Determination
Case number 736748
Financial firm AAI Limited
Determination | Case number: 736748 Page 1 of 10
Case number: 736748 8 February 2022
1 Determination overview
1.1 Complaint
The complainant is deceased and is represented by a family member X. For simplicity, the
estate of the complainant and representative will be referred to as “the complainant”.
The complainant lodged a claim under his home and contents insurance policy following a
storm in January 2016. The claim was accepted, and the financial firm (insurer) offered a
cash settlement to resolve the claim.
The complainant seeks an increase in the settlement amount. He is also seeking
compensation for the insurer’s delay in resolving the claim and personal injury caused by the
insurer’s alleged negligence in managing t he claim.
1.2 Issues and key findings
Is insurer required to increase its settlement offer?
The insurer is required to increase its cash settlement to the complainant for building repairs
as per the quote provided by JL and an additional 20% for contingencies.
Is the complainant entitled to compensation?
The complainant is entitled to $3,000 compensation for non-financial loss. The complainant is
not entitled to compensation for indirect financial loss.
Why is the outcome fair?
The outcome is fair because it recognises the costs and risk involved in the complainant
undertaking repairs himself.
1.3 Determination
This determination is substantially in favour of the insurer. The insurer is to:
make a cash settlement to the complainant for repairs as outlined in section 2.1
compensate the complainant for non-financial loss as outlined in section 2.2.
Determination | Case number: 736748 Page 2 of 10
2 Reasons for determination
2.1 Is insurer required to increase its settlement offer?
Insurer must act fairly and ensure a cash settlement covers all repairs
Under the terms of the policy, the insurer is entitled to decide the method of settlement.
However, AFCA expects an insurer to act reasonably in exercising its discretion, having
regard to the circumstances of the claim.
The cash settlement must accurately reflect the costs the complainant will incur in
undertaking repairs to the resultant damage.
It must also be recognised that in cash settling the claim, the complainant no longer has the
lifetime guarantee provided under the insurer’s policy. Further, a cash settleme nt transfers all
the risk from the insurer to the complainant of any unforeseen damage and any additional
work required once repairs commence.
Complainant is seeking an increase to the settlement of his claim
The insurer proposed a settlement amount of $712,948.24 comprising:
$477,463.54 for building repair costs ($397,886.29 + 20% contingency)
$235,484.70 for temporary accommodation and storage costs (includes $27,248.78
packing and storage cost for the duration of repairs).
The complainant was dissatisfi ed with the insurer’s settlement proposal. He proposed an
increase of $342,203.29, comprising:
$522,589.89 for building repair costs (includes 20% contingency)
$153,016 for additional works and contents items not included in the insurer’s offer
$67,000 (20%) for a project manager to oversee repairs, due to complainant’s incapacity
$312,581.64 for temporary accommodation and storage, which includes 20% contingency
and additional costs.
The P anel will address the adequacy of the insurer’s cash settlement f or each of these items
separately.
Available information shows some damage & defects unrelated to claim
The insurer engaged multiple experts including engineers, plumbers, builders and restorers.
They advised that while there was claim-related damage to the property, there was also
damage caused by defects unrelated to the claim. Below is a summary of the findings.
SP (plumber) found:
damage to the living and bedroom was caused by water leaking through deteriorated seals
and cracked tiles on the balconies of the rooms
the waterproof membrane has failed and allowed water to leak into the ceiling space
damage to the bathroom has been caused by two cracked shingles directly above it
JL (building consultant) found:
water damage was minor and could not have caused extensive damage to the floor
timber stripping has cupped through the home, including in areas with no water damage
two balconies are in poor condition
FM (engineer) found:
Determination | Case number: 736748 Page 3 of 10
the storm event contributed to damage to the timber flooring throughout the ground floor
except for the localised timber floor damage in the south western corner of bedroom
1(which was due to a breakdown of the silicone seal to the shower base in the ensuite)
poor inadequate installation methods were used in the installation of the timber flooring,
which has exacerbated the damage to the flooring in the ground floor.
A leak specialist also found the gutters were prone to overflowing as they were full of leaf litter
and debris. He concluded the damage and water ingress was due to poor and incorrect
original installation.
