Determination 739413

Rectification works and further cash settlement after fire claim

FirmHollard
Decided2021-04-12
ProductGeneral Insurance · Landlord
OutcomeFor the complainant in part
Amount awarded$36,003
Non-financial loss—
Amount claimed$175,990
SourceAFCA PDF

Summary

A landlord company claimed further rectification, landscaping, kitchen, outhouse, rent and moisture costs after a fire claim the insurer had settled by repair. AFCA found the floor damage was caused by poor workmanship and some moisture damage was covered, ordering $36,003.22 plus interest, including a $5,000 report cost contribution, and rejected the balance.

Moisture damage from fire-exposed roof and poor workmanship is not excluded as rising damp, while the remaining rectification and claimed costs were not shown to be caused by the insurer or its trades.

Issues

Subjects and remedies

home or building damagesmall businesspay claimpay compensationpay interest

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 739413 Financial firm The Hollard Insurance Company Pty Ltd Determination | Case number: 739413 Page 2 of 19 Case number: 739413 19 February 2021 Determination overview 1.1 Complaint The insured is a company of which the complainant is a director. The insured holds a landlord insurance policy with the financial firm (the insurer) and lodged a claim after its property was damaged by fire. The complainant is represented by its broker. For the sake of brevity, references to the complainant include references to the representative. The insurer accepted the claim and completed repairs. The complainant reports ongoing issues with the repairs and says the property requires rectification work. The complainant seeks for the insurer to cash settle it $175,990.00 for building works, landscaping, loss of rent, report costs and moisture damage. The insurer says it fulfilled its policy obligations and is not required to pay anything further. 1.2 Issues and key findings Is the insurer required to cash settle further for rectification work? The complainant has not established the property requires additional rectification, the insurer’s trades damaged the landscaping or that work was not completed in accordance with agreement, the scope of works or better. Is the insurer liable for claimed report costs and rent? The complainant is entitled to $5,000 for the cost of expert reports. The complainant is not entitled to further loss of rent. Is the insurer liable for the claimed moisture damage? The insurer is liable for the moisture damage to some of the affected flooring, plasterwork and paintwork because the available information establishes the fire damaged roof probably resulted in some the internal walls and flooring being exposed to the elements for a prolonged period which led to elevated moisture levels and that there was some poor workmanship in the laying of the floors. 1.3 Determination This determination is mostly in favour of the insurer. Should the complainant accept this determination then within seven days of notification of acceptance the insurer is required to cash settle the complainant: Determination | Case number: 739413 Page 3 of 19  $5,000 for the cost of expert reports  $31,003.22 for the cost of repair and rectification to the flooring in bedroom 1, bedroom 2 and the hallway and the cost of rectification of the moisture affected paintwork and plasterwork in the kitchen and living room  interest on $31,003.22 pursuant to section 57 of the Insurance Contracts Act from 27 November 2020 until the date of settlement. Determination | Case number: 739413 Page 4 of 19 Reasons for determination 2.1 Is the insurer required to cash settle further for rectification work? Circumstances of loss The complainant holds a landlord insurance policy with the insurer and lodged a claim on 25 January 2019 for damage caused by fire. The insurer liaised with the complainant to complete repairs by its builder BB and paid lost rent. In September 2019, the insurer advised the complainant repairs were completed and the property was ready for handover. The complainant identified faulty workmanship and engaged its own building consultant (T) to complete a report on the required rectification. The insurer also assessed the repairs. Its expert (BC) identified rectification was required. The builder BB rectified repairs. The insurer says the work was generally completed to the agreed SOW and was of a suitable standard. The insurer paid lost rent up until 30 June 2020. Subsequently, the complainant also identified some ongoing issues with the timber floors and walls. The insurer said these issues were caused by rising damp. The complainant is dissatisfied with the insurer’s position and see ks for the insurer to cash settle it $175,990.00. This includes:  landscaping to the front and back yards  the cost of kitchen cabinetry and appliances  the cost of building the outhouse (also referred to as games room)  the cost of a replacement vanity  costs of obtaining expert reports  ongoing loss of rent. The claim also includes amounts to remove and replace floorboards and skirting, removal and replacement of damaged plaster walls/cornices and new walls and ceiling paint which the complainant says is moisture related damage. The insurer says it fulfilled its policy obligations and is not required to pay anything