Home / Auto & General / Determination 741021

Determination 741021

Insurer declined water escape claim for veranda subsidence and re-stumping

FirmAuto & General
Decided2021-07-23
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$19,336
Non-financial loss—
Amount claimed$60,858
SourceAFCA PDF

Summary

Landlords claimed under building cover after a cracked stormwater pipe contributed to veranda subsidence and re-stumping of a 130-year-old house. AFCA ordered the insurer to pay 33% of the allowable repair costs, interest, and expert report costs.

The insured proved a valid claim from a sudden escape of liquid, so the insurer had to prove an exclusion; the leak caused part of the damage, so the insurer must pay the attributable share.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination Case number 741021 Financial firm Auto & General Services Pty Ltd Determination | Case number: 741021 Page 2 of 17 Case number: 741021 22 July 2021 1 Determination overview 1.1 Complaint The complainants held home landlord building insurance with the financial firm („the insurer‟) and lodged a claim for the escape of liquid from a stormwater pipe which they said caused movement of the veranda subfloor soils and associated damage to their property. The front veranda dropped resulting in cracking to the dwelling and the areas under the veranda and the front section of the house required restumping. The insurer denied the claim based on engineering evidence that the damage was not due to the insured event of leaking pipe but was rather due to other factors excluded by the policy. The complainants dispute this decision and have asked AFCA to review the matter. The case manager provided the parties with a recommendation on the issues in dispute apportioning liability mostly in favour of the insurer. The complainants accepted the recommendation, but it was not accepted by the insurer. In the circumstances, the complaint has been referred to a panel for determination . 1.2 Issues and key findings Is the insurer entitled to decline the claim? The insurer is not obliged to pay the full amount claimed but as there is damage caused by an insured event (the leak from the cracked stormwater pipe) as well as damage which pre- existed the leak or is excluded from cover it is fair some contribution is made to the complainants‟ claim. Why is the outcome fair? The outcome is fair because the available information establishes a complex situation whereby several factors probably caused the claimed damage. In circumstances where the complainants have established the leaking pipe was probably responsible for some of the damage, it is fair the insurer compensates the complainants a fair amount for the damage attributable to the leaking pipe. Determination | Case number: 741021 Page 3 of 17 1.3 Determination This determination is partially in favour of the complainants. Should the complainants accept this determination then within seven days of notification of acceptance the insurer is to pay to the complainants: > $19,335.50 (33% of the claimed and allowable cost of repairs) > interest pursuant to section 57 of the Insurance Contracts Act (the Act) on $19,335.50 from 24 April 2020 until settlement > the cost of expert reports > If the complainants have paid for the expert reports the insurer is also liable to pay interest pursuant to section 57 of the Act from the date of payment for the reports until the date of settlement. The complainants are to provide to the insurer invoices (if any) from their plumber and their engineer for the reports. Upon receipt of the invoices, the insurer is to pay for the reports or reimburse the complainants for the cost of the reports. Determination | Case number: 741021 Page 4 of 17 2 Reasons for determination The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). The panel considered all the material submitted by the parties, both before and after the recommendation. The panel is satisfied that the documentation it relied on has been provided to both parties. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted to those issues considered relevant to the outcome. No new material provided after recommendation After the recommendation was rejected, the insurer made further submissions in which it essentially reiterated its position. No new material was provided. Where relevant, these further submissions will be referred to in the determination. 2.1 Is the insurer entitled to decline the claim? Circumstances of the loss and damage The complainants do not claim damage due to a single storm event. They say the damage to the property was significantly contributed to by the escape of water from the broken stormwater pipe running along the side of the property resulting in the front veranda subsiding requiring re-stumping of the entire front of the property. They say they were unaware of the damage because the pipe was under a concrete path. They claim water drained under the house for an unknown length of time causing the damage. They point out the adjoining house which is subject to similar conditions has not sustained damage. The complainants say they lost rental income ($12,000) while repairs took place but also say they do not claim lost rent only the repair costs of $60,858.45. In late November 2018 the complainants‟ tenants did not want to renew their lease because of some maintenance issues. In January 2019 the complainants were told the house needed re-stumping. In February 2019 the complainants made a claim on the insurer claiming a plumber had advised a pipe under the concrete slab had burst and damaged the property. When the claim was denied, they removed the concrete, repaired