Home / Suncorp Group / Determination 741172

Determination 741172

Home insurer declined storm damage claim for swimming pool collapse on exclusion grounds

FirmSuncorp Group
Decided2021-04-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for pool damage after a February 2020 storm and the insurer declined it under the ground movement and seepage exclusions. AFCA found the insurer had not established the exclusions applied and ordered the claim to be settled by repair or cash settlement, with the amount to be determined later.

The insured must establish a valid storm claim and the insurer bears the onus to prove an exclusion applies on the balance of probabilities, which it failed to do.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 741172 Financial firm AAI Limited Determination | Case number: 741172 Page 2 of 15 Case number: 741172 6 April 2021 1 Determination overview 1.1 Complaint The complainant holds a home insurance policy with the financial firm (the insurer). On 11 February 2020, a claim was lodged for damage to the swimming pool at his home following a recent storm. The complainant says heavy rainfall caused ground movement which resulted in the collapse of the pool walls. The insurer appointed an engineer who concluded that damage to the pool is attributable to non-compliant installation and deterioration over time. The insurer says as these circumstances are excluded from co ver, it is entitled to decline the claim. The complainant says all the damage was caused by the storm and heavy rain. He seeks the insurer review its decision. He says a fair outcome is the removal and installation of a replacement swimming pool shell and bond beam and re-connection of the pool pump and the chlorination and filtration system to the plumbing system. The case manager provided the parties with a preliminary assessment on the issues in dispute. The preliminary assessment was in favour of the insurer. As the complainant does not accept the preliminary assessment, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the insurer entitled to decline the claim? No. The available information does not establish on the balance of probabilities the damage to the pool was caused by the excluded events relied by the insurer. 1.3 Determination This determination is in favour of the complainant. Should the complainant accept this determination then within seven days of notification of acceptance the claim and complaint are to be settled as set out in this determination under the heading “mechanism to settle the claim.” Determination | Case number: 741172 Page 3 of 15 2 Reasons for determination I have decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have considered all the material submitted by the parties, both before and after the preliminary assessment. I am satisfied that the documentation I have relied on has been provided to both parties. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. After the preliminary assessment was rejected, both parties made further submissions. Where relevant, these submissions will be referred to in the determination. 2.1 Is the insurer entitled to decline the claim? Insurer must establish exclusions apply The complainant must establish on the balance of probabilities he has suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. In the context of this claim, the complainant must establish that the damage was caused by the storm event in February 2020. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. The insurer must establish the proximate cause of the damage was ground movement or seepage of water down the sides or under the pool over time. The relevant policy extracts are set out in supporting section 3.3 of this determination. Parties’ material and submissions considered The insurer relies on two reports from a civil/structural engineer who inspected and photographed the pool on 8 May 2020. The engineer also reviewed photographs and images taken in late 2018 and early 2019. In his second report, the engineer rebuts the complainant‟s assertions and reiterates and amplifies his findings. The complainant has provided no independent expert reports. He has provided lengthy submissions and photographs. He says he is qualified to comment as he has worked as a building surveyor and consultant for 21 years. He says this experience included the approval, building practices and design certification of swimming pools . Determination | Case number: 741172 Page 4 of 15 A summary of the engineers‟ reports is set out in suppor ting section 3.4 of this determination. Relying on the engineers‟ reports and pre -claim images, the insurer says the proximate cause of damage to the pool was due to its non-compliant installation and deterioration and gradual ground subsidence over time and not a single storm event. It says the defective installation of the pool contributed to excessively elevated ground water levels over time. It makes a following submissions and observations:  the pool was lifting and there was movement of the surrounding paving from 2019  March 2019 photos shows the pool was discoloured and was not used since then  there are many problems with the installation and construction of the pool  a fractured seal caused a gap from which water had gone into the ground from the sides of the pool over time and rainfall from months before, along with the failure to top up