Determination 735404

Scope of water damage repairs and cash settlement amount

FirmAllianz Australia
Decided2021-05-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$57,486
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

The complainants disputed the insurer's water damage scope and cash settlement and sought extra items, appliances, air conditioning replacement and temporary accommodation. AFCA largely accepted the insurer's scope, ordered a cash settlement with temporary accommodation and interest, and awarded $2,000 non-financial loss.

Policy cover pays only for physical damage caused by the insured event, but the mould and unliveable home required temporary accommodation under the policy.

Issues

Subjects and remedies

health or medicalhome or building damagepay claimpay interestpay non financial loss

Related

All Allianz Australia determinations · Find similar determinations

Text of the determination

Determination Case number 735404 Financial firm Allianz Australia Insurance Limited Determination | Case number: 735404 Page 2 of 11 Case number: 735404 15 April 2021 1 Determination overview 1.1 Complaint On 10 March 2020, the complainants lodged a claim for damage to their home building caused by a burst water pipe in the upstairs bathroom. The insurer accepted the claim, assessed the damage and offered a cash settlement. The complainants disagree with the insurer’s scope of works and say the settlement amount is insufficient to adequately complete all the repairs. The complainants want to return the settlement payment and for the insurer’s builder (TB) to complete repairs. Further, they seek kitchen appliances and their air conditioning system to be replaced, as well as temporary accommodation. The complainants are also dissatisfied with the delays in settling the claim as the female complainant is severely ill and has suffered from living in a water damaged home. 1.2 Issues and key findings How should the claim be settled? The claim should be settled as set out in section 2.1. Should the insurer pay non-financial loss? Yes. The insurer should have arranged temporary accommodation given there is mould in the property and one of the complainants is receiving treatment for cancer. The insurer should pay $2,000 in non-financial loss. 1.3 Determination This determination is partially in favour of the complainants. The insurer is to settle the claim as set out in section 2.1. The insurer should pay $2,000 in non-financial loss. Determination | Case number: 735404 Page 3 of 11 2 Reasons for determination There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. Due to the complexities involved, this dispute has been referred directly for determination. The determination is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice, codes of practice and previous decisions where appropriate. This determination follows consideration of all relevant information exchanged. While the parties have raised numerous issues in their submissions, commentary has been restricted to those issues which are considered directly relevant to the outcome only. For the sake of brevity, in this determination the male or female complainant are referred to as ‘the complainants’, unless otherwise specified. 2.1 How should the claim be settled? Complainants seek cover for additional items The insurer has mainly relied upon TB’s scope of works and quoted amount dated 9 July 2020 to support its position. The complainants say these scope of works are incomplete. In an email dated 21 October 2020, they set out the items they say are missing and incomplete. I will review these items. Bamboo flooring damage stretches to the other side of the house The complainants note the insurer agreed the bamboo flooring on the second floor’s hall was damaged and is to be replaced. The complainants also say it stretches from the master bedroom’s door to the other side of the house. The insurer notes the bamboo flooring in the hall had no obvious signs of water damage. However, after speaking to the builder, the insurer allowed this flooring replacement on the basis that it is possible water compromised this area. The insurer also allowed for the open plan area. The insurer does not accept the water extended to the other side of the house. The photos provided do not show this damage extended to the length the complainant says. The contemporaneous inspections and scopes are consistent with the insurer’s position. Given this, I am not satisfied the insurer is required to include this item in the scope of works. Determination | Case number: 735404 Page 4 of 11 Bedroom flooring next to the master bedroom The complainants say water entered this room, causing damage to the carpet. However, on 2 July 2020, RX inspected the area. RX reported no smell or signs of mould in this carpet. It also saw no signs of water stains after lifting the carpet. The insurer has offered to steam clean it for $324.50. I am persuaded by RX’s evidence. It is supported by photos. Given this, the insurer’s offer for this item is fair. Wall between the master bedroom and smaller bedroom is also damaged The insurer notes TB’s scope has provi ded an allowance for replacing water affected skirtings and to paint walls in the master bedroom. The insurer says there is no evidence that an increase in the scope is required. The complainant says their builders’ quotes show an increase is required. Th is is not apparent in the complainant’s quotes. For instance, BB’s quote dated 29 June 2020, does not include this. Given this, I am not persuaded an additional item must be included. Ceiling under