the stormwater system and repaired the house. Once they engaged the plumber to make repairs, he confirmed a pipe under the concrete slab had burst and so they lodged a second claim in February 2020. The complainants‟ plasterer confirmed walls were cracked and damaged beyond economical repair because of the re-stumping work. Their builder described the internal and external works he undertook which he also said resulted from the house being re-stumped. Determination | Case number: 741021 Page 5 of 17 Parties ’ submissions and material considered Relying on its engineer (JH) the insurer declined the claim saying it does not cover damage caused by ground movement, subsidence or gradual deterioration. The insurer referred to the complainants‟ plumber‟s report noting tree roots were growing within the pipes and say damage from tree roots is also excluded from cover. The insurer says the rotting timber would have become evident prior to completely failing despite the complainants‟ advice the damage could not have been identified earlier. After the recommendation, the insured reiterated its position and refers to maintenance issues (tennis ball blockages) which it says are excluded from cover. The insurer continues to contend it is entitled to decline the claim because the policy specifically excludes cover for any loss or damage caused by subsidence regardless of its cause. Both parties have provided expert reports. A summary of the reports is set out in supporting section 3.4 of this determination. The complainants rely on their plumber (GV). He inspected and photographed the property on 24 May 2019. His camera shots show broken stormwater pipes in the nature strip and tennis balls lodged in the blockage. He also photographed the front down pipe and annotated the photograph as “severe break in stormwater pipe left of down pipe.” Relevant to the complainants‟ position the plumber found a section of the stormwater pipe was broken on the west side of the front downpipe. He said the pipe obviously had a crack in it which did not allow him to push his camera through to the rear of the property. When GV pushed his camera through to the front garden he found tennis balls in the pipe and tree roots. GV recommend the stormwater system to be replaced and concluded: Due to the blockages in the storm water system at the front of the property it is my opinion water has been overflowing from the channel grate at the rear of the property and in turn flooding the sub floor. I also believe the cracked storm water pipe under the down pipe on the south east corner of the dwelling has been a major factor in the subsidence of the dwelling. Please note this cracked storm water pipe is approximately 100mm off the foundations of the dwelling (south side). The insurer relies on an engineer (JH) who inspected and photographed the property on 21 February 2019. His photographs show the veranda and slab were in a deteriorated condition and because of this he says water was able to penetrate at several locations resulting in subfloor moisture and resultant timber rot. He said this occurred over a long period of time because of inadequate subfloor ventilation, site drainage, waterproofing mitigation and leaking of the veranda slab to the subfloor. One of JH‟s photographs of the side of the house shows a concrete path and he says this indicates poor site drainage as surface water must be diverted away from the house. As a result, when it rains, JH says water is channelled towards the subfloor of the house and constantly wets the soil underneath which increases the moisture under the house resulting in timber rot over time. JH did not test the plumbing systems. Determination | Case number: 741021 Page 6 of 17 JH provided a second report in April 2020 after the property had been re-stumped by the complainants. He was provided with the complainants‟ plumber‟s report but made no comment about it. JH reviewed photographs of the veranda taken before and after the re- stumping and says there is ongoing soil subsidence. In the third report in May 2020 JH was asked to comment specifically about the leak located by the plumber. JH notes the plumbing issues were fixed but says there is still subsidence. JH relies on photographs taken when he first inspected the property and says the condition of substructure members and supports confirm ongoing construction issues and continues to assert the damage is not related to a single event. Relevant to the plumber‟s report, he says: Based on the available evidence as per our report dated 2 April 2020, in our opinion the leak located by the plumber has not contributed to the damages to the veranda. The complainants arranged for their engineer (GM) to inspect the property in December 2020. GM says the significant movement of the north east corner of the house was not a typical characteristic of natural consolidation. GM notes there was no movement to the rear of the house or to the neighbour‟s house. He says when natural consolidation occurs it generally affects the whole property and not a small section. He notes the stormwater drain was repaired in July 2019 and since then has been no report of excess water under the house. From his visual inspection and experience with previous similar works GM concluded the damage and internal cracking is due to the blockage and failure of the stormwater drain and not from natural settlement. In January 2021 JH responded to GM‟s report. JH said although there are gaps between the side boards and the external façade below the floor line to the house (near the concrete path) these do not extend to the front veranda which is fully closed off on three sides