Text of the determination
Determination
Case number 739413
Financial firm The Hollard Insurance Company Pty Ltd
Determination | Case number: 739413 Page 2 of 19
Case number: 739413 19 February 2021
Determination overview
1.1 Complaint
The insured is a company of which the complainant is a director. The insured holds a
landlord insurance policy with the financial firm (the insurer) and lodged a claim after
its property was damaged by fire. The complainant is represented by its broker. For
the sake of brevity, references to the complainant include references to the
representative.
The insurer accepted the claim and completed repairs. The complainant reports
ongoing issues with the repairs and says the property requires rectification work. The
complainant seeks for the insurer to cash settle it $175,990.00 for building works,
landscaping, loss of rent, report costs and moisture damage.
The insurer says it fulfilled its policy obligations and is not required to pay anything
further.
1.2 Issues and key findings
Is the insurer required to cash settle further for rectification work?
The complainant has not established the property requires additional rectification, the
insurer’s trades damaged the landscaping or that work was not completed in
accordance with agreement, the scope of works or better.
Is the insurer liable for claimed report costs and rent?
The complainant is entitled to $5,000 for the cost of expert reports.
The complainant is not entitled to further loss of rent.
Is the insurer liable for the claimed moisture damage?
The insurer is liable for the moisture damage to some of the affected flooring,
plasterwork and paintwork because the available information establishes the fire
damaged roof probably resulted in some the internal walls and flooring being exposed
to the elements for a prolonged period which led to elevated moisture levels and that
there was some poor workmanship in the laying of the floors.
1.3 Determination
This determination is mostly in favour of the insurer.
Should the complainant accept this determination then within seven days of
notification of acceptance the insurer is required to cash settle the complainant:
Determination | Case number: 739413 Page 3 of 19
$5,000 for the cost of expert reports
$31,003.22 for the cost of repair and rectification to the flooring in bedroom 1,
bedroom 2 and the hallway and the cost of rectification of the moisture affected
paintwork and plasterwork in the kitchen and living room
interest on $31,003.22 pursuant to section 57 of the Insurance Contracts Act from
27 November 2020 until the date of settlement.
Determination | Case number: 739413 Page 4 of 19
Reasons for determination
2.1 Is the insurer required to cash settle further for rectification work?
Circumstances of loss
The complainant holds a landlord insurance policy with the insurer and lodged a claim
on 25 January 2019 for damage caused by fire. The insurer liaised with the
complainant to complete repairs by its builder BB and paid lost rent.
In September 2019, the insurer advised the complainant repairs were completed and
the property was ready for handover. The complainant identified faulty workmanship
and engaged its own building consultant (T) to complete a report on the required
rectification.
The insurer also assessed the repairs. Its expert (BC) identified rectification was
required. The builder BB rectified repairs. The insurer says the work was generally
completed to the agreed SOW and was of a suitable standard.
The insurer paid lost rent up until 30 June 2020.
Subsequently, the complainant also identified some ongoing issues with the timber
floors and walls. The insurer said these issues were caused by rising damp.
The complainant is dissatisfied with the insurer’s position and see ks for the insurer to
cash settle it $175,990.00. This includes:
landscaping to the front and back yards
the cost of kitchen cabinetry and appliances
the cost of building the outhouse (also referred to as games room)
the cost of a replacement vanity
costs of obtaining expert reports
ongoing loss of rent.
The claim also includes amounts to remove and replace floorboards and skirting,
removal and replacement of damaged plaster walls/cornices and new walls and
ceiling paint which the complainant says is moisture related damage.
The insurer says it fulfilled its policy obligations and is not required to pay anything
further.
Insurer is not liable for additional landscaping costs
The policy terms relied on by the parties are set out in supporting section 3.2 o f this
determination.
A summary of the material relied on by the parties is set out in supporting section 3.3
of this determination.
Determination | Case number: 739413 Page 5 of 19
The policy covers up to $2,000 for the replacement of landscaping features damaged
as a result of an accepted claim.
The complainant does not dispute the policy limit but says it should be cash settled an
additional $19,305 including GST to rectify damage done to the garden by the
insurer’s appointed trades. The complainant says the trades destroyed the paving,
curbing, reticulation and lawn and plants have died during the process.
The complainant provided a quotation outlining the cost of landscaping to the front
and rear yards to its original condition which included pressure cleaning and the re-
laying of driveway pavers.
