Home / Allianz Australia / Determination 741225

Determination 741225

Storm and flash flood building damage claim declined

FirmAllianz Australia
Decided2021-06-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$3,000
Amount claimed—
SourceAFCA PDF

Summary

A homeowner claimed storm and flash-flood cracking damage and the insurer declined after expert evidence showed long-term reactive clay movement. AFCA found the claim not covered but ordered $3,000 for significant claims-management delays.

The insured must prove the loss falls within cover, and the expert floor-level and soil evidence did not show a one-off storm or leaking pipe caused the damage.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 741225 Financial firm Allianz Australia Insurance Limited Determination | Case number: 741225 Page 2 of 16 Case number: 741225 19 April 2021 1 Determination overview 1.1 Complaint The complainant held a home and contents insurance policy (policy) with the financial firm (insurer) from 1 September 2016. On 4 January 2019, the complainant lodged a claim for damage to the insured property which he says was caused following a storm with resultant flash flooding on 14 December 2018. The complainant also claims a broken stormwater pipe has contributed to damage the building. The insurer has denied cover and sa ys the damage was not caused by an insured event. Rather, the damage is due to long term ongoing ground movement and gradual deterioration. The complainant disputes the insurer‟s declinature of the claim. 1.2 Issues and key findings Is the insurer entitled to decline the claim? Yes. The panel is not satisfied on the balance of probabilities, that the damage to the insured building falls within the terms of the policy. The policy covers loss or damage to the insured premises caused by the listed events set out in the product disclosure statement (PDS), which includes Storm. The information exchanged does not show, on balance, the damage was caused by the storm giving rise to the claim or a broken stormwater pipe found at the insured property. Is the complainant entitled to non-financial loss compensation? The insurer‟s claims management has caused an unusual degree of delay, stress and anxiety for the complainant. It is fair in the circumstances that the insurer pays the complainant $3,000 in non-financial loss compensation in line with the AFCA Rules. 1.3 Determination The determination is significantly in favour of the insurer. The insurer is entitled to deny the claim in line with the policy provisions. The insurer is to pay the complainant $3,000 in compensation for non-financial loss in line with the AFCA Rules. Determination | Case number: 741225 Page 3 of 16 2 Reasons for determination Due to the nature of and complexities involved in this complaint, it has been referred to a panel for determination. The panel comprises an Ombudsman, a member with considerable industry experience and a member with significant experience as a consumer representative. This determination follows consideration of all the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous AFCA decisions where applicable. For the purposes of this determination, commentary is restricted to only those issues considered relevant. 2.1 Is the insurer entitled to decline the claim? The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more the listed insured events, including „Storm, rainwater or run - off‟ and „Water or other liquid‟ damage. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the product disclosure statement (PDS). The insurer is entitled to rely on the policy provisions The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, the panel accepts the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The complaint bears the onus to establish a valid claim under the policy It is established law that the insured has the onus to establish, on the balance of probabilities (that is, more likely than not) that the loss falls within the terms of the policy. Only if a valid claim is shown to exists, will the onus shift to the insurer to show, on balance, it is entitled to decline the claim in line with the policy provisions. The damage claimed involves external and internal cracking to the insured building, which the complainant says was found on returning from Christmas holidays early in January 2019. The complainant says the damage is due to a significant storm and flash flooding event on 14 December 2018 and has been further exacerbated by a leaking stormwater pipe found on the property. There is no dispute that a storm event occurred on 14 December 2018 or that a leaking stormwater pipe was found on the insured property. It is also accepted that Determination | Case number: 741225 Page 4 of 16 the insured building presented with significant cracking damage in various areas of the residence. The issues in dispute however are whether this damage is the result of insured circumstances (storm/flash flooding and leaking pipe) or whether it is due to circumstances not covered or otherwise excluded under the policy. Complainant declined the insurer ’s original settlement offer After lodgement of the claim, the insurer appointed loss adjusters „ SK ‟ who then appointed building consultants „SE‟ to attend the insured property and investigate the cause and extent of the damage