resulting in no cross ventilation and the dead airspace. For natural consolidation to affect the whole property JH says this would require soil conditions and profile under the building to be uniform across the whole building and each part exposed to natural elements in identical ways which is rare. He says the founding soils are reactive and several factors affect movement in founding soils from changing moisture content. He describes factors which affect movement such as exposure to sunlight, good site drainage, presence/absence of trees/gardens close to that house (he provides a photograph of a tree at the front of the house) and leaking taps or pipes. Even if the cracking was not seen until 2018 JH says this does not mean there was no movement up until then. JH relies on a photograph showing packing to some of the stumps under the house indicating the house has been re-levelled at some time in the past. Complainants have established a valid claim The complainants must establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. In the context of this claim the complainants must establish the claimed damage was caused by the sudden and unexpected escape of liquid. The available evidence establishes the pipe was probably leaking over time. The policy does not cover loss or damage caused by water Determination | Case number: 741021 Page 7 of 17 escaping slowly over time unless it is reasonable that the complainants could not have known about the water escaping. The relevant policy extracts are set out in supporting section 3.2 of this determination The insurer says the complainants should have known because the rotten timber would have been evident prior to completely failing. The panel does not accept this contention. Even if the complainant noticed the veranda was not level, in view of the age of the house, the panel accepts it is reasonable the complainants could not have known about the water leaking under the house because the broken pipe was under a concrete path. The panel finds the report from the complainants‟ plumber persuasive. This is because he is an expert in relation to identifying water leaks and has investigated the plumbing in and around the complainants‟ property. His opinion is supported by testing and photographs. Although he notes other issues, he positively asserts the cracked stormwater pipe has been a major factor in the subsidence. His opinion is supported by the complainants‟ engineer. The panel notes the insurer‟s engineer says the leak located by the plumber has not contributed to the damages to the veranda, but he does not say why or amplify his opinion about the contribution of the leak to the claimed damage in any way. In the absence of compelling reasons to the contrary, the panel prefers the expert evidence of the complai nants‟ plumber. The panel accepts the complainants have established a valid claim. Some but not all claimed damage caused by leaking pipe Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. The panel accepts there is subsidence which policy exclusion is relied on by the insurer. The panel does not agree this exclusion applies in the circumstances of this claim. This exclusion applies if the cause of the damage was normal earth movement. The panel is not satisfied this is the case here. The panel accepts the proximate cause of the damage is the cracked stormwater pipe not normal earth movement. However, the panel notes other plumbing issues. The complainants‟ plumber refers not only to the cracked stormwater pipe but also to blockages in the stormwater system at the front of the property. He refers to impact breaks and says the pipe in this location was in bad condition. Tree roots and tennis balls were blocking the stormwater system towards the nature strip. The plumber says both blockages caused water to overflow from the grate at the rear of the property and flood the subfloor. The panel accepts damage was caused by the failure to maintain the front drainage system in good condition which is excluded from cover. The panel accepts this lack of maintenance is a cause of damage. The pipes leaked because of lack of maintenance, water escaped, and tree roots were attracted to the leaking water. The panel does not accept the tree roots were the proximate cause of the damage. The panel also accepts there are other relevant factors. The photographs show rotten timber under the veranda and packing on top of a pier. The panel accepts photograph show gradual deterioration and wear and tear under the veranda. Also, the veranda itself was deteriorated. The panel accepts water probably leaked onto the timber bearers below the veranda causing the timber to deteriorate over time. Determination | Case number: 741021 Page 8 of 17 Taking all matters into account, including the significant age of the house, the panel is satisfied not all the claimed damage was caused by the leaking pipe. The panel accepts the photographs demonstrate the relevant parts of the house had sustained damage caused by gradual deterioration and lack of maintenance over the years. The panel accepts the leaking pipe caused further damage to this old damage. Taking all matters into account, the panel is satisfied it is fair to attribute some of the damage to an insured event and some of the damage to uninsured events which occurred before the pipe began to leak and subsisted. The panel considers a fair attribution for the leaking pipe is 33%. This is because while the plumber refers to the cracked pipe being “a major factor” in the subsidence, he also refers to other factors and does not speak to the other causes of damage described by the insurer‟s engineer. In addition, the