Determination 733527

Strata claim for cracking damage declined on earth movement and other exclusions

FirmStrata Community Insurance Agencies Pty Ltd
Decided2021-03-03
ProductGeneral Insurance · Strata
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

Owners of a strata unit claimed for January 2020 cracking damage that the insurer declined under earth movement and other exclusions. AFCA found the damage more likely caused by a leaking stormwater pipe, which the policy covers, and ordered the insurer to meet the claim with statutory interest on any repairs already paid.

Once a valid claim is shown the insurer must prove an exclusion applies, and it did not persuasively rule out the leaking pipe, which the policy covers despite the earth movement exclusion.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 733527 Financial firm Strata Community Insurance Agencies Pty Ltd Determination | Case number: 733527 Page 2 of 12 Case number: 733527 4 February 2021 1 Determination overview 1.1 Complaint The complainants‟ unit is insured under a strata insurance policy administered by the financial firm on behalf of the relevant insurer. For easy reference, the financial firm will be referred to as the insurer in this determination. The complainants claimed for cracking and movement related damage to their unit that occurred in around January 2020. The insurer initially declined the claim on the basis the damage was due to earth movement, which it says the policy excludes. Following a further review, the insurer also says the claim is excluded because of the exclusions for:  loss or damage caused by gradual deterioration, inherent vice, latent defect, wear, tear, developing flaws, and normal settling, heaving, shrinkage or expansion in buildings, foundations, footings, walls, driveway or paths  the rectification of faulty or defective workmanship. The complainants believe the damage was caused by a leaking stormwater pipe. 1.2 Issue and key findings Is the insurer entitled to deny the claim? The insurer is not entitled to decline the claim. The available evidence establishes on the balance of probabilities that the damage to the complainants‟ unit was caused by a leaking underground stormwater pipe. The policy covers damage caused by a leaking pipe and the insurer has not persuasively established the operation of a relevant exclusion to deny the claim. 1.3 Determination This determination is in favour of the complainant. The insurer is to meet its liability under the policy for the damage to the c omplainants‟ unit within 14 days of being notified of their acceptance of this determination. If the complainants have repaired and paid for the cost of repairing the damage to their unit, the insurer is required to reimburse them for the cost incurred with interest under section 57 of the Insurance Contracts Act 1984 (the Act). Interest is payable from the date the complainants paid for the repair until they are reimbursed. Determination | Case number: 733527 Page 3 of 12 2 Reasons for determination I have decided this case based on what is fair in all the circumstances, having regard to the relevant legal principles, good industry practice, industry codes of practice and previous relevant decisions of AFCA and predecessor schemes. This complaint has not been subject to a preliminary assessment and has progressed to a determination pursuant to AFCA‟s rules and operating guidelines. I have considered all the material submitted by the parties. I am satisfied the documentation I have relied on has been provided to both parties. Parties have raised several issues and documents in support of their respective positions. While they have all been considered, this determination only addresses those necessary to explain the outcome reached. 2.1 Is the insurer entitled to deny the claim? Complainants must establish a valid claim The complainants must establish, on the balance of probabilities, they suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once established, the onus shifts to the insurer to prove, on balance, an exclusion applies if it seeks to deny or limit its liability for the loss. The relevant policy extracts are set out in section 3.1 of this determination. Complainants have a valid claim, so insurer must prove an exclusion applies The policy covers loss or damage to the complainants‟ unit arising from any sudden and accidental cause. The parties do not dispute that the unit‟s significant cracking and movement related damage in January 2020 was sudden and accidental. The complainants have established a valid claim in that the damage to their unit was sudden and accidental. Accordingly, the onus is on the insurer to prove a relevant exclusion applies. Insurer relies on many exclusions The insurer relies on several exclusions to decline the claim, relevantly – exclusions:  1(g), which excludes loss or damage caused by earth movement  1(m), which excludes loss or damage caused by the normal settling, heaving, shrinkage or expansion in buildings or related structures  