Home / NAB / Determination 733048

Determination 733048

Development loan approved for less than sought, with funding delays and a mortgage registration error

FirmNAB
Decided2021-08-10
ProductCredit · Business lending
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss$1,000
Amount claimed—
SourceAFCA PDF

Summary

A family trust property developer complained about NAB's development loans, including the approved amount, funding delays, fees and a mortgage registration error. AFCA largely found the bank acted properly and ordered $1,000 for stress caused by the registration error.

AFCA cannot review the bank's credit risk and security decisions under Rule C.1.3, and the complainants did not establish financial loss beyond the registration-related stress.

Issues

Subjects and remedies

small businessthird party authoritypay non financial loss

Related

All NAB determinations · Find similar determinations

Text of the determination

Determination Case number 733048 Financial firm National Australia Bank Limited Determination | Case number: 733048 Page 2 of 14 Case number: 733048 27 July 2021 1 Determination overview 1.1 Complaint Company J is the trustee for a family trust. Company J and Mr J (collectively, the complainants) have lodged the complaint about business lending provided by the financial firm (the bank) to fund Company J‟s property development project. In 2015, Company J bought a parcel of land (property W). The banks lent $250,000 towards the purchase (the W loan). The W loan security comprised of cross-collateralised mortgages over property W and other properties held by Company J and Mr J jointly with his then wife, Mrs J. Loan details are set out at section 3.1 of this determination. On 10 April 2017, Company J sought an increase to the W loan to fund the cost of development of property W. On 14 August 2017, bank approved an increase to the W loan of $580,000. The complainants say this was less than the amount they applied for and was insufficient to finalise the development. The complainants say for this reason, Company J experienced cashflow issues, ultimately leading to the bank requiring the sale of security properties before releasing further funds for development. On 18 May 2018, the bank provided an additional $220,000 loan to Company J for the development. A chronology of key dates is outlined at section 3.2 below. The complainants say the bank ‟s actions caused the m to incur loss, including because the bank:  failed to register mortgages over property W until 2017 causing delays  breached obligations relating to the W loan as it did not have proper authority to deal with Mr J‟s wife (Mrs J) on the account  unreasonably delayed the release of loan funds in 2017  approved less funds than requested and engaged in misleading conduct including about the amount it would approve in 2017 for the development  imposed additional contract conditions without written agreement  breach of obligations relating to the overall lending structure, including security required, extensions applied, settlement and discharge fees incurred, closure of a related facility G loan and engaging with a representative who had a conflict of interest. On 15 March 2021, the case manager provided a recommendation on these issues. The recommendation was substantially in favour of the bank and a copy of it is attached to this determination. The complainants rejected the recommendation for the reasons set out in section 2.2. I have reviewed the available information o n the file including the complainants‟ concerns raised in response to the recommendation provided. 1.2 Issues and key findings Were the findings in the recommendation correct? Based on all the relevant information, the findings in the recommendation were correct and are adopted in this determination. I have considered further submissions provided after the recommendation. Determination | Case number: 733048 Page 3 of 14 Do the complainants ’ further submissions change the outcome? I have considered the complainant‟s further submission s, but they do not change the outcome for the reasons set out in section 2 below. I agree with the case manager‟s reasons for the recommendation and the recommended outcome. Why is the outcome fair? The events the complainants describe are unfortunate and I understand the complainants have been through a difficult period where some of the issues were out of their control. But when the bank provided the W loan and increases, it met its legal obligations, acted in line with good industry practice, and complied with applicable industry codes. In these circumstances, it would not be fair to require it to compensate the complainants any more than has been provided within the recommendation. 1.3 Determination This determination is substantially in favour of the bank. I agree with the case manager‟s reasons for the recommendation and the recommended outcome. If the determination is accepted by the complainants within 30 days, then within 14 days of that acceptance the bank should pay $1,000 compensation for non-financial loss into an account nominated by the complainants. The $1,000 compensation is for the stress and inconvenience caused by the delay in registering the correct mortgage on W property. If the complainants do not accept this decision, then the bank is not required to pay any compensation to the complainants. Determination | Case number: 733048 Page 4 of 14 2 Reasons for determination 2.1 Were the findings in the recommendation correct? The findings of the recommendation were correct I am satisfied that the case man ager‟s r ecommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the rules and any relevant law. The findings in the recommendation are correct and are adopted in this determination. As I agree with the contents and finding of the recommendation it is attached to this determination and its findings are adopted into this determination. I will not repeat its contents in this decision. 2.2 Do the complainants ’ further submissions change the outcome? All the relevant information including t he complainants‟ further submissions have been reviewed and they do not change the outcome. The complainants rejected the recommendation In response to the recommendation, the complainants wrote to AFCA outlining their response and rejection of the recommendation . The complainants‟ reasons generally reiterated their claims which were already dealt with adequately in the recommendation and included the following:  the W loan was delayed by the failure by the bank to register the W property title and mortgage properly  the requirement for pre-sales was not the cause of delay of the W loan approval  the bank knowingly underfunded the W loan and it failed to fund management fees without telling the complainants  the recommendation incorrectly stated neither party provided a specific application amount for the W loan. The bank did specify $952,944 as an amount required within a document  the bank requested information and dealt with Mrs J without notifying Mr J or obtaining his consent  AFCA was not entitled to rely on the bank‟s Commercial Real Estate Credit Appetite Statement policy excerpt. I have reviewed all the relevant information including the complainants‟ submissions and the above rejection grounds in this determination. Most of the issues raised were adequately dealt with in the recommendation but I make the following comments in relation to the submissions. The W property title registration delay did not delay the W loan approval The complainants say, „… [t]he bank could not approve the W loan until it had registered its mortgage on the W property title ‟. The available information shows that in fact for the original funding of the 2015 W loan, the bank funded the loan without having registered its security interest in the asset through a mortgage. The bank made no error that caused a loss to the complainants in doing so. Lenders are not required to necessarily lodge a mortgage before they fund a loan. Whether the bank obtains security for a loan (and registers it correctly) is also a commercial risk Determination | Case number: 733048 Page 5 of 14 decision for the lender. It obtains security and registers it for its own benefit, not for the borrower. There is no information to show that the delay in registration of the security over W property caused a delay in funding or any other financial loss to the complainants. The complainants also refer to an email from the AFCA case manager to the bank on or around 9 December 2020 which they claim supports their position. The case manager was clarifying the bank‟s response to the following question: Does [the bank] consider that it would be neither diligent or prudent to provide credit to a borrower for