The insurer’s assessor noted maintenance issues which needed to be addressed by the
complainant. He said that following the completion of maintenance issues, the affected areas
would require a drying period until March 2017 (assessment report dated 31 October 2016).
The available information shows the maintenance was completed in March 2017.
Flooring specialist (FC) noted in December 2017:
the floor is in poor condition and that areas on levels 1 and 2 had no glue bond
moisture tests showed the lower level was wet with high readings, showing that moisture
entry was ongoing
the damage was caused by water entry and poor installation practices.
Available information also shows the property contained the following issues:
non-compliant external paved area, due to levels being the same level or higher than
internal flooring
no drainage outside of property to allow water to drain away from the house structure
balconies were non-compliant and leaking however have been repaired.
The insurer says the property was owner-built and would have required relevant building
permits etc. However, it says the complainant did not provide requested compliance
documentation. It says this affected its repairer’s ability to complete works in areas such as
balconies, upstairs bathroom and timber floor. This is because it could not risk carrying out
repairs without sighting compliance certificates.
Insurer is required to increase settlement for building repairs to accepted items
The insurer based its settlement offer of $477,463.54 on a quotation provided by its builder,
SG ($397,886.28), dated 3 January 2020.
The complainant is seeking $522,589.89 (an increase of $45,126.35), based on:
the initial quotation of $435,491.65 the insurer obtained from its builder, JL, on 8 July 2019
an additional $87,098.33, being 20% contingency on the above amount.
The complainant prefers JL’s quotation because:
JL completed all the groundwork following the event and is familiar with the property
the insurer’s file notes show JL was the only builder it liaised with in the last four years
SG ’s quotation is not proper or complete, because the figure in its tender document is
noted to only be a preliminary estimate.
Relevantly, SG’s quotation notes:
… it should be noted that the above stated estimates are preliminary only. The
scope of final specifications and structural engineering is currently limited and
therefore we can only provide a provisional sum estimate for this project. Our
project estimate should be considered a feasibility study rather than a fixed price
Determination | Case number: 736748 Page 4 of 10
proposal. Upon receiving final specifications and instructions [SG] will reserve the
right to revise its tender price based on the new information.
JL’s qu otation covers:
$421,171.10 for claimed items that are covered under the policy
$14,320.55 for items that may not be covered under the policy, but were included at the
complainant’s request, including flooring on level 2.
However, JL says that these additional items were requested by the complainant.
Having reviewed all the exchanged documentation, the panel is not satisfied that the
complainant has established that the $14,320.55 for the additional items, is covered under the
terms of the policy.
The assessor’s information (Jan 2018) noted the three builders appointed were not prepared
to complete the repairs as they could not warrant their work due to the balconies not having
any legal drainage points.
The complainant is likely to face challenges in engaging a builder to complete the works.
Further, SG’s quotation is a preliminary amount and not a definite quote.
For the reasons above, the panel is satisfied the complainant is entitled to a cash settlement
based on the quotation from JL, in the amount of $421,171.10 and an additional 20% for
contingencies. The cash settlement sum for repairs is $505,405.32.
Insurer is not required to include additional works in its settlement
The complainant seeks an additional $180,016, comprising:
$52,000 for painting of walls, ceilings, skirting (approximately 10% of building repair quote)
$20,000 for possible unforeseen damage not accounted for, including:
> removing, discarding and replacing insulation (ground floor and level 1)
> removing, discarding and replacing damaged boards in yellow tongue flooring
> removing and replacing third kitchen, including associated plumbing and electrical
works
replace 88sqm of timber flooring
$14,000 for items not included in scope of works or quotation, comprising:
> repairs to the stone tiles on the roof and damage to tiles that blew away in the storm
> guttering that gave away in the storm
> scaffolding costs
$67,000 for the cost of a project manager, given the complainant’s incapacitation (10% of
total cost being $675,605.89).
The quotation relied upon by the insurer includes painting for items accepted under the claim.
Costs for scaffolding and project management are also covered:
JL’s and SG’s quotations cover the cost of painting the walls, ceilings and skirting
SG’s quotation allows for removing the kitchens on the ground floor and level 1, including
electricals and plumbing
JL’s quote covers flooring in multiple areas
SG’s quote includes 553sqm of flooring
SG’s quote includes scaffolding costs and the cost of a project manag er.