insurer‟s engineer refers to several factors causing earth movement including leaking pipes. The panel notes the opinion of the complainants‟ engineer. However, the panel accepts there is insufficient ventilation in the relevant area of the property. The panel accepts there is significant movement of the north east corner of the property and agrees this is not typical natural consolidation, but the panel acknowledges GM did not have the opportunity to inspect the property before it was repaired and note the issues described by JH in his first report. Insurer to pay to the complainants $19,335.50 and interest The complainants claim $60,858.45 for re-stumping, replastering, re-painting, rendering, tiling and work undertaken by a builder, plumber and landscaper. The insurer has not contested the amounts claimed by the complainants. The panel has reviewed the complainant‟s invoices and quotations and is satisfied the amount claimed is fair. The policy covers the reasonable costs incurred to locate the unknown source of the leaking pipe ($770) subject to limits in Part B ($1,000). The insurer is not liable to cover the cost to repair the stormwater system ($2,090) or maintenance costs such as cleaning the gutters and removing the tennis balls ($176). In summary the panel accepts the insurer is liable to pay to the complainants: $60,858.45 -$2,090 -$176 = $58,592.45 X 33% $19,335.50 total payable The claim was first made on 5 February 2019. The insurer declined the claim based on the JH‟s first report. When the complainants made the second claim their plumber‟s report was made available to the insurer. The claim was declined again on 24 April 2020. In the circumstances, the panel is satisfied it is fair interest is paid pursuant to section 57 of the Insurance Contracts Act (the Act) on $19,335.50 from 24 April 2020 until settlement. Determination | Case number: 741021 Page 9 of 17 Insurer to pay for the complainants’ expert reports The complainants relied on a report from an engineer and a plumber. Under AFCA Rules where a complainant incurs costs obtaining an expert opinion to demonstrate their entitlement under the policy, AFCA may consider compensation for these costs (capped at $5,000.) When considering whether to require the insurer to make a cost contribution we consider the complexity of the complaint and whether the complainant needed to incur the costs to establish their claim. In circumstances where the insurer had obtained several reports from its expert engineer, the panel considers the complainants required expert opinion to establish their case and to respond to the insurer‟s expert opinion by obtaining the reports from the plumber and the engineer. If the plumber and the engineer charged a fee to provide the two reports relied on by the complainants, then the insurer is to pay for the cost of these reports from the date they were paid for until settlement. Should the complainants accept this determination then within seven days of notification of acceptance, the complainants are to provide to the insurer invoices (if any) from the plumber and the engineer for their reports. Upon receipt of the invoices, the insurer is to pay for the reports or reimburse the complainants for the cost of the reports. If the complainants have paid for the reports the insurer is also liable to pay interest pursuant to section 57 of the Act from the date of payment for the reports until the date of settlement. 2.2 Why is the outcome fair? The outcome is fair because the available information establishes a complex situation whereby several factors probably caused the claimed damage. However, in circumstances where the complainants have established the leaking pipe was probably responsible for some of the damage, it is fair the insurer compensates the complainants a fair amount for the damage attributable to the leaking pipe. Determination | Case number: 741021 Page 10 of 17 3 Supporting information 3.1 Process AFCA’s approach to this complaint It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. This matter was determined by a panel Due to the nature of this dispute, it has been referred to a panel for determination. The panel comprises the ombudsman, a member with significant experience in consumer and small business advocacy and a member with extensive experience as an insurer. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). How we assess complaints AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider available documents, the recollections of the parties, and all relevant circumstances. We give more weight to documents created at the time the events occurred. If there is no relevant documentation, we will decide what is most likely to have occurred based on the information provided to us. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.2 Case law and proximate cause Case law establishes: > The proximate cause of the loss is the dominant or effective or operative cause of the loss whether or not that be the last in time or the sole cause. > If there are several causes operating contemporaneously, each must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action. If one cause would have caused the harm in any case, and the other would not have done so in the absence of the first, the first is the proximate cause. > A common-sense approach is taken to determine proximate cause. 