further. Insurer is not liable for additional landscaping costs The policy terms relied on by the parties are set out in supporting section 3.2 o f this determination. A summary of the material relied on by the parties is set out in supporting section 3.3 of this determination. Determination | Case number: 739413 Page 5 of 19 The policy covers up to $2,000 for the replacement of landscaping features damaged as a result of an accepted claim. The complainant does not dispute the policy limit but says it should be cash settled an additional $19,305 including GST to rectify damage done to the garden by the insurer’s appointed trades. The complainant says the trades destroyed the paving, curbing, reticulation and lawn and plants have died during the process. The complainant provided a quotation outlining the cost of landscaping to the front and rear yards to its original condition which included pressure cleaning and the re- laying of driveway pavers. The complainant also provided a photograph of the front of the property which it says shows the damage caused by the insurer’s trades. The scope of works from the insurer’s engineer (SE) in February 2019 includes an aerial photograph of the property and of the front garden. The photos show a similar level of damage to the photo relied upon by the complainant. It shows the gardens were damaged or in poor condition in early February 2019. The panel considers this indicates the landscaping was either damaged by the fire or the fire fighters or was not in very good condition prior to the fire. The panel reviewed the material provided by the complainant. The complainant’s photograph is insufficient to establish the insurer’s builders caused further damage to the front or back gardens other than what was caused by the insured event. In the absence of contemporaneous persuasive evidence showing the insurer’s trades caused additional damage to the gardens, the panel is not satisfied the complainant has established the insurer is liable for the additional claimed landscaping costs of $19,305. Insurer restored kitchen and appliances as agreed by complainant The complainant seeks $26,015.00 to supply kitchen cabinets and appliances. The complainant says the kitchen has not been restored to its pre-loss condition and the kitchen has been reconfigured. The complainant says the insurer did not follow the SE’s scope of works, which allows to supply and install new kitchen cabinetry to match the existing cabinetry. The complainant also says there was no discussion with the cabinetmaker regarding the materials/appliances to be used and the configuration and no sign off was given prior to the work proceeding. The complainant provided photos of the kitchen in its pre -loss condition and relied upon the insurer’s report from BC dated 15 January 2020 confirming a reconfiguration of kitchen cabinetry. The photos show the kitchen has been reconfigured. Determination | Case number: 739413 Page 6 of 19 In July 2019, emails were exchanged between the broker and builder (BB) in which BB advised the previous configuration of the kitchen would not meet building standards and a reconfiguration was recommended. This email and attachments explaining BB’s proposal was provided to the complainant who responded on 22 July 2019 as follows: ….please advise the Builder to go with what he recommends and would look best. Please see attached authorising to do so. Thank you Kind Regards (com plainant) The complainant completed an authorisation for the changes on 21 July 2019. Given the complainant consented to the reconfiguration of the kitchen and the reconfiguration of the kitchen was required to bring the kitchen up to code, the panel is not satisfied the complainant established that the insurer is liable to rectify the kitchen to its previous configuration. The complainant also complains about the kitchen appliances. It says it did not agree to the replacement appliances and the change from an electric stove to gas. In the same correspondence in July 2019, the builder says the new appliances will be compliant. The builder said it would use a 900mm cooktop instead of a 600mm. It also said the kitchen flow in its design is far better with more usable bench space. The panel has considered photographs provided both before and after the fire. Having considered the available information and the correspondence which took place in July 2019, the panel is not satisfied the insurer is required to indemnify the complainant for kitchen appliances. Rear patio and games room although different from the scope is as good if not better than prior to the fire The complainant seeks $19,800.00 for rectification of the rear games/living room or outhouse (as described in some correspondence). The insurer says the supply of an outhouse is an addition to the property and therefore outside the scope of the claim. The complainant referred to SE’s scope of works, which allows for the supply and installation of steel framed rear patio and games room including pad footings to columns and steel stud framing. The complainant says the BC report confirms the rebuild did not follow the scope. BC identified the external wall materials varied from the original structure however said it provided a standard of construction, appearance and quality that is commensurate with, if not better than, its