Home insurer declined storm damage claim for swimming pool collapse on exclusion grounds
Text of the determination
Determination
Case number 741172
Financial firm AAI Limited
Determination | Case number: 741172 Page 2 of 15
Case number: 741172 6 April 2021
1 Determination overview
1.1 Complaint
The complainant holds a home insurance policy with the financial firm (the insurer).
On 11 February 2020, a claim was lodged for damage to the swimming pool at his
home following a recent storm. The complainant says heavy rainfall caused ground
movement which resulted in the collapse of the pool walls.
The insurer appointed an engineer who concluded that damage to the pool is
attributable to non-compliant installation and deterioration over time.
The insurer says as these circumstances are excluded from co ver, it is entitled to
decline the claim.
The complainant says all the damage was caused by the storm and heavy rain. He
seeks the insurer review its decision. He says a fair outcome is the removal and
installation of a replacement swimming pool shell and bond beam and re-connection
of the pool pump and the chlorination and filtration system to the plumbing system.
The case manager provided the parties with a preliminary assessment on the issues
in dispute. The preliminary assessment was in favour of the insurer.
As the complainant does not accept the preliminary assessment, the complaint has
been referred to me for determination .
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
No. The available information does not establish on the balance of probabilities the
damage to the pool was caused by the excluded events relied by the insurer.
1.3 Determination
This determination is in favour of the complainant.
Should the complainant accept this determination then within seven days of
notification of acceptance the claim and complaint are to be settled as set out in this
determination under the heading “mechanism to settle the claim.”
Determination | Case number: 741172 Page 3 of 15
2 Reasons for determination
I have decided this complaint based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding). I have considered all the material submitted by the parties,
both before and after the preliminary assessment. I am satisfied that the
documentation I have relied on has been provided to both parties.
The parties have raised numerous issues in their submissions to AFCA. However,
commentary in this determination is restricted to those issues considered relevant to
the outcome.
After the preliminary assessment was rejected, both parties made further
submissions. Where relevant, these submissions will be referred to in the
determination.
2.1 Is the insurer entitled to decline the claim?
Insurer must establish exclusions apply
The complainant must establish on the balance of probabilities he has suffered a loss
caused by an event to which the policy responds. This is known as a prima facie or
valid claim.
In the context of this claim, the complainant must establish that the damage was
caused by the storm event in February 2020.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
The insurer must establish the proximate cause of the damage was ground
movement or seepage of water down the sides or under the pool over time.
The relevant policy extracts are set out in supporting section 3.3 of this determination.
Parties’ material and submissions considered
The insurer relies on two reports from a civil/structural engineer who inspected and
photographed the pool on 8 May 2020. The engineer also reviewed photographs and
images taken in late 2018 and early 2019. In his second report, the engineer rebuts
the complainant‟s assertions and reiterates and amplifies his findings.
The complainant has provided no independent expert reports. He has provided
lengthy submissions and photographs. He says he is qualified to comment as he has
worked as a building surveyor and consultant for 21 years. He says this experience
included the approval, building practices and design certification of swimming pools .
Determination | Case number: 741172 Page 4 of 15
A summary of the engineers‟ reports is set out in suppor ting section 3.4 of this
determination.
Relying on the engineers‟ reports and pre -claim images, the insurer says the
proximate cause of damage to the pool was due to its non-compliant installation and
deterioration and gradual ground subsidence over time and not a single storm event.
It says the defective installation of the pool contributed to excessively elevated ground
water levels over time.