claimed. SE arranged for plumber „O‟ to inspect and test the p lumbing at the insured property. This included CCTV inspections of the sewerage and stormwater lines. Relevant information from these consultants‟ reports has been provided in section 3 below. The insurer on the recommendation of SE offered to partially accept the claim, limiting cover to cracking damage it found to be consistent with the leaking stormwater and sewerage lines . The offer was based on a quote from builders „AR‟ in the amount of $27,416. The offer was on the basis the complainant attends to repairing the damaged storm water and sewer pipes himself. The complainant declined the offer and advised he was not satisfied with SE‟s findings and requested the insurer engage a forensic engineer to comment on the cause of the damage. The insurer appointed forensic en gineer „SH‟ to the claim. Based on the information from SH, the insurer proceeded to decline the claim in its entirety and the offer to partially accept the claim was withdrawn. SH evidence concludes the cracking damage is not due to an insured event SH on attending the insured property noted there had been several extensions to the insured buildings, some before the complainant‟s purchase of the property in 2011 and some undertaken by the complainant in 2015. It is not in dispute the damage subject of the claim is limited to the original section of the insured building and the subsequent extensions completed before 2015 only. SH says the complainant‟s partner confirmed minor cracking damage had been noted as early as two years prior, however, that the significant cracking was noted on return from their holiday in January 2019. SH confirmed the insured property is constructed on highly reactive H1/H2 clay soils, which experience significant volumetric changes relative to changes in moisture content. SH, as part of its investigations undertook a floor level survey. This survey shows the maximum level difference over the floor across the house was 96mm. The lowest point was recorded in the hallway outside bedroom 1 and the high point was in the Determination | Case number: 741225 Page 5 of 16 eastern end of the laundry. The patterns of contours indicated moderate to extreme differential floor deviations throughout the property as well as a pattern of increasing reduction in the levels towards the west, in the direction of the street (front of house). SH notes the natural prosperity for different aged and sized footings to move relative to each other, including between the original house sections constructed at different times through the life of the residence. The brittle nature of the original solid brick wall construction is highly susceptible to cracking even with relatively minor differential foundation footing movement. SH says if the leaking service pipes were to have caused the building movement, the floor level survey would indicate a pattern of raised floor levels near the leaking pipes, which was not the case in this instance. Rather, it was quite the opposite with a continued reduction in levels moving from the rear (east) of the property towards the front (west). SH says that the moisture conditions of the lower residence foundation clays (below footings), were not affected by the leaking services and so these did not cause or contribute to the building movement damage. Similarly, SH notes had water from a one-off stormwater run-off event effected the deeper supporting reactive clays soils, it would be expected to see a pattern of relatively higher floor levels to the front of the property, which is not the case. SH concludes that the damage is related to long term and ongoing damage caused by the footings founded in highly reactive clay soils subject to seasonal/climatic moisture changes. This is exacerbated by long term ongoing drying effects of trees to the west of the property and existing construction conditions. Based on the above SH concluded neither the blocked service pipes nor leaking stormwater pipe caused or contributed to the variation in the floor levels or caused the observed damage to the property. Complainant says the damage was caused by the December 2018 storm In support of his position, the complainant has provided structural investigation reports f rom consultants „DG‟ (engineer). DG‟s first report was provided after it attended the property on 17 October 2019 and a second follow up report later in the life of the claim. In add ition to DG‟s reports, the complainant provided his own ingress of stormwater report. The panel notes, in this report the complainant provides his qualifications as being a chartered engineer in asset management with experience in forensic testing and fault detection in high voltage assets . The report is based on investigation performed between 26 July 2020 to 7 August 2020, relating to the stormwater pipe and stormwater kerb channel. Determination | Case number: 741225 Page 6 of 16 In its first report, DG says that movement and associated damage to the i nsured building is due to changes in the moisture content of the underlying foundation clays, caused by the flash flooding from the December 2018 storm event. DG expresses concern that the insurer‟s appointed consultants did not arrange or rely on soil testing to confirm contributions to the damage by the sewer and stormwater