $133,755.00 in its settlement offer and this has
been accepted by the complainant. That means that part of the settlement relating to
loss of rent totals $246,042.00, which already includes an overpayment of $8,260.00
by reference to the strict policy entitlement.
Taken together with the $3,000 already paid in recognition of delays, that means the
insurer is effectively paying an additional $11,000 for the loss of rent issue. The panel
is satisfied that additional payment represents a fair settlement for this component of
the claim in the circumstances. The insurer is not required to increase its settlement in
respect of loss of rent.
Cash settlement means the risk of repairs passes to the complainant
The insurer has opted to settle the claim in a cash basis, as it is entitled to do, to
cover its liability for the claim. However, the cash settlement amount needs to reflect
the reasonable cost to the complainant of having the insured repairs completed.
The quotes on which the insurer has based its cash settlement offer are not identified
as being actionable by the complainant as a retail customer, nor do they allow for
contingencies. They are also now effectively out of date.
As well, it is important to note that in receiving a cash settlement, the complainant is
also taking on the transfer of the risk involved in the repairs: he loses the benefit of
the insurer’s guarantee on repairs it would have otherwise undertaken itself; and he is
also assuming the risk of further claim-related damage being identified in the course
of repairs. The panel considers it is fair that the cash settlement amount takes
account of those issues.
Determination | Case number: 741337 Page 7 of 11
In this respect, the panel accepts consideration should be given to the soil testing
report provided by HC. HC says it cannot guarantee that there will not be movement
of the foundations as the soils dry out. That in turn is likely to cause further issues and
the risk of further damage.
It is also relevant to note that this is a n old building, and the water damage was
significant. The panel considers that increases the likelihood of potential further
issues being identified or arising in relation to the claim-related repairs.
Cash settlement amount for repairs to be increased by 20%
The panel considers it fair in the circumstances that the settlement amount applicable
to repair and rectification work be increased by 20%. That is to account for
contingencies and the transfer of risk, in light of the age of the building, the extent of
the water damage and the uncertainty about possible resulting future foundation
movement. The relevant component of the settlement to which that uplift should apply
consists of:
AB ’s revised quote $469,958
Additional variation items $ 30,659
Plastering & painting $ 9,760
Bar rectification work $ 24,750
$535,127
That means the settlement amount for repairs and rectification work is to be increased
by $107,025 (being 20% of $535,127).
Compensation for non-financial loss is warranted
AFCA may also award compensation for non-financial loss where there has been an
unusual and significant degree of upset or inconvenience caused by an insurer’s
handling of a claim.
The claim in this case arose in early 2018, and it was only in late 2019 that a
substantial amount towards a cash settlement was paid to the complainant, after
protracted issues in the insurer dealing with the initial make-safe and repair work and
then deciding to cash settle for the balance of the work.
The available evidence shows, and the insurer has acknowledged, considerable
delays in progressing the claim.
The panel notes the insurer has already paid $3,000 in what it says was an
acknowledgement of those delays (although that appears to have been made by
reference in particular to t he impact of delays on the complainant’s loss of rent). The
panel is satisfied it is fair and warranted in the circumstances, that a further $2,000
compensation for non-financial loss be paid. That is because the overall claims
handling and resulting delays have caused significant and unusual upset and
inconvenience to the complainant, over and above what might reasonably be
expected in the circumstances.
Determination | Case number: 741337 Page 8 of 11
Insurer is required to increase its cash settlement offer
Having regard to all the available evidence, the panel is satisfied it is fair that the
claim be cash settled by the insurer paying the outstanding balance of the $649,213
already offered (of which it is understood $600,000 has already been paid), together
with an additional payment comprising:
bar fit-out rectification in accordance with ID’s quote: $27,225 (= $24,750 + GST)
20% uplift on settlement amount for repair and rectification work in recognition of
the transfer of risk to the complainant for the repairs: $107,025
$2,000 compensation for non-financial loss.
The outcome is fair in the circumstances
The panel is satisfied the outcome of this complaint is fair in the circumstances. That
is because it identifies an area of damage for which the available evidence indicates
insurer should be held liable; as well as amending the proposed cash settlement
amount to reflect the impact on the complainant of having to take on the repairs
himself, and of assuming the risk of further unexpected claim-related issues arising.