It makes a following submissions and observations:
the pool was lifting and there was movement of the surrounding paving from 2019
March 2019 photos shows the pool was discoloured and was not used since then
there are many problems with the installation and construction of the pool
a fractured seal caused a gap from which water had gone into the ground from the
sides of the pool over time and rainfall from months before, along with the failure to
top up the pool during the event, caused hydrostatic pressure in the soil
there was no standpipe and insufficient drainage over time caused saturation and
destabilisation of the surrounding soil causing the soil to slump against the sides of
the pool
The complainant says the damage and the catastrophic failure was caused by the
weight of soil subsidence against the side of the pool caused by the storm event
which is covered by the policy. Relying on photographs and images he says:
he bought the property in January 2009 and although the pool was not pristine it
did not leak and did not lose water and remained full and was functional; before the
storm he had a functioning (albeit dirty) pool which had functioned for 40 years
without failure in all storm events; the pool could not be used after the storm
the pool discolouration image relied on was at the end of the swimming season; he
provided other photographs taken earlier in 2019 and 2016 showing the pool was
clean and operational
the insurer‟s builder inspected the pool seven weeks after the event and the
engineer inspected the pool 17 weeks after the event; the damage had already
occurred, but more rain greatly impacted the pool and its surrounds between the
storm and the inspections
the pool had not lifted; this is demonstrably wrong by the high end of the pool
which was unaffected; it is the surrounding ground which has subsided
it is unknown if there is subsurface drainage for the pool, but groundwater naturally
drained to a low-lying depression lower than the pool
the natural disaster storm event was such that most of the yard was saturated and
covered with water. Excessive water from the storm caused the satura ted soil to
subside against the pool sides; the weight of the subsiding soil pushed the sides of
Determination | Case number: 741172 Page 5 of 15
the pool in, away from the bond beam, causing the collapse and destruction of the
connection to the pool and separating the pool from the skimmer box; this occ urred
during the storm and is covered in the storm event
irrespective of installation, the pool had functioned for 40 years without fault. The
catastrophic failure occurred during a storm event which was declared a natural
disaster. There could never have been sufficient drainage to address the amount of
water
it is unfair to rely on Australian Standards which came after the pool installation
Before the preliminary assessment, the insurer arranged for its engineer to address
the assertions made by the complainant. The engineer reiterates the fundamental
cause of failure was the inherently defective installation of the pool. He says:
relying on photographs, the pool shell is clearly distorted along the centre section
of the long edge of the pool and such distortion (in excess of 30mms) is attributable
to a local lifting caused by excessive underlying hydrostatic pressure
it is less common for inground pools to distort by subsidence at the ends
the concrete slab paving surround is not a bond beam as it is not continuously cast
reinforced concrete edge beam tied to the outside face of the pool shell and does
not provide the lateral support afforded by the continuous collar provided by a
reinforced concrete bond beam
the absence of any continuity of a bond beam with its laterally stability benefits
makes the pool shell unduly vulnerable to lateral forces from soil saturation during
the storm even without the added water escaping from the pool via the skimmer
box aperture
the absence of a standpipe and a proper system of relief drainage can directly
result in the lifting of the shell
while slumping occurred, it was the deficiencies in the pool installation which
facilitated this failure
the account regarding the period of disuse of the pool is accepted but as it cannot
be established when the leak first developed in the skimmer box, it cannot be
established the pool could have been brought back to use
Submissions and material provided after preliminary assessment
After the preliminary assessment, the complainant essentially reiterated his position.
He challenges the independence of the engineer and relies on material sent to the
insurer – the pre-purchase inspection report and an image of a commercial swimming
pool similarly installed.
While the records for the installation of his pool were unavailable, the complainant
provided 3 images which he says supports his previous statements that the engineer
can be challenged because installations of early pools utilised expansion joints in the
Determination | Case number: 741172 Page 6 of 15
concrete serving as the bond beam and did not always include subservice drainage
standpipes, contrary to the engineer ‟s comments.
After the assessment, the insurer reiterates its position and says:
in the absence of any contradictory expert opinion from the complainant, it is
entitled to rely on the qualified and experienced expert engineer‟s conclusions, as
he is more suitably placed to make informed observations
although time elapsed between the storm event and the assessment the
observations and conclusions by the engi neer were informed by images which
predated the storm and evidence obtained in relation to the pool‟s incorrect
installation which are unaffected by the period of time between the storm and the
assessment
the full copy of the pre-purchase inspection report, and not only extracts, would be
more informative for the i nsurer‟s considerations, but were not provided
there still remains clear and unambiguous photographic evidence of movement
which pre-dated the storm event by about a year.
it does not dispute the occurrence of a storm event, which is covered by the policy.
However, it says this is not the proximate cause of the damage as there is clear
evidence of pre-existing issues pertaining to the pool and its surrounds and, even if
the storm caused damage, such actions of water seeping down the sides and
beneath the pool are still excluded.
Engineer’s reports insufficiently persuasive
The insurer does not dispute a storm event occurred and damage was sustained. The
insurer‟s engineer refers to damage depicte d in photographs as partially event
related. In the circumstances I am satisfied the complainant has established a valid
claim.
The insurer argues while the storm event occurred, and damage was sustained, the
damage to the pool was not caused by a single event, but the proximate cause of the
damage is excluded from cover by the policy.
