Home / Allianz Australia / Determination 740860

Determination 740860

Reduced cash settlement offer for earthquake damage to home

FirmAllianz Australia
Decided2021-06-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$103,825
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After an earthquake damaged their home, the complainants disputed the insurer's reduced settlement offer based on a later engineering apportionment. AFCA ordered a cash settlement of $99,024.89 for claim-related repairs, $4,800 temporary accommodation, and interest under section 57 of the Insurance Contracts Act.

The insurer's reduced offer relied on a generic later assessment of other properties rather than a site-specific review, so the original 60% apportionment was found fair.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 740860 Financial firm Allianz Australia Insurance Limited Determination | Case number: 740860 Page 2 of 11 Case number: 740860 22 April 2021 1 Determination overview 1.1 Complaint The complainants hold a Home & Contents Insurance Policy with the financial firm (the insurer). On 6 September 2018 the complainants lodged a claim for damage to their property following an earthquake. There is no dispute the property suffered some earthquake damage. The insurer initially offered to settle the claim for $80,000 based on an engineering opinion which concluded 60 percent damage due to the earthquake. When this was rejected the engineer reassessed the damage and concluded the damage was primarily caused by pre-existing structural defects. The insurer reassessed its liability and offered the complainant $32,558.30 being 20% of the assessed damage plus a 15% allowance for contingencies. The complainants say the offer is unreasonable. They say the insurer should either authorise the repairs or if unable to warrant the repairs, rebuild the home. 1.2 Issues and key findings Is the insurer’s offer fair in all the circumstances? No. The insurer should increase its offer to $99,024.89 being 60% of BBQ ’s quote including a 15% allowance for contingencies. Interest and temporary accommodation are payable as outlined in section 2 of this determination. Does Section 46 of the Insurance Contracts Act (the Act) assist the complainants? The Panel is satisfied that Section 46 of the Act does not apply to the current claim. 1.3 Determination The determination is substantially in favour of the complainants. Within 14 days of the complainants’ acceptance of this determination, the insurer is to pay to the complainants the following:  $99,024.89 being 60% of insured event related damage based on BBQ ’s quote including an allowance of 15% for contingencies and variations. Interest is to be paid pursuant to section 57 of the Act from 17 March 2020.  $4,800.00 for temporary accommodation at $600p/w for two months Otherwise, the insurer is not required to take any further action in relation to the claim. Determination | Case number: 740860 Page 3 of 11 2 Reasons for determination There has been a full exchange of information between the parties and each party has had the opportunity to address the issues in dispute. Due to the issues involved this matter has been referred to a panel for determination. The Panel comprises the Lead ombudsman, a member with considerable industry experience and a member with significant experience as a consumer representative. The determination follows consideration of all relevant material. It is based on what is fair in the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the insurer’s offer fair in all the circumstances? Policy provides cover for damage arising from earthquake The complainant s’ p olicy covers for accidental loss or damage, including damage caused by earthquake subject to the following policy condition: Landslide or subsidence. Cover only applies when the landslide or subsidence occurs within 72 hours of, and as a direct result of one of the following: … - Earthquake There is no dispute that a 5.7 magnitude earthquake occurred on or about 16 September 2018 and caused damage to the complainants’ property. The earthquake was followed by significant aftershocks and over 100 earth tremors. Once the damage was assessed the insurer has apportioned the damage. The insurer says some damage was caused by circumstances excluded from cover including wear and tear, gradual deterioration and defective or faulty workmanship. The complainant does not dispute that there was some pre-existing damage but disputes the percentage apportionment of liability relied on by the insurer. No alternative engineering assessments or scope of works provided The complainant has provided no expert evidence in support of their position that the insurer’s offer is unfair. Therefore, while the panel has regard for the complainant’s submissions, it is guided by the experts who have reviewed and assessed the damage. Determination | Case number: 740860 Page 4 of 11 Insurer’s expert has provided assessments as to apportionment of damage The insurer obtained reports from a consultant engineer SEC and geotechnical engineer GT. Summaries of the reports are set out in section 3.2 of this determination. Initially after inspecting the property in October 2018, SEC recommended apportioning the damage 60% earthquake and 40% pre-existing. The complainant did not dispute this apportionment but asked the insurer to delay finalisation of the claim for six months until seismic activity had reduced. This was not unreasonable given the ongoing seismic activity. Insurer’s scope of works addresses the claim related repairs The panel accepts the scope of works (SOW) details and addresses all earthquake related damage and repairs for which the insurer is liable. The SOW addresses each section of the property that has sustained damage and provides a break down as to how the repair works, supply of new material and reinstallation of existing undamaged fixtures will be managed. The preliminary SOW was prepared by SEC on 23 December 2018 and assisted by a geotechnical report from GT. GT classified the soil as moderately reactive to movement from moisture