the bamboo flooring is also damaged Whilst the complainant believes this is likely damaged given the insurer has agreed to replace the bamboo flooring, the available photos do not show this. The insurer is not required to include this item. Ceiling lights The complainants say these should be replaced. The comp lainants say their builders included this even though their quotes did not specifically set them out. The insurer says the lights are reusable as there is no evidence that they were water damaged. It is not apparent from the photos that the lights must be replaced. The complainant’s builders do not specifically comment on this. I do not accept the scope of works must include replacement. Wall between kitchen and dining room is not included The complainants say this needs to be included. This wall is behind the oven, which the insurer has agreed to replace. The insurer disputes this. The insurer notes there is no evidence of water damage to this wall. Determination | Case number: 735404 Page 5 of 11 There have been conflicting reports about whether the oven was damaged by the claimed event. Further, the photos do not show this area of the kitchen was affected. Given this, I am not persuaded this wall must be included in the scope of works. Bedroom door The complainant says this has been damaged in exactly the same way as the bathroom door, which has been replaced. The insurer disputes this. The photos do not show this is damaged. Given this, I am not persuaded this must be included in the scope of works. Ground floor hallway underneath the damaged bamboo flooring The complainants say this needs to be repainted. However, the photos do not support this. The insurer is not required to include this in the scope of works. Air conditioning system The complainants raised concerns about the air conditioning (a/c) system being damaged. The insurer has disputed this and has not included it in the scope of works. Both parties have provided several reports, which are summarised in section 3.2 below. Having carefully reviewed the available information, I note the following. The complainants’ second specialist NA confirms there is no a/c gas and several parts require replacing. However, they do not mention anything about water damage. The complainants’ other specialist (OA) says the water damaged the indoor evaporator unit, motors printed circuit boards, zone motors and ductwork. However, the insurer’s expert (A) made the following relevant points:  two of the three zone motors are located in the roof space and could not have been affected by the leaking bathroom  collapsing plasterwork could not have damaged the pipework containing refrigerant  there are no printed circuit boards located within the unit, just electrical fans Both A and the insurer’s builder TB noted the damage was limited to the lack of refrigerant which is unrelated to the claim. Further, when testing the system shortly after the event, the power, fans and air pressure were working. Given this, I am not persuaded the a/c system was damaged by water. Whilst OA refers to the zone motors and motors printed circuit boards being potentially damaged, A makes compelling arguments against this. Therefore, the insurer is not required to include the replacement of this system. Determination | Case number: 735404 Page 6 of 11 Damage currently not visible It is clear there is potential for more damage to be identified as repairs begin. TB’s quote clearly stated it does not include hidden or concealed damage or mould revealed during the repairs. According to the insurer, there is likely to be a lot of mould damage. How the claim should be settled The insurer notes that its builder, TB, is ready, willing and able to complete the works for the amount quoted. Given this, the fact the insurer is relying on TB’s quote and there is likely more damage to be identified as repairs begin, it is fair for the insurer to complete the claim related repairs. This means that if additional damage is identified, then the insurer can assess and, if required, include those items. Before doing so, the complainants must return any funds received related to the building repairs. If the complainant refuses to allow the insurer to complete the repairs, then it is fair for the insurer to rely on TB’s quote to base a cash settlement on. However, given the potential for variations, particularly regarding the mould where no scope of works has been provided, then a contingency of 25% should be included. Complainants not entitled to additional temporary accommodation The policy pays for the additional cost of temporary accommodation in the following circumstances: We will reimburse the additional costs you have to pay for temporary accommodation where:  the buildings you live in are damaged by an insured event to such an extent that you cannot live in them, and  you temporarily take accommodation at another address. The complainants say their home has been unliveable since the incident because the kitchen is not functional. They also note that two of their bedrooms have mould in them. The female complainant is quite ill. The insurer says the premises are liveable. The only appliance in the kitchen that has been damaged by the insured event is the dishwasher. Whilst the insurer has agreed to replace the oven, cooktop and rangehood, it does not accept these were damaged by the insured event. Having carefully considered the available information, I accept the premises were not fit to live in. Determination | Case number: 735404 Page 7 of 11 This is due to the mould. There is clearly mould at the premises. Pictures