Home / Suncorp Group / Determination 733277

Determination 733277

Storm damage claim partly denied and cash settlement disputed

FirmSuncorp Group
Decided2021-02-11
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed$101,573
SourceAFCA PDF

Summary

Homeowners claimed $101,573.15 for storm damage and disputed the insurer's $25,163.69 cash settlement. AFCA found most of the remaining damage pre-existed or was caused by maintenance and was excluded, but said the settlement should rise for an extra 100 roof tiles and sarking repairs.

The policy excludes damage from pre-existing faults and poor maintenance, and a cash settlement must reflect reasonable repair costs, which the insurer's offer largely did.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 733277 Financial firm AAI Limited Determination | Case number: 733277 Page 2 of 18 Case number: 733277 11 Febrauary 2021 1 Determination overview 1.1 Complaint The complainants lodged a claim with the financial firm (insurer) under their Home and Contents Insurance policy, for storm damage sustained to their property. The insurer has offered to provide a cash settlement for water damage found in various areas. However, it denied the balance of the claim on the basis the damage was not caused by storm but by factors excluded from cover under the policy (such as pre-existing damage and lack of maintenance). The complainants dispute the insurer’s decision and seek cover for the balance of the claim. The complainants also say the cash settlement offered is inadequate. 1.2 Issues and key findings Is the insurer entitled to limit its liability under the complainants ’ claim? The insurer is entitled to limit its liability under the claim because:  the available information establishes (on balance) the concerns identified with the veranda, kitchen and roof did not arise from the storm event giving rise to the claim. Rather, they pre-existed the event and are due to a lack of maintenance  loss or damage caused by a lack of maintenance and pre-existing faults are specifically excluded from cover . Is the insurer required to increase its settlement for accepted damage? The insurer is not required to increase its settlement for the accepted damage because:  the policy entitles the insurer to pay what it would cost it to complete repairs  the insurer’s offer to settle the claim related damage is fair and reasonable  the complainants have not substantiated an increase to the settlement amount. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any action in relation to the complaint, until such time the complainants provide information to substa ntiate an increased payment. If the insurer cash settles the claim it is to provide an uplift as set out in 2.2 hereof. Determination | Case number: 733277 Page 3 of 18 2 Reasons for determination I have decided this case on the basis of what I consider fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS and AFCA decisions, where relevant. I have taken into account all the material submitted by the parties. I am satisfied that the documentation I have relied on has been provided to both parties. For the purposes of this determination, I will deal with only those points considered relevant. 2.1 Is the insurer entitled to limit its liability under the complainant’s claim? Complainants seek remaining damage to be accepted by insurer The complainants say the storm caused damage to internal and external areas of the property, and seek repair/replacement of the following:  replacement of floor tiles in the veranda  replacement of flooring, ceilings and walls  replacement of carpets  damage to kitchen  replacement of main roof  replacement of garage roof and walls. Policy provides cover for insured events subject to exclusions The complainants are required to show, on the balance of probabilities, they have suffered a loss caused by an event insured against under the policy. This is known as a valid (or prima facie ) claim. If the complainants are able to establish a valid claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on a policy exclusion or is otherwise entitled to deny the claim. The complainants’ policy provides cover for damage caused by the insured events listed in the policy, subject to the conditions and exclusions set out in the policy. The complainants lodged a claim for storm damage which occurred in February 2020. The insurer accepts a storm occurred and the complainants ’ property sustained damage. Therefore, the complainants have established a valid claim under the insured event of storm. However, the policy excludes cover for damage caused by:  resultant cracking to paths, driveways or outdoor surfaces unless they are washed away by storm  wear, tear and gradual deterioration Determination | Case number: 733277 Page 4 of 18  pre-existing faults and poor maintenance. Evidence does not show veranda tiles were damaged by storm event The complainants say the hail damaged/cracked the ceramic floor tiles and dislodged the perimeter tiles in the veranda. The insurer appointed a structural engineer (DW), who says there is no obvious