lines. However, the panel notes, DG itself did not arrange nor has it relied on evidence from such soil testing in its reports. DG found the front gate footings were cracked, out of square and it did not open or close as intended. The blue stone pavement had significant cracking of grout and uneven surfaces due to foundation movement. It confirmed the significant cracking to various areas in the residence and found the front door jammi ng. DG formed the opinion that the cracking was due to the effects of moisture changes in the foundation clays. It confirmed the clays in the area are known to be highly reactive, they will expand and soften when wet (winter) and shrink and powder when dry (summer). DG says generally such changes tend to be uniform and are not crucial i.e. footings move in a similar pattern and do not cause significant damage. In its follow up report, having reviewed the complainant‟s own report dated 4 October 2020, DG re-confirms its view that the leaking stormwater pipe was a proximate cause for the movement and associated damage. It says, in the absence of tree roots being found during the complainant‟s investigations, that it is highly unlikely that surrounding trees contributed to any of the foundational movement. DG says the evidence in the form of a floor level survey should not be relied on and that it should only be used as a guide for repair works. It was satisfied the available information shows the moisture source resulting in the damage was less than two years old. Further, that it is well known that moisture in reactive clay soils causes heave, however, this is only easily identifiable when there is a single source of moisture. In instances, where there are multiple events/sources of moisture introduction over a short time, the footings can heave and shrink a multitude of times resulting in structural movement. DG says it is evident there are multiple contributing sources of moisture here causing the structural movement, but seasonal changes are not a dominant factor. The panel is not satisfied the complainant has established a valid claim While there is no dispute a storm event with flash flooding occurred on 14 December 2018, the available evidence does not show that the cracking damage was caused by this event. Rather, on balance, it shows the damage is the result of circumstances excluded from cover under the policy. The panel, having considered all the information from the parties and their appointed consultants, found the evidence from insurer to be th e more persuasive. SE‟s evidence appeared to be clearer, thoroughly investigated, logical and provided stronger supporting information, analysis and conclusions. Determination | Case number: 741225 Page 7 of 16 The Panel was less convinced by DG‟s evidence. . The reports, in particular DG‟s first report, was found to lack reasonable explanation as well as detail in support of its opinions and analysis. The p anel is not satisfied DG‟s recommendation to ignore the floor level survey conducted by SE or that this holds little value is sensible. The panel is of the opinion floor level investigations and associated results are entirely relative to and assist in coming to an informed decision regarding movement in the foundation clays at a property. DG‟s follow up report was more relevant as it provided more discussion and supporting information around the possible proximate or dominate cause for the damage. However, the panel did not find it persuasive and it seemed to rely more so on evidence in the complainant‟s own investigative report as the basis for DG‟s conclusions. The panel accepts the complainant is an engineer, however, his expertise/speciality is in a field unrelated to the issues in this complaint. The complainant‟s report does not comment on the cause of the foundation movement and focuses on and/or identifies an issue with a municipality asset (stormwater line). Given this, the panel is not convinced it would be reasonable nor fair in the circumstances to prefer the complainant‟s information over that provided by SE . The evidence indicates the insured building had presented with cracking damage a few years prior (although less severe) and there was rotting of flooring, which also indicates an ongoing long-term moisture issue. The Panel acknowledges the complainant‟s opinion that the stormwater line was most likely damaged during council works on 27 February 2019. This is close to two months after the damage to the insured building is said to have been noted in early January 2019. The panel notes the floor level investigations do not support a pattern consistent with movement within the foundational clay soils caused by a one-off storm/flash flooding event nor a leaking stormwater pipe. In the absence of persuasive evidence in support of his position, the panel is not satisfied the complainant has established the damage claimed is due to circumstances covered under the policy. Accordingly, the insurer is entitled to decline the claim in line with the policy provisions. 