The complainant also provided a photograph of the front of the property which it says
shows the damage caused by the insurer’s trades.
The scope of works from the insurer’s engineer (SE) in February 2019 includes an
aerial photograph of the property and of the front garden. The photos show a similar
level of damage to the photo relied upon by the complainant. It shows the gardens
were damaged or in poor condition in early February 2019. The panel considers this
indicates the landscaping was either damaged by the fire or the fire fighters or was
not in very good condition prior to the fire.
The panel reviewed the material provided by the complainant. The complainant’s
photograph is insufficient to establish the insurer’s builders caused further damage to
the front or back gardens other than what was caused by the insured event.
In the absence of contemporaneous persuasive evidence showing the insurer’s
trades caused additional damage to the gardens, the panel is not satisfied the
complainant has established the insurer is liable for the additional claimed
landscaping costs of $19,305.
Insurer restored kitchen and appliances as agreed by complainant
The complainant seeks $26,015.00 to supply kitchen cabinets and appliances. The
complainant says the kitchen has not been restored to its pre-loss condition and the
kitchen has been reconfigured.
The complainant says the insurer did not follow the SE’s scope of works, which allows
to supply and install new kitchen cabinetry to match the existing cabinetry.
The complainant also says there was no discussion with the cabinetmaker regarding
the materials/appliances to be used and the configuration and no sign off was given
prior to the work proceeding.
The complainant provided photos of the kitchen in its pre -loss condition and relied
upon the insurer’s report from BC dated 15 January 2020 confirming a reconfiguration
of kitchen cabinetry. The photos show the kitchen has been reconfigured.
Determination | Case number: 739413 Page 6 of 19
In July 2019, emails were exchanged between the broker and builder (BB) in which
BB advised the previous configuration of the kitchen would not meet building
standards and a reconfiguration was recommended. This email and attachments
explaining BB’s proposal was provided to the complainant who responded on 22 July
2019 as follows:
….please advise the Builder to go with what he recommends and would look
best. Please see attached authorising to do so. Thank you Kind Regards
(com plainant)
The complainant completed an authorisation for the changes on 21 July 2019.
Given the complainant consented to the reconfiguration of the kitchen and the
reconfiguration of the kitchen was required to bring the kitchen up to code, the panel
is not satisfied the complainant established that the insurer is liable to rectify the
kitchen to its previous configuration.
The complainant also complains about the kitchen appliances. It says it did not agree
to the replacement appliances and the change from an electric stove to gas.
In the same correspondence in July 2019, the builder says the new appliances will be
compliant. The builder said it would use a 900mm cooktop instead of a 600mm. It also
said the kitchen flow in its design is far better with more usable bench space.
The panel has considered photographs provided both before and after the fire. Having
considered the available information and the correspondence which took place in July
2019, the panel is not satisfied the insurer is required to indemnify the complainant for
kitchen appliances.
Rear patio and games room although different from the scope is as good if not
better than prior to the fire
The complainant seeks $19,800.00 for rectification of the rear games/living room or
outhouse (as described in some correspondence).
The insurer says the supply of an outhouse is an addition to the property and
therefore outside the scope of the claim.
The complainant referred to SE’s scope of works, which allows for the supply and
installation of steel framed rear patio and games room including pad footings to
columns and steel stud framing.
The complainant says the BC report confirms the rebuild did not follow the scope.
BC identified the external wall materials varied from the original structure however
said it provided a standard of construction, appearance and quality that is
commensurate with, if not better than, its status prior to the loss.
Determination | Case number: 739413 Page 7 of 19
The complainant also says there was no discussion about the materials to be used
and no sign off prior to the work proceeding.
The insurer’s assessor says BB could modify the cladding and i nstall skylights if
required, however, these items were not in the scope and no feedback was provided
by the insured or its broker.
The complainant maintains the structure requires rectification.
The scope allowed to demolish the rear patio and games room structure.
The panel is not satisfied the complainant has provided sufficient persuasive evidence
to indicate how the works to this structure are inadequate.
BC inspected the repairs in December 2019 and January 2020. BC agrees the
external wall materials may vary from the original structure but as noted above BC
says when complete, it will be as good as, if not better than its pre -loss state.