evidence to indicate a specific or singular defined event that caused or contributed to the damage. However, it is usually a combination of two or more of the factors below, that produce stresses sufficient to result in distress to floor tiles:  absence of dedicated movement joints at the time of installation  unsuitable substrate preparation, inappropriate choice of fixative or inadequate application of fixative  structural building movements which cause compression of the substrate  long term shrinkage of the concrete floor slab which can result in compression to the upper surface of the slab and attached surface finishes such as floor tiles  natural long-term tile growth from moisture vapour from the environment. DW explains the damage could also be caused by foundation movement such as from natural seasonal changes in the moisture condition of the clay foundation soil. Although, he thinks it unlikely the veranda slab/foundation suffered any differential settlement because he observed no significant cracking to the brickwork walls extending along the North, East and South sides of the veranda. DW concluded:  the damage to the veranda floor tiles is not related to the claimed event, but caused by the absence of suitable intermediate movement joints, as required by the relevant Australian standard  the loss of perimeter nosing tiles is not from the claimed event but due to poor construction detailing  loading on nosing tiles (such as foot traffic or impact loading) would cause them to detach due to method of installation  the aged appearance of the tiles in a number of locations suggest that a high proportion of the cracking most likely pre -dated the claimed event  there was no obvious impact damage on the surface of the floor tiles suggesting cracking unlikely to be related to impact damage or the event. Having considered the available evidence, I am persuaded by DW’s report. DW identified a lack of suitable movement joints in the floor tiles and poor construction of perimeter tiles. Further, there is no indication on DW’s report that the storm contributed to the damage. Therefore, I accept its evidence that: Determination | Case number: 733277 Page 5 of 18  the damage to the veranda floor tiles is not related to the claimed event  the cause of damage was the absence of movement joints and poor installation  a high proportion of the cracking most likely pre-dated the claimed event. The policy excludes damage caused by faults that existed before the loss or damage occurred: We will not:  Fix a faul t that existed before the loss or damage occurred… I accept the insurer has shown the failure to install movement joints constituted an existing fault. On this basis, and in the absence of any evidence to the contrary, the insurer is entitled to deny the claim for the veranda floor tiles. Evidence does not show flooring, ceilings and walls require replacement The complainants are dissatisfied with the insurer’s decision not to replace some of the items they consider were damaged by the storm. This includes yellow tongue flooring in the lounge area, which they say requires replacement as it has become structurally unsound from water damage. The insurer relies on its assessor’s report to say that while the flooring was exposed to water, it is made to withstand getting wet and simply getting wet does not necessitate replacement. The insurer’s builder (SH) also reported there is no evidence of damage caused by the storm. I am satisfied the insurer is not required to replace the yellow tongue flooring as the complainants have not shown what damage it has suffered due to the storm event or the reasons they believe it requires replacement. The available material also indicates that while the insurer was happy to re-assess the yellow tongue flooring, the complainants were not open to this. I am satisfied that apart from the repairs it has already accepted, the insurer is not required to replace the ceilings and walls. This is because the available material shows that apart from the ceiling in bedroom 2, the plaster has kept its structural integrity and there is only water staining to the paint. Further, the complainants have not provided evidence to support why these items require replacement rather than repair. Evidence does not show all carpets need to be replaced The insurer engaged a restorer (CG) to address remediation at the property. The available information shows CG found that apart from bedroom 4, none of the other carpets required full replacement and were restorable. CG also noted there was no smell or staining evident in the other rooms. Determination | Case number: 733277 Page 6 of 18 The complainants provided a quotation for the carpet from LC for $7,980.01, which includes all the bedrooms, family room and hall and says: ‘the current carpet has been water damaged and is now showing signs of mould damage. The carpet is not repairable and will need to be replaced’. The insurer says the quote is not reasonable because:  there were no measurements taken of the room  the complainants have not provided photos of damage  it has not been