3.3 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the i nsurer‟s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Determination | Case number: 741021 Page 11 of 17 General Exclusions And Conditions Of Cover It is important to understand that insurance policies do not cover every eventuality. You should read your policy and be aware of what is excluded from cover and the conditions to be observed. Please refer to the sections entitled "General Exclusions"(pages 29 to 32) and "Conditions of Cover"(page s 34 to 35) Cover Part 1 – Insured Events This section des cribes the insured events you are covered for, and the conditions and exclusions that specifically apply to each insured event. They should be read with the general exclusio ns on pages 29 - 32 . Insured event We will NOT cover: 6. Storm and rainwater Including loss or damage from: the escape of rainwater from any water pipe, drain or gutter surface run - off rainwater from surrounding areas that occurs within 24 hours of a storm or heavy rain. Including loss or damage caus ed by erosion, subsidence, landslide, mudslide or any other earth movement that occurs within 72 hours of a storm or heavy rain and as a result of that storm or heavy rain. loss or damage caus ed by flood unless you have selected and we have agreed to provide this optional cover. los s or damage caus ed by rain, hail, wind or dust due to: a design fault, structural defect or faulty workmanship lack of maintenance (a defect that you knew about or should reasonably have known about and did not fix) an opening that was not created by the s torm building additions, renovation or alteration work. loss or damage to: fences and gates that are not structurally sound or well - maintained artificial grass or turf garden retaining walls garden borders, driveways, paths or gardens the liner and/or cove r of a swimming pool or spa water in a swimming pool or spa the surface of a tennis court jetties, wharves and pontoons. Determination | Case number: 741021 Page 12 of 17 Insured event We will NOT cover: 9. Sudden and unexpected escape of liquid at the insured address from:  aquariums  baths, sinks, toilets, basins or any  fixed plumbing apparatus  drainage or sewage systems  fixed heating or cooling system or  sealed portable unit or tank gutters and drainpipes attached to  your home  pipes and taps  refrigerators or freezers  washing machines or dish washers  water beds water collection trays in any  refrigerator or freezer. We will also pay reasonable costs incurred to locat e the unknown source of a leaking pipe, but only if the leaking liquid is causing damage to your home and/ or contents. The most we will pay is shown in Part B. the cost of repair or replacement of the item that the liquid escaped from, including the cost of repairs to a leaking shower floor, base, walls, glass screening, doors, tiles or grouting ... loss or damage caus ed by liquid that has escaped slowly over a period of time, unless it is reasonable that you could not have known about the liquid escaping. … Determination | Case number: 741021 Page 13 of 17 General Exclusions Applying To The Whole Policy We will not cover: Defects, faulty workmanship, lack of maintenance  loss or damage or the incurring of legal liability caused by a design fault, structural defect or faulty workmanship that you knew about and did not fix before the loss or damage occurred  loss or damage caused by your failure to maintain the home and/or contents in good condition  loss or damage caused by your failure to take reasonable care of the home and/or contents. Earth movement loss or damage or the incurring of legal liability caused by erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement. But subject to the policy terms and conditions, we will cover loss or damage caused by earth movement that occurs within 72 hours and as a direct result of the following insured events:  Earthquake,  Explosion, or  Storm and rainwater. Gradual deterioration loss or damage caused by rust, corrosion, rot, mould, rising damp, mildew, gradual deterioration, wear, tear or fading. Trees, shrubs or plants  loss or damage or the incurring of legal liability caused by tree lopping or felling on the site  loss or damage or the incurring of legal liability caused by the roots of trees, plants or shrubs. Determination | Case number: 741021 Page 14 of 17 3.4 Extracts from material relied on by the parties Date Action Insurer’s engineer’s report (JH) 2 7 February 2019  Inspected and photographed site 21 February 2019 because the front veranda of the home has dropped.  Veranda concrete slab sloping towards the south east.  Timber rot/failure in the timber members in multiple areas supporting the veranda concrete slab. This has caused the conc rete veranda slab to drop  Brick pier cracked and leaning at the south east veranda subfloor.  Overall veranda and slab in a deteriorated condition.  No ventilation panels seen to the veranda subfloor.  Water can penetrate and come into direct contact with the timber members through deficiencies such as cracks in the slab, cracks in the brickwork or a hole.  Due to the deteriorated condition of the veranda, water is able to penetrate at a number of locations including the joint across the slab.  Veranda subfloor timber members are damaged.  A combination of factors resulting in the subfloor moisture and resultant timber rot has occurred over a long period of time including inadequate subfloor ventilation, site drainage, waterproofing mitigation, and leaking of veranda slab to subfloor area.  Photographs show the south east side of the house is not compliant with surface water drainage requirements and when it rains water channelled towards the subfloor of the house from the south eastern elevation wetting the soil underneath. This increases mo isture under the house and results in excessive timber rot over a long period of time.  