show evidence of some mould in the main bedroom. In its submission dated 28 October 2020, the insurer said that it expects to find a lot of mould damage once repairs begin. There is no dispute the female complainant is unwell with stage 3 breast cancer. Given this, I do not agree that the home can be considered liveable in context of the mould and the female complainant’s medical condition . This situation is further exacerbated by the fact that various kitchen appliances are not working. Therefore, I do not accept the insurer’s position to refuse temporary accommodation was fair in all these circumstances. Accordingly, if the complainants can provide evidence to show they incurred reasonable additional accommodation costs, then the insurer is liable for this. The insurer is also to pay interest for these costs pursuant to section 57 of the Insurance Contracts Act 1984. Interest is payable from when the costs were incurred to when the insurer issued reimbursement. The insurer has allowed for eight weeks of temporary accommodation while repairs are carried out. CF recommended payment based on a weekly amount of $550 per week, for a period of eight weeks. This amounts to $4,400. Given there is no evidence to show this period or rate is unreasonable, I am satisfied this amount is fair if the claim is to be cash settled. If the insurer is to repair the damage, then the insurer must pay for reasonable temporary accommodation costs whilst claim related repairs are being undertaken. Insurer is to pay the following if the complainants want a cash settlement If the complainants choose to accept a cash settlement, then the insurer is to make the following payments to the complainants within 14 days of receiving this confirmation minus any payment it has already made:  $40,851.17 based on TB’s revised quote  $10,212.79 for possible variances and contingencies  $230.00 for the replacement of the rangehood  $1,557.60 for window replacement  $234.50 for carpet cleaning in bedroom 2  $4,400 temporary accommodation  any temporary accommodation costs the complainants have reasonably incurred plus interest Determination | Case number: 735404 Page 8 of 11 2.2 Are the complainants entitled to compensation for delays? AFCA may award compensation in certain circumstances Under paragraph D.3 of the AFCA Rules, we may award compensation for non-financial loss (up to $5,000) where there has been an unusual amount of physical inconvenience, time taken to resolve the situation or interference with a comp lainant’s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation and expects a complainant to bear a normal degree of inconvenience during a claim. In considering an award for non-financial loss compensation, we look at what is fair in all the circumstances. Specifically, for this case, it is appropriate to factor the overall claims experience rather than focusing on specific individual events. Complainants are dissatisfied with claims experience Early in the AFCA complaint, the complainants made it clear the claim is to be marked urgent due to the female complainant’s health concerns. The complainants expressed discontent with their claims experience in the early stages of the claim. Among other issues, they were dissatisfied with delays in the settlement of the contents claim, the insurer changing its mind about its extent of liability, having to live in a water damaged house and the insurer not willing to repair the home. The insurer has handled the claim in a reasonable and timely manner I do acknowledge that the home was not liveable given the extent of potential mould and the female complainant’s medical condition. This would have resulted in stress and inconvenience to the complainants that should have been mitigated. However, I accept the main delays have been due to the complainants seeking to add items to the scope of works that mostly have not been substantiated. Therefore, I cannot accept the insurer is responsible for this. Further, the insurer has agreed to replace various items where there is conflicting information about whether they were damaged by the insured event. This includes the oven and rangehood. This was reasonable and would have mitigated the failure to provide temporary accommodation to an exte nt. Therefore, given this and considering our conservative approach, it is fair for the insurer to pay $2,000 in non-financial loss. Determination | Case number: 735404 Page 9 of 11 3 Supporting information 3.1 Relevant policy wording from Product Disclosure Statement (PDS) Pg 10 How we will settle your buildings claim 1. At our option, we will: a. repair or rebuild the damaged part of your building to the same condition as when it was new; or b. pay you the reasonable cost of repairing or rebuilding any damaged part of your building to the same condition as when it was new; or c. pay you up to the amount of the sum insured. If we pay you the reasonable cost of repair or rebuilding, this means the cost of repairing or rebuilding less any discount available to us were we to repair or rebuild … 2. When it is not possible to use original materials during the repair or rebuilding process, the nearest available equivalent to the original materials will be used. We will not pay to repair or rebuild property which has not been physically damaged. Pg 24 Additional cost of temporary accommodation (Applicable only when you have contents cover) ‘additional costs’ mean those rental and other related costs which you have to incur at the location of your temporary accommodation which are in addition to the costs you would have had to