Determination 733839

Insurer's cash settlement for fire repairs was inadequate and it did not comply with prior recommendation

FirmAuto & General
Decided2020-09-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$73,108
Non-financial loss$1,000
Amount claimed$121,712
SourceAFCA PDF

Summary

The complainants said the insurer's cash settlement for fire repairs was inadequate and that it had not complied with a prior recommendation. AFCA found the settlement must rise to $65,000 plus specified items, the insulation scope must be increased, and $1,000 non-financial loss is payable.

The insurer's final scope and offer were not actionable, and it failed to clarify the split system or communicate its offer in writing.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay non financial loss

Related

All Auto & General determinations · Find similar determinations

Text of the determination

Determination Case number 733839 Financial firm Auto & General Services Pty Ltd Determination | Case number: 733839 Page 2 of 13 Case number: 733839 11 September 2020 1 Determination overview 1.1 Complaint The complainants have lodged a claim with the financial firm (insurer) for damage sustained to their property following a fire event. The insurer has commenced repairs for the damage in line with AFCA’s determination 610713. However, the complain ants have stopped the repairs and seek cash settlement for the remainder of the repairs. The Authority issued a subsequent recommendation 686831, addressing delays and disagreement between the parties as to the scope of works. The parties agree to settle the outstanding repairs by a cash payment, however, there is a dispute regarding a fair and reasonable figure. 1.2 Issues and key findings Has the insurer complied with the Recommendation? I am not satisfied the insurer has fully complied with the Authority’s recommendation. Is the insurer’s cash settlement fair and reasonable? The insurer is required to increase its cash settlement as outlined in Section two of this determination. Is the insurer liable for any compensation? The insurer is required to pay the complainants $500 compensation. 1.3 Determination This determination is in favour of the complainants. Within 14 days of the complainants accepting this determination, the insurer is required to pay the complainants:  $65,000 for the repairs  $550 towards BK’s i nvoice  $515 for the disposal of rubbish  $393.04 for painting and cleaning  $5,000 for the smoke damaged books  $1,650 towards the carpet  $500 compensation awarded under recommendation 686831  $500 non-financial compensation as outlined below. Determination | Case number: 733839 Page 3 of 13 2 Reasons for determination This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions where applicable. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered. While the parties have raised numero us issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. 2.1 Has the insurer complied with the Recommendation? Circumstances of the loss There is no dispute the complainants’ property sustained damage following a fire event. There is no dispute the complainants have established a valid claim under the terms and conditions of the policy. The parties disagree as to the extent of the damage following the event. This claim has been subject to two previous AFCA complaints. A summary of the outcomes is outlined in Section three of this determination. In this complaint, the complainants say:  the insurer has not complied with the recommendation issued under complaint 686831  the cash settlement offer is not adequate to cover all the required repairs  the insurer has failed to replace the split conditioning system  the insulation has been downgraded and is not compliant with the building code  they ar e not satisfied with the insurer’s handling of the claim. It is not in dispute that the parties accepted the terms of the recommendation. As such, the insurer was required to compile a scope of works to restore the kitchen in line with the previous scope of works. This includes all items identified as not being completed as per the scope of works:  remove and replace with a new unit, the reverse cycle air-conditioning register located upon the living room wall  replace the heating unit with the duct work and the wall mounted thermostat.  