the purpose of property development who is not the registered proprietor of the subject property? The bank responded saying it was an „innocent mistake‟ in referring to the failure to discharge the vendor‟s mortgage in 2015 over W property . The case manager responded noting whether it was innocent does not take away from whether it was an error. I have reviewed the case manager ‟ s statements referred to by the complainant. These statements were made when the case manager was in the process of investigating the complaint. This was prior to the case manager‟s investigation being completed and addressed in the recommendation. The statements did not constitute a final formal view or decision by AFCA. Although it is acknowledged an error occurred for which the bank should pay compensation to the complainants for the stress and inconvenience, it did not cause a financial loss. The complainants also state that the bank paid their solicitor to lodge the caveat on the title which delayed the registration of title. However, the bank acted reasonably in advising the complainants to lodge a caveat to protect their interests. Based on the information available, any further delay to the transfer of land due to the caveat still being on title cannot be attributed to a bank error. The bank did not unreasonably delay the W loan approval The complainants note a statement made by Banker M in the deferral comments of the credit memorandum in their rejection submissions. The statement was that „… a back payment of $30k management fee will be seen at approval.‟ The complainants claim this statement is an acknowledgement of the title registration delay causing the W loan delay. This comment was made by the banker, not the credit manager, in the context of a deferral. That means the loan application memorandum was referred back to Banker M for further comment from the credit manager. The comments made do not constitute the final position of the bank and it is not a comment that would be included in a letter of offer. Ultimately, the management fees were not included in the loan offer. The complainants make further claims regarding the delay in registering the title and mortgage once the parties became aware of the matter. The recommendation considered this matter and I agree with its analysis and the non-financial compensation award to Mr J is appropriate. The application did not commence until the required pre-sales were obtained The complainants also claim the 26 July 201 7 email from Banker M to Mrs J “ confirms that [banker M] was proceeding from that date without needing pre-sales based on the strong security position with the other properties, and how well the last stage sold.” I disagree with this interpretation of the email. The complete paragraph within the email states: Determination | Case number: 733048 Page 6 of 14 Ongoing negotiations at this point with my credit manager, I am making progress however, should know more this afternoon or tomorrow. Banks are very hesitant to extend funding without the needed pre sales, but I am making the case based on the strong security position with your other properties, and how well the last stage sold. Accordingly, I do not accept the bank indicated to the complainants that the pre-sales were not required in 2017. The complainants say pre-sales would not have become apparent until after banker M had progressed his submission. This statement is inconsistent with the above claim and the several emails between the bank and both Mrs J and the complainants‟ solicitor. The complainants‟ solicitor was sending the bank the contracts for the pre-sales as they were obtained. The chronology within the recommendation has further details in this regard. In relation to the complainants‟ claim that the pre -sales issue did not delay the loan application in 2017, the available information shows the bank repeatedly and consistently advised of its preference to obtain pre-sales prior to an application formally commencing in 2017. As explained in the recommendation, the application did not commence until the complainants provided it with evidence of the pre-sales it required, at which time the application proceeded. Whether or not the bank sought to obtain pre-sales was a market risk issue. Market risk is one risk element amongst others in loans of this type, which include debt servicing risk and developer risk. As a whole, these elements form an overall „credit risk‟. In this case, the bank requested pre-sales as it wanted to be satisfied that it would be repaid its funds from a credit risk perspective. The complainants‟ rejection grounds do not change th e substantive facts of the case and findings within the recommendation that despite the delay in the title registration, the complainants had not provided the necessary pre-sales for the application to commence. The title registration delay and the time taken to obtain the pre-sales for five of the 12 lots may have coincided, but it does not mean the title registration was to blame. I agree with the recommendation‟s findings that the time taken to obtain the pre-sales was among the reasons for the delay in starting the loan application process. It has not been shown the bank underfunded the W loan in error The complainants claim that the bank should have funded the management fees for the development and underfunded the project in error. They refer to the several comments made by Banker M in the 2 August 2017 credit memorandum that refer to management fees being funded. As is good banking practice, a management fee will typically only be included within the loan funds if an external qualified project manager is used in this type of development. In this case Mr J himself was to be the project manager. The bank said on 15 October 2020: The $580k was based on costs associated with the as [sic] outlined in the application, which excluded personal costs – noting the customer refers to these costs as Project management fees but they are a „cover‟ for personal expenses as he is the technically just managing his own business – not paying another employee as a project manager. The 2 August 2017 credit memorandum was not a credit approval memorandum. Despite any comments made in the memorandum, the bank was not obligated to fund management fees and it ultimately did not do so. It has not been established that this was an error by the bank. Determination | Case number: 733048 Page 7 of 14 The terms of the loan provided in August 2017 were clearly disclosed to the parties including the complainants when they accepted the loan. There is no clear information to show that the complainants sought funding of more than $580,000 in mid-2017. The relevant information shows the complainants understood this was the application amount prior to the loan application commencing. Although the complainants say that there is a bank document referencing a higher amount, there is no information to show that any higher amount was ever applied for or approved. The bank had sufficient information to show the project could be progressed based on the loan amount applied for and approved. The complainants also say that incorrect data had been inserted by the bank into the loan application process including the gross realisable value. They say that if the bank had not make this mistake, it would have used a higher gross realisable value and the bank would have funded the higher amount of up to $985,000. I do not accept this position. There is no information to show that, but for the gross realisable value figure, the bank would have approved a higher loan amount. Nor has it been shown that this would have changed the complainants‟ financial position or otherwise avoided some loss. Therefore, while I have not reviewed whether the figure entered was a mistake, I consider this claim to be somewhat speculative and AFCA is not able to provide an outcome based on speculation. Accordingly the assertion does not progress the complainants‟ claim. Mrs J had authority to deal with the bank regarding the W loan The complainants made several statements in their rejection submission regarding the claim that the bank requested information from Mrs J without informing Mr J. This included, „[t]he real question is, did the bank have authority to deal with Mrs J behind my back?