changes. SEC considered the foundations were less than 400mm deep and inadequate for the site. The insurer estimated the cost to meet the SOW at $140,235.65 for improvements and $77,198.40 which it says it was liable for 60 percent. The insurer had the SOW quoted by builders M on 9 July 2019. M estimated a total repair cost of $115,056.92 for which the insurer stated its liability was 60 percent or $69,034.15 (based on the panel’s calculation). Due to pre-existing issues with the property, M was unable to carry out a quality warrantable repair. The quote did not include a contingency sum. In response to M’s quote, the insurer offered to resolve the claim for $80,000 however, the complainants were unhappy with this offer. Insurer reduced offer based on supplementary engineering assessment The insurer reduced its offer to $32.558.30 after obtaining a supplementary report from SEC. Based on a desktop assessment SEC revised its apportionment of liability. It was of the view the initial assessment was rather generous and recommended reducing apportionment from 60 percent to 20 percent for earthquake related damage. S’s rationale for a reduction in liability was: Our initial estimate of >40% and <60%, on reflection, is considered by the writer as generous in view of the damage (based on other damaged properties reviewed Determination | Case number: 740860 Page 5 of 11 in the district in the last 8 months). From a review of the soils testing, the construction and other properties surveyed, these numbers could well be revised to >80% of the damage due to pre-existing and latent conditions. The remaining 20% or possibly less due to ground vibrations triggering additional subsidence and extending existing cracking. The insurer obtained a new quote from builder BBQ which estimated the repairs and improvements at $247,354.73 plus $24,460.41 for repairs to the granny flat (total $271,815.14). Based on B’s quote the insurer offered: Description Amount B quote $271,815.14 Less un - event related upgrades $128,300.81 Insuranc e related repairs $143,514.33 Less 80% pre - existing damage ($114,811.46) $28,702.87 Plus 15% Contingency ($4,305.43 ) $ 33,008.30 Less excess ($450) $32,558.30 Total settlement $32,558.30 The panel acknowledges further engineering assessments may result in revised apportionment with respect to liability. The panel notes however that the assessment was not based on a site-specific review. The assessment does not refer to the differing construction methods used in the other properties. Insurer is to increase its cash settlement to 60 percent of B’s quote The panel is not satisfied the insurer’s offer is fair in the circumstances as it has chosen to reduce its liability based on an engineering assessment which considers other sites and properties constructed from different methods. The panel is of the view that the insurer’s original apportionment being 60 percent event related is fair in the circumstances. The initial calculations were site specific rather than an unsubstantiated generic opinion. The panel accepts the insurer is not required to cover the cost of building improvements. The information on file suggests these upgrades are unrelated to the claimed event. The complainant does not dispute this. The panel considers it fair the insurer increases its offer as follows: Determination | Case number: 740860 Page 6 of 11 B Quote (for claim related repairs) $ 143,514.33 Less 40% for un - event related repairs - $57,405.73 Subtotal 60% for claim related repairs $86,108.60 15% contingency $12,916.29 Subtotal – which attracts interests $99,024.89* * Plus interested in accordance with section 57 of the act. As the insurer’s builder is unable to warrant the works, the insurer is not compelled to undertake the works and is therefore required to cash settle the complainants. The insurer is therefore required to cash settle the complainants for the repairs to their property in the sum $99,024.89 plus, interest in accordance with section 57 of the Act 1984, calculated from 17 March 2020 being the date of B’s quote. It is fair the insurer pays 8 weeks for temporary accommodation Based on the scope of works, there appears to be repairs that are required to be undertaken to the kitchen and the propert y’s sole bathroom. The policy states that the insurer will provide 12 months temporary accommodation based on reasonable costs. While the works itemized in the scope of works do not appear excessive, it is reasonable to assume that the complainants will not be able to reside at the property as it only has one bathroom. Therefore, and for the sake of finality, the panel has undertaken a review of the rental cost of properties located near to the comp lainants’ property. It has calculated the average weekly rental for such properties is approximately $600 per week. Therefore, the panel has included an allowance for 8 weeks temporary accommodation calculated at $600 per week. Therefore, the insurer is to pay $4,800 for temporary accommodation. 2.2 Does Section 46 of the Act assist the complainants? Section 46 of the Act has no application in the circumstances The parties have raised section 46 of the Act, and whether this is enlivened in the circumstances. Under section 46, an insurer cannot rely on a policy exclusion which applies by reference to a defect in an item, if at the time the policy was entered into: Determination | Case number: 740860 Page 7 of 11  the insured person was not aware of the defect, and  a reasonable person in their circumstances could not be expected to have been aware of the defect. Section 46 only operates to assist an insured person where the exclusion on which the insurer is seeking to rely refers to the defect having existed at a time before entering the contract. In this case the insurer is not relying on an exclusion. It says the foundations did not sustain damage because of the insured event, earthquake. It says there is no insured event under which the damage to the foundations is covered by the policy. The panel agrees. While the insurer is seeking to reduce its liability because of the