the electrical power points located on the living room wall, have been removed, but are not noted in the scope and will need to be replaced Determination | Case number: 733839 Page 4 of 13  an electrical certificate of compliance should be provided where reinstatement or replacement of electrical work occurs  the fire damaged ceiling joists (the ones smoke sealed with paint) will need to be fully replaced on a like-for-like basis  the building rubble which was placed in the insured's recycling bins is to be removed and disposed of by the builder  the insurer is to add 10 percent contingency  the insurer is to pay the complainants $500 in non-financial compensation. The insurer only communicated its offer verbally and not in writing Whilst the exchanged information shows the insurer was attempting to comply with the scope of works as outlined in the recommendation and included this additional list, this scope of works was only briefly communicated to the complainants during a telephone conversation. Having reviewed the claims notes, I note:  since 20 May 2020, the insurer has been liaising with the builders to amend the scope in line with AFCA’s recommendation  the contemporaneous notes of the discussions, reflects the sense of urgency in finalising the scope  on 2 June 2020, the insurer apologised to the complainants for any delays  on 9 June 2020, the insurer spoke with the complainant where the complainant expressed his dissatisfaction with the offer. The complainants say they did not receive the scope of works and the insurer did not communicate a formal offer in writing. The insurer says that due to a staff member being on leave, the offer was not communicated in writing with the complainants. Further, the complainants rejected the offer verbally. I consider, regardless of the complainants’ verbal rejection, it was appropriate for the insurer to provide the complainants with a copy of the scope of works and offer, in writing. I will address the other findings of the recommendation in the following sections of this determination. Determination | Case number: 733839 Page 5 of 13 2.2 Is the insurer’s cash settlement fair and reasonable ? Parties agree to cash settle the claim The insurer’s policy states the insurer can decide whether it will repair damage to the building or pay an insured what it would cost the insurer to repair the building. When the insurer repairs the building, it guarantees the quality of materials and workmanship of the work for the lifetime of the building. If a defect arises in the lifetime of the building because of poor quality workmanship or incorrect materials, then the insurer will rectify the problem. This is one of the reasons AFCA considers it is generally preferable for an insurer to carry out repairs. Further, a cash settlement transfers all the risk from the insurer to the complainants of any unforeseen damage and any additional work required once repairs commence. It is not in dispute the parties agree to cash settle the claim. I accept there is a breakdown in communication between parties. Further, the complainants say they do not trust the insurer. The complainants have continuously raised concerns and expressed dissatisfaction with the quality of repairs I consider it is appropriate in the circumstances for the insurer to cash settle the complainants for the fair and reasonable costs of the remainder of the repairs. For clarity, I note the insurer has commenced the repairs in line with AFCA’s determination 610713. However, the complainants terminated the repairs. The insurer says the builder can no longer access the site as it appears the complainants have changed the locks. Further, I note the complainants moved back into the property due to their concerns with the lockdown during the pandemic. The complainants are dissatisfied with the insurer’s final scope of works The insurer has provided a copy of its final scope of works following the acceptance of the recommendation. Repairs total $48,327.28. Further, I note the insurer has allowed an extra 10 percent as a buffer for any unforeseeable damage as a contingency. The insurer made an offer of $53,160.62. The insurer is seeking to cash settle its liability under the policy for this amount. The complainants expressed their dissatisfaction with the offered amount. In substantiating their positions, the complainants say:  they have provided an actionable quote from a builder totalling $121,712  the insulation has been incorrectly downgraded, and the correct insulation should be R4  the split system is missing from the insurer’s scope of works. Determination | Case number: 733839 Page 6 of 13 I note the complainants’ initial builder quote totalling $121,712 , has been considered by AFCA under determination 610713, as not being an accurate reflection of the cost of repairs resulting from the fire. Given the complainants’ dissatisfaction with the insurer’s s cope of works and offer, the onus shifts to them to establish the reasons for the inadequacy of the insurer’s scope of works and offer (if any). The complainants’ quantity surveyor’s report is not an actionable quote The complainants engaged a quantity surveyor (BK) to review the insurer’s scope and provide an estimate of the rectification. BK estimated the cost of repairs to be $83,441. T he insurer says BK’s quote is not fair and reasonable:  BK’s quote is not actionable given he is not a registered builder  the rates used are much higher than a builder’s rates  BK made extra allowance in addition to the existing scope for the bins and miscellaneous preliminaries  the insurer can complete the repairs for the amount it has been quoted in their scope. I accep t BK’s estimate is not an actionable quote. BK’s estimate is mainly based on the insurer’s scope of works , however, with higher labour and material rates. BK did