2(b), which excludes the cost of rectifying faulty or defective workmanship  1(c)(i) and (ii), which exclude loss or damage caused by gradual deterioration, inherent vice, latent defects, wear, tear or developing flaws. Determination | Case number: 733527 Page 4 of 12 Insurer’s engineers say unit damage is due to some sort of earth movem ent The insurer appointed several experts to investigate the claim. This included builder „ ASB ‟ , plumber „ RPG ‟, adjuster „ PCS ‟ , and geotechnical (GG) and structural (SCE) engineers. A summary of the information given by these experts are outlined in section 3.2 of this determination. The insurer appears to mainly rely on the opinions of GG and SCE. Their specific opinions are not entirely consistent but broadly, they say the unit‟s damage was due to some form of earth movement coupled with undersized and shallow footings. GG says the damage was due to:  the unit‟s footings and structures not being designed to accommodate shrink -swell movements for a class „M‟ site  differential shrink-swell movements due to moisture variation caused by: > watering of garden beds leading to water infiltration into the soils near or beneath the footings > possible soakwells in the vicinity, the locations of which it does not know. SCE says the damage was due to long term soil movement and not based on any single event. SCE also says:  there are no soakwells near the entry of the complainants‟ unit  there is no evidence the unit‟s stormwater system contributed to movement as the pipework was above the bottom of the footing level and full of water  subsidence to the unit‟s concrete footpat h appears consistent with the soil type and general movement of the property as outlined in GG‟s report  the unit‟s footings are undersized for a class „M‟ site, as outlined in GG‟s report  the unit is founded at depths of 250- 300mm and with such „shallow foundations‟: „the level of expected surface movement is then transferred into the structure hence severe long-term movement and ultimately cracking to the ridged and heavy structure as viewed‟  water trapped in the relevant stormwater pipework is likely due to long-term settlement at the front of the home causing its gradient to reverse. Unit can be expected to experience moderate ground movement The original building plans indicate that the complainants‟ unit was constructed on a site consisting of „moderate to high reactive clay‟. GG and SCE say the site would be classified as „M‟ on current building standards, which the CSIRO says may experience moderate ground movement from moisture changes. Determination | Case number: 733527 Page 5 of 12 As seasonal moisture changes are natural occurrences, I accept that the complainants‟ unit could be expected to experience some movement due to moderate ground movement. Therefore, any cracks developing from this would normally be excluded as damage arising from the normal settling, heaving or shrinkage of the unit‟s fo undation or footings. There is a leaking stormwater pipe at the area with the most severe damage However, the front of the complainants‟ unit experienced more than mere moderate ground movement in January 2020. The unit experienced a sudden and worsening incident of cracking in January 2020, which also resulted in the lounge ceiling detaching and cracks appearing at various locations around the unit. The most severe cracks in the unit were to the internal walls in the master bedroom and the wall separating the entry and the master bedroom. On balance, this suggests:  this area of the unit probably experienced the greatest movement  the lounge ceiling detachment and cracks appearing at other locations of the unit were likely due to the movement at this area. There is no dispute the walls with the severest cracks are located closest to an underground stormwater system that was found to be leaking by RPG. As reactive soil reacts to moisture, it is reasonable a leaking pipe can cause significant soil movement in that area which, in turn, can cause the unit to move and crack. GG failed to test soil at location of leak despite being required to do so While several experts (including SCE) pointed out that the soil in the area of the leaking pipe required testing, GG never did this. SCE identified seven locations around the complainants‟ unit that needed soil testing in its damage location plan. However, GG only conducted soil tests:  at the northern side of the front garden (i.e. location „BH01‟), which was not identifi ed in SCE‟s damage location plan as an area to be tested  in front of the unit‟s living room front window (i.e. location „TP01‟) and kitchen at the rear of the unit (i.e. location „TP02‟). GG did not test the soils at five other locations identified in SCE‟ s damage location plan. This included the crucial area of the leaking pipe. No explanation was provided on why the soils at these locations were not tested. As the soil at the location of the leak was never tested, I am not satisfied the insurer has persuasively:  established a