2.2 Is the complainant entitled to non-financial loss compensation? Insurer is to pay the complainant $3,000 in non-financial loss compensation The AFCA Rules (Rule D 3.3) allow for an award of up to $5,000 for non-financial loss compensation, if the insurer caused the complainant to suffer an unusual degree or Determination | Case number: 741225 Page 8 of 16 extent of inconvenience, delay or interference. AFCA takes a conservative approach when considering any award of compensation. The panel notes the complainant raises various concerns relating the insurer‟s management of the claim, the consultants appointed to the claim, the insurer‟s processes and the time it has taken to bring this matter to conclusion. The panel accept the evidence shows there were significant delays caused by the insurer‟s poor management of the claim, especially during the assessment and investigation periods. This includes significant delay in the appointment of consultants‟ SE and the assessment component of the claim. The insurer‟s decision to partially the accept the claim without having completed reasonable investigation and then subsequent decision to decline the claim in its entirety, also significantly contributed to delays and stress experienced by the complainant under the claim. There was a lack of communication at times and failure to provide information to the complainant he was otherwise entitled to , when requested. This will have caused the complainant an unusual extent or degree of stress, anxiety, inconvenience as well as contributed to delays experienced in finalising the claim. For the reasons considered above, the Panel determines the insurer is to pay the complainants $3,000 in non-financial loss compensation in line with the AFCA Rules. Other matters The panel notes the complainant seeks reimbursement for expenses incurred in sourcing information from the various consultants he appointed as well as the works carried out to the sewer line at the insured property. However, the panel is not satisfied the insurer is obliged to reimburse the complainant for these expenses. It was the complainant ‟s decision to approach and appoint the consultants and their evidence has not assisted the panel in providing this determination. Regarding the repair costs incurred, the Panel is satisfied it is reasonable to accept these expenses were incurred in repairing/maintaining the insured property, which is the complainant‟s responsibility and is not a benefit available under the policy. Determination | Case number: 741225 Page 9 of 16 3 Supporting information 3.1 Process AFCA ’s approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the legal principles, applicable industry codes or guidance, good industry practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All the provided information has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. 3.2 Relevant Policy Terms Page Product Di sclosure Statement 28 - Storm, rainwater or run - off “ storm ” means violent wind (including cyclones and tornadoes), thunderstorms and hail whic h may be accompanied by rain or snow “run - off” means rainwat er that has collected on or has flowed across normally dry ground or has over flowed from swimming pools or spas 28 – Storm, rainwater or run - off We will not pay for loss or damage: caused by:  soil movement including erosion, landslide, mudslide or subsidence,  shrinkage or expansion of earth or land, or  hydrostatic pressure; 3.3 Relevant Expert Reports Record Key points SK ’ s Loss Adjuster Report 18 January 2019  The Insured advised on Friday 14 Dec ember 2018, she discovered the side of the risk premises to be flooded from the heavy downpours of rain which occurred that afternoon.  The Insured advised she discovered a small amount of water had leaked from the ceiling in the lounge room. The water small amount of water was mopped up to mitigate any further loss.  The Insured advised they left the risk premises over the Chris tmas Determination | Case number: 741225 Page 10 of 16 Record Key points period and upon returning on Saturday 5 January 2019 they discovered a large amount of cracking to the internal plasterboard walls and minor cracking to the external render of the premises.  During our inspection we noted a large amount of cracking thr oughout the entire front section of the premises. The Insured advis ed minor cracking was present in the hallway however the cracking is more serve the previously  It was evident during our ins pection we will require ** Building Cons ultants to attend the ris k premises and investigate the cause further  O’ s Plumber Report 11 March 2019  CCTV Inspection of Sewer Line - failed  CCTV Inspection of the storm water line - failed O’ s Plumber Report 1 April 2019  Cold water line pressure test – passed  Hot water line pressure test – passed SE Building Consultant Report 5 April 2019  I am of the opinion that cracking has occurred throughout the residence where there has been an alteration (saturation) to the moisture contents of the soil / foundations / footings throughout the residence. The additional moisture has occurred from the following sources:  Storm water blockages.  Sewer blockages.  Storm event which caused water inundation to the front and western perimeter of the residence.  The additional moisture into the ground has saturated the soil increasing the moisture conte nt (resulting in “heave” of the footings), and if moisture content decreases, then the soil will shrink (resulting in settlement of the footings).  