pre-existing defects it is not saying the pre-existing defects caused the earthquake damage. Accordingly, the panel is satisfied section 46 of the Act has no application in relation to the defect and further potential defects in the foundations. Determination | Case number: 740860 Page 8 of 11 3 Supporting information 3.1 Relevant Policy Terms Page Product Di sclosure Statement 16 - 17 Part A – Buildings and Contents Accidental damage cover What is covered We will cover your buildings and your cont ents for accidental loss or accidental damage. There is some loss or damage we will only cover under specific conditions. This is accidental loss or accidental damage caused by: • Landslide or subsidence. Cover only applies when the landslide or subsidence occurs within 72 hours of, and as a direct result of, one of the following: … - Earthquake; What we will not pay for We will not cover your buildings and your contents for any accidental loss or accidental damage caused by:  Landslide or subsidence except as described on pages 16 to 17;  Settl ing, shrinkage, or any movement of earth;  Erosion …  Rust, corrosion, gradual deterioration, depreciation, wear or tear …  A defect in an item, faulty workmanship, structural defects or faulty design; 36 - 37 Paying claims How we pay a claim for you r buildings When loss or damage occurs to your buildings, we will pay the cost of rebuilding your buildings or repairing the damaged portions to the same condition as when they were new. We will also pay any additional costs required for your buildings to comply with government or local authority bylaws. We will not pay these additional costs if you were required to comply with these bylaws, and had not done so, before the loss or damage occurred. Determination | Case number: 740860 Page 9 of 11 Page Product Di sclosure Statement Rebuilding or repairing your buildings must commence within six months of the loss or damage occurring. If it does not commence wit hin six months, we will do one of the following:  Reinstate or repair your buildings to the condition they were in just before the loss or damage occurred;  Pay you the cost of reinstating or repairing your buildings to the condition they were in just before the loss or damage occurred; or  Pay you the value of the land and your buildings just before the loss or damage occurred. We will re duce this payment by the value of your land and your buildings after the loss or damage occurred. We decide which one we will do. 3.2 Relevant Expert Reports Page Product Di sclosure Statement Insurer’s Consultant Engineer SEC Report 25 October 2018  t he cracking present ed in this case as with other claims in the immediat e area, due to its location 34km from the epicentre, indicates signific ant movement - with extensions of existing settlement cracking evident throughout. During our site visit we reviewed extensive settlement cracking to which the earthquake appears to have contributed  Home built c1970s, approx. 250m 2  Single storey residence is double brick on a raised brick foundation, slab.  Roof in good condition.  Walls are in generally good condition, wi th cracking as marked out on the plan supplied < Cat 4 (AS2870).  Floor in good condition.  Kitchen (section) of the home has separated away from the main home with pre - existing settlement and repairs noted to frontage.  Various disconnections to brickwork at the changes in direction and general cracking.  Ceilings to the home in average condition paint pealing in various locations, some separations noted at cornices.  Tiles to bathroom damaged.  Window frames dilapidated, require refurbishment.  Patio in good con dition, and pool in good condition.  Granny flat, no damage. CAUSE OF DAMAGE  Gradual subsidence and loss of compaction to the foundations Determination | Case number: 740860 Page 10 of 11 Page Product Di sclosure Statement since construction. (>40% )  Earthquake or ground vibrations triggering additional subsidence/settlement causing the extension of existing cracking to the home. (< 60%)  All damage including the additional earthquake damage to the home as presented is as outlined above is considerable, however prior to the repairs being completed a number of tasks will be required to be completed. Insurer’s Geotechnical ( G T ) Report 14 December 2018  In accordance with Australian Standard 2870 (2011) Residential slabs and footings, the area shown on the accompanying site plan of T Street, Frankland River WA is classified as class M  Moderately reactive clay or silt sites, which may experience moderate g round movement from moisture changes Insurer’s Consultant Engineer SEC Subsequent Report 13 September 2019  Since this claim was presented in November 2018 we have since reviewed a further 60 homes and properties in the south - west region including 10 properties near the Frankland township.  The closest other earthquake damaged building was the Community Centre which was within 500m of the property. This building while a relatively modern building, was affected by the same earthquake however only had min or cracking to the building. This building, which is 3 times the size of the above house has repairs valued at < $50,000.  As an opinion our initial estimate of > 40% and < 60%, on reflection, is considered by the writer as a generous view of the damage (ba sed on other damaged properties reviewed in the district in the last 8 months). From a review of the soils testing, the construction and other properties surveyed these numbers could well be revised to >80% of the damage due to pre - existing and latent cond itions. The remaining 20% or possibly less due to ground vibrations triggering additional subsidence and extending existing cracking. 3.3 Other Documents Considered  Insurer’s quote obtained from M dated 9 July 2019  Insurer’s quote obtained from B dated 17 Mar ch 2020  Complainants submissions dated 10 October 2020 Determination | Case number: 740860 Page 11 of 11  Complainants submissions dated 30 October 2020  Complainants submissions dated 1 February 2021

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.