Home / QBE / Determination 740306

Determination 740306

Extra costs of reinstatement and ancillary costs under cyclone claim

FirmQBE
Decided2021-09-21
ProductGeneral Insurance · Business / commercial
OutcomeFor the complainant in part
Amount awarded$5,000
Non-financial loss—
Amount claimed$329,867
SourceAFCA PDF

Summary

The complainant, a business owner represented by a claims firm, claimed reinstatement extra costs and ancillary costs after Cyclone Debbie damage. AFCA found the insurer had not shown it could rely on the policy condition to limit extra reinstatement costs, and ordered cash settlement of balance repairs, specified ancillary costs, loss of rent to March 2020, a capped travel contribution and representative costs, plus statutory interest.

The insurer bears the onus of showing a policy condition applies, and it failed to show non-compliance with building requirements at the time the developments were built or before the cyclone damage.

Issues

Subjects and remedies

business interruptionhome or building damagenatural disasterpay claimpay compensationpay interestprovide documentsreassess claim

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 740306 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 740306 Page 2 of 18 Case number: 740306 13 September 2021 1 Determination overview 1.1 Complaint The complainant company is represented by a claims management firm. Reference to ‘ the complainant ’ in this determination includes reference to its representative. The complainant held business property insurance with the financial firm (insurer). On 3 April 2017, the complainant lodged a claim for damage to its property and for ancillary costs arising from Cyclone Debbie on 28 March 2017. There is no dispute the cyclone damaged the insured property. However, the parties disagree over the extent of the insurer ’s liability for reinstatement of the buildings, and certain ancillary costs. 1.2 Issues and key findings Is the insurer entitled to limit liability for the costs of reinstatement? No. The insurer has not shown it was entitled to rely on a policy condition to reduce its liability for the extra costs of reinstatement provided for under the policy. Is the insurer liable for all ancillary costs claimed by complainant? No. The insurer is not liable for all the ancillary costs claimed by complainant, but only for those as set out in section 2.2 of this determination. Why is the outcome fair? It would not be fair for the insurer to deny liability for costs to which the complainant is entitled under the policy. 1.3 Determination This determination is substantially in favour of the complainant. Subject to the complainant providing evidence of costs incurred (as required in this determination below), the insurer is to cash settle the following:  the cost of cyclone repairs (to the extent not already paid) including the extra costs of reinstatement incurred, as set out in section 2.1 of this determination  those of the claimed ancillary costs (including loss of rent) specified in section 2.2 of this determination. The insurer must also pay statutory interest on those payments (under section 57 of the Insurance Contracts Act 1984 (the Act)), calculated from the dates the respective amounts were paid by the complainant, to the date of settlement. Determination | Case number: 740306 Page 3 of 18 2 Reasons for determination 2.1 Is the insurer entitled to limit liability for the costs of reinstatement? Policy covers extra costs of reinstatement in certain circumstances The insured property consists of two buildings. For simplicity, this determination refers to them as the north building and the south building. The north building contains a restaurant on the ground level, accommodation units 1, 2 and 3, and a recreation deck on the first-floor level. The south building contains accommodation unit 4, two stores and a common laundry on the ground floor, and accommodation units 5 and 6 on the first floor. There is no dispute both buildings were damaged by the cyclone. The policy provides cover for reinstatement. It says: You are insured on a ‘Reinstatement or replacement basis’ unless the Policy Schedule indicates otherwise. When buildings, specified items, contents or stock are lost or damaged, we will, at our option: (a) pay the cost of rebuilding, replacing or repairing the buildings, specified items, stock or contents; (b) replace contents, stock or specified items with similar property; (c) rebuild the buildings at the premises shown on your Policy Schedule or at another site; (d) pay you the amount shown on the proof of purchase for specified items unless the specified items are works of art, antiques or curios; (e) pay you the amount of a valuation by the Auctioneers and Valuers Association of Australia if the specified items are works of art, antiques or curios. In addition, the policy provides cover for certain ‘extra costs of reinstatement’ . The policy says the insurer will: pay the extra costs of reinstatement (including demolition or dismantling) of damaged property insured which are necessarily incurred to comply with the requirements of any Act of Parliament or Regulation made under an Act or By-law or the Regulation of any Municipal or Statutory Authority other than those relating to the heritage status of a building. The policy includes certain conditions which apply to