I am also of the opinion that the vertica l cracking (internal and external) is caused by differential movement of the two different building materials, for example (rendered brick and plasterboard) and (rendered brick and fibrous cement sheet ) where the installation of a control joint and the use of flexible sealant would accommodate such movement. SH Forensic Engineer Report 20 May 2020  6.1. The front gate was operational however slightly out of alignment.  6.2. Diagonal and crack damage to the western residence wall ranging up to 3mm in width.  6.3. Horiz ontal crack damage extending from the top corner of bed 1 western window ranging up to 2.75mm in width.  6.4. Vertical cracking extending through the window ledge extending down to footing level ranging up to 3mm in width.  6.5. Patio formed by pavers bearing on raised section of soil (likely fill), retained by sleeper ret aining walls. Minor gaps noted bet ween Determination | Case number: 741225 Page 11 of 16 Record Key points some pavers, however no significant recent issue found.  6.6. No significant issue found with the concret e footpath adjoining the southern boundary. This section was grading towards the front street footpath.  6.7. Multiple vertical and horizontal cracking/dislodgement of the wall render, to the southern wall of bed 1, including below the window, and along the damp proof course. ranging up to Diagonal and crack damage to the western residence wall ranging up to 3mm in widt h.  6.8. Diagonal wall crack extending form the top corner of bed 2 window.  6.9. Co nc rete footpath is generally grading towards the west.  6.10. Vertical cracking ranging up to 3mm in width found above the door to the meals/kitchen.  6.11. Vertical cracking ranging up to 2mm in width found above and below the window to the meals.  6.12. Movement noted in the articulation joint hidden between a steel post (between the kitchen and laundry).  6.13. Low subfloor vent located at pavement level to the laundry/bathroom wall.  6.14. A pump pit is located below the timber deck to the west of bedro om 3. A proper view of the pit could not be achieved, however appears to contain only 1 pump. The pump size could not be confirmed.  6.15. The concrete foot path outside the bathroom/laundry was relatively flat.  6.16. Front door consists of a non - original heavy - duty steel frame. This door was stuck and could not be operated.  6.17. Scrape marks found to the door frame at the door latch indicating previous jamming.  6.18. Horizontal crack damage not ed extending from the top front door corner ranging up to 5m m in width.  6.19. Extensive cracking (vertical, diagonal and horizontal) to the hallway wall common with bed 1, ranging up to a maximum 7mm in width  6.20. Movement gaps noted between the cornices and the northern and southern walls.  6.21. Visually obvious depression/dropping in the floor, forming a maximum 29mm gap between the skirting and the floorboard outside bed 1. Timber deterioration was noted to one of the floorboards directly below the skirting.  6.22. Diagonal crack ranging u p to 3mm found to the eastern end of the northern wall.  6.23. Vertical cracks found extending from each corner of the bed 2 door.  6.24. Crack damage noted in 6. 17 were also observed within bed 1 to the common hallway wall.  6.25. Historic paint repairs t o ceiling, consistent with historic roof leak issues (nort h west corner).  6.26. Diagonal cracks ranging up to 3mm noted to the western Determination | Case number: 741225 Page 12 of 16 Record Key points wall and southern wall (western end).  6.27. Diagonal crack damage ranging up to 5mm in width found to the eastern wall.  6.28. Large cracks to cornices along the southern wall ranging up to 4mm in width. This cornice may be loose.  6.29. Cracking ranging up to 1.5mm found to the ceiling adjoining the northern wall  6.30. Diagonal crack ranging up to 4mm found to the wester n wall (southern end).  6.31. Horizontal cracking extending from the window corner extending towards the west.  6.32. A gap between the cornice and wall ranging up to 4mm in width found to the eastern wall.  6.33. Vertical cracks found extending from each corner of the door ranging up to 2mm in width.  6.34. No cornices found in bed 2  7.1. According to the Geological Survey of Victoria geological map (1:63, 360 series), the soil in this area is located in the province of Quaternary aged (volcanic origin) ba saltic deposits. Therefore, in the absence of abnormal moisture conditions, we expect highly reactive CLAY foundations (Class H1/ H2 type soils) in accordance with Australian Standard 2870 – 2011 Residential slabs and footings .  7.2. Such reactive clay soil s experienc e significant volumetric changes with relative changes in moisture content, i.e. if the moisture content increases the clay soils will tend to swell (resulting in “heave” of the footings), and if the moisture content decreases, then the clay soi ls tend to shrink (resulting in settlement of the footings)  8.1. The recorded maximum level difference over the floor of the house was 96mm.  8.2. The low point was recorded in the hallway outside bed 1.  8.3. The high point was rec orded in the eastern en d of the laundry.  8.4. The patterns of the contours indicate:  The survey was undertaken using a Nivc omp 25 digital level (whic h has an accuracy of +/ - 2mm).  The results of the monitoring survey are shown on the attached Level Survey Plan.  