the pool during the event, caused hydrostatic pressure in the soil  there was no standpipe and insufficient drainage over time caused saturation and destabilisation of the surrounding soil causing the soil to slump against the sides of the pool The complainant says the damage and the catastrophic failure was caused by the weight of soil subsidence against the side of the pool caused by the storm event which is covered by the policy. Relying on photographs and images he says:  he bought the property in January 2009 and although the pool was not pristine it did not leak and did not lose water and remained full and was functional; before the storm he had a functioning (albeit dirty) pool which had functioned for 40 years without failure in all storm events; the pool could not be used after the storm  the pool discolouration image relied on was at the end of the swimming season; he provided other photographs taken earlier in 2019 and 2016 showing the pool was clean and operational  the insurer‟s builder inspected the pool seven weeks after the event and the engineer inspected the pool 17 weeks after the event; the damage had already occurred, but more rain greatly impacted the pool and its surrounds between the storm and the inspections  the pool had not lifted; this is demonstrably wrong by the high end of the pool which was unaffected; it is the surrounding ground which has subsided  it is unknown if there is subsurface drainage for the pool, but groundwater naturally drained to a low-lying depression lower than the pool  the natural disaster storm event was such that most of the yard was saturated and covered with water. Excessive water from the storm caused the satura ted soil to subside against the pool sides; the weight of the subsiding soil pushed the sides of Determination | Case number: 741172 Page 5 of 15 the pool in, away from the bond beam, causing the collapse and destruction of the connection to the pool and separating the pool from the skimmer box; this occ urred during the storm and is covered in the storm event  irrespective of installation, the pool had functioned for 40 years without fault. The catastrophic failure occurred during a storm event which was declared a natural disaster. There could never have been sufficient drainage to address the amount of water  it is unfair to rely on Australian Standards which came after the pool installation Before the preliminary assessment, the insurer arranged for its engineer to address the assertions made by the complainant. The engineer reiterates the fundamental cause of failure was the inherently defective installation of the pool. He says:  relying on photographs, the pool shell is clearly distorted along the centre section of the long edge of the pool and such distortion (in excess of 30mms) is attributable to a local lifting caused by excessive underlying hydrostatic pressure  it is less common for inground pools to distort by subsidence at the ends  the concrete slab paving surround is not a bond beam as it is not continuously cast reinforced concrete edge beam tied to the outside face of the pool shell and does not provide the lateral support afforded by the continuous collar provided by a reinforced concrete bond beam  the absence of any continuity of a bond beam with its laterally stability benefits makes the pool shell unduly vulnerable to lateral forces from soil saturation during the storm even without the added water escaping from the pool via the skimmer box aperture  the absence of a standpipe and a proper system of relief drainage can directly result in the lifting of the shell  while slumping occurred, it was the deficiencies in the pool installation which facilitated this failure  the account regarding the period of disuse of the pool is accepted but as it cannot be established when the leak first developed in the skimmer box, it cannot be established the pool could have been brought back to use Submissions and material provided after preliminary assessment After the preliminary assessment, the complainant essentially reiterated his position. He challenges the independence of the engineer and relies on material sent to the insurer – the pre-purchase inspection report and an image of a commercial swimming pool similarly installed. While the records for the installation of his pool were unavailable, the complainant provided 3 images which he says supports his previous statements that the engineer can be challenged because installations of early pools utilised expansion joints in the Determination | Case number: 741172 Page 6 of 15 concrete serving as the bond beam and did not always include subservice drainage standpipes, contrary to the engineer ‟s comments. After the assessment, the insurer reiterates its position and says:  in the absence of any contradictory expert opinion from the complainant, it is entitled to rely on the qualified and experienced expert engineer‟s conclusions, as he is more suitably placed to make informed observations  although time elapsed between the storm event and the assessment the observations and conclusions by the engi neer were informed by images which predated the storm and evidence obtained in relation to the pool‟s incorrect installation which are unaffected by the period of time between the storm and the assessment  the full copy of the pre-purchase inspection report, and not only extracts, would be