the extra costs of reinstatement. The condition relevant to this complaint is: (c) the amount recoverable shall not include the additional costs incurred with complying with any such Act, Regulation or By-law or requirement with which you have been required to comply prior to the happening of the damage. Determination | Case number: 740306 Page 4 of 18 Insurer seeks to rely on policy condition to limit its liability The insurer has the onus of establishing the application of any condition it seeks to rely on to reduce its liability. The insurer says the complainant did not comply with condition c (above) and refers to several non-compliances as the basis for declining further cover. Its reasons can be broadly summarised as follows:  the complainant bought the property around December 2002  local council (WRC) records search results provided to a buyer in 2002 would have indicated to them, parts of the existing development were unlawful, or the building certification process was not finalised for some of the development  regardless, they are required to comply with section 114 of the Queensland Building Act 1975 ( QBA)  their use of the buildings without certificates of classification contravenes sections 110, 112, 114, and 115 of the QBA  the complainant was required, and failed, to comply with the rele vant building codes for: > the 1981 development (south building first floor accommodation units 5 and 6) > the 2005 development (north building conversion of motel units to a restaurant and shops) > the 2014 development (north building recreation deck built). The insurer obtained reports from a building consultant (SBC) and builder certifiers (DC and BCA). The reports stated there were the following non-compliance issues with the north building:  Adjacent to Units 1, 2 & 3 (north building), no step down was observed to balcony areas from internal living areas; this does not meet the vertical upward termination heights as outlined in AS 4654:2012 Waterproof Membranes for Above Ground Use .  Adjacent to Units 1, 2 & 3, no fall or drainage was observed to balcony areas from internal living areas; this does not meet the requirements as outlined in AS 4654:2012 Waterproof Membranes for Above Ground Use .  Northern elevation first floor addition to the north building consists of a steel portal frame supporting hardwood joi sts to create a ‘raised balcony’ with 137mm x 23mm MODWOOD© composite decking fixed to joists, ‘waterproofing’ to the ground floor from balcony above is achieved using a ‘reverse roof’ of COLORBOND® Custom orb with a pitch of 0.1 ⁰ which does not comply with the manufacturer ’ s recommendations for the product. Determination | Case number: 740306 Page 5 of 18  Ground floor café soffit is lined with a pre-finished 4.5mm plywood which also does not appear fit to be suitable for external use, with shadow line joins created by the use of painted timber battens.  WRC confirmed no records are available for any building application or building approval for the above-mentioned first-floor addition. The reports stated the following non-compliance issues with the south building:  Balustrade barriers to the external access walkway to the hot water system cupboard and walkway to unit 5 and unit 6 do not comply with the current Building Code of Australia Volume 2 Clause 3.9.2.3 Construction of barriers to prevent falls and are not considered safe for use.  Penetrations of the masonry walls by hardwood roof beams do not satisfy the current Building Code of Australia Volume 2 Part 3.7.1 Fire Separation .  Infill door panel between units 1 and 2 do not satisfy the current Building Code of Australia Volume 2 Part 3.7.1 Fire Separation .  No fire collars were observed to drainage poly vinyl chloride stack pipes which does not satisfy the current Building Code of Australia Volume 2 Part 3.7.1 Fire Separation .  Under the QBA, the ground level of the north building is still only permitted to be used as accommodation units. The owner has contravened Section 110 of the QBA since the commencement of the ground level shop and refreshment premises use. With respect to the 2014 development, the insurer acc epts WRC issued a ‘ Form 21 Final Inspection Certificate ’. However, it believes the certificate was issued in error. BCA says there are some significant fire safety issues with this building permit and the front building generally. The original parts of the building had been built in about 1974. Evidence is not persuasive as to non-compliance The panel is not persuaded by the insurer’s evidence. The insurer has not provided evidence that the regulations quoted above and relied on were the same, or carried the same requirements, as those in place circa 1981 and 2005, when the changes were made to the property. Sections 110 – 112 of the QBA relate to, ‘Changes to BCA classification or use within classification’. Sections 114 and 115 of the QBA relate to, ‘R estrictions on the use of buildings’. The insurer has shown the above regulations are relevant to the construction of the 1981 and 2005 developments. It follows, it has not shown the developments were non-compliant with relevant standards at the time of their construction. Determination | Case number: 740306 Page 6 of 18 The panel acknowledges there is no record of certificates of classification being issued for the 1981 and 2005 developments. There