connection or correlation between the soil in this area and the soils at locations „BH01‟, „TP01‟ or „TP02‟ Determination | Case number: 733527 Page 6 of 12  ruled out the leaking pipe as being the cause of the unit‟s damage. GG and SCE are inconsistent as to footing depth and cause of damage Further difficulties with the opinions of GG and SCE include the following. While GG and SCE appear consistent that the unit‟s footings are inadequate for a class „M‟ site, they appear inconsistent about their depths. SCE says the unit‟s footings were founded some 250mm – 350mm deep, but GG says they were founded at depths of 410mm and 450mm based on its investigations at locations „TP01‟ and „TP02‟. Leaving aside the inconsistency, it is also unfair for the insurer to compare the unit‟s footings to building standards that were not yet in place when the unit was constructed. SCE also claims that the unit‟s damage was due to „long term soil movement‟ and there are no soakwells near the unit‟s entry. On the other hand, GG says the damage was due to „watering of garden beds‟ and „possible soakwells‟. Given the inconsistencies, it is difficult to accept either position as established. Inconclusive if leaking pipe is due to defective installation or earth movement I am also not satisfied the insurer has persuasively established that the unit‟s damage was necessarily due to a defectively installed stormwater piping system. RPG says a pipe was backflowing and a joint was leaking, and attributes both to defective installation. However, SCE seems to believe long-term settlement at the front of the unit caused the relevant pipe‟s gradient to reverse . Further, other than pointing out that the relevant joint was leaking, RPG does not particularly explain how it was defectively installed. Given these inconsistencies and a lack of persuasive explanation for the leak, I am not satisfied either position has been established. It is inconclusive if the leaking pipe was caused by defective installation or earth movement. Weight of evidence indicates leaking pipe was the cause of the unit’s damage Ultimately, the evidence shows that the complainants‟ unit was constructed some 30 - 31 years ago (i.e. around 1989 – 1990). If the footings were inadequate from the start, whether by design or actual construction, then it is reasonable to expect the unit to have experienced significant movement damage earlier and not 30 years later. While there is some evidence the unit experienced movement before, there is no evidence it experienced the kind of movement experienced in January 2020. The area of the unit that experienced the most significant movement and cracking also happens to be the same area where a leaking pipe was found. The soil in this area was never tested despite it being identified as an area to be tested, so the pipe was never persuasively ruled out as a cause of damage . It has not also been Determination | Case number: 733527 Page 7 of 12 persuasively established that the relevant pipe was leaking because of poor installation, earth movement or any other excluded cause. Considering these matters, I am, on balance, satisfied that the damage to the complainants‟ unit was more likely than not caused by the leaking underground pipe. While the policy generally excludes loss or damage caused by earth movement, it provides cover when such loss or damage is caused by a leaking pipe. Given this, I am satisfied that the complainants are entitled to cover for the movement related damage to their unit in January 2020. I am also satisfied they are entitled to cover for the cost of locating the leak and up to $1,000 for repairing the leak. Insurer is to cover the damage to the complainants’ unit Accordingly, the insurer is required to take the relevant steps to meet its liability under the policy for the movement related damage to the complainants‟ unit within 14 days of being notified of their acceptance of this determination. If the complainants have already repaired and paid for the cost of repairing the relevant damage, the insurer is to reimburse them the cost of repairs with interest at the statutory rate under section 57 of the Act. Interest is payable from the date the complainants paid for the repairs until they are reimbursed. Determination | Case number: 733527 Page 8 of 12 3 Supporting information 3.1 Relevant policy terms General definitions – the meaning of some words … Earth Movement means heavage, landslide, land-slippage, mudslide, settling, shrinkage, subsidence or collapse. … Loss or Damage means direct physical loss of, destruction of, or damage to property from any sudden and accidental cause not otherwise excluded by this Policy. … Section 1 – Part A You are covered for the following Events. 