The assessor’s report of 15 January 2020 indicates sign off from BC advising the
authorised work has been completed to a standard which finalised the involvement of
the builder. This was confirmed in writing by BC on 22 June 2020.
The panel is satisfied the final assessment report notes all outstanding rectification
work has been completed and there is no compelli ng material from the complainant to
suggest otherwise.
In the absence of any information provided by the complainant, the panel is not
satisfied the complainant has established the insurer is liable to replace the rear patio
and games room structure or cash settle the complainant $19,800.00.
Complainant agreed to vanity replacement
The complainant seeks $2,750.00 for a replacement bathroom vanity. He says the
original vanity was removed and replaced with an inferior unit.
The complainant says the scope allows for removal of the vanity but makes no
comment about replacing it, however, it is evident a replacement vanity was installed.
T says:
vanity joinery not as original, original was better quality unit and finish.
There is no information as to how T has determined the vanity is inferior.
As per the reconfiguration of the kitchen, emails were exchanged between the parties
in July 2019 in which BB advised he redesigned the bathroom vanity cabinet to
ensure its longevity. This was communicated to the complainant in the same email
Determination | Case number: 739413 Page 8 of 19
(with attachments) as the changes to the kitchen and the complainant expressed no
opinion but advised BB to proceed with his recommendations.
Given the complainant consented to changes, the panel is not satisfied the
complainant has established that the insurer is liable to rectify the bathroom vanity to
its previous configuration or pay the complainant $2,750.
2.2 Is the insurer liable for claimed report costs and rent?
Insurer to contribute $5,000 to the cost of expert reports
The complainant seeks for the insurer to reimburse it for expert reports being the cost
of the reports from T and from AC which were obtained to identify faulty workmanship.
AC provided a report in October 2020 about the timber floor.
The complainant says the reports were required to determine the quality of
workmanship by BB and to identify matters of construction that, in its opinion, were
either defective or incomplete. It also raised concerns BC was not independent party
given it is a supplier of services to BB.
The insurer says while the insured may obtain the services of any suitably qualified
person to report, these costs are to be borne by the complainant. The insurer will only
reimburse report costs with its agreement and at its discretion. It also says T’s costs
are excessive.
The insurer also submits it agreed with the appointment of BC to complete an
assessment and provide findings based on the works completed by BB and T’s report
was redundant and not used for the rectification scope.
The complainant says the report is payable under the policy which provides for
payment of the reasonable costs of architects, surveyors and legal fees. It also says
BC relied on T’s report.
The panel does not accept the reports are payable under the policy as neither T or
AC are architects, surveyors or lawyers. Further, in circumstances where the
complainant did not seek the consent of the insurer prior to incurring T’s costs, the
panel is not satisfied it is fair that the full amount of T’s cost s is paid particularly in
circumstances where a settlement mechanism was available to the parties as
evidenced by the solution to appoint BC to review the work and provide a report. The
panel does not accept the available information establishes BC was not independent.
Pursuant to its Rules AFCA can decide that an insurer is to contribute to professional
costs (capped at $5,000) incurred by a complainant during a complaint.
When considering whether to require the insurer to make a costs contribution, AFCA
considers the complexity of the complaint and whether the complainant needed to
incur the costs to understand or establish that claim.
Determination | Case number: 739413 Page 9 of 19
The panel found the complainant’s reports from T helpful in considering the issues
and as to whether rectification work was required. The panel also notes BC
considered the report, but only to the extent in which it predates the insurer’s report
and the insurer was required to respond to the report.
The panel is not persuaded T’s reports establish the insurer is liable for any of the
remedies the complainant is seeking.
As set out later in this determination, the panel used AC’s report to review the claimed
damage to the flooring.
The panel accepts the issues in this complaint are complex and the complainant
needed to incur some costs to help establish the claim.
In the circumstances, the panel considers it fair that the insurer contributes $5,000
towards the costs incurred by the complainant to obtain reports from T and AC.
Insurer not required to pay anything further for lost rent
The complainant seeks the insurer to cash settle it $360 per week for a notional
period for completion of the proposed rectification work being 16 weeks.
The insurer says it does not accept rectification work is required and no further loss of
rent will be paid.
The policy covers loss of rent if a tenant cannot safely reside in the building because
of damage caused to the building.
As set out earlier in this determination, the panel is not satisfied the complainant has
established the claimed rectification work is required. The available information
establishes the insurance repairs were completed in June 2020.