status prior to the loss. Determination | Case number: 739413 Page 7 of 19 The complainant also says there was no discussion about the materials to be used and no sign off prior to the work proceeding. The insurer’s assessor says BB could modify the cladding and i nstall skylights if required, however, these items were not in the scope and no feedback was provided by the insured or its broker. The complainant maintains the structure requires rectification. The scope allowed to demolish the rear patio and games room structure. The panel is not satisfied the complainant has provided sufficient persuasive evidence to indicate how the works to this structure are inadequate. BC inspected the repairs in December 2019 and January 2020. BC agrees the external wall materials may vary from the original structure but as noted above BC says when complete, it will be as good as, if not better than its pre -loss state. The assessor’s report of 15 January 2020 indicates sign off from BC advising the authorised work has been completed to a standard which finalised the involvement of the builder. This was confirmed in writing by BC on 22 June 2020. The panel is satisfied the final assessment report notes all outstanding rectification work has been completed and there is no compelli ng material from the complainant to suggest otherwise. In the absence of any information provided by the complainant, the panel is not satisfied the complainant has established the insurer is liable to replace the rear patio and games room structure or cash settle the complainant $19,800.00. Complainant agreed to vanity replacement The complainant seeks $2,750.00 for a replacement bathroom vanity. He says the original vanity was removed and replaced with an inferior unit. The complainant says the scope allows for removal of the vanity but makes no comment about replacing it, however, it is evident a replacement vanity was installed. T says: vanity joinery not as original, original was better quality unit and finish. There is no information as to how T has determined the vanity is inferior. As per the reconfiguration of the kitchen, emails were exchanged between the parties in July 2019 in which BB advised he redesigned the bathroom vanity cabinet to ensure its longevity. This was communicated to the complainant in the same email Determination | Case number: 739413 Page 8 of 19 (with attachments) as the changes to the kitchen and the complainant expressed no opinion but advised BB to proceed with his recommendations. Given the complainant consented to changes, the panel is not satisfied the complainant has established that the insurer is liable to rectify the bathroom vanity to its previous configuration or pay the complainant $2,750. 2.2 Is the insurer liable for claimed report costs and rent? Insurer to contribute $5,000 to the cost of expert reports The complainant seeks for the insurer to reimburse it for expert reports being the cost of the reports from T and from AC which were obtained to identify faulty workmanship. AC provided a report in October 2020 about the timber floor. The complainant says the reports were required to determine the quality of workmanship by BB and to identify matters of construction that, in its opinion, were either defective or incomplete. It also raised concerns BC was not independent party given it is a supplier of services to BB. The insurer says while the insured may obtain the services of any suitably qualified person to report, these costs are to be borne by the complainant. The insurer will only reimburse report costs with its agreement and at its discretion. It also says T’s costs are excessive. The insurer also submits it agreed with the appointment of BC to complete an assessment and provide findings based on the works completed by BB and T’s report was redundant and not used for the rectification scope. The complainant says the report is payable under the policy which provides for payment of the reasonable costs of architects, surveyors and legal fees. It also says BC relied on T’s report. The panel does not accept the reports are payable under the policy as neither T or AC are architects, surveyors or lawyers. Further, in circumstances where the complainant did not seek the consent of the insurer prior to incurring T’s costs, the panel is not satisfied it is fair that the full amount of T’s cost s is paid particularly in circumstances where a settlement mechanism was available to the parties as evidenced by the solution to appoint BC to review the work and provide a report. The panel does not accept the available information establishes BC was not independent. Pursuant to its Rules AFCA can decide that an insurer is to contribute to professional costs (capped at $5,000) incurred by a complainant during a complaint. When considering whether to require the insurer to make a costs contribution, AFCA considers the complexity of the complaint and whether the complainant needed to incur the costs to understand or establish that claim. Determination | Case number: 739413 Page 9 of 19 The panel found the complainant’s reports from T helpful in considering the issues and as to whether rectification work was required. The panel also notes BC considered the report, but only to the extent in which it predates the insurer’s report and the insurer was required to respond