The insurer also noted that the timber flooring did not require replacement.
Determination | Case number: 736748 Page 5 of 10
Further, the repair quotations include an amount for contingency which includes unforeseen
damage.
For the reasons above, the panel is not satisfied the insurer is required to include additional
works in its settlement.
However, the panel notes the circumstances of the complainant and the extent of the work
that needs to be performed.
Given the exchanged material, the panel is satisfied that it would be fair for the insurer to
contribute to the costs of project management in the amount of $31,587.00 (being 7.5% of
JL’s quote of $421 ,171.10).
Insurer is to address contents claim subject to evidence of loss
Following the insurer’s settleme nt proposal, the complainant sought the following to be
included as part of his claim:
$30,000 for six damaged Iranian rugs which he says the insurer did not clean or dry out
$10,000 for the cost of removing, discarding and replacing soiled curtains and blinds.
The available information does not show the complainant had previously raised these costs or
provided details about the loss. The insurer has therefore not had the opportunity to assess
the loss. It has also previously requested evidence of loss.
The panel is satisfied the insurer is only required to address this aspect of the claim once the
complainant provides evidence and details surrounding the loss.
Insurer is not required to increase settlement for accommodation and storage
The insurer offered $235,484.70 for the cost of temporary accommodation and storage.
The complainant seeks $312,581 (an increase of $77,096.30) for temporary accommodation
and storage comprising:
$47,096.94, being 20% contingency on the insurer’s offer
$25,000 for the cost of installing his life support machine at the temporary accommodation
$5,000 for the cost of removing the life support machine and relocating it to his home.
The complainant says the reasons for the contingency is that he will not be able to obtain the
same prices as the insurer.
Given the circumstances of the complaint, the costs associated with installing and relocating
a life support machine no longer apply. The only amount in dispute therefore is the
complainant’s request for 20% contingency ($47,096.94) on the insurer’s offer.
The complainant has, however, not provided any information to substantiate a 20% increase
to the cash settlement for accommodation. It may be beneficial to obtain a new quotation but
in the interests of avoiding further delay, the panel is satisfied it would be fair to allow an uplift
of 7.5% on the temporary accommodation offered, to account for any increase since the
original quotation.
2.2 Is the complainant entitled to compensation?
The complainant is not entitled to compensation for indirect financial loss
The complainant says the insurer’s actions caused detriment as below:
Determination | Case number: 736748 Page 6 of 10
in cutting out the ceiling the insurer exposed it to the weather while the complainant was
on life support and his wife also suffered from medical conditions
the plastic covering on the bedroom floor remained there after the insurer remediated the
mould, causing him and his wife to slip on numerous occasions
the insurer failed to do a proper make-safe even after the complainant informed it that he
broke both his feet on the bubble on the floor
the insurer provided a wheelchair, however, he paid for:
> door to the bathroom to be extended in order for the wheelchair to get through
> a ramp at the front door, electric hoist and hospital bed.
Under the AFCA Rules, we can award up to $5,400 compensation for indirect financial loss.
This may include the loss of use of a damaged item, the cost of renting a replacement item, a
loss of income, or a loss of business opportunities.
While the policy does not cover consequential loss, AFCA can award compensation if a
complainant suffered an additional loss due to the insurer’s mishandling of the claim.
In relation to the complainant’s second fall, the insurer says this occurred while the
complainant was entering the bathroom, which had a slight step between the floor and room.
The insurer says this modification work was undertaken by a private contractor engaged by
the complainant, not by the insurer. Therefore, it says it is not responsible for the accident. It
further says it does not cover legal liability arising from the injury of the insured.
The insurer and its trades were aware the complainant was bedridden and on dialysis.
However, the information shows temporary accommodation was offered to the complainant.
While the complainant says he asked for temporary accommodation multiple times, this is not
supported by the material available. Given this, the panel is not satisfied the complainant is
entitled to compensation for indirect financial loss.
The complainant has also raised concerns about the insurer’s negligence. AFCA does not
consider complaints of this nature and the complainant can make a separate complaint to the
insurer in relation to negligence.