Having reviewed the available information and the photographs provided, the panel is
satisfied that a tenant could safely reside in the building in June 2020.
The insurer has paid loss of rent from the time of the fire until 30 June 2020.
On the available information and for the reasons stated, the panel is satisfied the
complainant is not entitled to anything further for loss of rent.
2.3 Is the insurer liable for the claimed moisture damage?
Expert reports considered
The complainant seeks for the insurer to accept liability for moisture damage which
has damaged the plaster walls, cornices and the flooring.
Determination | Case number: 739413 Page 10 of 19
The complainant’s second quotat ion shows it claims to remove and replace floor
boards and skirting ($30,645), to remove and replace damaged plaster walls/cornices
($23,930) and new wall and ceiling paint ($6,970).
The policy covers accidental loss or damage, subject to conditions and exclusions.
The policy specifically excludes damage caused by rising damp or dampness.
The parties rely on expert reports which are summarised in supporting section 3.3 of
this determination.
The insurer’s report from BB identifies three walls in the mast er bedroom are showing
signs of elevated moisture readings and there is evidence in the external brickwork of
long term rising damp. BB also says the kitchen internal/external upper walls have
elevated moisture levels from water ingress after the roof was damaged by the fire.
A plumber was engaged. He found no leak.
BB concluded the cause of the identified moisture was rising damp which he says is
not uncommon in a building of this age.
The complainant’s report from PD says the damp readings were inconsistent with
rising damp and damage was caused by exposure to the elements and the
workmanship of the repair. PD identified high damp ratings in the floor timber and
high visible damp deterioration such as swelling and delamination. PD noted skirtings
and architraves have visible swelling and twisting too.
The panel considers PD ’ s report is insufficiently specific to identify exactly which
damage is compensable.
The complainant engaged a floor specialist (AC). AC identified crowning in the
floorboards in two bedrooms and the passageway. He said the rooms which were not
the subject of recent remedial works showed no crowning.
AC said the damage to the floor is not because of rising damp but because the floors
were prematurely sanded and coated while there was elevated moisture was still
present.
Some of the claimed damage is claim related
The panel accepts the probable cause of the damage to the floors in the two
bedrooms and the passageway is poor workmanship.
AC also said most walls returned suitable moisture readings except for two walls in
the kitchen.
Having reviewed photographs, the panel is satisfied the moisture readings in the
kitchen were probably caused by long time term exposure to elements due to an
absence of a roof after the fire and before the roof was repaired.
Determination | Case number: 739413 Page 11 of 19
The panel finds the report from AC more compelling than BB’s report because it is
independent and contains detailed reasoning with photographs, and moisture
readings.
The panel is satisfied the proximate cause of the claimed loss is caused by the fire
and/or subsequent exposure or by the poor repairs.
Insurer to pay to the complainant $31,003.23 plus interest
Given the property must dry out before repairs can be completed, the insurer is
required to cash settle the cost of repairing the damaged floorboards in the hallway,
bedroom 1 and bedroom 2 as well as some plaster and paintwork.
The insurer has provided no information about the cost of repairs. The material from
the complainant is also not helpful as it claims for removal of all the floor boards and
walls in circumstances where the available evidence establishes only some of the
floor boards and walls are damaged.
The panel has considered the photographs provided and the sketch in AC’s report.
The panel accepts about half of the flooring needs to be replaced.
The panel is satisfied it is fair the insurer indemnifies the complainant for half the cost
of removing and replacing the floor boards and skirting ($15,322.50).
The panel notes BB identified three walls in the master bedroom which showed signs
of elevated moisture readings, but the external brickwork showed long term rising
damp.
Having considered the photographs of the external brickwork, the panel agrees the
moisture in the master bedroom is probably from long term rising damp.
BB identifies the kitchen internal/external upper walls have elevated moisture levels
from water ingress after the roof was damaged by the fire.
According to AC most of the walls returned suitable readings but two walls in the
kitchen and wall in the living room returned slightly elevated readings.
The panel is satisfied it is probable the damage in these areas in the kitchen and
living room was caused by water coming into the house after the roof was fire
damaged.
Having considered a sketch of the house and photographs, the panel is satisfied it is
fair the insurer pays a third of the cost to remove/replace damaged plaster
walls/cornices and paint walls and ceilings ($10,300).