When interpret ing level survey data, it should be noted that tolerances on floor surface levels can affect results; however, survey data provides a good general indication of relative movements in a building.  The levels have been adjusted for changes in floor covering thicknesses and reduced, with an arbitrary dat um of zero being given to the lowest point identified over the floor of the building. Cont ours are drawn at 10mm intervals.  The following points can be noted from the level survey information: > Relatively moderate to extreme differential floor deviations found throughout the residenc e. Determination | Case number: 741225 Page 13 of 16 Record Key points > A global pattern of reducing floor level increasing towards the west in the direction of the street trees. > A low spot in the hallway outside the north east corne r of bed 1. > A high spot near the eastern end of the laundry. No other patterns of localised raised floor levels presented in the survey.  9.2. If water escaping from a leaking stormwat er pipe or sewer pipe was to have caused building movement damage at th e subject property then due to the reactive soils at the subject site (refer to paragraphs 7.1 to 7.6) the floor level survey would indicate a pattern of raised floor levels in the vicinity of the leaking pipes as the reactive soils become hydrated and exp and / heave.  9.3. In this case other than a level in the north east corner of the laundry, there are no distinct patters of localised raised floors to indicated heaved soils/foundations.  9.4. With regards to the north east corner of the laundry we not we did not find any concentrated significant damage in this region to indicate moisture affected reactive soils in this region.  9.5. It is, therefore, our opinion that the moisture conditions of the lower residence foundation clays (i.e. clay soils below th e level of the footings) have not been affected by any leaking service(s), to cause residence building movements (including from the stormwat er and sewer defects noted in the Plumber‟s reports).  9.6. Had the surface water from the one - off event affected t he deeper supporting reactive soils to the property to cause building movements we would have expected to see a pattern of relatively higher floor levels to the front of the property, as compared to the rear of the property.  9.7. We note however the patte rn of movement is the opposite to that noted in 8.6, that is lower floor levels were found to the front of the property as compared to the rear of the property.  9.8. It is, therefore, our opinion that the moisture conditions of the lower residence foundat ion clays (i.e. clay soils below the level of the footings) have not been affected by the one off surface water event, to cause residence building movements.  9.9. We note that the subfloor vents to the southern side of bed 1 and bed 2 contain freeboard cl earance from the pavement level found to be 165mm and 115mm respectively, which would act to protect these openings from any surface water.  9.10. Based on our observations we did not find any global issues with the front patio paving consistent with the o ne - off event.  9.11. As noted in section 7 the site is expected to be located on reactive soils. Such soils are subject to significant volumetric changes (shrink/swell) as they react to increases and decreases in moisture content.  9.12. The floor level su rvey indicates a global pattern of increasing lowering/settling floor levels increasing towards the west.  9.13. Settlement type movement in reactive clay sites is typically formed when the foundation soils dry out (losing moisture) causing the clay to slo wly shrink.  9.14. In this case we observed a cluster of significant trees along Determination | Case number: 741225 Page 14 of 16 Record Key points the street and in the nat ure strip.  9.15. With regard to the loc ations of trees in close proximity to residential domestic type footings, Australian Standard AS2870, Appendix B, Clause B2.3 (c ), advis es that individual trees should not be located closer to the residence than their mature height for class H1/H2 sites. Furthermore, this distance increas es by a factor of 1.5 to 2.0 for multiple trees. Although this rule is approx imate only the subject residence is clearly located within the „zone of influence‟ of the tree.  9.16. Therefore, we consider the most probable cause of the settlement relat ed building movement is related the above - noted trees causing long term soil drying which has affected the moisture conditions of the adjoining foundations causing settlement. We note the global nature of the building movement patterns is consistent with global effects caused by trees.  9.17. Based on the expected foundation and footing conditions, and the results of the floor level survey we consider that the predominant cause of the crack damage/building movement is related to long term and ongoing building movement, caused by footings founded in reactive clay foundations, subjected to typical seasonal moisture changes exacerbated by long term tree root drying affecting the footings to the east of the residence.  9.18. The above - noted damage has been accentuated by the existing construction conditions noted in 9.1.  