‟ The bank did not need to obtain explicit consent from the complainants to establish that Mrs J had authority to deal with it regarding the W loan. The operation of implied actual authority and ostensible (apparent) authority were explained sufficiently within the recommendation. As I agree with the recommendation and it is attached to this decision I will not repeat them again. I also agree with the reasoning and information included within the recommendation and will not repeat them here. In addition, I consider it appropriate and fair to make the following further points. There has been no claim made that Mrs J signed anything improperly and there is no information to show that she did so. Mrs J was clearly the point of contact for the bank regarding the W loan as: > there are no emails between the bank and anyone other than Mrs J and the complainant‟s lawyer prior to loan funding. In particular, there are no emails or any other evidence of communication between Mr J and the bank > the bank sent an email to Mrs J and the complainants ‟ lawyer on 29 May 2017 addressing both of them and Mr J, collectively. Presumably, if this were a matter of concern, the complainants ‟ lawyer would have advised Mr J > the bank was liaising with the complainants ‟ lawyer regarding some matters for the W loan and the W property, however there is no evidence within these emails that the lawyer was the main point of contact in seeking funding and the complainant‟s agent regarding the application for the W loan. Whether Mrs J was involved as a project manager in the business venture or had any skills in this area does not negate that she was, evidently, the main point of contact and the complainants‟ agent . That the complainants entrusted a person with no skills as a project manager is a business risk they decided to take. The bank itself considered the skills of Mrs J in the credit memoran dum (page 8). It stated, „[Mr J] drives the day to day operations on the Determination | Case number: 733048 Page 8 of 14 site, however [Mrs J] is also well versed in this work. ‟ The bank considered the „key management business risk‟ as „low‟. Mrs J gave a guarantee for the initial funding of the W loan in September 2015 and the W loan increase in August 2017. As a guarantor she had more rights, not less, within the Banking Code of Practice to be notified of any changes to the loan and the bank was in fact obligated to notify her of the variation. Notification occurred through her arranging the loan and signing the loan variation guarantee. The available information does not support Mr J’s position he did not know Mrs J was liaising with the bank Mr J says he was not aware the bank was discussing the application with Mrs J in 2017. However the available information shows he is likely to have been aware because: > He also states in the same paragraph that he „was under considerable stress at that time [when he signed the letter of variation in August 2017] because of the losses incurred resulting from the registration delay‟. But there is no information provided to show him communicating with the bank about this or about any other matter before the loan was funded > As Mr J was not liaising with the bank in relation to the funding, he must have known Mrs J was dealing with the bank on behalf of the company > He accepted the loan and therefore agreed to be bound by the terms of the agreement, regardless of any previous communication between Mrs J and the bank > There is no contemporaneous information that he raised concerns about Mrs J‟s involvement or the loan amount being insufficient at the time. In addition, the privacy laws including the Australian Privacy Principles (APPs) do not apply to companies and corporate trustees. The bank did not breach the confidentiality of the company as it is accepted based on all of the above (and those further reasons within the recommendation) that Mrs J was the complainants‟ agent and it was reasonable for it to do so. There is no information to support the claim that the bank was liaising with Mrs J without Mr J‟s knowledge . AFCA has exchanged all relevant information including the bank’s policy excerpt The complainants say that the recommendation „relies heavily on the excerp t o f the bank‟s policy‟ and this is not in accordance with AFCA Rules 10.4 and 10.5. These rules are set out in section 3.3 below. In summary, these Rules provide that:  if the information is not shared, AFCA cannot rely upon it when reaching a decision including a recommendation about the complaint  a party claiming there are special circumstances why information should not be shared with the other party must give sufficient reasons. Or suggest how the other party can be given an opportunity to respond to the information insofar as it is relevant to the complaint. In this case, on 8 January 2021 AFCA requested the bank provide the complete policy document that was referred to in a previous email. The bank did not provide the complete document. It said the complete document was commercially sensitive. Instead, on 16 January 2021 it provided relevant excerpts of the policy within a tailored document (the „policy excerpt document‟) that included other submissions. AFCA assessed this document and determined that the complete policy document was not required. AFCA exchanged the relevant policy excerpt document with the complainants on 25 January 2021 after obtaining consent from the bank. In the recommendation, AFCA did not Determination | Case number: 733048 Page 9 of 14 rely on any policy or section of policy that was not exchanged with the complainant as it did not receive any other policy documentation. The complainants also said in an email to AFCA dated 13 April 2021, „[s]urely the complete [policy] document needed to be provided?‟ . I have reviewed the circumstances of this complaint including the original claims and the rejection grounds made by the complainants. I have accordingly also reviewed the policy excerpt document and I am satisfied that it was sufficient for:  the bank to rely on it in making its claim regarding its application of the policy  the AFCA case manager to rely on in making the recommendation; and  for me to rely on in making this determination. The correct contracts were referred to in the recommendation As part of the complainants‟ rejection, they said „the 2015 and 2016 conditions of contract were referred to, these were not the applicable contracts.‟ . The complainant did not provide any further information to substantiate this claim. I have reviewed the contracts referred to in the recommendation and those contracts held by AFCA. I am satisfied that the correct contracts and applicable contracts conditions were referred to within the recommendation. 2.3 Why is the outcome fair? The outcome is fair as the facts and law have been considered appropriately The outcome is fair in all the circumstances because the bank met its obligations as a diligent and prudent lender and it has not been shown that the bank caused the complainants any loss beyond that set out in the recommendation. Determination | Case number: 733048 Page 10 of 14 3 Supporting information 3.1 Relevant loan details Date approved Loan reference Loan Type Borrower Loan amount 28/04/2014 RR loan Business Markets – Flexible Rate Loan Mr J & Mrs J $487,000 8/05/2014 G loan (*696) Market Rate Facility Company J ATF Family Trust $394,000 16/09/2015 (variation) 14/08/2017 W loan (*719) Market Rate Facility Company J ATF Family Trust $250,000 +$580,000= $830,000 18/05/2018 *176 Market Rate Facility Company J ATF Family Trust $220,000 3.2 Chronology Date Key points 28 April 2014 RR loan approved 8 May 2014 G loan approved 26 May 2014 G property purchased 16 September 2015 W loan approved for W property purchase 3 January 2017 Bank provides letter of advice extending expiry of G loan and W loan to 31 December 2017 7 April 2017 Discussion for additional funding for W loan commenc ed, according to complainant 29 May 2017 The complainants‟ solicitor notified the bank that the transfer of land and mortgage registration for property W was not completed Error in trans fer of land and mortgage registration for Property W acknowledged by bank Banker M emails the complainants‟ solicitor at the time, Mr P, twice and includes Mrs J‟s email address as a participant. In the second email of that day from bank sta ff member M, the subject line of the email is „RE:[Company J – Property W]. the Determination | Case number: 733048 Page 11 of 14 first line of the email is addressed to Mr P, Mrs J and Mr J Mr P lodged a caveat (*963) on the title of property W 30 May 2017 1x property W proposed lot cont ract of sale si gned 1 June 2017 2x property W proposed lot cont ract of sale signed 15 July 2017 1x property W proposed lot cont ract of sale signed 26 July 2017 Banker M emails Mrs J: Ongoing negotiations at this point with my credit manager, I am making progress however, should know more this aft ernoon or tomorrow. Banks are very hesitant to extend funding without the needed pre sales, but I am making the case based on the strong security position with your other properties, and how well the last stage sold. 27 July 2017 Banker M emails Mrs J, he states „on top of the $580K we are funding, what have you already spent on that block for development.