The complainant is entitled to compensation for non-financial loss
Under the AFCA Rules, we can award up to $5,400 compensation for non-financial loss. We
will only award this type of compensation if a complainant has suffered an unusual degree of
stress, inconvenience, or delay because the insurer mishandled the claim. We may, however,
reduce the amount of compensation awarded if the loss was partially caused by the
complainant’s actions or by factors outside the insurer’s control.
The complainant says that for years the insurer allowed him to believe it would repair the
property. He also says he and his wife suffered injury due to the insurer’s negligence in
leaving the property in an unsafe condition.
The available information shows:
on 22 September 2017, JL advised the assessor that it is not interested in carrying out
repairs and would recommend a cash settlement because it could not warranty repairs to
the floor
on 4 April 2018, one of the settlement options the insurer offered to the complainant was
that it could arrange repairs through JL if the complainant could provide information about
the original builder, warranties and compliance certificates
on 3 April 2020, the insurer obtained a quotation from SG.
Determination | Case number: 736748 Page 7 of 10
It is unclear from the available information, whether the complainant was advised that JL
could not carry out repairs in September 2017. However, he was advised a few months later
that the insurer could only arrange repairs via JL if the complainant provided the necessary
documentation. The available information shows the compliance certification was not
provided.
The material also shows the insurer had difficulty sourcing a repairer due to the compliance
issues at the property and because the complainant did not provide compliance certification
as requested. However, the insurer has acknowledged some mistakes were made in its
handling of the claim. The panel is satisfied an amount of $3,000 is therefore sufficient for this
aspect of the claim.
2.3 Why is the outcome fair?
The outcome is fair because it recognises the costs and risk involved in the complainant
undertaking repairs himself.
Determination | Case number: 736748 Page 8 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. W e have reviewed and
considered all the information the parties have provided.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in the insurance industry.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 736748 Page 9 of 10
3.2 Key policy terms
Subject Term
What you are covered for
p.18
Storm
We cover
Loss or damage to the building caused by a storm.
We do not cover
Temporary accommodation
p.28
We cover
When an ins ured event damages the building to the extent you
cannot live there, and we agree, we will pay for your reasonable
temporary accommodation costs for the time it will take to repair or
rebuild the building to a liveable condition. The most we will pay is:
up to 4 weeks in short term accommodation agreed to by us (e.g.
standard rat es for a hotel, motel or serviced apartment), then if
necessary;
up to another 48 weeks in residential accommodation of a similar
standard to the building.
Limit
The most we will pay for any one event is 10% of the building sum
insured, unless your certificate of insurance shows that you have
Complete Replacement Cover® option (see page 31), in which case
we pay the rea sonable and necessary costs.
What we do not cover –
general exclusions
p p .35 - 40
You are not covered under any section of your policy for damage,
loss, cost or legal liability that is caused by, arises from or involves:
…
Consequential losse s or extra costs following an incident
covered by your policy
c onsequential loss (financial and non - financial loss) or extra costs
following an incident covered by your policy, such as:
…
medical expenses;
…
any costs related to stress or anxiety;
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or
should reasonably have known about) and did not fix before the loss
or damage occurred (e.g. if there are signs that a defect previously
caused damage, we will not p ay a later claim for further damage
from this defect).
…
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot,
action of light, atmospheric or climatic conditions or gradual
deterioration such as, but not limited to:
tiles and their adhesive or grouting breaking down;
Determination | Case number: 736748 Page 10 of 10
weat hering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete
How we settle building
claims
p.45
If we agree to pay a claim for loss, theft or damage to the building,
we will decide if we will:
repair dam age to the building;
rebuild the building;
pay you what it would cost us to repair or rebuild the building;
pay you the building sum insured shown on your certificate of
insurance;
Note : This does not apply if you have selected the Complete
Replacement Cover ® option.
give you a voucher, store credit or stored value card for the
amount it would cost us to repair or rebuild an item.
If we rebuild (or pay you what it would cost us to rebuild), we will do
so on a `new for old’ basis.
If we repair (or pay you what it would cost us to repair), we will at our
option do so on a `new for old’ basis or repair to a similar condition
to what the building was in before the loss or damage occurred.
Unless we tell you otherwise, we will deduct any amounts you owe
u s from any amount we owe you.