more informative for the i nsurer‟s considerations, but were not provided  there still remains clear and unambiguous photographic evidence of movement which pre-dated the storm event by about a year.  it does not dispute the occurrence of a storm event, which is covered by the policy. However, it says this is not the proximate cause of the damage as there is clear evidence of pre-existing issues pertaining to the pool and its surrounds and, even if the storm caused damage, such actions of water seeping down the sides and beneath the pool are still excluded. Engineer’s reports insufficiently persuasive The insurer does not dispute a storm event occurred and damage was sustained. The insurer‟s engineer refers to damage depicte d in photographs as partially event related. In the circumstances I am satisfied the complainant has established a valid claim. The insurer argues while the storm event occurred, and damage was sustained, the damage to the pool was not caused by a single event, but the proximate cause of the damage is excluded from cover by the policy. The onus rests with the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to decline the claim. The insurer relies on an engineer who says the proximate cause of the damage is the inadequate and inappropriate overall installation work to the pool which resulted in excessively elevated groundwater levels. In the storm event he says substantial rainfall accumulation happened over a short period leading to the final failure of the installation. I have carefully considered the engineer‟s report. I do not find it sufficiently persuasive for several reasons. Determination | Case number: 741172 Page 7 of 15 The engineer relies on certain installations required by an Australian Standard such as the requirement for a bond beam, a stand pipe and surface drainage around the perimeter of the pool. He also says the skimmer box was not properly secured to the pool shell and it should have been set in the concrete bond beam. The engineer says the pool is over 25 years old. The complainant says the pool is 40 years old. In any event, the Australian Standard relied on was published in 1994. On the available information I am not sufficiently persuaded that when the pool was installed this Australian Standard was in force. In the circumstances, I am not satisfied it is fair to rely on this Australian Standard. Further, the information provided by the complainant after the preliminary assessment regarding how swimming pools were installed before the Austra lian Standard has not been addressed by the insurer‟s engineer. Relevantly, the engineer concedes it cannot be established exactly when the separation and leak first developed at the skimmer box. I am also not persuaded the engineer who wrote the report has sufficient relevant expertise in view of the fact he says he also consulted with someone he described as a “pool expert consultant”. Insurer not entitled to decline the claim The parties refer to a pre-purchase inspection report. This information has not been made available to AFCA. In any event, in view of my concern that it is not established the pool was installed after the Australian Standard came into effect, I am not convinced of the probity of this information. I accept the photographs provided by the engineer show the pool lip is raised above the paving surround. I also accept photographs taken in March 2019 show settlement of the paving slabs and movement. However, I am not satisfied this establishes on the balance of probabilities the pool failed in the storm event because of water seeping through the earth or down the sides of the pool. In view of the images provided by the complainant, I do not accept the pool was not in use at the time of the storm event. I accept the policy does not provide cover if there has been earth movement, but the insurer will provide cover if this movement was caused by storm. In view of the evidence from the complainant as to the level of damage seen contemporaneo us with the storm event and in view of the nature of the storm event, I am satisfied it is probable the earth movement caused damage to the pool within 72 hours of the storm. For the reasons stated I am not satisfied the insurer has established on the balance of probabilities the pool damage was caused over time or because of structural or Determination | Case number: 741172 Page 8 of 15 design fault. In the circumstances, I am not satisfied the insurer is entitled to decline the claim. Mechanism to settle the claim The policy provides if the insurer agrees to pay a claim it will decide if it will repair the damage or pay what it would cost it to repair the damage. In his submission to AFCA on 9 October 2020, the complainant says: a fair outcome is the removal and installation of a replacement swimming pool shell and bond beam. The pool pump, chlorination and filtration system are all still perfectly fine, although clearly reconnection to the plumbing system will be required. In his first report, the engineer made recommendations in regard to proper remediation which included: 11.2 the removal and re-bedding of the pool shell and water circulation and drainage pipework, together with the installation of a bond-beam, paving surround and surface, sub-soil and bedding drainage and a standpipe all in accordance with AS/NZ1839. 