to the report. The panel is not persuaded T’s reports establish the insurer is liable for any of the remedies the complainant is seeking. As set out later in this determination, the panel used AC’s report to review the claimed damage to the flooring. The panel accepts the issues in this complaint are complex and the complainant needed to incur some costs to help establish the claim. In the circumstances, the panel considers it fair that the insurer contributes $5,000 towards the costs incurred by the complainant to obtain reports from T and AC. Insurer not required to pay anything further for lost rent The complainant seeks the insurer to cash settle it $360 per week for a notional period for completion of the proposed rectification work being 16 weeks. The insurer says it does not accept rectification work is required and no further loss of rent will be paid. The policy covers loss of rent if a tenant cannot safely reside in the building because of damage caused to the building. As set out earlier in this determination, the panel is not satisfied the complainant has established the claimed rectification work is required. The available information establishes the insurance repairs were completed in June 2020. Having reviewed the available information and the photographs provided, the panel is satisfied that a tenant could safely reside in the building in June 2020. The insurer has paid loss of rent from the time of the fire until 30 June 2020. On the available information and for the reasons stated, the panel is satisfied the complainant is not entitled to anything further for loss of rent. 2.3 Is the insurer liable for the claimed moisture damage? Expert reports considered The complainant seeks for the insurer to accept liability for moisture damage which has damaged the plaster walls, cornices and the flooring. Determination | Case number: 739413 Page 10 of 19 The complainant’s second quotat ion shows it claims to remove and replace floor boards and skirting ($30,645), to remove and replace damaged plaster walls/cornices ($23,930) and new wall and ceiling paint ($6,970). The policy covers accidental loss or damage, subject to conditions and exclusions. The policy specifically excludes damage caused by rising damp or dampness. The parties rely on expert reports which are summarised in supporting section 3.3 of this determination. The insurer’s report from BB identifies three walls in the mast er bedroom are showing signs of elevated moisture readings and there is evidence in the external brickwork of long term rising damp. BB also says the kitchen internal/external upper walls have elevated moisture levels from water ingress after the roof was damaged by the fire. A plumber was engaged. He found no leak. BB concluded the cause of the identified moisture was rising damp which he says is not uncommon in a building of this age. The complainant’s report from PD says the damp readings were inconsistent with rising damp and damage was caused by exposure to the elements and the workmanship of the repair. PD identified high damp ratings in the floor timber and high visible damp deterioration such as swelling and delamination. PD noted skirtings and architraves have visible swelling and twisting too. The panel considers PD ’ s report is insufficiently specific to identify exactly which damage is compensable. The complainant engaged a floor specialist (AC). AC identified crowning in the floorboards in two bedrooms and the passageway. He said the rooms which were not the subject of recent remedial works showed no crowning. AC said the damage to the floor is not because of rising damp but because the floors were prematurely sanded and coated while there was elevated moisture was still present. Some of the claimed damage is claim related The panel accepts the probable cause of the damage to the floors in the two bedrooms and the passageway is poor workmanship. AC also said most walls returned suitable moisture readings except for two walls in the kitchen. Having reviewed photographs, the panel is satisfied the moisture readings in the kitchen were probably caused by long time term exposure to elements due to an absence of a roof after the fire and before the roof was repaired. Determination | Case number: 739413 Page 11 of 19 The panel finds the report from AC more compelling than BB’s report because it is independent and contains detailed reasoning with photographs, and moisture readings. The panel is satisfied the proximate cause of the claimed loss is caused by the fire and/or subsequent exposure or by the poor repairs. Insurer to pay to the complainant $31,003.23 plus interest Given the property must dry out before repairs can be completed, the insurer is required to cash settle the cost of repairing the damaged floorboards in the hallway, bedroom 1 and bedroom 2 as well as some plaster and paintwork. The insurer has provided no information about the cost of repairs. The material from the complainant is also not helpful as it claims for removal of all the floor boards and walls in circumstances where the available evidence establishes only some of the floor boards and walls are damaged. The panel has considered the photographs provided and the sketch in AC’s report. The panel accepts about half of the flooring needs to be replaced. The panel is satisfied it is fair the