Home / AIG Australia Limited / Determination 735718
Determination 735718
Claim declined for building movement damage
Summary
The complainant, a beneficiary under a strata policy, claimed building cracking after gas works. AFCA accepted the insurer's structural engineer report, found the damage long-term and not caused by the works, and ordered no payment.
The structural engineer's report was more persuasive than the plumber's unsubstantiated opinion, so the proximate cause was long-term footing movement rather than the excavation.
Issues
- Claim denial primary · not upheld“The damage was most likely long term and ongoing, caused by reactive clay footings, and not associated with the excavation works.”
- Delay secondary · upheld“Such a delay is unusual and is generally unacceptable.”
Subjects and remedies
home or building damageno remedy
Related
All AIG Australia Limited determinations · Find similar determinations
Text of the determination
Determination
Case number 735718
Financial firm AIG Australia Limited
Determination | Case number: 735718 Page 2 of 6
Case number: 735718 11 January 2021
1 Determination overview
1.1 Complaint
The complainant is a beneficiary under a Strata Insurance policy held in the name of
the Owners Corporation. The complainant lodged a claim on or about 26 February
2020 for damage sustained to his building . He believes the damage occurred
following excavation works conducted by a gas company when updating a gas line at
the rear of the property.
The financial firm (insurer) declined the claim on receipt of a structural engineer’s
report. It says the damage is not because of the gas works but relates to ongoing
building movement caused by the footings founded in clay and subject to seasonal
and climatic moisture changes.
The complainant does not believe the insurer’s structural engineer has completed a
proper inspection of the property. The complainant says that the claim has been
poorly handled, that the insurer has failed to properly communicate its decisions and
has failed to deal with the matter in a timely manner.
1.2 Issues and key findings
Is the insurer liable with respect to the damage sustained to the complai nant’s
property?
No. The damage, whilst accidental damage, was most likely long term and ongoing,
caused by the footings of the buildings being founded in reactive clay foundations and
subject to seasonal and climatic changes. The information provided does not
establish the damage was associated with the excavation works conducted by the
gas company.
Is the complainant entitled to compensation for non-financial loss?
No. I accept there has been a delay between the inspection of the property and the
supply of the engineering report. However, the delay has not caused any unusual
degree of inconvenience or time taken to resolve the situation. The complainant is not
entitled to compensation for non-financial loss.
1.3 Determination
This determination is in favour of the insurer.
The insurer is entitled to rely upon the terms and conditions of the policy to refuse
payment of the complainant’s claim.
Determination | Case number: 735718 Page 3 of 6
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
This complaint has been subject of a preliminary assessment. The preliminary
assessment provided by the case manager was in favour of the insurer. The
complainant has rejected the preliminary assessment but has not provided any further
information to accompany the rejection of the recommendation.
This determination follows consideration of all relevant information. It is based on
what is fair in all the circumstances, having regard to relevant legal principles, terms
of the policy, good industry practice including codes of practice and prior
determinations where applicable.
2.1 Is the insurer liable with respect to the damage to the complainant’s
property?
The insurer is not liable to meet the costs to repair the loss or damage sustained to
the complainant’s property .
The policy provides cover for accidental loss or damage
The policy is a Strata Title insurance policy. Under section 1 of the policy, cover is
provided up to the sum insured for accidental loss or damage to the buildings and/or
common contents that occur during the period of insurance.
The policy does not define ‘accidental loss or damage’ but this is generally accepted
to mean damage that is unintended and unexpected.
There is no dispute that the property has suffered some form of crack
damage/building movement to the pavements or that following works conducted by
the gas company, some sections of the concrete pavement were replaced.
The relevant issue for consideration is not whether the building movement was
accidental but whether the building movement can be related to the claimed incident.
Reports disagree as to the likely cause of damage
It is necessary to determine whether the proximate cause of damage that is the
dominant or effective cause of damage was the excavation work conducted by the
gas company or some other incident that occurred during the period of insurance.
The complainant has relied upon a report from a plumber (PC) dated 10 February
2020.