The onus rests with the insurer to prove on the balance of probabilities that an
exclusion applies if it seeks to decline the claim.
The insurer relies on an engineer who says the proximate cause of the damage is the
inadequate and inappropriate overall installation work to the pool which resulted in
excessively elevated groundwater levels. In the storm event he says substantial
rainfall accumulation happened over a short period leading to the final failure of the
installation.
I have carefully considered the engineer‟s report. I do not find it sufficiently persuasive
for several reasons.
Determination | Case number: 741172 Page 7 of 15
The engineer relies on certain installations required by an Australian Standard such
as the requirement for a bond beam, a stand pipe and surface drainage around the
perimeter of the pool. He also says the skimmer box was not properly secured to the
pool shell and it should have been set in the concrete bond beam.
The engineer says the pool is over 25 years old. The complainant says the pool is 40
years old. In any event, the Australian Standard relied on was published in 1994. On
the available information I am not sufficiently persuaded that when the pool was
installed this Australian Standard was in force. In the circumstances, I am not satisfied
it is fair to rely on this Australian Standard.
Further, the information provided by the complainant after the preliminary assessment
regarding how swimming pools were installed before the Austra lian Standard has not
been addressed by the insurer‟s engineer.
Relevantly, the engineer concedes it cannot be established exactly when the
separation and leak first developed at the skimmer box.
I am also not persuaded the engineer who wrote the report has sufficient relevant
expertise in view of the fact he says he also consulted with someone he described as
a “pool expert consultant”.
Insurer not entitled to decline the claim
The parties refer to a pre-purchase inspection report. This information has not been
made available to AFCA. In any event, in view of my concern that it is not established
the pool was installed after the Australian Standard came into effect, I am not
convinced of the probity of this information.
I accept the photographs provided by the engineer show the pool lip is raised above
the paving surround. I also accept photographs taken in March 2019 show settlement
of the paving slabs and movement. However, I am not satisfied this establishes on the
balance of probabilities the pool failed in the storm event because of water seeping
through the earth or down the sides of the pool.
In view of the images provided by the complainant, I do not accept the pool was not in
use at the time of the storm event.
I accept the policy does not provide cover if there has been earth movement, but the
insurer will provide cover if this movement was caused by storm. In view of the
evidence from the complainant as to the level of damage seen contemporaneo us with
the storm event and in view of the nature of the storm event, I am satisfied it is
probable the earth movement caused damage to the pool within 72 hours of the
storm.
For the reasons stated I am not satisfied the insurer has established on the balance of
probabilities the pool damage was caused over time or because of structural or
Determination | Case number: 741172 Page 8 of 15
design fault. In the circumstances, I am not satisfied the insurer is entitled to decline
the claim.
Mechanism to settle the claim
The policy provides if the insurer agrees to pay a claim it will decide if it will repair the
damage or pay what it would cost it to repair the damage.
In his submission to AFCA on 9 October 2020, the complainant says:
a fair outcome is the removal and installation of a replacement swimming pool
shell and bond beam. The pool pump, chlorination and filtration system are all still
perfectly fine, although clearly reconnection to the plumbing system will be
required.
In his first report, the engineer made recommendations in regard to proper
remediation which included:
11.2 the removal and re-bedding of the pool shell and water circulation and
drainage pipework, together with the installation of a bond-beam, paving surround
and surface, sub-soil and bedding drainage and a standpipe all in accordance
with AS/NZ1839.
11.3 It is recommended that the work be carried out by a reputable licensed pool
installer.
11.4 It is anticipated that, given its age and current condition, fracturing of the pool
shell is likely to occur during this process. In addition, the pool shell would not be
considered warrantable by any licensed pool installer. Therefore, a new pool shell
would be required.
11.5 It is also recommended that the intercept drainage at the Eastern end of the
pool enclosure (and, subject to professional advice, probably the Southern edge
of the pool enclosure) be completed in advance of the pool reinstatement works.
Should the complainant accept this determination then within seven days of
notification of acceptance, the insurer is to arrange for the engineer to prepare a
scope of works to repair the pool.
The parties may then obtain quotations for the cost of repairs once they agree the
scope of works.
The insurer is to elect whether it will repair the pool or cash settle the claim.
Determination | Case number: 741172 Page 9 of 15
Should the insurer elect to cash settle the claim, the insurer should ensure a fair cash
settlement includes an allowance for contingencies and variations which may occur
once repairs commence.