insurer indemnifies the complainant for half the cost of removing and replacing the floor boards and skirting ($15,322.50). The panel notes BB identified three walls in the master bedroom which showed signs of elevated moisture readings, but the external brickwork showed long term rising damp. Having considered the photographs of the external brickwork, the panel agrees the moisture in the master bedroom is probably from long term rising damp. BB identifies the kitchen internal/external upper walls have elevated moisture levels from water ingress after the roof was damaged by the fire. According to AC most of the walls returned suitable readings but two walls in the kitchen and wall in the living room returned slightly elevated readings. The panel is satisfied it is probable the damage in these areas in the kitchen and living room was caused by water coming into the house after the roof was fire damaged. Having considered a sketch of the house and photographs, the panel is satisfied it is fair the insurer pays a third of the cost to remove/replace damaged plaster walls/cornices and paint walls and ceilings ($10,300). The panel also makes an allowance of 10% on the allowable amounts for project management, builder’s margin, rubbish removal and final clean ($2,56 2.25). Determination | Case number: 739413 Page 12 of 19 Finally, as the claims is to be cash settled, the panel considers it is fair to make a further allowance of 10% for variations and contingencies which may occur once repairs commence ($2,818.47). Should the complainant accept this determination then within seven days of notification of acceptance the insurer is to pay to the complainant $31,003.23. The insurer is also to pay interest pursuant to section 57 of the Insurance Contracts Act from 27 November 2020 being 14 days after the date of the compl ainant’s letter providing the expert reports relied on by the panel (13 November 2020) until the date of settlement. Determination | Case number: 739413 Page 13 of 19 Supporting information 3.1 Our Approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the AFCA Rules. The panel consists of an ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Words with Special Meaning accidental loss or damage means a sudden or unexpected loss to insured property but excludes damage that is otherwise excluded in this PDS. WHAT YOU ARE INSURED FOR Accidental damage cover When you insure your building and/or your contents under this policy, you will be covered for accidental loss or damage that occurs during the period of insurance and at the insured location. Determination | Case number: 739413 Page 14 of 19 There are limitations and exclusions to the cover provided for certain events. These limitations and exclusions may restrict the amount payable in the event of a claim or alternatively they may prevent a claim from being paid at all. Loss of rent following damage or prevention of access When we accept a claim and we agree that your tenant cannot safely reside in or access the building because of damage caused to your building, or an adjoining building, we will pay the actual rent you lose while the damaged building is being repaired or rebuilt. We will also pay for loss of rent: • if your tenant is denied legal access to your building by a local, state or Commonwealth authority; • if your building becomes uninhabitable for a period exceeding 7 days due to murder, suicide or attempted murder or suicide. We will not pay for loss of rent: • beyond the period it should reasonably take to repair, rebuild or reinstate your building; • if your building has not been tenanted for more than 100 consecutive days immediately before the loss or damage. The most we will pay under this benefit is the lesser of 24 months’ rent, at a maximum of $1,500 per week, or the actual rent you lose. Landscaping costs following a claim We will pay up to $2,000 for the reasonable costs of replacement of landscaping features such as trees, shrubs, bushes, rock features, fountains and ponds that are damaged in an incident that results in a claim that we accept for damage to your building, other than a claim for deliberate damage. WHEN WE WILL NOT PAY A CLAIM FOR LOSS OR DAMAGE UNDER THIS POLICY You are not covered for any loss or damage caused by or resulting from: • mould or mildew or fungi, wet or dry rot, rising damp or dampness; Determination | Case number: 739413 Page 15 of 19 Architects, surveyors and legal fees We will pay the reasonable costs of architects, surveyors and legal fees when loss or damage occurs. The most we will pay under this benefit is 20% of your building sum insured. How we settle claims for your building When we agree to pay a claim for your building, we will rebuild or repair your building as new, or pay you the cost of rebuilding or replacing it, at our discretion. We will only pay up to your building sum insured, or any lesser limit that applies, less any applicable excess. We will only pay to repair or rebuild that part of your building that was damaged. We do not cover any additional expenses to replace undamaged parts of your building to create a uniform appearance. Where the original materials used to build your building are not readily available in Australia, we will pay for the cost of materials we believe to be of a similar kind or quality. We will only pay up to your building sum insured less any applicable excesses. 