Damage seen to the veranda subfloor is not the result of a single event. Complainants’ plumbing report and photos (GV) 24 May 2019  Plumber attended to investigat e plumbing 24 May 2019 including sewer, water and stormwat er.  Hous e 130 years old. On stumps. Slight gradient on the block which falls towards the front.  Stormwater runs along the south picking up two downpipes. Stormwater t hen heads north connecting up a rain head on north west corner which also catches water from next door‟s roof .  Installed camera up stormwater system from the gutter - pipe blocked with tennis balls in the front garden.  Also found pipe in bad condition ba ck towards the nature strip where found impact breaks. Tree roots growing in the pipes too.  Could not push my camera towards the rear of the property due to a broken pipe on the west side of the front down pipe. Pipe had an obvious crack in the side. Determination | Case number: 741021 Page 15 of 17 Tree roots in this pipe too.  Gained access to the stormwat er pipe at the back and found this section of pipe in good condition.  Concluded water has been overflowing from the channel grate at the rear of the property and flooding the subfloor because of blocka ges in the stormwater system at the front of the property.  Cracked stormwater pipe under the downpipe on the south east corner of the dwelling has been a major factor in the subsidence. This cracked pipe is about 100mm off the foundations of the dwelling (south side)  Recommended stormwater system be replaced from the road to the rear of the property.  Images show stormwater pipes broken in nature strip, tennis balls lodged and severe break in stormwat er pipe left of downpipe and overflowing stormwater grate. Insurer’s engineer’s report (JH) 2 April 2020  Reviewed previous report and photographs taken before and after the re - stumping and says veranda floor substructure movements are due to an ongoing soil subsidence (60 to 80% clear content) causing dif ferential settlement due to its level of compaction with the changes of water and moisture content in the soil and is not related to a single event.  Re - stumping did not restore the veranda floor structure integrity and slab levels to the original conditio n prior to any previous events or soil settlement.  Recommended a site - specific soil test and engagement of professional structural engineer. Insurer’s engineer’s report (JH) 5 May 2020  Plumbing issues fixed by insured and building is still subsiding.  Co nditions of the substructure members and supports confirm ongoing construction issues and the damage is not related to a single event.  Leak located by the plumber has not contributed to the damages to the veranda. Complainant’s tiler (HA) 2 4 August 2020  Employed by complainants to carry out tiling and stonework knowing the house been re - stumped back to level.  Noticed on a heavy rain day that the stormwater pipe down the pathway had separated and enormous amount of water had escaped under the house.  Notif ied complainants as this had occurred for some time.  No doubt loss of water would be a major contributor to previous stump failure. Complainants’ engineer  Inspected 2 December 2020. Determination | Case number: 741021 Page 16 of 17 (GM) 2 December 2020  Hous e 130 years old. Complainants purchased 2013. No cracking until 2018. In under a year there was significant movement of the north east corner of the property which is not typical of natural consolidation.  Previous to the stormwater drain repairs in Ju ly 2019 there was water pooling under the house.  Unus ual bec ause house is ventilated with gaps at the side. Since the drains repaired no wat er under the house. Timber bearers in good condition and soil under the house is clay but dry.  No movement to the s outh end of the hous e or to the house next door on the west. When nat ural consolidation occurs it generally affects the whole property and not a small section.  From our vis ual inspection and experience damage and internal cracking of the house is due to t he blockage and failure of the stormwater drain and not from natural settlement. Insurer’s engineer’s report (JH) 21 January 2021  Asked to comment on GM report.  Confirms front veranda is fully closed off which means there is no cross ventilation and dea d airspace. As for the rest of the house, it is fully closed off on the right side and the front and the left side and the rear have gaps bet ween the side boards. This would provide some ventilation. However, there is no cross ventilation at front right co rner where the rotten timber is.  Various factors relate to nat ural consolidation including the vicinity of trees.  Fact cracking not seen until 2018 does not mean no movement occurred up until then. Packing present to some of the stumps under the hous e ind icates house has been re - levelled in the past and there‟s been a history of foundation movement.  Significant movement due to natural consolidation can occur in less than a year to a building on reactive clay in dry conditions or when affected by trees.  Rei terates photographs taken in February 2019 show rotting timber under the front veranda.  In April 2019 re - stumping work included a new beam and joist installed under the front veranda so the reason GM reported sound timber was that the rotting timber had be en replaced when GM inspected. 3.5 Other relevant material considered and relied on  Parties‟ submissions /emails and all attachments to all submissions/emails both before and after the recommendation  Parties‟ expert reports Determination | Case number: 741021 Page 17 of 17  Photographs, invoices and quotations  Claim notes  Correspondence between the parties

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.