Determination | Case number: 741172 Page 10 of 15
3 Supporting information
3.1 Process
AFCA’s approach to this complain t
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie or valid claim.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on
oath, or to require third parties to give evidence. When we assess complaints, we
consider available documents, the recollections of the parties, and all relevant
circumstances. We give more weight to documents created at the time the events
occurred. If there is no relevant documentation, we will decide what is most likely to
have occurred based on the information provided to us. If there are conflicting
recollections and these are evenly weighted, we may find that a claim cannot be
established.
3.2 Caselaw and proximate cause
Case law establishes:
The proximate cause of the loss is the dominant or effective or operative cause of
the loss whether or not that be the last in time or the sole cause.
If there are several causes operating contemporaneously, each must be examined
for the qualities of reality, predominance and efficiency as the active, efficient
cause that sets a relevant chain of events in action. If one cause would have
caused the harm in any case, and the other w ould not have done so in the
absence of the first, the first is the proximate cause.
A common - sense approach is taken to determine proximate cause.
3.3 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties
and in the insurer‟s Notice of Response. Both the policy document and the Notice
have been exchanged with the complainant.
What you are covered for - Insured Events
We cover the building for loss or damage at the insured address caused by an
insured event during the period of insurance. There are some things we do not
Determination | Case number: 741172 Page 11 of 15
cover, and these are shown in the „We do not cover‟ section of the following
tables on pages 16 to 25 and in the „What we do not cover - general exclusions‟
on pages 35 to 40.
Storm
We cover
Loss or damage to the building caused by a storm
What we do not cover – general exclusions (cont’d)
You are not covered under any section of your policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement, but we will cover landslide or subsidence that is
specifically covered under the following insured events:
• Storm
• Flood (but only if yo u are covered for the insured event „Flood‟)
• Earthquake and Tsunami
• Explosion.
Seepage of water
water seeping or running:
• through the earth (hydrostatic water seepage);
• down the sides of earth or earth fill that is up against the building;
• down the sides or underneath swimming pools or spas causing them
to move, change shape, lift or leak through their hydrostatic valves;
• against or through retaining walls and forcing them to move or crack;
• from agricultural pipes.
Determination | Case number: 741172 Page 12 of 15
What do we mean by that?
Event or incident
means a single event, accident or occurrence which you did not intend or expect
to happen.
3.4 Extracts from material relied on by the parties
Date Action
Insurer’s builder’ s report (DW)
30 March 2020
Since storm 9 February 2020, paved area to the pool
perimeter has severely dropped/settled
Subsidence issue consistent with erosion over time
rather than one o f f storm event
Insurer’s engineer’s report
(MC)
18 May 2020
Inspected and photographed pool 8 May 2020
Reviewed photographs taken late 2018 and early 2019
Image15 annotat ed “ View, looking North - West along
the Southern side paving and pool edge at and near
skimmer box. This image shows a distinct gap had
already developed, increasing towards the ski mmer
box location, bet ween the downstand of the pool lip
and the concrete paving. G enerally, in addition to the
visible gap, the lip downstand was originally set into
the concrete paving by a minimum of 5mm – see
Image 11 – therefore, an overall relative m ovement of
up to 10mm had already occurred here ”
Image 16 from Nearmap annotated: “shows an aerial
photo of the pool taken on 31 Marc h 2019. The pool
water had already discoloured and was no longer
being used (and the i nsured has confirmed that the
pool ha s not been used since then, which can be
further confirmed by later aerial photos which show
progressive discolouration).
Image 19 : shows “ attempt to locate evidence of
surface drainage around the surround paving
perimeter. Despite excavating down to a de pth of
some 200mm below the top of paving, none was found
(nor believed by the Insured to exist) ” .