1. We will pay up to the Sum Insured shown on the Schedule for Section 1, against Loss or Damage to Your Insured Property on the basis set out in “Claims - basis of settlement”, including the cost of: (a) (i) architects fees, surveyors fees and other professional fees; (ii) removal, storage and/or disposal of debris, being the residue of Your damaged Insured Property (including debris required to be removed from adjoining or adjacent public or private land), damaged Lot Owners and occupiers Contents and of anything which caused the Loss or Damage; (iii) clearing, cleaning and repairing drains, gutters, sewers and the like where the blockage causes or is the result of physical damage to the pipe or drain; (iv) dismantling, demolishing, shoring up, propping, underpinning, or other temporary repairs; … 9. Exploratory costs, Replacement of defective parts When Your Insured Property suffers Loss or Damage as a result of: (a) bursting, leaking, discharging or overflowing of water tanks, water apparatus or water pipes; … … We will pay the reasonable costs of locating the cause of the Loss or Damage and for any Loss or Damage caused in locating the leak. We will also pay: Determination | Case number: 733527 Page 9 of 12 (i) up to $1,000 for the repair or replacement of the defective part or parts of such tanks, apparatus, pipes or other installations giving rise to the Loss or Damage; and … We will not pay for any of these costs if the bursting, leaking, discharging or overflowing is caused by a building defect, building movement, faulty workmanship, rust, oxidation, corrosion, Wear, Tear, gradual corrosion, gradual deterioration, Earth Movement or by trees, plants or their roots; … Exclusions - what We do not cover under Parts A, B and C 1. We will not pay for Loss or Damage: (c) (i) caused by moths, termites or other insects, vermin, mice, rats, rust or oxidisation, mildew, mould, contamination or pollution, wet or dry rot, corrosion, gradual corrosion or deterioration, change in colour, dampness of atmosphere or other variations in temperature, evaporation, disease, inherent vice or latent defect, loss of weight, change in texture or finish or pecking, biting, chewing or scratching by birds or animals; (ii) caused by Wear, Tear, fading, concrete or brick cancer, gradual deterioration or developing flaws; … (g) caused by vibration or from the removal or weakening of or interference with the support of land or buildings or any other property, Erosion or Earth Movement. However We will pay if the Loss or Damage is due to: … (ii) bursting, leaking or overflowing of water tanks, pipes, drains, gutters or other water or liquid carrying apparatus; … ... (m) due to normal settling, creeping, heaving, seepage, shrinkage, or expansion in buildings, foundations / footings, walls, bridges, roadways, kerbing, driveways, paths, garden borders and other structural improvements. 2. We will not pay for: … (b) the cost of rectifying faulty or defective materials or faulty or defective workmanship; Determination | Case number: 733527 Page 10 of 12 3.2 Relevant expert information Record Key points Insurer’s structural engineer (SCE ) Damage location plan 20January 2020  Damage location plan outlines: > the various damages to the complainants‟ unit, with the main damage areas predominantly located at the front middle and right side of the unit > seven areas where soil testing was required, including at the location nearest to the area of the unit that suffered the most movement relat ed damage > the front lawn area of the unit had subsided SCE Preliminary assessment r eport 22January 2020  Unit inspected on 16 January 2020  P reliminary opinion : > localised subsidenc e occurring to the front of the home, causing the cracking and subsequently cause d the ceiling to separate as the rooms increase in dimensio n during this settlement phase. > Sewer drainage pipes are at the rear of the unit, away from the region of subsidence, so they unlikely played a role in the unit‟s movement > Water feed pipes – builder ASB found no leaks so the pipes unlikely contributed to the unit‟s movement > Stormwater drains – there is a soak well, downpipes to the front of the unit, the location and position of the soak well or outlet is unknown and will require an ins pecti on to check for any damage to pipework > The unit‟s front garden, entry and concrete path appears to slope to the area of subsidence, so there is likely to be „some deep settlement to the soils‟ at the front of the unit > The damage is due to subsidence caus e d by poorly compacted soils (likely at depth) when constructed.  