shown that the water damage occurred to all areas of the property. Further, CG’s report contradicts the above, when it says:  the carpets are restorable  it found no staining or visible signs of mould on the surface of the carpet, CG also notes that it was unable to complete a full assessment because the complainants would not allow the carpet to be pulled back for further inspection. The insurer says that in order for it to consider all carpets as non-restorable, it requires a full detailed report from the restorer to determine if the carpets are restorable including pictures of the damage and professional opinion. The complainants say the carpets smell and that photos will not accurately reflect the damage. While I acknowledge this, the complainants have not established that all of the carpets were damaged and require replacement. Further, CG’s report contradicts their statement. I am satisfied the insurer is not required to replace all carpets until the complainants provide information to substantiate that replacement is necessary or allows the insurer’s restorer to carry out a proper assessment. Complainants have not shown damage to kitchen caused by storm event The complainants say the insurer has not addressed the damage in the kitchen area, specifically damage to the kitchen splashback, benchtop and cupboard. They say the glass splashback was damaged when one of the complainants accidently hit it with a metal container while rushing to collect water that was leaking through the kitchen window. The complainants are also unhappy w ith the insurer’s decision to treat the damage to the splashback as a separate claim. They maintain the event is part of the same claim as they were attempting to mitigate the damage. While I acknowledge the complainants may have been attempting to mitigate the loss, there is no information to show how the damage occurred or that it was caused by the Determination | Case number: 733277 Page 7 of 18 claimed event. Therefore, I am satisfied the claim for the splashback can be considered a separate claim. The insurer’s assessor did not note any damage to the splashback or water damage to the rest of the kitchen on his attendance. However, the available material shows the insurer offered to re-assess the damage to the kitchen, including non-invasive exploration of the kitchen via a camera in the wall for thermal testing. The complainants however, were not happy for the insurer to undertake further assessment. For the reasons above, I am satisfied the insurer is not required to accept damage to the kitchen until:  it has had an opportunity to complete an assessment of the claimed damage or  the complainants provide sufficient information to establish damage caused by the storm. Insurer is not required to replace main roof The complainants say all of the damage to the main roof was caused by the storm and requires replacement. The insurer acknowledged there was some storm damage to the roof and offered to cash settle the complainants for 100 chipped/broken roof tiles as the type of tile is discontinued. It also offered an additional amount for a safety rail around the perimeter of the property. However, the insurer says it is not liable to replace the roof under the coverage for storm, as SH’s roofer reported there were several maintenance issues including:  gutters blocked in areas with mud and debris and unable to drain properly  lead flashing on front lower roof dislodged from wall due to poor installation  no lead flashing installed on lower roof which appears unfinished  failed ridge capping in several areas of cement bed and pointing which allowed water to enter the ceiling below. The roofer concluded that water entered through the roof due to a combination of storm damage to tiles, unsealed or missing lead flashing and choked gutters from lack of maintenance. The complainants provided a report from their roofer, OE, who found:  the general condition of the roof was good  the valleys, gutters and downpipes were adequate  slight cracks in the ridge mortar  approximately 200 broken/chipped tiles Determination | Case number: 733277 Page 8 of 18  holes in the sarking caused by hail and broken tiles. OE concluded the broken tiles will need to be replaced and sarking repaired. He says this is because more tiles have cracked over time due to hail including hairline cracks which will expand and contract over time, continuously opening up the cracks. OE therefore provided a quotation for replacement of the roof. As per the available material, I acknowledge the roof sustained damage from the storm. However, the available information does not show the roof was damaged to the extent that it needs to be replaced. This is because OE says there were only 200 broken tiles on the roof. Further, the complainants have not provided any other evidence to support the reason the roof should be replaced rather than repaired. OE also says the valleys, gutters and downpipes were ‘adequate’, but does not clarify whether or not they contributed to the damage. The complainants say SH’s roofer only attended to do a make -safe and