not elaborate on the reasons why his estimated rates are substantially higher than the insurer. While noting the above, I also accept the insurer’s scope of works is not actionable either and any cash settlement figure should be increased to allow for:  any volume discounts reflected in the insurer’s quote  project management or supervision costs. I note the insurer has allowed $340 which in my opinion is not a true reflection of accurate costs likely to be incurred by the complainants in undertaking the repairs  unforeseen damage that will only be discovered once repairs commence  the additional risk assumed by the complainants in undertaking the repairs  the passage of time including any increase in costs since the insurer quote. Given the challenges associated with the pandemic i.e. lockdown, a builder’s availability might be a challenge for the complainants. I note the complainants were unable to obtain a builder’s quote due to these challenges. I do not accept the complainant’s tendered scope of works is more accurate or actionable just because the rates are higher. Determination | Case number: 733839 Page 7 of 13 I note there are few items which are in dispute between parties which BK has factored in to his scope. I will address these items individually later in the determination. The insurer is required to increase its scope to meet the R.4.0 for insulation The complainants say the insurer’s sco pe of works has allowed for the incorrect ceiling insulation. In BK’s scope, I note:  item 4/1A: Remove and replace ceiling insulation to entire house ceiling - glass wool batts - R2.1 75mm thick - 136m2  item 4/1B: E/O for R4 - materials only. Having review ed the insurer’s scope of works, I note:  item 4.10: Remove and replace ceiling insulation to entire house ceiling - glass wool batts - R2.1 75mm thick - 136m2  item 4.20: Remove and replace ceiling insulation to entire house ceiling - glass wool batts - R2.1 75mm thick - 136m2. The insurer says the initial quote supplied by (TC) states that glass wool batts R2.1 was required. The insurer argues every builder attended has reflected the same rating of the bats. Neither parties have provided evidence to establish the current building requirement for the insulation. Further, the insurer has not elaborated as to why the R.4 is not acceptable. It is unclear whether the difference between the R2.1 and R.4 is a building requirement or a sustainable option. In the absence of any other information and for finality, I consider the complainants costings for the ceiling insulation to be acceptable. It follows, the insurer is liable for the R4.0 insulation as per BK’s scope of works . Evidence shows the insurer has replaced the split system The split system is one of the main issues in dispute regarding the final scope of works and costings. The insurer engaged an independent assessor (CR) to assess the quality of the repairs and address the complainants’ concerns. Amongst other things, CR assessed the reverse cycle air-conditioning unit and the ducted heating. In addressing the reverse cycle air conditioner, CR says a certificate of compliance from the contractor who undertook work on the unit was left on site. The certificate stated the unit was reconnected using the existing supply isolator and existing interconnection. In which case it would appear the existing unit has been refurbished and not replaced as per the scope. Having reviewed the certificate of compliance, I note it is dated 20 December 2019. Determination | Case number: 733839 Page 8 of 13 In addressing the ducted heating, CR says the builder’s scope provides for ‘test and report on ducted heating and advise if replacement is required’. However, the next line items provides for replacement of the entire ducted heating system to the dwelling. Further, the scope indicates the existing vents are to be removed and then reinstalled to the ceiling. CR says the scope indicates the existing ducted heating ceiling registers were to be re-used which was the case during the inspection. CR concludes the reasons for quoting of the replacement of the entire system is unclear. The complainants say:  the insurer agreed to replace the split system following its acceptance of AFCA’s recommendation, as per its email dated 20 May 2020  CR says the split system has not been replaced  t he old unit’s casing has been left in the front yard and the internal parts of the un it were not disposed of as the internal parts are not evident in the photo  the casting of the split system has been left in the front yard and there are no internal components evident in the skip bins. In addressing CR’s findings, the insurer’s home assessor (BW) says in his email dated 19 March 2020:  the split system has been replaced and the ‘reconnect’ noted on the compliance certificate is a possible mistake  the ducted heating was tested and is in working order and all duct work was replaced as per the scope  the ducted heating unit was tested, and replacement is not required as it has not been damaged during the fire event. In substantiating its position regarding the replacement of the split system, the insurer has provided:  a quote dated 12 December 2019 from a heating and cooling specialist (AA) addressed to the builder for the replacement of a 5kw split system totalling $4,400. I note a comment ‘inspected gas heater / looks to be in good working order’. Further, I note there is a manufacturer warranty for six years.  