are conflicting submissions from WRC as to whether this is because the relevant inspections and paperwork were never completed, or due to poor record-keeping. Even if the panel did accept inspections and paperwork were never completed, this would not assist the insurer to rely on condition c, for the reasons set out below. SBC says repairs (other than make safe works) for damage to unauthorised building work should not be undertaken until the following approvals are obtained:  development approval for material change of use  development approval for building works. SBC says all unauthorised building works may not be able to obtain the required development approval for material change of use. It says works obtaining development approval would require substantial modification/rectification to achieve building works approval and compliance under the QBA. There is, however, insufficient evidence WRC would have withheld approval for the material change of use and building works due to non-compliance at the date the developments were constructed. It is not enough for BCA to simply say, ‘ there are some significant fire safety issues with this Building Permit and the front building generally ’. The insurer must show which ‘ Act, Regulation or By-law or requirement ’ it believes the complainant contravened when constructing the developments. It is also unclear under which sections of the QBA SBC says works would require ‘substantial modification/rectification’ in order to be compliant. Nor is SBC clear about whether works would be required to comply with modern standards (due to changes in standards and regulations since the developments were constructed), or the standards that applied at the time of their construction. The panel is not satisfied the insurer’s submissions and evidence shows the complainant was required, and failed, to comply with relevant building codes/by-laws or regulations for the 1981, 2005, and 2014 developments. Insufficient evidence complainant was aware of any non-compliance in 2002 BCA says WRC’s records provided to a buyer in 2002 would have indicated the 1981 development was non-compliant. It refers to a notice dated 2 May 2002, issued by WRC, identifying several non- compliances at property number 14, addressed to Mr and Mrs J (the prior property owners). The panel notes the complainan t’ s property is number 346. Determination | Case number: 740306 Page 7 of 18 BCA assumes, ‘ the site address [number 14] is a typographical mistake by the Council [WRC]’. It asserts the notice supports its view, ‘ there are no inspection records nor a Certificate of Classification for the upper level [1981 development]’ ; and given the notice is dated before the complainant purchased the property, the complainant was aware of this. The complainant disputes BCA’s position. It says when it bought the property, it requested, and obtained, a certificate of classification from WRC. The certificate of classification is an undated certificate for a property located on the same road as the complainant’ s premises. There is no street number listed. The complainant says it operated under this certificate for many years. The panel considers BCA’s position is not persuasiv e for the following reasons. BCA provided no compelling reasons for assuming ‘ the site address [14 SH Road] is a typogr aphical mistake by the Council’ and that the notice refers to the insured premises, number 346. Even if the panel did accept the notice refers to the insured premises, it would not assist BCA. This is because the complainant says it did not receive the documents until 2020 – which BCA does not dispute, nor has the panel any reason to doubt. To the extent any compliance issues existed in 2002, there is insufficient evidence the complainant would have aware of them before it bought the property. The panel is not satisfied the above shows the complainant was required, and failed, to comply with relevant building codes/by-laws or regulations for the 1981 developments. Insurer not entitled to decline cover for extra costs of reinstatement The panel is not satisfied the insurer has shown the complainant failed to comply with a requirement to comply with any such act, regulation or by-law or requirement, at the date the developments were constructed or otherwise prior to the cyclone damage occurring. That means the insurer has not shown it was entitled to rely on condition c to reduce its liability. Insurer is required to cash settle for the balance of the claim The insurer is required to settle the complainant ’ s claim in respect of the extra costs of reinstatement, as set out below and in accordance with the policy and terms and conditions (but taking account of any applicable policy deductibles, if those have not already been taken). Determination | Case number: 740306 Page 8 of 18 The insurer is entitled to reduce its liability for the cost of obtaining development approval for material change of use. This is because it was a loss the complainant was always going to incur. Therefore, it is entitled to deduct this cost from the final settlement. The available evidence is clear that building approval is required to complete rectification in line with current regulations. On balance, the insurer was always going to incur this cost in the course of fulfilling its policy obligations (as it has not shown it was entitled