3.3 Expert evidence Record Key points Complainant’s report (T) 20 September 2019  T (described as retail fit out) ins pected and photographed 17 and 18 September, met complainant 23 September and reported in detail in relation to the condition at the time of inspection and what needed to be don e to bring work up to standard.  Kitchen: remedy to remove and reinstall with quality equivalent joinery to match existing layout.  Skirting and architraves fitted poorly or not removed and reinstated from water damage. Water damage to walls seeping through paintwork. Living Room Skirting on RHS entrance wall @ hallway junction has swelling from water damage. Hallway: Water damage seeping through wall paint. Bathroom Water leak. Bedroom 3 Skirting poor, water damage, skirting swollen, rectification work not f lush joint. Bedroom 1 Water residue inside robe.  New joinery unit again cheap replacement  Gardens and landscaping require considerable attention  Kitchen equipment is substandard replacement.  Describes points that supersede defect and remedies if items rep lac ed in their entirety including new outhouse, new kitchen joinery, new doors, new kitchen equipment, new skirting and architraves. Tax Invoice (T) 8 October 2019  Defect building inspection report cost $11,814 including GST . Financial firm’s expert (BB)  Confirms approved works complete and home ready for re - occupation. Determination | Case number: 739413 Page 16 of 19 Record Key points Report 26 - 09 - 2019 Notice of completion has been sent to local council.  Reports work done to games room and says works completed fulfil engineer’s scope, approved plans and details pro vided.  Final inspection 25 September 2019 and photographs included. Financial firm’s expert (BB) Report 29 - 10 - 2019  Inspected, photographed and report ed on moisture issues in kitchen and master bedroom as high levels of moisture found in internal walls in several rooms of the home.  All three walls of master bedroom showing signs of elevated moisture which is affecting the timber flooring, skirting boards and walls above.  Living room front wall and RHS ent ry walls were elevated in moisture levels .  Plumbing specialist engaged and found no leak.  Caus e is rising damp which would not be uncommon in a building of this age. There is evidence of external brickwork fretting from long term rising damp.  Kitchen internal/external upper walls have elevat ed moisture levels from water ingress after the roof cover was damaged in the fire in this area. This will dry out nat urally over time - re - occurrence of minor staining may be evident and will require stain blocking and painting onc e walls are dry.  Insured will need to ens ure additional subfloor ventilation is added to combat the rising damp.  At no cost completed structural drying t o the sout h facing master bed wall and skirting and kitchen and re - painted. Leak detection report 31 October 2019  Conducted leak detection tests and visually inspected all plumbing.  Dampness was found in the front bedrooms away from the wet areas.  Issue was not related to the plumbing services. Financial firm’s expert (BC) Report 15 - Jan - 2020  Purpose of this report is to adjudicate on the quality of workmanship and identify the works that remain.  Reviewed report from T, original 2013 patio approval, eng ineer’s scope and builder’s correspondence.  Inspected with BB 10 December 2019 and 9 January 2020 and with complainant 12 December 2019.  Photographs attached show before and after photographs.  Discounted some items because not damaged by fire or firefig hting.  Upon satisfactory completion of work specified in appendix A the fire damage repairs will be commensurate with the building prior to the loss and constructed to a sufficient standard and quality of workmanship.  Correspondence bet ween the builder an d the insured regarding the change in design to the kitchen cabinetry and layout. BB has advised the reason for the change in design was due to the required spatial requirements for the gas cooktop in relation to adjoining cabinetry. Noted that a gas cookt op has been installed in lieu of the former electric cooktop at BB’s expense. The opinion of the writer is that the standard of fitment, layout and functionality of the kitchen is of a quality that is better than existed prior to the loss.  Whilst the external wall materials used in the construction of the Determination | Case number: 739413 Page 17 of 19 Record Key points enclosed, non - habit able structure may vary from the original structure it is the opinion of the writ er that this structure, when complete, will provide a standard of construction, appearance and qual ity that is commensurate with, if not better than, prior to the loss . Financial firm’s adjuster (S) Report 15 - Jan - 2020  S ign off from BC a dvising the authorised work has been completed to a standard which finalises the involvement of BB.  L oss of rent paid up until 28 November 2019. Financial firm’s expert (BC) Report 22 June 2020  I nsuranc e repairs undertaken by BB are complete. This opinion relies partly upon third - party verification and photographic evidence provided by BB . This opinion also relies upon the verbal confirmation by BB hat a suitably sized soak well has been installed at the front left - hand corner of the property.  