The panel also makes an allowance of 10% on the allowable amounts for project
management, builder’s margin, rubbish removal and final clean ($2,56 2.25).
Determination | Case number: 739413 Page 12 of 19
Finally, as the claims is to be cash settled, the panel considers it is fair to make a
further allowance of 10% for variations and contingencies which may occur once
repairs commence ($2,818.47).
Should the complainant accept this determination then within seven days of
notification of acceptance the insurer is to pay to the complainant $31,003.23.
The insurer is also to pay interest pursuant to section 57 of the Insurance Contracts
Act from 27 November 2020 being 14 days after the date of the compl ainant’s letter
providing the expert reports relied on by the panel (13 November 2020) until the date
of settlement.
Determination | Case number: 739413 Page 13 of 19
Supporting information
3.1 Our Approach
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the AFCA Rules. The panel consists of an ombudsman and
two representatives with consumer and insurance experience.
The panel has decided this complaint based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all the material provided by the parties. While
the parties have raised numerous issues in their submissions, for the purposes of this
determination the panel has restricted its commentary to those issues that it considers
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie or valid claim.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties
and in the insurer’s Notice of Response. Both the policy document and the Notice
have been exchanged with the complainant.
Words with Special Meaning
accidental loss or damage means a sudden or unexpected loss to insured
property but excludes damage that is otherwise excluded in this PDS.
WHAT YOU ARE INSURED FOR
Accidental damage cover
When you insure your building and/or your contents under this policy, you will be
covered for accidental loss or damage that occurs during the period of insurance
and at the insured location.
Determination | Case number: 739413 Page 14 of 19
There are limitations and exclusions to the cover provided for certain events.
These limitations and exclusions may restrict the amount payable in the event of a
claim or alternatively they may prevent a claim from being paid at all.
Loss of rent following damage or prevention of access
When we accept a claim and we agree that your tenant cannot safely reside in or
access the building because of damage caused to your building, or an adjoining
building, we will pay the actual rent you lose while the damaged building is being
repaired or rebuilt.
We will also pay for loss of rent:
• if your tenant is denied legal access to your building by a local, state or
Commonwealth authority;
• if your building becomes uninhabitable for a period exceeding 7 days due to
murder, suicide or attempted murder or suicide.
We will not pay for loss of rent:
• beyond the period it should reasonably take to repair, rebuild or reinstate your
building;
• if your building has not been tenanted for more than 100 consecutive days
immediately before the loss or damage.
The most we will pay under this benefit is the lesser of 24 months’ rent, at a
maximum of $1,500 per week, or the actual rent you lose.
Landscaping costs following a claim
We will pay up to $2,000 for the reasonable costs of replacement of landscaping
features such as trees, shrubs, bushes, rock features, fountains and ponds that
are damaged in an incident that results in a claim that we accept for damage to
your building, other than a claim for deliberate damage.
WHEN WE WILL NOT PAY A CLAIM FOR LOSS OR DAMAGE UNDER THIS
POLICY
You are not covered for any loss or damage caused by or resulting from:
• mould or mildew or fungi, wet or dry rot, rising damp or dampness;
Determination | Case number: 739413 Page 15 of 19
Architects, surveyors and legal fees
We will pay the reasonable costs of architects, surveyors and legal fees when
loss or damage occurs. The most we will pay under this benefit is 20% of your
building sum insured.
How we settle claims for your building
When we agree to pay a claim for your building, we will rebuild or repair your
building as new, or pay you the cost of rebuilding or replacing it, at our discretion.
We will only pay up to your building sum insured, or any lesser limit that applies,
less any applicable excess.
We will only pay to repair or rebuild that part of your building that was damaged.
We do not cover any additional expenses to replace undamaged parts of your
building to create a uniform appearance. Where the original materials used to
build your building are not readily available in Australia, we will pay for the cost of
materials we believe to be of a similar kind or quality.
We will only pay up to your building sum insured less any applicable excesses.
3.3 Expert evidence
Record Key points
Complainant’s report (T)
20 September 2019
T (described as retail fit out) ins pected and photographed 17 and 18
September, met complainant 23 September and reported in detail in
relation to the condition at the time of inspection and what needed to be
don e to bring work up to standard.
Kitchen: remedy to remove and reinstall with quality equivalent joinery to
match existing layout.