an invoice dated 20 December 2019 from AA for the split system totalling $4,400  a Victorian Building Authority’ s (VBA) compliance certificate dated 2 June 2020, showing supply and installation of a new split system. Further supply and installation of new duct and branches to existing gas heater. Determination | Case number: 733839 Page 9 of 13 In considering the evidence, I am satisfied the insurer has replaced the split system, the ducts and branches as per its scope of works. Further in accordance with the recommendation, provided VBA’s compliance cert ificate for the electrical work, which in my opinion is a compelling piece of evidence. I accept there is confusion regarding the electrical work carried out, considering the compliance certificate left on site and assessed by CR. Further, I accept the insurer’s failure to clarify this issue following the recommendation acceptance has caused confusion. I will address this point later in the following sections. It is fair the insurer increases its cash settlement figure to $65,000 Having carefully considered the parties evidence and arguments, I accept the insurer’s costing is a reason able starting point for considering a fair and reasonable cash settlement for the outstanding repairs. As outlined above, I consider it is appropriate for the insurer to increase its cash settlement. I note the insurer has added a 10 percent contingency in addition to its scope of works. Further, I note the insurer has accepted:  $393.04 for the paint and cleaning costs  $5,000 for the damaged books, As outlined above, I accept the insurer is liable for the associated costs for the insulation. The complainants say many items of their clothing has been returned in a damaged status following restoration. I note the complainants have not provided any evidence to establish the extent of the loss (if any). The complainants have expressed their concerns regarding the electrical works in the property and say it is not working properly. The complainants are unsure if there are any associated costs for compliance. In addressing these concerns, the insurer says all electrical items have been isolated to complete repairs, which were ceased because of the complainants. Further, an allowance has been made in the scope for any outstanding work. The insurer says the existing supply isolator has not been affected by the fire and does not require replacement. Further a certificate of compliance by VBA is not required. I note the complainants have not provided any evidence to re fute the insurer’s argument. Having considered the evidence I consider it fair that the insurer increases its cash settlement for the outstanding repairs to $65,000. I accept there is a risk for the complainants regarding undertaking the repairs and hidden costs which have not been accounted for. Determination | Case number: 733839 Page 10 of 13 I am not satisfied that BK’s scope is a real reflection of a fair and reasonable actionable quote as it is simply not a quote but rather an estimate by a quantity surveyor. The complainants have tendered an invoice from BK for the cost incurred in compiling its scope of works. Whilst I consider BK’s report has not comprehensively advanced the complainants’ position, I consider it is fair the insurer pays 50 percent of the invoice, being $550, as I have accepted the insulation cost as per his report. It is fair the insurer pays the complainants $515 for the skip bin The complainants say they have incurred $515 in ordering a skip bin to dispose all the rubbish left behind by the insurers. The insurer says an allowance has been made for the disposal of rubbish in the scope of works. I do not accept this argument. The complainants have disposed the material already left on site. Further, I consider the complainants will incur further costs in disposing new materials during repairs which I accept is reflected in the repair costs. I consider it is fair the insurer pays for the $515 incurred by the complainants. It is fair the insurer pays the complainants $1,650 towards the carpet It is not in dispute the fire has smoke damaged some of the floors which requires sanding back and polishing. Namely, pantry, kitchen, living room and hallway. Given the evolving situation with the pandemic, the complainants decided to move back into the property. The complainants say the carpet was a cheap and quick solution to enable the rooms to be safe for habitation for the complainants and their children. The complainants provided an invoice for $3,300 for the cost incurred for the carpet. There is no evidence the fire has damaged the flooring in the entire property. In saying that, I consider the complainants have mitigated their