Although the rear enclosed patio has been constructed in a style that is commensurate with a habi table part of the building the ins ured should be advised that the patio is classified as a non - habitable structure. Complainant’s expert (PD) Report 15 - Oct - 2020  On discussion with the owner and after thorough inspection with moisture met ers and laser thermometers, we found the damp readings were inconsistent with rising damp. The protemeter picked up very low readings on most walls due to no rising damp being present. The inconsistent readings could be contributed to surface laid condensation due to th e property being unoccupied and unfurnished.  Walls are in suitable state of repair.  Floor timber has high damp ratings and high visible damp det erioration such as swelling and delamination. Skirtings and architraves have visible swelling and twisting.  Fl oor joists due to the age of the property will be installed on brick piers to the under - floor void which also would have needed a complete drying out process before new joists were installed. Again, the joists are open to fungal attack during the drying ou t process.  Renovation to the property has been below par in many ways however the floor timber will need addressing as it will almost certainly in time become a major safety issue. Complainant’s expert (AC) Invoice 09 - Oct - 2020  $990 including GST to at tend site and undertake an inspection of a solid timber floor installation in relation to the insured address.  Conc erns: To assess the condition of the floor, together with signs of surface distortion in the form of cupping and cracks within some floorboards. Complainant’s expert (AC) Report 20 - Oct - 2020  Inspected, tested and photographed floor 14 October 2020 to assess concerns regarding the appearance of distortion of floorboards and to assess moisture testing of walls.  Complainant advises large sections of the roof were missing and left open and exposed to the elements bet ween January and June 2019. Remedial works regarding timber floor undertaken in August 2019. Property remained unoccupied, but complainant noticed movement in the floor.  Remedi al work to the timber floor in August 2019 including sanding and Determination | Case number: 739413 Page 18 of 19 Record Key points coating of passage area and bedrooms one and two. Individual floor board removed and replaced in bedroom two.  Complainant says flooring in the refurbished areas have deteriorated with signs of splitting and movement.  Noted and measured floor board edges lower than the centre of the board wit hin the flooring in the bedrooms one and two and passage (crowning). Some boards showing significant splitting towards the edge of the floor boards.  While most walls returned suitable moisture readings, two walls in the kitchen together with a wall in the living room had hollow sounding spots. Isolated spots in the passage was slightly elevated.  Photos 1 and 2 show crowning in the bedroom one and two.  Photos 3 (on the left - hand side) shows the appearance of crowning throughout the passageway, whilst photo 4, supplied from the complainant, shows the exposed roof spac e above the passageway prior to the commencement of remedial works.  Photos show areas which were not sanded and polished were flat.  Crowning was limited to the areas of floor which had been site sanded and coat ed during the recent remedial works, with no signs of cr owning noted within the untouched flooring beneath the carpet in the living area and in the passage linen cupboard.  This occurs when moisture affected floors have cupped and sanded and finished when there is still moisture variation present through the boards. Floor that crowns indicates moisture levels have returned to even through the thickness of the boards and moist ure levels are no longer high beneath the floor.  Minor crowning can be sanded out. But if pronounced it needs board replacement ensuring sub floor completely dry.  Disagree crowning is because of rising damp as inspection shows the crowning was limited to the flooring which was re - sanded and coating during remedial works.  Only suitable remedial option to achieve a commercially acceptable floor installation, would be to remove and replace the entire flooring within bedrooms 1, 2 and passageway areas, follo wed by sanding and coating these replaced areas of flooring. This remedial action would also require the removal and replacement of the skirting boards and quadrant beading surrounding these areas.  M ain contributing causes of the problem were considered t o be premature sanding and coating of the f loor whilst an elevated moisture gradient was still present during the remedial works.  F loor is unacceptable in its current condition and will require a remedial response, with this action considered to include t he removal and replacement of the flooring within the passage, bedroom 1, and 2, followed by the sanding and coating of the replacement floor. 3.4 Other relevant material considered and relied on  Parties’ submissions/emails and all attachments to all submissi ons/emails.  Parties’ expert reports, engineer’s scope of work, invoices and quotations. Determination | Case number: 739413 Page 19 of 19  Insurer’s reports from adjuster.  Photographs.  Correspondence between the parties.