‟ He also asks for „another copy of the costing‟s document‟. Mrs J replies the following day „I have attached an excel spreadsheet with what we have put into the development so far‟ 2 August 2017 Credit memo submitted by Banker M for W loan. It states (page 12): Part of the development cash flow is a project managers fee which is $10k per month, which is paid to our cust omers. This is more than sufficient to cover interest costs for the duration of this transaction and sale of properties. Complainants signed a privacy and confidentiality consent form for the W loan application/ variation 3 August 2017 Banker M emails Mrs J and advises „release from [property W vendor] is in my possession. Lets sign some mortgages tomorrow?‟ 1x property W proposed lot cont ract of sale signed (t otal of five now obtained) 4 August 2017 Banker M emails Mrs J with an update on the application and requests a statement of position and evidence of the borrowers tax being up to date 7 August 2017 Banker M emails Mrs J advising of a temporary $50,000 on Company J account *532 Trans fer of title for property W to Trustee *666 Mortgage *683 lodged on property W 14 August 2017 Letter of variation – W loan – $580,000 increase Mr J on behalf of Company J signed the letter of variation on for the loan amount of $580,000 Determination | Case number: 733048 Page 12 of 14 13 Sep 2017 Caveat *963 cancelled 14 Sep 2017 Trans fer of title for property W to Trustee *666 on 7 August 2017 withdrawn Trans fer of title for property W to Company J ATF J Family Trust Mortgage *683 lodged on 7 August 2017 re - ent ered Mortgage *166 lodged on 14 September 2017 31 December 2017 Bank provide letter of advice extending G loan expiry to 31 December 2017 18 May 2018 Loan *176 approved 4 June 2018 The bank sent Mr J an email stating that the funds provided in facility *176 were to be provided with additional conditions including BICOE (c onstruction loan conditions ). 12 June 2018 Loan *176 funds released 21 May 2018 G loan and W loan expiry date varied to 31 July 2018 20 July 2018 The G loan and W loan facilities closed 30 July 2018 Settlement fees applied to transaction account (*532) of $4,150 including: 11x $200 (settlement fees) = $2,200 13x $150 (discharge fees) = $1,950 14 Sep 2018 The bank advised the complainants in an email: [the bank] does not lend funds for personal living expenses. 17 July 2020 Managing partner for the G branch stated in an email: We provided adequate funding as per the budget submitted, however customer failed adhere to the funding usage noting significant funds utilised for personal living expens es. Customer also failed to allow sufficient funds for works and d id not get a QS report. 17 August 2020 Complainants‟ chronology document dated 27 August 2020, Mr J states: I was not receiving my project management fees that I needed for my personal expenses, loan fees and business expenses. 6 October 2020 Complainant s advise AFCA: [the bank] new my only source of income was from project management of the development but failed to include the $120,000 fees in the approved funding. [the bank] also approved a management fee back payment of $30,000 (to the 1st May 2017) but failed to release those funds. Determination | Case number: 733048 Page 13 of 14 … The project manager fee was omitted from the project expenditure (page 9) [of the credit memo] it was included in my personal earnings (page 14). 15 October 2020 The bank advised AFCA: The $580k was based on costs associated with the as outlined in the application, which excluded personal costs – noting the customer refers to these costs as Project management fees but they are a „cover‟ for personal expenses as he is the technically just managing his own business – not paying another employee as a project manager. 3.3 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted our determination to the issues that are relevant to the outcome. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established. 3.4 Relevant AFCA Rules A.10 Information sharing and opportunity to make submissions A.10.4 Despite rules A.10.1 and A.10.2, AFCA need not provide a party with access to relevant information, if the party that provided the information does not consent to the information being shared with the other party and tells AFCA this when they provide the Determination | Case number: 733048 Page 14 of 14 information. However, if the information is not shared AFCA cannot rely upon it when reaching a decision about the merits of the complaint, unless special circumstances apply. A.10.5 A party claiming special circumstances should give reasons why the information should be taken into account without being shared with the other party, and should suggest how the other party can be given an opportunity to rebut the information to the extent it is relevant to the complaint. (page 14 of AFCA Rules issues 25 April 2020; this version of the Rules is applicable as the complaint was lodged on 22 June 2020) Recommendation Case number 733048 Financial firm National Australia Bank Limited Determination | Case number: 733048 Page 1 of 18 Case number: 733048 15 March 2021 4 Overview 4.1 Complaint This complaint is about business lending that was provided for property development. Company J as trustee for the J Family Trust was a property developer. The sole director of Company J was Mr J (collectively, the complainants). The complainants bought a parcel of land (property W) in 2015 with $250,000 funding (the W loan) from the financial firm (the bank). This funding was secured by cross-collateralised mortgages over property W and other properties. Further details on the loans is at Section 3.3 below. On 10 April 2017, the complainants sought an increase to the W loan to fund the costs for development of property W. On 14 August 2017, bank approved an increase to the W loan of $580,000. The complainants say this was less than the amount applied for and was insufficient to finalise the development. This caused cashflow issues that ultimately led to the bank requiring the sale of security properties before releasing further funds for development. The bank provided an additional $220,000 loan to the complainants on 18 May 2018 for the development of property W. A chronology is at section 3.4 below. The complainants say the bank:  breached obligations relating to the W loan, being that it: > did not have authority to deal with Mr J‟s wife, Mrs J > unreasonably took 116 days to release W loan funds in 2017 > approved less funds than the amount requested > misled them about the approval of the W loan, including the amount that would be approved > took another 200 days to release the additional funds for property W and this was unreasonable > unreasonably would not release funds until other, cross-collateralised properties were sold, which forced the properties to be sold for under market value > added contract conditions to the additional loan without written agreement by the parties  breached obligations relating to the overall lending structure, being: > inappropriately took Mr J‟s son‟s property as security for the loans > was not entitled to apply short-term extensions to the loans > incorrectly charged settlement and discharge fees > the G loan was improperly closed out with the W loan > that its representative had a conflict of interest  has caused the complainants loss. Determination | Case number: 733048 Page 2 of 18 4.2 Issues and key findings Did the bank breach obligations relating to the W loans? No, the bank did not mislead the complainants, it was entitled to deal with Mrs J, and acted in accordance with the W loan contract terms. The available information shows there was a delay in the bank transferring title of a property, however this did not cause a delay in funding. Did the bank breach obligations relating to the overall lending structure? The bank was entitled to make its own assessment with respect to the security it required, acted in accordance with the applicable contract terms and conditions, and there is no information to suggest the bank‟s representative had a conflict of interest. The bank did fail to notify the complainants of short-term loan extensions. Did the bank’s conduct cause the complainants a financial loss? No, the bank‟s conduct did not cause the complainants a financial loss. Although the bank failed to notify the complainants of the short-term extensions, the complainants benefitted from the bank‟s actions. I accept the bank‟s delay in transferring title caused Mr J stress and inconvenience and the bank should pay $1,000 for non-financial loss. 4.3 Recommendation This recommendation is substantially in favour of