challenging situation and I accept it is fair the insurer pays the complainants $1,650 towards the carpet. Further, I accept by such action, the complainants mitigated further alternative accommodation costs. Determination | Case number: 733839 Page 11 of 13 2.3 Is the insurer liable for any further compensation? The complainants are dissatisfied with the insurer’s handling of the claim The complainants have expressed their dissatisfaction for the way the insurer has handled the claim. The complainants say:  the property has been left unlocked on numerous occasions  builder has left the site unclean  debris were left on site which they had to address  the insurer has continued to show lack of empathy  the insurer has been unhelpful with the temporary accommodation  the insurer has continuously attempted to diminish the extent of the damage  the insurer has unreasonably delayed the claim. The complainants are entitled to $500 compensation Having reviewed the claims contemporaneous notes, I am satisfied that:  following the loss, the complainants refused to reconnect the power back to the property, so the insurer could proceed with mitigation repairs following the event  the insurer has continuously attended to the complai nants’ requests and dissatisfaction regarding the alternative accommodation arrangements  the ins urer continuously addressed the complainants’ concerns appointing an engineer to assess any potential asbestos  the complainants unreasonably delayed the restora tion process for the contents  the complainants refused access to the insurer’s experts on numerous occasions to undertake the necessary assessment, restoration or repairs  requested experts, such as the fire investigator checking rooms for smoke and soot damage, to leave the property as they do not trust the technology used  some of the issues were outside the insurer’s control such as the water ingress at the rental property  the insurer has paid for the alternative accommodation above the policy limit to accommodate the complainants ’ needs. The complainants lived in the property through winter where heating is an issue. I accept it was the complainants’ decision to move back into the property in its unrepaired status. Whilst I note their argument about their concerns regarding the pandemic, I am not satisfied it was the insurer’s wrong doing or actions which led to this situation. Considering the evidence, I am satisfied that the insurer has handled the claim reasonably over all. The exchanged evidence shows the insurer apologised to the complainants on numerous occasions and has attempted to resolve the claim in a timely manner. Determination | Case number: 733839 Page 12 of 13 CR concluded repairs undertaken by the insurer were done to acceptable repair method and standard, despite the complainants’ dissatisfaction with the quality of repairs. The i nsurer continued to address the complainants’ concerns by engaging different experts to assess the extent of the damage and address these concerns. In saying that, I accept the complainants’ argument regarding the smoke-stained timber was valid. Further, the insurer agreed to cover the complainants’ books and pay them $5,000. I note the complainants were unable to provide any proof of ownership of these books. Further the complainants disposed these books prior to insurer inspecting the damage. I note the insurer has previously paid the complainants $500 compensation as per AFCA’s determination 610713. Further, the complainants were awarded $500 under recommendation 686831. The insurer is required to pay this amount to the complainants if it has not already done so. I consider an additional $500 compensation is reasonable in the circumstances. The insurer did not clarify the split system replacement at the time of the recommendation acceptance. Further, the insurer should have communicated its offer to the complainants in writing regardless of the complainants’ verbal decision , given the extent of the loss. Determination | Case number: 733839 Page 13 of 13 3 Supporting information 3.1 Previous AFCA’s complaints Complaint Outcome 1. 610713 Determination issued  The insurer is required to arrange repairs of the property based on its scope of works, including the engagement of a hygienist  The insurer is required to respond to each matter raised by the complainant regarding the contents assessme nt  The insurer is required to assess the roof gutter damage  The insurer is to pay $500 as compensation. 2. 686831 Recommendation issued  The insurer is to compile a scope of works and costing required to restore the kitchen in line wit h the previous scope of works and the engineer’s report. This includes all items identified as not being completed as per the scope of works and any items yet to be repairer  The insurer is to pay the complainants the value of this scope of works plus 10% to ensure the statement of works is actionable  The insurer should also pay the complainants $500 in consideration of stress and inconvenienc e experienc ed due to its non - compliance with the previous scope of works.