Skirting and architraves fitted poorly or not removed and reinstated from
water damage. Water damage to walls seeping through paintwork.
Living Room Skirting on RHS entrance wall @ hallway junction has
swelling from water damage. Hallway: Water damage seeping through
wall paint. Bathroom Water leak. Bedroom 3 Skirting poor, water
damage, skirting swollen, rectification work not f lush joint. Bedroom 1
Water residue inside robe.
New joinery unit again cheap replacement
Gardens and landscaping require considerable attention
Kitchen equipment is substandard replacement.
Describes points that supersede defect and remedies if items rep lac ed
in their entirety including new outhouse, new kitchen joinery, new doors,
new kitchen equipment, new skirting and architraves.
Tax Invoice (T)
8 October 2019
Defect building inspection report cost $11,814 including GST .
Financial firm’s expert (BB) Confirms approved works complete and home ready for re - occupation.
Determination | Case number: 739413 Page 16 of 19
Record Key points
Report
26 - 09 - 2019
Notice of completion has been sent to local council.
Reports work done to games room and says works completed fulfil
engineer’s scope, approved plans and details pro vided.
Final inspection 25 September 2019 and photographs included.
Financial firm’s expert (BB)
Report
29 - 10 - 2019
Inspected, photographed and report ed on moisture issues in kitchen and
master bedroom as high levels of moisture found in internal walls in
several rooms of the home.
All three walls of master bedroom showing signs of elevated moisture
which is affecting the timber flooring, skirting boards and walls above.
Living room front wall and RHS ent ry walls were elevated in moisture
levels .
Plumbing specialist engaged and found no leak.
Caus e is rising damp which would not be uncommon in a building of this
age. There is evidence of external brickwork fretting from long term
rising damp.
Kitchen internal/external upper walls have elevat ed moisture levels from
water ingress after the roof cover was damaged in the fire in this area.
This will dry out nat urally over time - re - occurrence of minor staining may
be evident and will require stain blocking and painting onc e walls are
dry.
Insured will need to ens ure additional subfloor ventilation is added to
combat the rising damp.
At no cost completed structural drying t o the sout h facing master bed
wall and skirting and kitchen and re - painted.
Leak detection report
31 October 2019
Conducted leak detection tests and visually inspected all plumbing.
Dampness was found in the front bedrooms away from the wet areas.
Issue was not related to the plumbing services.
Financial firm’s expert (BC)
Report
15 - Jan - 2020
Purpose of this report is to adjudicate on the quality of workmanship and
identify the works that remain.
Reviewed report from T, original 2013 patio approval, eng ineer’s scope
and builder’s correspondence.
Inspected with BB 10 December 2019 and 9 January 2020 and with
complainant 12 December 2019.
Photographs attached show before and after photographs.
Discounted some items because not damaged by fire or firefig hting.
Upon satisfactory completion of work specified in appendix A the fire
damage repairs will be commensurate with the building prior to the loss
and constructed to a sufficient standard and quality of workmanship.
Correspondence bet ween the builder an d the insured regarding the
change in design to the kitchen cabinetry and layout. BB has advised
the reason for the change in design was due to the required spatial
requirements for the gas cooktop in relation to adjoining cabinetry.
Noted that a gas cookt op has been installed in lieu of the former electric
cooktop at BB’s expense. The opinion of the writer is that the standard
of fitment, layout and functionality of the kitchen is of a quality that is
better than existed prior to the loss.
Whilst the external wall materials used in the construction of the
Determination | Case number: 739413 Page 17 of 19
Record Key points
enclosed, non - habit able structure may vary from the original structure it
is the opinion of the writ er that this structure, when complete, will provide
a standard of construction, appearance and qual ity that is
commensurate with, if not better than, prior to the loss .
Financial firm’s adjuster (S)
Report
15 - Jan - 2020
S ign off from BC a dvising the authorised work has been completed to a
standard which finalises the involvement of BB.
L oss of rent paid up until 28 November 2019.
Financial firm’s expert (BC)
Report
22 June 2020
I nsuranc e repairs undertaken by BB are complete. This opinion relies
partly upon third - party verification and photographic evidence provided
by BB . This opinion also relies upon the verbal confirmation by BB hat a
suitably sized soak well has been installed at the front left - hand corner
of the property.