9.19. The above - noted building movements has likely caused wall loads to trans fer into the heavy - duty steel door which causing a misalignment in the steel frame and affecting its operation.  9.20. The flooring in the hallway outside bed 1 was found to have dropped. Due to a la ck of access into the subfloor, the precise cause of this issue could not be determined however considered unrelated to any leak related issue or the one - off front yard surface water inundation event.  9.21. Also at this hallway location, we found a deteri orated floorboard. Such a localised issue is not expected to be related to either the Event (or from a blocked stormwater or sewer system issue).  9.22. If further information is required on the issues noted in 9.20/9.21, we would require that an access ha tch is provided in the floor at this location (or close by) to allow for inspection.  10.1. The blocked stormwater and sewer pipelines have not caused nor contributed to the variations in floor levels and the observed building damage.  10.2. The one - off front yard surface water inundation event has not caused nor cont ribut ed to the variations in the floor levels and the observed building damage.  10.3. The variation in the floor levels to the building and the observed building damage is related to long - term and ongoing building movement caused by footings founded in clay reactive foundations, subject to seasonal/climatic moisture changes exacerbated by long - term and ongoing tree drying effects from the Determination | Case number: 741225 Page 15 of 16 Record Key points trees to the west. The movement and damage have been exacerbated by the existing construction conditions noted in 9.1.  10.4. The loc alised dropped hallway floor and deteriorated timber floorboard is not considered to be related to the Event or from blocked stormwater or sewer system issues. If further information is required to determine causation of the damage in this zone, we would require that subfloor access is installed in close proximity to allow for further inspection.  10.5. The existence of impermeable paving around the gate would h elp protect the deeper foundations from the one - off surface inundation event. The minor misalignment of the gate is more likely to be related to the nearby (footpath) tree, which can affect reactive soils and cause movements to supported footings, such as the gate footing. This movement has likely been ex acerbated by the isolated nature of the gate footing DG Civil Engineer Report February 2020  It is our opinion that the cracking is due to the effects of moisture changes in the foundation clays.  We were advised that the property had been flooded in December 2018.  The flood had saturated the ground under the hous e and caused movement and cracking.  There was found a leaking stormwater pipe located on the front boundary at the join between the property PVC pipe and the earthenware pipe running under the footpath, because of the level of the pipe it is in our opinion that this has compounded the cause of movement in the front of the house and associated floor rot.  The blue stone pavement has moved, and th e front gate is out of square, it is our opinion that is the result of the leaking storm water pipe.  We were advised that the sewer blockages were minor and did not result in out flowing of sewerage.  Clays in this area are known to be highly reactive, and c lays of this type will expand and soft en when wet, particularly in winter, and will shrink and powder when dry, such as in summer.  Generally, such changes tend to be uniform and therefore are not crucial, i.e. all footings in the building move by similar a mount. When there are leaking pipes or ponding in the area and the water is allowed to penetrate near the building, then the foundations become excessively wet locally, and likewise when there are trees or shrubs close to the foundations the roots draw lar ge quantities of water from the clay, causing excessive drying and hence shrinkage in local areas. Either (or both) problems can cause excessive and non - uniform movement in the footings. DG Civil Engineer Follow Up Report  After reviewing complainant‟s report, it was found the source of the water ingress has been identified Determination | Case number: 741225 Page 16 of 16 Record Key points  As there is a predominant water source in the front yard and the absence of tree roots found during excavations, it is highly unlikely that surrounding trees contributed to any foundation movement  In DG‟s opinion, stormwater ingress is a recent event of less than two years. Based on building inspections no structural movement was evident on 20 March 2018  Floor levels found lowest point aligns with floor r ot found in the hallway  Based on the evidence, it is highly probable that the moisture source is less than two years old. The level survey should only be used as a guide for repair works  When there are multiple events inundation and multiple sources of moi sture over a relatively short period, the footings can heave and shrink a multitude of times resulting in structural movements  It is evident there are multiple cont ributing sources of moisture contributing to structural movement - seasonal changes are no t a dominant factor in this case. 3.4 Other Documents Considered  Complainant‟s submission and support documents dated 22 September 2020

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.