questions the basis on which the insurer decided the number of tiles that were damaged. Further to the complainants’ q uery, the insurer offered to arrange another roof assessment, however the complainants refused this. Based on OE’s report, it is reasonable that the insurer should increase its settlement offer to include:  an additional 100 broken/chipped tiles  repairs to the holes in the sarking caused by hail and broken tiles. As the insurer has already offered to re-assess the main roof, I think it only fair the complainants allow a re-assessment before the insurer is required to accept any further damage claimed. Insurer is not required to replace garage roof The complainant says there is hail damage to the rear fibre cement cladding, polycarbonate skylight roof sheet, dislocated gutter and eaves lining. SH found that while the garage skylight was damaged by the storm, the rear fibre cement would not have been physically compromised. It further states the issues with the gutter were not caused by the storm but is due to faulty installation. OE also found the metal roof to the rear of the property was damaged by hail as evidence by dents tot metal sheets and ridge capping. Further, the insurer found the damage to the rear garage wall, garage gutter and side eaves is considered maintenance because:  some pre-existing damage to the metal garage roof as evidenced by previous sealant repairs to the polycarbonate skylight roof sheet Determination | Case number: 733277 Page 9 of 18  faulty installation of garage gutter and inadequate support as evidenced by missing portion of gutter in garage, with remaining gutter nail-fixed to the structure through a side wall  the policy requires an insured to keep the home well-maintained. While the insurer included the cost of replacing the polycarbonate skylight roof sheet which was damaged by the storm, it would not accept liability for maintenance issues. The policy excludes damage caused that pre-existed the claimed event and damage due to poor maintenance. In the absence of any other evidence, I am satisfied the remaining damage claimed is not covered under the policy. 2.2 Is the insurer required increase its settlement for accepted damage? The policy allows insurer to decide whether to cash settle or repair The complainants say the insurer’s proposed settlement for the accepted works is inadequate. The insurer maintains the settlement amount is correct based on the quotations and scope of works it obtained. The policy allows the insurer, in settling a claim, to decide whether to repair the damage or pay the insured what it costs the insurer to repair it. The complainants indicated a preference for a cash settlement rather than repairs. The insurer offered a cash settlement for the amount it determined its repairer could undertake the works. The insurer needs to pay the reasonable cost of repairs It is fair that a reasonable and realistic allowance be made for the costs of all the repair elements for which the insurer is responsible. It is also important to note that it appears the quotes obtained by the insurer were prepared on the basis that it would be the insurer attending to the repair work, rather than the complainant having to source his own repairer. That means he, as a retail customer, may not be able to have the work completed for the same price (such as any trade discounts available to the insurer). So, in calculating an appropriate and fair cash settlement amount, it is necessary to consider all reasonable factors, including the nature of the repairs required and whether the cash settlement will adequately ensure the complainant is able to properly complete the repairs and cover all reasonable possibilities (including cleaning and debris removal at completion of repairs). The amount should also take into account the fact the complainant loses the lifetime guarantee available if the insurer carries out the work. Determination | Case number: 733277 Page 10 of 18 The insurer has acknowledged that in accepting a cash settlement, the complainant is potentially faced with additional contingencies and unforeseen costs in assuming responsibility for privately arranging the claim related repairs. It also recognises that the complainant loses the lifetime repair guarantee benefit under the policy. The insurer therefore increased its settlement offer by 15%. No evidence to show insurer cannot complete repairs for amount offered The complainants provided a quotation from their builder (MS) for $101,573.15. Based on its assessment and scope of works, the insurer offered the complainant $25,163.69 for the remaining damage to the building, which included 15% for contingencies. I am not satisfied the amount requested by the complainants is reasonable. This is because:  while MS says the damage is consistent with storm damage, it has not provided a detailed report or evidence to support this statement  neither the complainant nor MS has shown why some accepted items require replacement rather than repair (e.g. the quotation includes a cost to replace the roof, while the available information