the bank. If this recommendation is accepted by both parties within 30 days, then within 14 days of acceptance the bank should pay the complainant $1,000 into a nominated bank account. Determination | Case number: 733048 Page 3 of 18 5 Reasons for recommendation 5.1 Did the bank breach obligations relating to the W loans? The bank did not breach obligations to the complainants relating to the W loans. Mrs J had authority to deal with the bank regarding the W loan The complainants say that Mrs J did not have authority to deal with the bank regarding the application and approval of the W loan. Authority can be extended by a company in two ways:  implied actual authority – where authority is inferred from the circumstances of the relationship and the conduct of the parties  ostensible (apparent) authority – where a company makes a representation to a third party that one of its agents has authority to contract with it when in fact, the agent does not. In the circumstances of this complaint, I consider that the information establishes Mrs J had both implied actual authority and ostensible authority to deal with the bank about the W loan, being:  Mrs J was Mr J‟s wife at the time of the loan application to approval  at no time before or after approval did Mr J instruct the bank that it was not to liaise with Mrs J  Mrs J was involved in the business as a project manager and her email address was clearly an address associated with the business  Mrs J was emailed on multiple occasions by the bank staff about the status of the W loan application and the queries leading up to the W loan‟s approval, see the chronology at section 3.4 including: > 29 May 2017: bank staff member M emails the complainants‟ solicitor at the time, Mr P, twice and includes Mrs J‟s email address as a participant. In the second email of that day from bank staff member M, the subject line of the email is „RE:[Company J – Property W]. the first line of the email is addressed to Mr P, Mrs J and Mr J > 27 July 2017: bank staff member M emails Mrs J, he states „on top of the $580K we are funding, what have yo u already spent on that block for development.‟ He also asks for „another copy of the costing‟s document‟. Mrs J replies the following day „I have attached an excel spreadsheet with what we have put into the development so far‟ > 3 August 2017: bank staff me mber M emails Mrs J and advises „release from [property W vendor] is in my possession. Lets sign some mortgages tomorrow?‟ > 4 August 2017: bank staff member M emails Mrs J with an update on the application and requests a statement of position and evidence of the borrowers tax being up to date > 7 August 2017: bank staff member M emails Mrs J advising of a temporary $50,000 on Company J account *532  Mr J, on behalf of Company J, signed the letter of variation on 14 August 2017 for the loan amount of $580,000. Determination | Case number: 733048 Page 4 of 18 I also note that the complainants use several of the emails between Mrs J and the bank to in relation to other claims in this complaint. Based on the above, Mrs J had authority to deal the bank with respect to the W loan. Mr J‟s acceptance of the letter o f variation is significant because it provided confirmation of Mrs J‟s authority to discuss the application. Accordingly, I find Mrs J was an agent of the complainants regarding the W loan. The bank delayed transferring title but this did not affect the W loan’s approval On 29 May 2017, the complainants‟ solicitor notified the bank that the transfer of land and mortgage registration for property W was not completed. The complainant‟s solicitor lodged a caveat the same day to protect Company J‟s interest. Generally, it is diligent and prudent for a funding bank to complete these actions within one or two months of settlement. Here, the error was identified approximately two years after settlement. The bank acknowledged its error and endeavoured to complete these actions as soon as practicable. The bank promptly transferred the title, but there was a further delay of about 38 days before the mortgage could be registered. This arose because of the complainants‟ caveat. From the available information, the bank ‟s failure to transfer title and register the mortgage did not affect the funding of the W loan. The loss arising from the bank‟s conduct is discussed in further detail at section 2.3 below. The bank did not delay funding the W loan The complainants say there was an unreasonable delay in funding from 10 April 2017, when the W loan was requested to approval on 14 August 2017. The bank says that pre- sale contracts of property W‟s subdivisions were required before the loan application process could start and the W loan was approved shortly after these were received. To support its position, the bank has provided excerpts of its Commercial Real Estate Credit Appetite Statement (Policy). The Policy outlines the minimum committed pre-sales required for an application for property development to proceed. The Policy required 1.2x debt cover from net pre-sales for a conservative loan to value ratio – which the bank considered applied here. The complainants obtained five pre-sales contracts and provided them to the bank on 3 August 2017. The bank considered this was sufficient to commence the application pursuant to its Policy and noted a reduced debt cover of 1x was appropriate based on the borrower being an experienced developer. The W loan was offered on 14 August 2017 via a letter of variation. This occurred 12 days after the complainants provided the pre-sale contracts required for the application to proceed. I consider this is a reasonable amount of time for the bank to consider and approve the W loan application. The complainants say that: lending is based on equity, if a developer has sufficient then he does not need pre- sales, I have never been required to provide pre-sales Determination | Case number: 733048 Page 5 of 18 They further say the Policy: shows that if total development costs were under < 2M then normal DCA [Delegated Commitment Authority] applied and pre-sales did not apply. The DCA refers to the specific banker‟s delegated authority to lend funds. It refers to the internal process required, depending on the amount of funds sought and whether it is higher or lower than the DCA. This is an internal processing policy and does not relate to how a bank makes its credit decisions. Further, from at least 26 July 2017 the bank specifically advised the complainants: Banks are very hesitant to extend funding without the needed pre sales. Based on the above the bank complied with its Policy and did not make any error or breach any obligation it owed to the complainants by requiring pre-sales for the application to formally commence. The bank did not unreasonably delay approving the W loan. The parties dispute the amount of credit requested The complainants say they requested $717,000 (alternatively, $650,953 +GST). The bank says the amount applied for, and approved, was $580,000. Neither party has provided a loan application demonstrating that a specific amount was applied for. There is a cash flow projection for the development provided by the complainants. This shows a peak debt of $650,953 pending settlement of the first confirmed sale. If goods and services tax (GST) is added to this amount, the peak debt is $716,046. However, there is no identifiable mention of GST in the projections. The bank‟s credit memorandum dated 2 August 2017 (credit memo) states the complainants seek funding of $580,000 to complete the subdivision of property W. The lending submission prepared by the banker and the deferral and approval notes prepared by the credit manager also include the same amount. The difference between the amount the complainant says was requested and what the bank approved appears to relate to approximately $120,000 for Mr J‟s „project management fees‟. The bank says: The $580k was based on costs associated with the as (sic) outlined in the application, which excluded personal costs – noting the customer refers to these costs as Project management fees but they are a „cover‟ for personal expenses as he is the technically just managing his own business – not paying another employee as a project manager. During a conciliation conducted by AFCA, the complai nants‟ legal representative stated: [Mr J] relied on those fees for his own personal funds and to pay off company interest until the titles were free. In any event, the the disputed loan amounts are ambiguous as to their basis and do not clearly correlate with the project management fees or GST. Based on the conflicting positions and the limited contemporaneous information, I am unable to ascertain what level of funding was discussed between the parties. However, the