Pool over 25 years old and is in poor condition and
constructed as an inground prefabricated fibreglass
pool with paving surround comprising conc rete slabs
Pool shell had lifted resulting from elevated ground
water levels and the escape of water via the skimmer
box/pool shell seal which has complet ely failed
Highly probable seal fracture commenced as early as
late 2018 and progressed providing a narrow gap
th rough which water could go down into the ground at
the side of the pool in rainfall during the months before
Determination | Case number: 741172 Page 13 of 15
Date Action
the claim event and during the claim event, failing to
top up the pool and removing the opportunity for the
pool water level to equalise with the s urrounding
ground water level resulting in hydrostatic differential
pressure unrelieved by any necessary drainage (which
was absent) which would contribut e to causing the
pool shell to lift
Had the skimmer box been set into the bond beam and
connected and sealed to the pool shell then the seal
may not have broken – box completely separate from
pool shell
Photographs taken some time before 31 March 2019
show lifting of the pool shell
No standpipe provided to the pool installation (required
by Australian Stan dards) so opportunity for the relief of
excessive groundwater lost
Ground saturated because of lack of proper drainage
causing soil to slump against the pool face and deflect
the pool sides
No face plat e present
Pool paving disrupted, and earlier photogra phs show
pre - existing settlement of the pool surround paving
Tried unsuccessfully to locate evidence of surface
drainage around the surrounding paving perimeter
This is a kit pool which was installed by an amateur
including no formal bond beam as required by
Australian Standards
Damage not caused by a single event
D amage caused by the inadequate and inappropriate
overall installation work to the pool which has resulted
periodically in excessively elevated ground water
levels
C laim event has provided substantial rainfall
accumulation over a short period and this has
facilitated a substantial increment in the final failure of
the installation
Insurer’s engineer’s report
(MC)
18 May 2020
E ngineer rebuts the complainant‟s assertions
R epeats the fundamental cause of failure was the
inherently defective installation of the pool namely:
A bsence of a bond beam which provides significant
added support and stability to the pool edge and
assists in both supporting and tying in the skimmer box
to the rea r face of the pool. Without this the connection
the pool shell is extremely vulnerable to failure
resulting in chronic leakage .
A bsence of any mechanical tying of the skimmer box
flange to the pool shell (bolt ed connection between the
box and the pool shel l, including a face plat e to the
Determination | Case number: 741172 Page 14 of 15
Date Action
shell – also absent). The skimmer box forms part of the
pool plumbing, and connections should be secure and
waterproof. This connection (relying solely on mastic
sealant) was extremely vulnerable to failure, including
catas trophic, highly - accelerated failure as initial failure
leads to progressive saturation of the fill material,
which, in turn, via the commencement of „slumping‟ of
the fill/distortion of the pool shell results in further
separation at the connection, amplif ying the leakage
and, in turn, further progressing the slumping action.
This will manifest in loss of pool water and, therefore,
non - function of the circulation system. If detected
early, action to rectify the deficiencies could be taken
and, ideally would result in the „upgrade‟ of the
connection to standard requirements by the provision
of secure fixings an d more comprehensively by the
installation of a bond - beam to the pool again as
required by standard.
A bsence of a standpipe which provides ongoing
me tering purely by visual inspection and use of a tape
measure to ascertain the level of the ground water
table. T his can also act as a means of escape of
excessively pressurised ground water, although the
pool‟s hydrostatic valve would come into play before
this. This is usually associated directly with a deeper
relief drainage system. The i nsured advised that he
had no knowledge of any such relief drainage
(including no evidence of any outlet point, whether at
the surface lower, down and further away, given an
adequate slope in the surrounding ground, or into a
drainage pit, then conducted to the stormwater
system). The implications are no properly functioning
system exists, resulting in the potential for excessive
hydrostatic forces to develop contributing to raised
ground water levels and even resulting in undue lifting
of the pool shell, such occurred along the northern
edge of the pool.
Absence of typical pool surround drainage. This
drainage, required by standard, provides a shallow
„dewatering system‟ around the pool which assists in
maintaining a relatively low ground wat er table, by
relieving immediate saturation from direct and diverted
rainfall (i. e. rainfall landing on the pool surround
paving) as well as pool splash - water. This can also
manifest in relative settlement of the surround paving,
such as had already occurred in 2019 as confirmed by
the i nsured‟s photo.
A bove deficiencies ar e important in the specific
location of this pool, owing to the much higher ground
levels of the neighbouring pro perties to the east and
Determination | Case number: 741172 Page 15 of 15
Date Action
south. T he Insured was in the process of installing an
interception drain at the east of the lawn beyond the
pool . This was covered in detail in our report with the
very specific failure modes that can result from the
absence of the provisions required under AS 1839.
3.5 Other relevant material considered and relied on
Parties‟ submissions /emails and all attachments to all submissions/emails both
before and after the preliminary assessment
Photographs and plans
Correspondence between the parties.