shows it is repairable)  neither the complainant nor MS has shown that the declined items were damaged by the storm event. Further to a comparison of the complainant’s quote against the insurer’s, the insurer deducted items it did not consider were damaged by the storm and items that could be repaired instead of replaced. This is outlined in section 3.3 below. The items that the insurer accepted as part of the claim works out to $22.023.65 on the complainant’s quote. The insurer says this amount is close to the settlement amount it offered of $25,163.69. Having reviewed the available information, I am satisfied the settlement amount offered by the insurer is fair and reasonable for the items it has accepted as part of the claim. While the complainants say they obtained a detailed report and quotation from another builder for the internal damage, they have not provided a copy of this to the insurer for its consideration. The complainants say they opted for a cash settlement to allow their own tradespeople to undertake repair work. While they say this is because they have no confidence in the insurer’s builder to complete the works to a good standard, they have not provided reasons to substantiate this. Determination | Case number: 733277 Page 11 of 18 Further, when the complainants expressed unhappiness with SH, the insurer offered to appoint a different builder. However, the complainants refused this offer for fear it would delay the claims process. Having reviewed the available information, I am satisfied the insurer is not required to increase its offer of settlement because:  it is entitled under the policy to repair the damage or pay the complainant what it would cost the insurer to complete repairs  the complainant chose to opt for a cash settlement from the insurer  the insurer has shown a willingness for its builder to complete the repairs for the amount it has offered to pay the complainant  the policy contains a lifetime repair guarantee for repairs the insurer completes  the complainant has not substantiated an increase in the settlement amount or reasons for not having confidence in the insurer’s builder  the insurer has shown the amount it offered is fair and reasonable for the damage it considers was caused by the storm event. Other matters The complainants have expressed concerns with the unprofessionalism of the insurer’s representative SH. They say he was racist and coughed in the house after telling the complainants he had recently been near someone who had COVID-19. The insurer has offe red to provide the complainant’s feedback to the relevant team. The insurer is to investigate this aspect of the complaint in completion of the claim. If the complainants are not satisfied with the outcome of the insurer’s investigation, they are entitled to lodge a new complaint. Determination | Case number: 733277 Page 12 of 18 3 Supporting information 3.1 Relevant policy provisions Section Relevant wording Your re sponsibilities Page 11 You must:  keep your home and contents well maintained and in good condition. For what we mean by ‘well maintained and in good condition’, see ‘Words with special meanings’ on pages 97 to 101; What you are covered for – Insured events Page 22 S torm We cover Loss or damage caused by a storm . We do not cover …  resultant cracking to paths, driveways, any outdoor surfaces, but we will cover them if they are washed away by the storm; General exclusions Page 79 You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual de terioration such as but not limited to :  tiles and their adhesive or grouting breaking down;  weat hering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete. How we settle your claim Page 87 We choose how we settle home claims If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:  repair damage to your home; …  pay you what it would cost us to repair your home; If we repair (or pay you what it would cost us to repair), we will at our option do so on a ‘new for old’ basis or to a similar condition to what your home was in before the loss or damage occurred. We will not : … fix a fault that existed before the los s or damage occurred; Words with special meanings Page 101 Well maintained and in good condition means your home or unit and contents do not have any faults or defects that might cause loss or damage to your home and contents, loss or damage to property of others or injury to people. This includes but is not limited to the following: Determination | Case number: 733277 Page 13 of 18 Section Relevant wording  the roof does not leak when it rains  there are no areas of the roof that are rusted through …  there are no holes in floors, walls, ceilings or any other parts of your hom e or unit (e.g. external wall cladding, internal plaster, floorboards); …  there are no steps, gutters, flooring, walls, ceilings or any other areas of your home or unit that are loose, falling down, missing or rusted through;  all previous damage including damage cau sed by flood has been repaired… 3.2 Relevant information Record Key points Complainant’s expert (MS) Builder report/quotation 