available information indicates that the complainants subsequently were made aware that the bank intended to approve $580,000, as discussed further below. Mrs J was aware the bank considered the loan amount requested was $580,000 Communication between the parties leading up to loan W‟s approva l show the bank intended to approve $580,000. On 27 July 2017, the bank sent an email to Mrs J that included: Determination | Case number: 733048 Page 6 of 18 On top of the $580k we are funding, what have you already spent on that block for the development. Mrs J , the complainants‟ agent, replied to this email and did not raise issue with the stated amount of credit being sought. Further, Mr J signed the business letter of variation that outlines the amount of funding being offered to the Company J was increasing from $250,000 to $830,000 (the difference being $580,000). There is no information to suggest the complainants raised concerns with the amount of funds on either 27 July 2017 or on receipt of the letter of variation. Mr J says: At the time I had no option but to accept the offer because of the increasing costs being incurred while the development works were being delayed and I had no income. However, there is no contemporaneous information to support that the complainants considered the funds were insufficient at the time they were provided. In the circumstances, I consider the complainants were aware the bank intended to provide $580,000 at the W loan was provided. The bank did not mislead the complainants about the amount that would be approved The complainants say the bank misled them to believe the W loan would be approved for $717,000, rather than the $580,000. To establish misleading conduct, a complainant must show:  the financial firm made a statement or engaged in conduct that was (or was likely to be) misleading and deceptive (misrepresentation)  the complainant relied on the misrepresentation to change their position, and  the complainant suffered loss as a result. The complainants claim that oral representations were made by bank through its representative, Banker M, to Mr J that: [the bank] considered the development good and that I had sufficient security and they had security over all my other real property. The complainants also refer to an email Banker M sent to Mrs J on 26 July 2017 which stated: Ongoing negotiations at this point with my credit manager, I am making progress however, should know more this afternoon or tomorrow. Banks are very hesitant to extend funding without the needed pre sales, but I am making the case based on the strong security position with your other properties, and how well the last stage sold. Mr J also says that Banker M was „enthusiastic‟ and said there „would be no problems‟ providing the required funds. I do not consider these communications amount to misleading conduct for the following reasons:  the bank‟s security position is only one factor it will consider before it provides credit to a prospective borrower  there is no corroborating documentary information that there was a statement made that there would be „no problems‟ in providing the funds  a banker being enthusiastic about a loan being provided does not mean it will be provided Determination | Case number: 733048 Page 7 of 18  the email above clearly states that approval is still needed from the credit manager and includes an unambiguous caveat that pre-sales are generally needed  there is no information to suggest that an amount of $717,000 would be provided  Mr J was an experienced commercial builder who should have reasonably been aware the loan would not be provided based solely on these statements. There is no evidence of delay in approving the additional W loan funds The complainants claim the bank caused a further 200 day delay in providing additional funds to complete the development. Mr J says that on 1 February 2018: I required [the bank] to supply funds for payment of the $181,485 council infrastructure charges, this payment was required prior to Council starting the process to sign off the development and release the titles There is no information that shows a request or application for these additional funds was made on this date. However, there is an internal form dated 28 February 2018 referring the complainants to the bank‟s specialised business unit. The form refers to the complainants having proposed an additional request for $313,000 to complete the development. The complainants varied two existing contracts and signed a new loan contract on 22 May 2018 for $220,000 (2018 funds). The purpose of the new facility was primarily to fund the council infrastructure charges. If 1 February 2018 is accepted as the date of the request, the request was approved 111 days later (3.5 months). Generally, business lending is not as straightforward as consumer lending. There are additional considerations that must be made by a lender. In this case there was also a separation between M rs J and Mr J and this affected the bank‟s security position (Mrs J was a guarantor for all debt). In the circumstances, I do not consider the bank unreasonably delayed the approval of the additional funds. The bank did not unreasonably delay the release of the 2018 funds The bank released the 2018 funds on 12 June 2018. The bank itself made the payments that the 2018 funds were required for, including the council infrastructure charges. Other payments included legal fees for easements, defect rectifications and various business costs. The drawdown was approximately $196,500. The funds were released 22 days after the contract date. I do not consider this was an unreasonable amount of time to release the funds given the specific and several payments that were required to be made and that the bank made the payments itself. The bank was entitled not to release the additional funds as a credit decision The complainants say the bank unreasonably would not release the additional funds until other, cross-collateralised properties were sold, which forced the properties to be sold for under market value. The bank lent money to the complainants with the mutual, contractual understanding that it was to be repaid before or by the loan expiry dates. These loans were provided by the bank with the condition that they were secured by various assets. The complainants sought additional funding to complete the W property development. The bank appears to have been unwilling to lend additional funds until it had been repaid for the other loans (G loan and C loan) through asset sales. The bank was contractually entitled to Determination | Case number: 733048 Page 8 of 18 recoup its loan funds before or by the loan expiry dates (and it was contractually entitled to vary the expiry dates), refer to Section 3.7. There is also no obligation for the bank to lend funds to an existing customer that requests them. As with the $580,000 variation to the W loan, the bank was entitled to make a decision to lend credit based on its appetite for exposure to risk. It is incorrect to describe these events as a forced sale. At all times, the complainants remained able to refinance if they did not want to proceed with the contractual relationship they had with the bank. The complainants arranged for the sale of the properties themselves, so whether they were sold under market value is a matter for the complainants. It is irrelevant to the agreement made between the parties and the associated terms and conditions. Refer to section 2.2 below for further discussion regarding the closure of the G loan. The bank was contractually entitled to include further building and constructio n loan conditions (BICOE conditions) The complainants say the bank added BICOE conditions to the 2018 funds without written agreement between the parties and it was not entitled to do so. The letter of offer for the 2018 funds were signed by the bank on 22 May 2018, this did not include BICOE conditions. On 4 June 2018, the bank sent Mr J an email stating that the 2018 funds could only be provided with additional conditions including BICOE. The bank provided AFCA with the terms and conditions applicable to its business products. These include the following term: 7 Variation and notice provisions 7.1 Changes [bank] may make: (a) In addition to the other changes [bank] may make to these terms and conditions, [bank] may change any other terms and conditions (including by imposing new fees or charges, changing the amount, type, or method of calculation of fees and charges payable). [Bank] will make any changes in accordance with any applicable legislation and industry codes. This term allowed the bank to include the BICOE conditions on 4 June 2018. Once the complainants signed the offer they were bound by these terms, including the one above. The bank did not breach the contract. The bank did not breach any other legislation or code by implementing the BICOE conditions. 