incur if you continued to live at your risk address. If you normally live in the buildings, the amount we will pay will be based on the buildings’ rentable value. We will reimburse the additional costs you have to pay for temporary accommodation where: • the buildings you live in are damaged by an insured event to such an extent that you cannot live in them, and • you temporarily take accommodation at another address. We will pay for temporary accommodation for: • the period which we agree is reasonable necessary, or • 12 months, whichever period of time is the lesser. Pg 46 When we will not pay a claim under your policy 1. Unless we state differently in your policy, we will not pay for: … b. any loss or damage which is not caused directly by one of the insured events; … Determination | Case number: 735404 Page 10 of 11 3.2 Relevant claim file notes 29 April 2020 Insd called to f/up claim and advised that he has requested CS from the LA as the insd's wife is in hospital due to breast cancer and would like the claim to be settled as a matter of urgency. … 12 June 2020 INS …… called to discuss how dissatisfied he is with the claim process. He advised only part the contents has been settled and would like the claim escalated INS has advised that the LA SR is speaking to him with disrespect and he is not happy with this INS advised his wife is going through breast cancer and is finding the entire claim process stressful. INS requested that assessor be changed to another company …..INS advised that the SOW from [TB] did not include a room that was not reviewed due to his son sleeping in it at the time of the site visit. Advised that this will need to be assessed and included in the sow INS advised that he wants an outcome as soon as possible as he wants to use his own trades to do the works INS advised he had sent in a quote from his builder - advised him that this was for a full renovation of the home not for the claimed damages and due to this a second quote was being sourced Advised the INS l will contact the LA and request if she can finalise the contents items that are outstanding and to confirm if she has arranged for [TB] to re attend. 3.3 Key points on expert material relied on Record Key points AIR CONDITIONING Complainant’s a/c specialist (OS ) Report 4 August 2020  Due to recent water damage , a/c system is damage d in the indoor evaporator unit, motors printed circuit boards, zone motors and ductwork. All require replacing but not advisable .  Full extent of damage unknown until these parts are replaced . Complainant’s a/c specialist (OS) Service r eport 6 August 2020  Duc ted a/c not heating, found system damaged from water  No refrigerant in system, printed circuit boards damaged, zone motors damaged, duct work damaged Complainant’s a/c specialist (OS) Email 4 September 2020  Evaporator unit: The pipework was damaged by the collapsing structure and caus ed a gas leak , would have contaminated the system with moisture.  Motors printed circuit boards: the evaporator u nit’s printed circuit boards not working with the co rrect power supplied. Replacement required to test for any oth er faults.  Zone motors: Unsure of extent of damage until the system works again.  Ductwork: exposed to water spray, more than likely will have a bad odour once the ducted system becomes is operational again. Complainant’s a/c specialist (NA)  System has no gas in it at all, due to this system is now contaminat ed  Wall controller has no display, needs replacing. Determination | Case number: 735404 Page 11 of 11 Record Key points Report 18 November 2020  Indoor board has failed, no longer available.  Zone motors are faulty, require replacement.  No further testing can be done until parts replaced  System needs to be replaced, cannot be repaired.  Recommend replacing ductwork as well. Insurer’s builder (TB) Electrical report 25 March 2020  A/c unit had power. Fans and air pressure were working.  A/c unit did not have any refrigerant gas left.  Internal and control fan in working order.  A/c system has no damage related or unrelated to the event.  There was a large amount of oil around the rota lock and on the compressor. Not related to the event. Insurer’s a/c specialist (AF) Report 27 September 2020  S ystem ’ s major components working correctly. C ontrol system has a fault - not allow complet e testing of the system.  C ollaps e of the plasterboard could not damage pipework containing refrigerant , plaster is below the pipework.  no printed circuit board within the indoor unit  Two of three zone motors are in the roof spac e above bathroom . C ould not have been water damaged due to location  The ductwork may have water damage . U nable to inspect until t he t emporary ceiling has been removed.  The refrigerant leak is not claim related . Oil around the outdoor unit service valve is consistent with the system ’ s age.  Cont rol system requires replacement. T he system was operating during the initial assessment , the control fault would also be age , wear and tear related . KITCHEN APPLIANCES Complainant’s electrician (PE ) Report 19 April 2020  Wall oven and dishwasher have water damaged and are deemed Beyond Economic Repair. I nsurer’s electrician (SK) Report 24 September 2020  Rangehood: not working, brand could not be found.  Gas cooktop (Everdure): not working.  Gas o ven (Chefs Classic Extra) : lights are up but unable to test due to excessive grease build up (safety issue as grease could catch alight ).  Found no signs of water egress, all appliances are very dirty and greasy .

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.