to reply on condition c to reduce its liability). Therefore, it is not entitled to deduct this cost from settlement. In June 2019, the insurer paid the complainant $591,601 ($527,914 for building repairs plus $63,687 for loss of rent). The complainant provided its own significantly higher estimate of costs. The complainant says the insurer’s scope of works is incomplete. The panel notes the complainant sold the property in April 2021, which is after this complaint was made. The complainant has said that all its scoped works were completed by November 2020. It is not clear whether that also includes attending to all related and necessary compliance issues, however the panel considers it reasonable to assume that is the case. Given that the insurer has to date sought to reduce its liability for the claim, then the scope of works and quote on which its original cash settlement was calculated is unlikely to include all claim-related work/costs for which it is liable (and specifically with regard to the extra costs of reinstatement relating to building compliance requirements). Upon the complainant’s acceptance of this determination, the parties are to work together to scope the cost to the complainant of cyclone claim-related repairs and the extra costs of reinstatement, in line with the policy terms and conditions, and by reference to the complainant’s paid invoices . For this to occur, the complainant must provide the insurer with paid invoices demonstrating the relevant claim-related costs incurred. The insurer must cover those costs (up to relevant policy limits), and pay statutory interest on the respective amounts, calculated from the date(s) the invoices were paid, until the date of settlement. Determination | Case number: 740306 Page 9 of 18 2.2 Is the insurer liable for all ancillary costs being claimed? Onus is on the complainant to demonstrate entitlement to ancillary costs It is well established at law that the onus is on the complainant to demonstrate they suffered a loss for which the policy provides cover. The complainant is also claiming the following ancillary costs: Item Cost Asbestos reinspection report after completion $ 6 , 505.25 Re set up Motel Business and booking sites $ 869.5 Safety layout Fire Exit Signs for Doors $ 1 , 893.38 Locksmiths supply new and rekey all locks (Fire exit doors and frames to be replaced cannot reuse locks) Ladders $ 283.73 Stationary $ 58.14 Replace damaged Swann CCTV cameras $ 1 , 456 Replace damaged Bose speakers $ 587.55 Replace damaged Qantas furniture $ 10 , 123.55 Replace damaged LG 7kg washing machine $ 843 Replace damaged lightbox and signage $ 599 Quote 26052020 $3,117.33 D amaged front fascia 400mm x 5mtr Ironstone $500 QFRS $935 E xtinguishers, hose reels , and signage Travel and a ccommodation over 3 years for meetings w it h C&L, PEP, ICPS, LMI, Council , P , A , Builders, Engineers, Designer etc $58,606 Late rent fee as per lease 2 % / month or any part thereof $68,312.89 Legal advice $2,151.87 Book keeping fees $4,180.95 WRC $1,149.79 PRD $1,972.74 Loss of i ncome (rent) 28/03/ 2019 to 28/03/2020 $164,621 Total $329,866.67 Complainant has not shown legal advice costs were necessarily incurred AFCA asked the complainant for p aid invoices showing what the ‘legal advice’ entailed and a brief explanation about how it was necessary for claim/complaint handling. The complainant did not respond. In the absence of such evidence, the panel cannot fairly ask the insurer to cover the $2,151.87 legal advice costs being claimed. It is not required to pay, or do anything further, in respect of that component of the claim. Determination | Case number: 740306 Page 10 of 18 Insurer must compensate complainant for professional representation The panel finds it was reasonable for the complainant to engage a professional representative for the following reasons:  it tried to resolve the matter with the insurer, without success, for some months without professional representation  there was a significant power imbalance; the insurer has a much higher level of knowledge, expertise, and resources to support its position  distinctions between causation (proximate cause, contribution, etc) are complex issues most general consumers are not well-placed to address without expert assistance. The complainant, through its professional representative, provided compelling and convincing evidence to support its position. The panel is satisfied the complaint raised complex issues and the complainant would have been unable to reasonably handle the complaint without representation. Accordingly, it is fair and reasonable in the circumstances for the insurer to compensate the complainant for the costs incurred in engaging a representative. The complainant must provide the invoices and remittance advice for the work its representative performed for the claim and complaint so that the relevant amount can be confirmed. The maximum the insurer is required to pay is $5,000 for these costs, in accordance with the AFCA Rules. The insurer must also pay interest on those costs incurred, in line with section 57 of the ICA, from the date the invoice(s) were paid until the date it makes the payment. AFC A Rule D.6.3 says, ‘An award of interest is not taken into account for the purposes of the maximum value of remedy under rule D.4 [which sets out monetary limits] ’. This means