11.3 It is recommended that the work be carried out by a reputable licensed pool installer. 11.4 It is anticipated that, given its age and current condition, fracturing of the pool shell is likely to occur during this process. In addition, the pool shell would not be considered warrantable by any licensed pool installer. Therefore, a new pool shell would be required. 11.5 It is also recommended that the intercept drainage at the Eastern end of the pool enclosure (and, subject to professional advice, probably the Southern edge of the pool enclosure) be completed in advance of the pool reinstatement works. Should the complainant accept this determination then within seven days of notification of acceptance, the insurer is to arrange for the engineer to prepare a scope of works to repair the pool. The parties may then obtain quotations for the cost of repairs once they agree the scope of works. The insurer is to elect whether it will repair the pool or cash settle the claim. Determination | Case number: 741172 Page 9 of 15 Should the insurer elect to cash settle the claim, the insurer should ensure a fair cash settlement includes an allowance for contingencies and variations which may occur once repairs commence. Determination | Case number: 741172 Page 10 of 15 3 Supporting information 3.1 Process AFCA’s approach to this complain t It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Caselaw and proximate cause Case law establishes:  The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause.  If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other w ould not have done so in the absence of the first, the first is the proximate cause.  A common - sense approach is taken to determine proximate cause. 3.3 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‟s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. What you are covered for - Insured Events We cover the building for loss or damage at the insured address caused by an insured event during the period of insurance. There are some things we do not Determination | Case number: 741172 Page 11 of 15 cover, and these are shown in the „We do not cover‟ section of the following tables on pages 16 to 25 and in the „What we do not cover - general exclusions‟ on pages 35 to 40. Storm We cover Loss or damage to the building caused by a storm What we do not cover – general exclusions (cont’d) You are not covered under any section of your policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but we will cover landslide or subsidence that is specifically covered under the following insured events: • Storm • Flood (but only if yo u are covered for the insured event „Flood‟) • Earthquake and Tsunami • Explosion. Seepage of water water seeping or running: • through the earth (hydrostatic water seepage); • down the sides of earth or earth fill that is up against the building; • down the sides or underneath swimming pools or spas causing them to move, change shape, lift or leak through their hydrostatic valves; • against or through retaining walls and forcing them to move or crack; • from agricultural pipes. Determination | Case number: 741172 Page 12 of 15 What do we mean by that? Event or incident means a single event, accident or occurrence which you did not intend or expect to happen. 3.4 Extracts from material relied on by the parties Date Action Insurer’s builder’ s report (DW) 30 March 2020  Since storm 9 February 2020, paved area to the pool perimeter has severely dropped/settled  Subsidence issue consistent with erosion over time rather than one o f f storm event Insurer’s engineer’s report (MC) 18 May 2020  Inspected and photographed pool 8 May 2020  Reviewed photographs taken late 2018 and early 2019  Image15 annotat ed “ View, looking North - West along the Southern side paving and pool edge at and near skimmer box. This image shows a distinct gap had already developed, increasing towards the ski mmer box location, bet ween the downstand of the pool lip and the concrete paving. G enerally, in addition to the visible gap, the lip downstand was originally set into the concrete paving by a minimum of 5mm – see Image 11 – therefore, an overall relative m ovement of up to 10mm had already occurred here ”  Image 16 from Nearmap annotated: “shows an aerial photo of the pool taken on 31 Marc h 2019. The pool water had already discoloured and was no longer being used (and the i nsured has confirmed that the pool ha s not been used since then, which can be further confirmed by later aerial photos which show progressive discolouration).  Image 19 : shows “ attempt to locate evidence of surface drainage around the surround paving perimeter. Despite excavating down to a de pth of some 200mm below the top of paving, none was found (nor believed by the Insured to exist) ” .  