Some further investigative recommendations made were: > Soil tests are required and part of conc rete pathway needs to be removed to determine size of footings and soil type below > A couple of downpipes to the front of the unit require inspection to determine location and whether there are any defects such as cracking Insurer’s builder (ASB ) R eport 28 January 2020  Inspected unit on 15 January 2020  Unit is approximately 30 years old, constructed of tiled roof, brick walls and maintained in good condition  Roof inspection showed no evidence of storm created opening  Living area ceiling is sagging, with visible cracking and deflection  Worst cracking damage was to the dividing wall between unit‟s master bedroom and entry are  Ceiling is mainly secured by adhesive daubs, which is appropriat e at the time unit was built  Possible „subsidenc e/slab movement‟ that is causing „twisting/movement of roof framing, with subs equent adhesive daub failure‟  Ceiling damage is related to ceiling frame movement as a result of the issues with the internal walls Determination | Case number: 733527 Page 11 of 12 Record Key points ASB Email 8 March 2020  Cont ractors doing initial camera inspection reported they could not get any conclusive information as there was too much water in the soa kwells  Next step is to remove a section of the concrete paving to expose the soakwells and attempt to verify where the water is presenting from Insurer’s adjuster (PCS ) First r eport 18 March 2020  An attempt to take CCTV footage through underground pipes leading to a soakwell was performed but this was inconclusive due to the amount of water in the soak well  Following further investigative work is now being arranged: > Remove concret e paving to gain ac cess to perform soil testing and reinstate > Excavate down the side of the downpipe and around the soakwells > Auger bore the soil areas  SCE advises that while it will expose the soak wells, all investigative work is still required, including the soil testing, to establish if there is any movement taking plac e within the soil Insurer’s plumber (RPG ) Plumbing report 3 April 2020  RPG says: > Stormwater drain has back fall and large amount of silt due to original poor installation of stormwater drainage system > Water is seeping from a badly installed 45 degree pipe joint  Report supplemented by photos purporting to show: > Spirit level showing the relevant pipe back falls > The purported badly installed and leaking junction pipe Insurer’s geotechnical engineer (GG ) Geotechnical r eport 8 April 2020  Fieldwork carried out on 24 March 2020, comprising: > A walkover inspection > Drilling of a machine auger borehole at one location (BH01) > Hand excavation of test pits and hand auger boreholes at four locations (adjacent to the footings), extending to depths of between 0.75m and 1.3m (TP01, TP02) > Perth sand penetrometer (PSP) testing at two locations (TP03 and TP04 – unrelated to the complainants‟ unit) > Recording footing dimensions at three locations > Collection of representative samples for inspection and possible laboratory testing  Noted several downpipes from the gutters but does not know if they extend to the stormwater drainage network or simply into soakwells near the unit  Conc rete footings were exposed at three locations, wh ich: > were 200 - 250mm thick and were 350 - 450mm deep > have polythene membranes below the footings in test pits TP01 and TP02  Unit‟s site is considered a class M site  Likely causes of unit‟s cracking are: > Unit‟s footings and structure not being designed to acco mmodate shrink - swell movements for a class M site > Differential shrink - s well movements due to moisture variation in Determination | Case number: 733527 Page 12 of 12 Record Key points the soil due to (1) watering of garden beds causing water to infiltrate the soils near or beneath footings and (2) possible soakwells (the lo cations of whic h it does not know) in the vicinity of the unit  230mm thick concrete footing found outside living room front window, to a depth of 410mm (i.e. location TP01)  220mm thick concrete footing found outside kitchen area at the rear of the unit, to a depth of 450mm (i.e. location TP02) Insurer’s adjuster (PCS ) Second report 20 April 2020  Offers no personal opinion on cause of damage but rather, cites structural engineer‟s finding that cause of damage is due to long - term soil movement and not based on any single event  Unclear how PCS knows SCE‟s findings in April 2020 when SCE‟s report saying the above was issued on 14 May 2020 SCE Damage assessment r eport 14 May 2020  Caus e of damage points towards a long - term design/construction issue, where class S footings were used when class M footings should have been us ed  No soak well near entry of complainants‟ unit  Stormwater pipes are full of water and not draining correctly due to negative grade  No evidence that the stormwat er system has contributed to the movement as pipework was above the bottom of the footing level and full of water  Unit‟s footings are suitable for a class A/S site but are undersized for a class M site, which require deeper foundations  Unit is founded about 250mm - 300mm and wit h shallow foundations, the level of expected surface movement is then transferred into the structure hence severe long - ter m movement and ultimately cracking to the ridged and heavy structure  Localised stormwat er inspection suggests that water is trapped in the pipework and unable to flow because of incorrect installation, however what is likely to have occurred is that long - t erm settlement to the front of the home allowed for the pipes‟ gradient to reverse  Damage to unit is due to long - term soil movement and not based on any single event