interest is payable in addition to any maximum amount paid for the costs of professional representation. Complainant has not shown an entitlement to late rent & book-keeping fees The complainant did not provide any evidence to support its claim for the $68,312.89 late rent or book-keeping fees, other than to generally refer to, ‘ Late rent fee as per lease 2% / month or any part thereof ’ and ‘… Book keeping fees ’ . The panel does not accept this satisfies their onus to demonstrate they suffered a loss for which the policy provides cover. The panel does not require the insurer to cover this part of the claim. Insurer is required to compensate the complainant for $5,000 travel costs As noted above, the complainant claims $58,606 travel costs. The policy generally excludes cover for ‘ any consequential loss ’. Determination | Case number: 740306 Page 11 of 18 Under AFCA Rule D.5, an AFCA decision-maker may decide a financial firm is to contribute to travel costs incurred by a complainant throughout the complaint. Unless special circumstances apply, AFCA will not require the firm to contribute more than $5,000 to these costs. The panel cons iders the complainant’s concerns with the insurer limiting its liability were sufficient to warrant them travelling to the property – to gather evidence to assist in establishing their entitlement to the extra costs of reinstatement. The complainant has not provided any evidence to support their claim for travel costs, other than generally referring to, ‘ Travel and accommodation over 3 years for meetings with [various parties]’ . The panel does not consider this demonstrates special circumstances should apply to require the insurer to contribute more than $5,000 to their travel costs. Accordingly, the panel considers it fair in the circumstances the insurer contributes $5,000 towards travel costs – on receipt of evidence demonstrating travel costs were incurred. Insurer is liable for loss of income (rent) up to 28 March 2020 The complainant has business interruption covering it for an a nnual revenue sum insured of $330,000 for an indemnity period of up to 24 months. The damage occurred on 28 March 2017. Therefore, the policy covers annual income to 28 March 2019. The policy says ‘annual revenue’ is: The revenue earned during the twelve months immediately before the date of the damage to which such adjustments will be made as may be necessary to provide for the trend of your business and for variations in or other circumstances affecting your business either before or after the damage or which would have affected your business had the damage not occurred, so that the adjusted figures will represent as nearly as may be reasonably practicable the results which, but for the damage, would have been obtained during the relative period after the damage. As at 15 March 2019, the insurer calculated the complainant’s loss of rent at $63,687. The complainant rejected the offer. The complainant claims $164,621 for loss of income from 28 March 2019 to 28 March 2020; they want the insurer to extend the policy coverage by 12 months. They also seek CPI increases and interest from 1 August 2018 to 28 March 2020, though they did not provide a figure for these further amounts. Determination | Case number: 740306 Page 12 of 18 It is not in dispute the complainant’s property suffered extensive damage and required extensive repairs. Therefore, it follows the complainant would have lost rent/income for a time while the property was under repair. The panel accepts the insurer is liable for the reasonable extra costs of reinstatement. Therefore, the panel also accepts it is fair for the insurer to compensate the complainant for income they lost due to repair delays caused by the insurer incorrectly declining the extra costs, and for the reasonable timeframe the property was under repair. The expert reports agree the damage to the property was significant and structural. It follows the repairs would also be significant. It is unclear how the works associated with the extra cost of reinstatement materially changed the timeframe of the repairs overall and for how long the property was not fit for purpose. Given the complainant says the repairs took five months to complete, the extra cost of reinstatement does not appear to have significantly lengthened the time the repairs took overall. The complainant lodged the claim on 3 April 2017. Up to 15 March 2019, the parties appeared to have been working together to reach a mutually agreeable scope of works for repairs. The insurer made its $591,601 cash settlement offer on 15 March 2019, which the complainant rejected (although that amount was subsequently paid). According to the available evidence, the complainant provided the insurer with new information relating to the disputed compliance issues around 10 months later – on 13 January 2020. A complaint was lodged with the insurer’s internal dispute resolution department on 12 March 2020. The insurer maintained its decision, although incorrectly, on 2 April 2020 and the complainant appears to have taken reasonable steps to mitigate further loss by completing the repairs in a timely fashion – beginning repairs in June 2020 and finishing them in November 2020. There was a significant delay between the insurer declining the extra costs and the complainant providing new information – information