Pool over 25 years old and is in poor condition and constructed as an inground prefabricated fibreglass pool with paving surround comprising conc rete slabs  Pool shell had lifted resulting from elevated ground water levels and the escape of water via the skimmer box/pool shell seal which has complet ely failed  Highly probable seal fracture commenced as early as late 2018 and progressed providing a narrow gap th rough which water could go down into the ground at the side of the pool in rainfall during the months before Determination | Case number: 741172 Page 13 of 15 Date Action the claim event and during the claim event, failing to top up the pool and removing the opportunity for the pool water level to equalise with the s urrounding ground water level resulting in hydrostatic differential pressure unrelieved by any necessary drainage (which was absent) which would contribut e to causing the pool shell to lift  Had the skimmer box been set into the bond beam and connected and sealed to the pool shell then the seal may not have broken – box completely separate from pool shell  Photographs taken some time before 31 March 2019 show lifting of the pool shell  No standpipe provided to the pool installation (required by Australian Stan dards) so opportunity for the relief of excessive groundwater lost  Ground saturated because of lack of proper drainage causing soil to slump against the pool face and deflect the pool sides  No face plat e present  Pool paving disrupted, and earlier photogra phs show pre - existing settlement of the pool surround paving  Tried unsuccessfully to locate evidence of surface drainage around the surrounding paving perimeter  This is a kit pool which was installed by an amateur including no formal bond beam as required by Australian Standards  Damage not caused by a single event  D amage caused by the inadequate and inappropriate overall installation work to the pool which has resulted periodically in excessively elevated ground water levels  C laim event has provided substantial rainfall accumulation over a short period and this has facilitated a substantial increment in the final failure of the installation Insurer’s engineer’s report (MC) 18 May 2020  E ngineer rebuts the complainant‟s assertions  R epeats the fundamental cause of failure was the inherently defective installation of the pool namely:  A bsence of a bond beam which provides significant added support and stability to the pool edge and assists in both supporting and tying in the skimmer box to the rea r face of the pool. Without this the connection the pool shell is extremely vulnerable to failure resulting in chronic leakage .  A bsence of any mechanical tying of the skimmer box flange to the pool shell (bolt ed connection between the box and the pool shel l, including a face plat e to the Determination | Case number: 741172 Page 14 of 15 Date Action shell – also absent). The skimmer box forms part of the pool plumbing, and connections should be secure and waterproof. This connection (relying solely on mastic sealant) was extremely vulnerable to failure, including catas trophic, highly - accelerated failure as initial failure leads to progressive saturation of the fill material, which, in turn, via the commencement of „slumping‟ of the fill/distortion of the pool shell results in further separation at the connection, amplif ying the leakage and, in turn, further progressing the slumping action. This will manifest in loss of pool water and, therefore, non - function of the circulation system. If detected early, action to rectify the deficiencies could be taken and, ideally would result in the „upgrade‟ of the connection to standard requirements by the provision of secure fixings an d more comprehensively by the installation of a bond - beam to the pool again as required by standard.  A bsence of a standpipe which provides ongoing me tering purely by visual inspection and use of a tape measure to ascertain the level of the ground water table. T his can also act as a means of escape of excessively pressurised ground water, although the pool‟s hydrostatic valve would come into play before this. This is usually associated directly with a deeper relief drainage system. The i nsured advised that he had no knowledge of any such relief drainage (including no evidence of any outlet point, whether at the surface lower, down and further away, given an adequate slope in the surrounding ground, or into a drainage pit, then conducted to the stormwater system). The implications are no properly functioning system exists, resulting in the potential for excessive hydrostatic forces to develop contributing to raised ground water levels and even resulting in undue lifting of the pool shell, such occurred along the northern edge of the pool.  Absence of typical pool surround drainage. This drainage, required by standard, provides a shallow „dewatering system‟ around the pool which assists in maintaining a relatively low ground wat er table, by relieving immediate saturation from direct and diverted rainfall (i. e. rainfall landing on the pool surround paving) as well as pool splash - water. This can also manifest in relative settlement of the surround paving, such as had already occurred in 2019 as confirmed by the i nsured‟s photo.  A bove deficiencies ar e important in the specific location of this pool, owing to the much higher ground levels of the neighbouring pro perties to the east and Determination | Case number: 741172 Page 15 of 15 Date Action south. T he Insured was in the process of installing an interception drain at the east of the lawn beyond the pool . This was covered in detail in our report with the very specific failure modes that can result from the absence of the provisions required under AS 1839. 3.5 Other relevant material considered and relied on  Parties‟ submissions /emails and all attachments to all submissions/emails both before and after the preliminary assessment  Photographs and plans  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.