5.2 Did the bank breach obligations relating to the overall lending structure? The bank generally complied with its obligations relating to the overall lending, except for failing to notify the complainants of the short-term loan extensions. AFCA cannot consider the bank’s assessment of credit risk and security The complainants say the bank should not have taken Mr J‟s son‟s property as security for the loans. AFCA can consider specific types of disputes about financial firms. However, we do not have the power to consider disputes solely about a financial firm‟s assessment of credit risk or the security to be required for a loan and a decision to provide (or decline) finance under our Rules (C.1.3.a – refer to section 3.3 below for further details). As such, we cannot review the bank ‟s decision to require Mr J‟s son to provide a guarantee for the complainants‟ loans. Determination | Case number: 733048 Page 9 of 18 The bank was entitled to apply short-term extensions to the facilities The complainants say the three-month short-term extensions the bank applied to the W loan and G loan on 15 December 2017 were in breach of the contract terms. They say the bank breached clause 16.4 of the contract terms and conditions (in the W loan), which states: [u]nless otherwise provided, the terms of this agreement may only be varied by the written agreement of the parties. The bank says that as the facilities were due to mature on 31 December 2017, the short-term extensions were provided so that the facilities were not charged default interest. I have reviewed the facility contracts. The W loan contract signed by the parties on 16 September 2015 includes the following clause: 16 CHANGES TO THIS AGREEMENT 16.1 What [the bank] can change [the bank] can, at any time: (g) change your repayment obligations… (j) change any other provision of this agreement. The G loan signed by the parties on 8 May 2014 includes a similar clause within the bank‟s business products terms and conditions document applicable at the time. Further details of the applicable terms and conditions are at section 3.6 below. The key wording in clause 16.4 is „unless otherwise provided‟. Clause 16.1 „otherwise provides‟ that the bank can change repayment obligations at any time. It did not breach clause 16.4 in doing so. Further, the bank provided the short-term extension to prevent default and therefore default interest being applied. In doing so the complainants avoided default fees and penalty interest which would have been much higher than what was applied to the loans. The bank was entitled to make the further short-term extensions to the loans. The bank did not make any error or breach any obligation it owed to the complainants in doing so. The bank did not make any error regarding the pricing periods The complainants say the bank took control of the pricing periods of the G loan and W loan from 31 December 2017. They consider the pricing period in compliance with the contract terms was 180-days and the bank did not comply with this. I have reviewed the terms of both contracts. Clause 5.1(v) of the special conditions of the W loan states „a Pricing Period ends no later than the Expiry Date‟. Clause 5.1(v) of the G loan states, „a Pricing Period must not end after the Expiry Date‟. The Expiry date is the date the loan expires or matures. When the bank provided short-term extensions, the pricing periods were also amended to be the same date. Any existing 180-day pricing period ceased. This is because a pricing period cannot extend beyond a term of a loan in accordance with the contract. The bank acted in in accordance with the terms and conditions of the loans. There was no notification of short term extensions and pricing period changes In accordance with the terms and conditions of the W loan and the G loan, the bank was required to give the complainants at least 30 days prior written notice of certain changes it made to the loans. This included applying the short-term extensions which in turn varied the Determination | Case number: 733048 Page 10 of 18 method by which interest was calculated and the frequency with which interest was debited. Refer to Section 3.7. for the applicable terms. The bank has not provided information to show it notified the complainants about the short- term extensions it applied to both the W loan and G loan. The bank was entitled to charge the mortgage discharge and settlement fees The complainants say the bank charged fees totalling $4,150 for discharge of mortgages and attending settlements, see section 3.4 below for a breakdown of the fees. The complainants say they were unaware of these fees and they were not allowed under the terms of the contract. They also considered there was only one mortgage to be discharged and three settlements to attend. Repayment of the loans were dependent on the sale of subdivided lots from development. Accordingly, the bank was prudent in maintaining its security interest in each of the lots until it was repaid. Eleven lots settled on the same day, and the bank attended each of these settlements to discharge the mortgages. The bank also advised the additional discharge fee related to a guarantee that the complainants had provided to Mr J‟s son of which was reliant on the same security being sold. The mortgage registration fees are fees charged by the Titles Office of Queensland. The bank was entitled to charge fees for the discharge of mortgages and attending settlement in accordance with:  the terms and conditions applicable to business products (clause 7, detailed below in section 3.6 below)  the bank‟s business banking fees – a guide to fees and charges document  Clause 5 of the terms and conditions of the W loan which states: You must pay [bank] and indemnify [bank] for an amount equal to any costs or taxes in connection with: (i) The transaction documents, the facilities or any other transactions under or in relation to them The bank did not make any error in charging these fees to the complainants. The bank was entitled to request repayment and close the G loan The complainants say the bank was not entitled to close out the G loan or require the sale of property G. The complainants say they were „under considerable pressure‟ from the bank to sell property G. They also noted that stages of the G property development were not complete and the bank did not allow a 12 month sales period as recommended by a valuation. A person who makes a claim that they entered into a transaction because of undue influence must prove they were affected by illegitimate, wrongful or unfair conduct in such a way as to leave them without a free and voluntary choice. Commercial pressure is generally insufficient to establish undue influence. In this case, there is no information to support a claim of undue influence. The bank lent money to the complainants with the mutual, contractual understanding that it was to be repaid before or by the loan expiry date. The loan term allowed the complainants to repay the borrowed amount within that timeframe including through an asset sale or refinance. The complainants were not forced to sell the property. Determination | Case number: 733048 Page 11 of 18 The complainants signed a contract that varied the expiry date of the G loan on 22 May 2018. The new expiry date was 31 July 2018. The bank was not obliged to extend the term for the G loan. Despite this, it did so. The G loan and W loan facilities were ultimately closed on 20 July 2018. Without a further extension being provided or applied for, the loan would have matured. It was in the complainants‟ interests to sell the asset to repay the debt because the loan would have defaulted. This would have incurred significant costs. The bank was entitled to either maintain the initial term of the loan or apply a short-term extension, the latter of which it did. The bank was not obliged to extend the term of a loan to align with a recommended sale period within a valuation or if the property development was not fully completed. The bank acted within the terms of the contract. The information does not suggest there was of a conflict of interest The complainants claim that a bank staff member had a conflict of interest concerning a different property (property G) that they owned and intended to develop. The complaints say that a bank staff member (Mr W) was involved in management of their loans. They say there was a conflict of interest because Mr W resided in proximity to property G and Mr W‟s wife objected to the development approval application for the site. The bank provided a statement from Mr W, that stated: I was one of the Business Banking Manager based at [G branch (the complainants‟ branch)] until 30th July 2014 I commenced a role in the Banks Fulfilment Centre on the 1st August 2014 I subsequently took a role as Agribusiness Manager based in [R] on 17th November 2017 and still hold this role. Since 1st August 2014, I was not the Manager or had control of any [G branch] customer. The complainants have been unable to provide AFCA with:  information to support that Mr W was involved in the management of their loans after July 2014  a copy of the objection, noting the local Council stated it was privileged information that could not be released  information to support that the banker resided in proximity to property G. Based on the available information, the complainants have not established that there was a conflict of interest. 