which the insurer should have been reasonably aware reinforced the fact it had declined the extra costs incorrectly. However, it should have been reasonably clear to the insurer from late 2018 (by which time it received multiple compliance reports) it had not done enough to meet its onus to show it was entitled to rely on the policy condition to reduce its liability. The panel considers it fair in the circumstances that the insurer’s liability for loss of income be extended by a further 12 months – that is, from 28 March 2019 to 28 March 2020, subject to the complainant providing reasonable appropriate evidence of the loss suffered in that period. Determination | Case number: 740306 Page 13 of 18 On receipt of evidence demonstrating lost income, the insurer is required to meet the complainan t’s claim for loss of rent – in line with the evidence provided and the terms of the policy. Insurer liable for remaining costs in line with policy terms and conditions Of the remaining ancillary costs, the insurer only refuted the following: In respect of the additional miscellaneous we note that items such as the CCTV, Bose speakers and Qantas furniture were considered in the settlement. We have not been provided with evidence to substantiate any additional sum being awarded in respect of these, nor have we been provided with evidence of storm damage to items such as the ladders or washing machines. The [insurer] submits that costs for legal advice should not be covered under the Policy. The insurer does not dispute the CCTV, Bose speakers, and Qantas furniture were damaged by the cyclone. It only refers to the ladders or washing machines as lacking evidence of storm damage. The insurer says the CCTV, Bose speakers, and Qantas furniture were ‘considered’ in the settlement and it has ‘ not been provided with evidence to substantiate any additional sum being awarded in respect of these ’. It refers to a breakdown of the building settlement of $527,914 in support. The building settlement breakdown does not contain clear evidence that payments were made for CCTV, Bose speakers, or Qantas furniture. The complainant says it paid for the CCTV and Bose speakers to be replaced at a cost of $2,043.55. The panel is satisfied it is fair in the circumstances for the insurer to reimburse the complainant these costs (less any payments already made) in line with the policy terms and conditions because:  the insurer has not objected to the complainant’s assertion they were damaged by the cyclone  the insurer has not made it sufficiently clear these items were already paid  the replacement costs appear reasonable for the claimed items. With respect to the damaged Qantas furniture, the complainant says the $10,123.55 claimed is for a quote. It is unclear precisely what the ‘Qantas furniture’ consists of. However, given the extensive damage to the property, it is not unreasonable to expect that a large amount of furniture was damaged. On receipt of a paid, itemised invoice detailing the items making up the ‘Qantas furniture’ claim and the costs incurred, the insurer is to assess that part of the claim and make payments in line with the policy terms and conditions, less any payments already made. Determination | Case number: 740306 Page 14 of 18 In the absence of any opposition from the insurer for the remaining items, the panel is satisfied it does not object to remaining costs and they do not appear unreasonable for the items claimed. Therefore, the insurer is to cover the remaining reasonable costs in line with the policy terms and conditions, up to the policy limits. The insurer may reduce the additional settlement amount(s) by any policy deductibles, such as the applicable policy excess – subject to receiving paid invoices from the complainant, demonstrating the cost(s) were incurred. It must also pay interest on the amounts in line with section 57 of the Act, calculated from the date the invoices were paid, to the date of settlement. 2.3 Why is the outcome fair? It is fair that the insurer be held liable for the costs reasonably incurred by the complainant in repairing/reinstating the claim-related damage, including the costs of compliance. The insurer has not shown it was entitled, under the policy terms and conditions, to decline all costs it has not yet covered. Determination | Case number: 740306 Page 15 of 18 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. Determination | Case number: 740306 Page 16 of 18 3.2 Policy terms and conditions Section Policy wording Busine ss Property cover 1. Buildings, specified items, contents Reinstatement or replacement You are insured on a ‘Reinstatement or replac ement basis’ unless the Policy Schedule indicates otherwise. When buildings, specified items, contents or stock are lost or damaged, we will, at our option: (a) pay the cost of rebuilding, replacing or repairing the buildings, specified items, stock or contents; (b) replace contents, stock or specified items with similar property; (c) rebuild the buildings at the premises shown on your Policy Schedule or at another site; (d) pay you the amount shown on the proof of purchase for specified items unless the specifie d items are works of art, antiques or curios; (e) pay you the amount of a valuation by the Auctioneers and Valuers Association of Australia if the specified items are works of art, antiques or