PC concluded that following the gas company’s excavation and upgrade of the gas
line at the rear of the property, this has softened the soil and as a result following
Determination | Case number: 735718 Page 4 of 6
rains, sections of the ground have collapsed, leading to the building movement. In a
further report dated 30 September 2020, PC considered there were vibrations and soil
removed during the excavation that has caused the ground to sink with the outcome
causing the sewer gully concrete mouth to also drop and collapse.
The reports from PC are not detailed. PC has not explained the method of his
assessments nor has he addressed issues with respect to any pre-existing damage or
pre-existing movement to the building or surrounding areas.
The insurer appointed a structural engineer (S) to assess the extent of damage. S
was first instructed on 25 March 2020 and attended the premises to conduct its
inspection on 29 May 2020. S provided a detailed report accompanied by a series of
photographs following its inspection of the property. I do not propose repeating the
findings in detail as the report has been exchanged with the complainant. In
summary, S found the damage was associated with:
shallow and relatively flexible footing systems compared with modern Australian
standards
the brittle nature of the original unarticulated solid brick wall construction of the
residence, making it highly susceptible to cracking even with relatively minor
differential foundation/footing movement
variable yard conditions between paved and unpaved regions around the perimeter
of the building that can cause long-term differential foundation moisture conditions
and differential footing movements
reactive clay soils that are subject to moderate volumetric changes.
S considered the building and pavement movement was most likely related to long-
term and ongoing building movement caused by footings founded in clay reactive
foundations, subject to seasonal/climatic moisture changes. The movement and
damage had been exacerbated by the existing construction conditions noted. S
further considered that there was no structural damage but only cosmetic damage to
the property.
S provided a supplementary report in response to the complainant’s further
submissions and the submissions from PC. S noted that PC had not provided any
associated CCTV or photographic supplement with respect to any test conducted on
the below ground plumbing. PC had not provided any substantiation of their opinions
with respect to the soil behaviour and movement.
S considered that if there was water escaping from leaking services, this would cause
the soil to heave. This was not noted by S on its inspection of the property. S
concluded that in the absence of any further evidence, leaking pipes had not caused
or contributed to the observed pavement damage. Further, whilst PC had considered
the concrete mouth on the gully trap had dropped and collapsed, the gap between the
pavement and the underside of the mouth was accentuated by a missing concrete
ring insert.
Determination | Case number: 735718 Page 5 of 6
Insurer’s structural engineer S is more persuasive
I am satisfied that the report from S is more persuasive. I am satisfied that most likely
the proximate cause of the damage claimed was due to long-term and ongoing
building movement. This is most likely caused by the footings being founded in
reactive clay foundations which are subject to seasonal and climatic changes.
The insurer is entitled to rely upon the terms and conditions of the policy to refuse
payment of the claim.
2.2 Is the complainant entitled to compensation for non-financial loss?
AFCA can award compensation for non-financial loss
Under the AFCA Rules, Rule D3.3, AFCA can award compensation of up to $5,000 in
circumstances where a complainant has suffered an unusual degree of physical
inconvenience or time taken to resolve a situation as a result of the handling of a
claim by an insurer.
The complainant says that the insurer has unreasonably delayed the handling of the
claim. I note it took approximately nine weeks from being appointed for S to arrange
an inspection of the property. It took approximately 11 weeks for S to provide the
report from when first appointed. The insurer explained this was caused by an
administrative error on behalf of the structural engineer.
Such a delay is unusual and is generally unacceptable. There is however no
information to suggest that the complainant has suffered any prejudice caused by the
delay or that it has contributed in any way to any further damage to the complainant’s
property.
The insurer has explained the reasons for the delay and it would appear based on the
insurer’s explanation that the complainant’s broker was informed throughout as to the
progress of the claim.
AFCA has a conservative approach to the award of compensation for non-financial
loss. AFCA expects the complainant to be moderately robust and to bear the normal
degree of inconvenience experienced through any claims process.
Determination | Case number: 735718 Page 6 of 6
Other than to apologise for the delay, I do not consider that compensation for non-
financial loss should be awarded.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.