Determination | Case number: 741337 Page 9 of 11
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances,
having regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information,
and each party has had the opportunity to address any issues raised. We have
reviewed and considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have
restricted this Determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The
panel includes:
4 an ombudsman
5 a member with significant experience in consumer and small business advocacy
6 a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on
oath, or to require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there
are no relevant documents, we will decide what most likely occurred based on the
available information.
If there are conflicting recollections and these are evenly weighted, we may find that a
claim cannot be established.
Determination | Case number: 741337 Page 10 of 11
6.1 Relevant expert reports
Record Key points
Complainant’s expert (AM)
Supplementary Report
19 December 2019
statements made … stating that my report dated 30/10/2019,
confirms that the subfloor was in "poor pre - existing conditions" is
NOT correct.
t he damage referred in my report is the damage caused by the
removal of asbestos/floorboards and subsequent clean up due to
the asbestos remov al. It is not to be taken as pre - existing damage.
the dislodged joists and bearers need to be re - nailed toget her and
refixed. This in itself will be difficult bec ause these members are
very old seasoned hardwood timbers.
Refixing these members will in tum require re - planing the tops of
the joists in order to reproduce an accurate overall horizontal level
surface, this re - planing will be impossible to achieve as there are
too many old nails left embedded in the joists.
subfloor frame damage is always bound to happen when
floorboards are removed (it is not a delicat e operation). In this
case made wors e by the asbestos removalists having to wear
heavy protective clothing/face masks and by the fact that the
removed floorboards were thicker than normal (22mm thi ck) nailed
to old timber joists
proper floor cannot be achieved by re using the existing sub floor
structure .
Complainant’s expert (CFC)
Letter
6 April 2020
a fter viewing the condition the property has been left in since the
make safe crew had been in there I found the property to be in a
very unsafe condition for any trades to be in there even to quote,
however, for the sake of the exercise I entered the build ing at my
own risk to find that all of the floor boards have been removed and
in turn a lot of the sub floor structure has been dislodged!, no de
nailing has taken place, portions of the sub floor structure have
been removed and no walking plat forms apart from some make
shift planks put down by the owner have been installed to enable
trades to safely walk through to inspect, measure or estimate
tasks required.
in no unc ertain circumstances will we ask our tradesmen to work
with the existing materials becau se of a number of reasons, 1
being that the rusted nails of which there are thousands will not all
come out of the timber joists without snapping, 2 portions of the
sub floor are to be replaced becaus e they are simply gone
missing, 3 all joists would need to be levelled and no one in their
right mind would put an electric plainer on all of that timber with
the amount of nails that would still be in the joists even after de
nailing took place.
all existing subfloor structures should be removed and dispos ed of
and a new subfloor should be built in its place.
Insurer ’ s expert (AN) asbestos would be required to be removed during the course of
Determination | Case number: 741337 Page 11 of 11
Record Key points
Report
13 September 2018
relaying the smooth - edge for the commercial - grade carpet
required in the public bar at the site.
Insurer ’ s Expert (AN)
Report
14 November 2018
[regarding updat e on mould remediation]
Bar:
r emoval of Kaowool insulation used as insulation for the ceiling of
the cellar. These have been removed and disposed along with the
timber ceiling in the cel lar
r emoval of all ceramic flooring behind the Bar counter
d iscovered unrelated mould inside the fire hos e in the bar – this is
due to the water pipes inside the cabinet . Only the lower sections
of the brick walls were wet which is pot entially a rising damp issue.
Insurer’s expert (HC)
Email
15 November 2019
s oil moisture samples indicate that there are elevated moisture
levels underneath the building at a shallow depth, in the soils that
the footings are founded.
cannot guarantee that there won't be movement of the foundations
as the soils dry out.
t he load already applied by the weight of the existing bricks would
be enough to cause movement if the soils settle as they dry out.
the building has been fine for 170 years but there has been a
recent event that has changed the status quo of the soils
underneat h the building that have been dry for a long time that will
have some effects on the foundations .