16 February 2020  Damage is consistent with a claimable event of Storm  Total price for supply, install and delivery $101,573.15 Insurer’s expert (SH) Revised b uilder assessment report 21 February 2020  Garage > While garage skylight has been storm damaged, the rear fibre cement would not have been physically compromised > the demise of the gutter is due to faulty ins tallation and not due to event  Boundary fences > Several panels starting to lean due to storm – noted separately as a cash settlement  Maintenance issues/prior damage: > pre - existing damage to ridge cap bedding and pointing > mi ssing lead flashing to rear tile roof > choked gutters > faulty garage gutter installation > veranda tiles faulty workmanship  Resultant damage: > w ater staining to bedroom 4 window sill – maintenance > storm damage to rear garage wall – maintenance > storm damage to g arage gutter – maintenance > storm damage to side eaves – maintenance > storm damage to front patio tiles – maintenance  repair cost $5,900 I nsurer’s expert (SH) Roofing report 21 February 2020  Tiles on the roof are discontinued  g utters blocked in areas w ith mud/debris, not draining properly  l ead flashing dislodged from brick wall and sealed  no lead flashing installed in rear lower roof  r idge capping in several areas – failed cement bed – pointing which may allow water to seep into the ceiling below Determination | Case number: 733277 Page 14 of 18 Record Key points  slight pr e - existing damage to garage metal roof w ith sealant repairs to the polycarbonate skylight roof sheet  p ortion of garage gutter missing, remaining gutter nail fixed through si de wall to structure – faulty workmanship & possible cause of gutter failure due to inadequate support  w ater entry caused by a combination of storm damage to the tiles, unsealed or missing lead flashing (faulty workmanship) and choked gutters from lack of maintenance. Insurer’s expert (DW ) Structural engineering report 16 February 2020  Within the tiled floor area, we observed no intermediate movement joints or perimeter movement joint along the western side of the verandah along the junction to the external wall of the dwelling or around the brick piers  there was no obvious impact damage to the surfac e finishes of the tiles likely to be relat ed to hailstone impact  the Australian Standard AS3958.1 – 2007 (Ceramic Tiles ) is the current standard which relates to the installation of ceramic floor tiles – this standard was not applicable at t he time of the lower level verandah tile installation (in about 2002), however the previous version of this standard gives similar information regarding the installation of ceramic floor tiles  cracking extending in the east - west direction across the widt h of the verandah at the area of the central stair was aged in appearance with spalled grouting, suggesting the crack had been present for some time  cracking extending in a south - west direction from the nort h - west corner of the central stair was aged in appe arance with spalled grouting, suggesting the crack had been present for some time  there was evidence of moss growth in the missing tile area suggesting the surface below the tile had been damp for a prolonged period  cracking floor tiles is likely to result from a combination of: > structural building movements, which can cause compression of the substrate > natural long - term tile growth over an extended period, such as from moisture vapour uptake from the environment > foundation movement, such as from natural se asonal changes in the moisture condition of clay foundation soil which can cause differential movement of the dwelling structure > movement joints – large area of tiling without apparent dedicated movement joints at the time of initial installation > other var iables – unsuitable substrate preparation, inappropriate choice of fixative, inadequate application of fixative  there was no obvious evidence to indicate a specific or singular defined event that has caused or contributed to the observed damage to the floo r tiles in this location  the cracking/damage to the floor tiles of the verandah area is not considered to be related to the event  it is considered that the cracking/damage to the floor tiles is related to the abs ence of suitable intermediate movement joint s, Determination | Case number: 733277 Page 15 of 18 Record Key points which is not in accordance with the requirements of AS3958.1  the loss of the perimeter ‘nosing’ tiles is not considered to be related directly to the event  it is considered that the loss of some of the perimeter ‘nosing’ tiles is related to poor constru ction detailing  loading on the nosing tiles such as ‘foot traffic’ or impact loading would be expected to cause the ‘nosing’ tiles to become detached due to the method of installation. Insurer’s expert (CG) Initial remediation report 20 Mar 2020  cause of damage – storm water ingress through external roof linings  damage consistent with event  resultant damage – water impact to carpet floor coverings, structural linings, contents items  contents items have been cash settled with the insured. Insurer’s expert (SH) Revised builder assessment report 8 April 2020  Dual assessment carried out with SP  Repair cost $11, 599. 