Although the rear enclosed patio has been constructed in a style that is
commensurate with a habi table part of the building the ins ured should
be advised that the patio is classified as a non - habitable structure.
Complainant’s expert (PD)
Report
15 - Oct - 2020
On discussion with the owner and after thorough inspection with
moisture met ers and laser thermometers, we found the damp readings
were inconsistent with rising damp. The protemeter picked up very low
readings on most walls due to no rising damp being present. The
inconsistent readings could be contributed to surface laid condensation
due to th e property being unoccupied and unfurnished.
Walls are in suitable state of repair.
Floor timber has high damp ratings and high visible damp det erioration
such as swelling and delamination. Skirtings and architraves have
visible swelling and twisting.
Fl oor joists due to the age of the property will be installed on brick piers
to the under - floor void which also would have needed a complete drying
out process before new joists were installed. Again, the joists are open
to fungal attack during the drying ou t process.
Renovation to the property has been below par in many ways however
the floor timber will need addressing as it will almost certainly in time
become a major safety issue.
Complainant’s expert (AC)
Invoice
09 - Oct - 2020
$990 including GST to at tend site and undertake an inspection of a solid
timber floor installation in relation to the insured address.
Conc erns: To assess the condition of the floor, together with signs of
surface distortion in the form of cupping and cracks within some
floorboards.
Complainant’s expert (AC)
Report
20 - Oct - 2020
Inspected, tested and photographed floor 14 October 2020 to assess
concerns regarding the appearance of distortion of floorboards and to
assess moisture testing of walls.
Complainant advises large sections of the roof were missing and left
open and exposed to the elements bet ween January and June 2019.
Remedial works regarding timber floor undertaken in August 2019.
Property remained unoccupied, but complainant noticed movement in
the floor.
Remedi al work to the timber floor in August 2019 including sanding and
Determination | Case number: 739413 Page 18 of 19
Record Key points
coating of passage area and bedrooms one and two. Individual floor
board removed and replaced in bedroom two.
Complainant says flooring in the refurbished areas have deteriorated
with signs of splitting and movement.
Noted and measured floor board edges lower than the centre of the
board wit hin the flooring in the bedrooms one and two and passage
(crowning). Some boards showing significant splitting towards the edge
of the floor boards.
While most walls returned suitable moisture readings, two walls in the
kitchen together with a wall in the living room had hollow sounding
spots. Isolated spots in the passage was slightly elevated.
Photos 1 and 2 show crowning in the bedroom one and two.
Photos 3 (on the left - hand side) shows the appearance of crowning
throughout the passageway, whilst photo 4, supplied from the
complainant, shows the exposed roof spac e above the passageway
prior to the commencement of remedial works.
Photos show areas which were not sanded and polished were flat.
Crowning was limited to the areas of floor which had been site sanded
and coat ed during the recent remedial works, with no signs of cr owning
noted within the untouched flooring beneath the carpet in the living area
and in the passage linen cupboard.
This occurs when moisture affected floors have cupped and sanded and
finished when there is still moisture variation present through the boards.
Floor that crowns indicates moisture levels have returned to even
through the thickness of the boards and moist ure levels are no longer
high beneath the floor.
Minor crowning can be sanded out. But if pronounced it needs board
replacement ensuring sub floor completely dry.
Disagree crowning is because of rising damp as inspection shows the
crowning was limited to the flooring which was re - sanded and coating
during remedial works.
Only suitable remedial option to achieve a commercially acceptable floor
installation, would be to remove and replace the entire flooring within
bedrooms 1, 2 and passageway areas, follo wed by sanding and coating
these replaced areas of flooring. This remedial action would also require
the removal and replacement of the skirting boards and quadrant
beading surrounding these areas.
M ain contributing causes of the problem were considered t o be
premature sanding and coating of the f loor whilst an elevated moisture
gradient was still present during the remedial works.
F loor is unacceptable in its current condition and will require a remedial
response, with this action considered to include t he removal and
replacement of the flooring within the passage, bedroom 1, and 2,
followed by the sanding and coating of the replacement floor.
3.4 Other relevant material considered and relied on
Parties’ submissions/emails and all attachments to all submissi ons/emails.
Parties’ expert reports, engineer’s scope of work, invoices and quotations.
Determination | Case number: 739413 Page 19 of 19
Insurer’s reports from adjuster.
Photographs.
Correspondence between the parties.