curios. Reinstatement or replacement is subject to the followin g conditions: (f) when rebuilding at another site, we will not pay more than we would pay to rebuild at the premises; (g) the work of rebuilding, replacing or repairing must be commenced within a reasonable time of the loss or damage, after our consent has been obtained. If you do not, we will pay no more than the cost that would have been incurred if the work of rebuilding, replacement or reinstatement has been commenced and carried out with reasonable dispatch; (h) when any property insured is damaged, b ut not destroyed, we will not pay more than the amount that we could have been called upon to pay if that property had been destroyed; (i) we will only pay to return the property insured to a condition substantially the same as, but not better or more extensive than, its condition when new, using building materials readily available and in common use in the Commonwealt h of Australia. 4. Extra cost of reinstatement If you are insured under this cover section on a reinstatement or replacement basis, we will pay the extra cost of reinstatement (including demolition or dismantling) of damaged property insured which are necessarily incurred to comply with the requirements of any Act of Parliament or Regulation made under an Act or By - law or the Regulation o f any Municipal or Statutory Authority other than those relating to the heritage status of a building. 6. Conditions which apply to extra costs of reinstatement The following conditions apply: (a) the work of reinstatement must be commenced and carried out within a reas onable period, failing which we will not pay more than the amount which would have been pay able under Determination | Case number: 740306 Page 17 of 18 Section Policy wording the Policy if the work of reinstatement had been commenced and carried out with reasonable dispatch; (b) the work of reinstatement may be carried out wholly or partially upon any other site, if the requirements of the Act, Regulation or By - law necessitate it, subject to our liability not being increased; (c) the amount recoverable shall not include the additional costs incurred with complyi ng with any such Act, Regulation or By - law or requirement with which you have been required to comply prior to the happening of the damage. Our total liability under this clause ‘Extra cost of reinstatement’ will be limited to: (d) the sub limit of liabili ty shown in the current Policy Schedule for ‘Extra cost of reinstatement’ which shall be in addition to the sum insured; or (e) 10% of the limit of the total sum insured for this cover section; or (f) the balance of the sum insured for this cover section; whichever is the greater. The under - insurance condition of the 'Business property' cover section of the Policy will not be applied to the amount payable under this clause. 3.3 Building Act 1975 (Queensland) Section Legislation 110 – Re striction on making B CA cla ssification or use change The owner of a building must ensure a BCA classification or use change is not made to the building unless — (a) a building certifier who is either of the following has approved the change and the building as changed complies with the building assessment provisions — (i) a local government building certifier; (ii) a private certifier (class A); or (b) the change has been approved under section 112. Max imum penalty — 165 penalty units. 112 – Conce ssi onal approval for particular existing buildings (1) This section applies only to a building in existence before 14 December 1993. (2) A building certifier who is either of the following may approve a BCA classification or us e change for the building or part of the building without the building or part as changed having to comply Determination | Case number: 740306 Page 18 of 18 Section Legislation with the building assessment provisions, other than the BCA, parts E1 and E4 — (a) a local government building certifier; (b) a private certifier (class A). … 114 – No occupation or use of particular buildings without certificate of occupancy (1) This section applies if — (a) the building the subject of a building development approval is not — (i) a single detached class 1a building; or (ii) a class 10 building or structure; and (b) a certificate of occupancy has not been given for the building. … 115 – Compliance with relevant BCA and QDC provi sions for occupation and use of building (1) A person must not, unless the pers on has a reasonable excuse, occupy or use a building if the building does not comply with the following for the occupation or use — (a) any relevant BCA provisions for its class of building; (b) any relevant QDC provisions for the building. (4) For subsections (1) and (2), the relevant BCA provisions for the class of building and the relevant Q DC provisions for the building are — (a) if there is a building development approval for the building, the provisions of the BCA for the class and the provisions of the QDC for the building in force — (i) generally — when the approval was granted; or (ii) if, under this Act, the provisions as they were in force at an earlier time applied to building assessment work for the approval — at the earlier time; or (b) ot herwise, any provisions of the BCA for the class and the provisions of the QDC for the building in fo rce when building work for the building started. …