57 Insurer’s expert Updated assessment report 22 April 2020  Include one extra window to remove and replace timber frame: cash settlement $750  Total $20,611.91 including Builder’s margin. Insurer’s expert (CG) Remediation report 11 May 2020  Returned to premises to inspect floor carpet coverings  carpets in bedrooms 2, 3, 5 and upstairs lounge – salvageable and 0% moisture reading  carpet floor coverings appeared to be in salvageable condition with no visible staining present to surface  technicians attempted to lift carpet for inspection of underlay but could not do so as complainant had concerns. Insurer’s expert (LC) Carpet quote 20 May 2020  Areas – bedrooms, family and hall  The current carpet has been water damaged and is now showing signs of mould damage.  The carpet is not repairable and will need to be replaced  Quote $7,980.01 Complainant’s expert (OE) Roofing report 23 Jun 2020  g eneral condition of roof is good, slight cracks in ridge mortar  d amage – broken tiles  n o related maintenance issues  i nsurable repairs – tiles to be replaced and sarking repaired  v alleys, gutters & d/pipes adequate  i nternal damage – stains to ceiling  m ultiple brok en tiles to the roof – more tiles have cracked over time since the original visit due to hail causing hairline fractures in the tiles – tiles will expand and cont ract over time, opening up the hairline cracks to the tiles – this will continue to happen and more tiles will break – some of the broken tiles are under the ridge Determination | Case number: 733277 Page 16 of 18 Record Key points capping and this will be disturbed when repairing the roof – tiles not made anymore  approximately 200 chipped or broken tiles – expect there will be more fractured tiles  d amage to the sa rking where some of the brok en tiles are – the tiles broken due to hail have pierced the sarking and caused the holes  m etal roof to the rear of the property also damaged by hail – dents to metal sheets and ridge capping  Recommendation : replace sarking across roof and replace tiles using new tiles  Quote: > $38,038 – remove tiles from roof, remove battens & sarking, supply/install new sarking and battens to roof, supply and install new tiles and ridge capping, supply and install all fixings to finish roof r epair including all safety equipment > $7,260 – remove metal roof sheets and cappings from back roof, supply and install new metal sheets, cappings and poly sheets, supply and install all fixings to complet e roof repair. Insurer’s expert Updated assessment report 10 Sept 2020  Total $25,163.69 including Builder’s margin  if the customer did not wish to be cash settled and our panel builder was to repair the property, they offer a lifetime warranty on workmanship and materials  Kitchen – there were no visible signs of water damage to the area. The on ly damage is from where the customer has broken the splash back from dropping a saucepan on the glass.  Garage – the only damage to the garage was the roof. I am unsure why the customer’s builder has quoted to replace the entire structure of the garage. This seems extreme for damage to the polycarbonate sheet on roof sheet. 3.3 Insurer comparison of complainan t’s quote Item Scope of work MS quote Insurer deduction Main roof Roof does not need full replacement & replacing 200 tiles is an acceptable repair method $10,340 $4,240 Veranda MS quote allowed for removal & replac ement of all tiles, while insurer found the damage was not caused by storm $12,570 $12,570 Determination | Case number: 733277 Page 17 of 18 Item Scope of work MS quote Insurer deduction Bedroom 1 MS quote allowed removal & replacement of cornice & plasterboard ceiling while insurer says replacement not necessary, only painting. $1,890 $1,230 Bedro o m 2 Remove and replace plasterboard wall and paint – insurer accepted damage $1,640 $0 Bedroom 3 Remove and replace cornice and plasterboard ceiling $2,745 $1,895 + 190 Bedroom 4 Remove and replace cornice and plasterboard wall $1,380 $720 1 st floor living (contents deducted from quote) Remove and replace carpet, fix floorboards, replace window architrave, remove & replace cornice and plasterboard ceiling, remove and replace light $15,620 $14,360 1 st floor foyer Remove and replace cornice and plasterboard ceiling $1,140 $780 Kitchen Inspect & report on wall behind kitchen cabinetry under window, remove and replace glass splashback and prepare and paint ceiling $2,890 $1,900 Garage Remove existing structure and replace with new to match existing structure. FF garage not damaged, only polycarbonate roof sheeting $25,000 $25,000 Boundary fence Remove and replace C olorbond fencing and waste/cleaning $6,720 Settled Sub total $80,295 $17,410 Determination | Case number: 733277 Page 18 of 18 Item Scope of work MS quote Insurer deduction Margin 15% $12,044.25 $2,611.50 GST 10% $9,233.90 $2,002.15 Total $101,573.15 $22,023.65

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.