5.3 Did the bank’s conduct cause the complain ants a financial loss? There is no information for loss relating to lodging the caveat on property W After the complainants became aware that the bank had not transferred the titled, they instructed his solicitor to lodge a caveat on the title to property W. Given the circumstances, this was a reasonable action to take to protect the complainants‟ interest in the property and it was reasonably foreseeable to the bank. This loss may be classified as an indirect loss, AFCA‟s approach to indirect loss is detailed at section 3.1 below. Determination | Case number: 733048 Page 12 of 18 To receive compensation, the complainants‟ must provide information to show the costs incurred regarding the lodgement of the caveat and associated legal fees. The complainants have not provided any evidence of costs incurred. Accordingly, I cannot make an award for this indirect loss. There was no loss resulting from not being notified of short-term extensions The bank applied several short-term extensions to the W loan and G loan. It did so in accordance with the applicable contract terms. However, it did not notify the complainants in accordance with those terms. Mr J advised he did not request a short-term extension. However, if the loans matured, they would have defaulted. Whilst there is no information to show the bank notified the complainants about the short-term extensions, in applying them, the complainants avoided default fees and penalty interest. These costs would have been much greater than the difference between the applicable rates of the short- term extensions. Accordingly, the bank‟s conduct resulted in a benefit to the complainants, so there is no loss to compensate. There was no loss from the BICOE conditions and the bank making payments Mr J says he suffered embarrassment from the bank paying the council infrastructure fees. We expect complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Firstly, the bank making the required payments for which the funds were provided, is not a loss to the complainants. The council charges were required to be paid, the bank paid them. Secondly, AFCA do not co nsider that the bank making the required payments on behalf of Company J (not Mr J) to the council, or any other payee, could reasonably cause a material degree of upset or embarrassment to Mr J. It is immaterial who made the payment. The bank should compensate Mr J for non-financial loss AFCA may award a complainant compensation for non- financial loss where a financial firm‟s wrongful conduct causes them an unusual degree of stress and inconvenience. AFCA‟s approach to non-financial loss is detailed at section 3.1 below. I accept the bank‟s failure to transfer the title of property W for two years would have caused Mr J, as sole director of Company J, stress and anxiety. Based on this, I consider it appropriate for the bank to compensate him $1,000 for non-financial loss. Determination | Case number: 733048 Page 13 of 18 6 Supporting information 6.1 AFCA approach to this complaint This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions of AFCA or its predecessor schemes (which are not binding). A full exchange of the relevant information has taken place between the respective parties. Each party has had the opportunity of addressing any issues raised. All of the provided material has been reviewed and considered. The parties have raised numerous issues in their submissions to AFCA. However, commentary in this determination is restricted only to those issues considered relevant to the outcome. Indirect loss Indirect loss is financial loss wh ich is caused by the bank‟s conduct but is more distant than direct financial loss. Before we decide whether to award compensation for indirect loss, we will consider:  if the financial firm made an error or failed to comply with an obligation to the complainant  if so, what loss the complainant suffered because of the financial firm‟s actions  if the loss was reasonably foreseeable to both parties, and  whether the loss is too remote from the error or failure. To make an award, AFCA needs to be provided information that shows the loss and how it was caused. Under AFCA‟s Rules, the maximum amount we can award for indirect financial loss is $5,000 per claim. AFCA approach to non-financial loss Non-financial loss includes claims for stress or inconvenience caused by an error of the bank. The maximum amount we can award for non-financial loss is $5,000 for each claim. We take a conservative approach to awarding compensation for non-financial loss. Compensation for non-financial loss is only provided where the complainant has suffered from an unusual amount of physical inconvenience or the time taken to resolve the situation has been unusually long. We do not award non-financial loss compensation merely because the complainant has suffered some inconvenience and anxiety. We expect complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. Generally, we will only award compensation for non-financial loss suffered by an individual. However, where a complaint is made by a company, we may award compensation for stress or inconvenience suffered by the company‟s directors if this is appropriate because of their close association with the company. Determination | Case number: 733048 Page 14 of 18 6.2 Key references  Parties‟ submissions  Conciliation notes  Development Approval – Council G – Ref: 2016 - *3 – 14 July 2016  Emails between the parties  Certificate of titles for Property W  Commercial Real Estate Credit Appetite Statement (RSS FY17) - extract  Complainant‟s chronology of events  Credit memorandums  Contracts of sale for property W proposed lots – x5  Privacy and confidentiality consent form – 2 August 2017  Property W cash flow projection  G loan – Letter of offer/contract – 8 May 2014  W loan – Letter of offer/contract – 16 September 2015  W loan – letter of variation/contract – 14 August 2017  Valuation – 24 May 2017  Bank‟s internal referral form – 28 February 2018  Account statements – Account *532  Terms and conditions [bank] business products – Effective 7 November 2016 6.3 Relevant loan details Date approved Loan reference Loan Type Borrower Loan amount 28/04/2014 RR loan Business Markets – Flexible Rate Loan Mr J & Mrs J $487,000 8/05/2014 G loan (*696) Market Rate Facility Company J ATF J Family Trust $394,000 16/09/2015 (variation) 14/08/2017 W loan (*719) Market Rate Facility Company J ATF J Family Trust $250,000 +$580,000= $830,000 18/05/2018 *176 Market Rate Facility Company J ATF J Family Trust $220,000 Determination | Case number: 733048 Page 15 of 18 6.4 Discharge and settlement fees Transaction date Account Amount Description 30/07/2018 *532 (transaction account) $4,150 Comprising: 11x $200 (settlement fees) = $2,200 13x $150 (discharge fees) = $1,950 Settlement Fee 6.5 Chronology Date Key points 28 April 2014 RR loan approved 8 May 2014 G loan approved 26 May 2014 G property purchased 16 September 2015 W loan approved 3 January 2017 Bank provides letter of advice extending expiry of G loan and W loan to 31 December 2017 7 April 2017 Discussion for additional funding for W loan commenced , according to complainant 29 May 2017 The complainants‟ solicitor notified the bank that the transfer of land and mortgage registration for property W was not completed Error in transfer of land and mortgage registration for Property W ack nowledged by bank B ank er M emails the complainants‟ solicitor at the time, Mr P, twice and includes Mrs J‟s email address as a participant. In the second email of that day from bank staff member M, the subject line of the email is „RE:[Company J – Propert y W]. the first line of the email is addressed to Mr P, Mrs J and Mr J Mr P lodged a caveat (*963) on the title of property W 30 May 2017 1x property W proposed lot contract of sale signed Determination | Case number: 733048 Page 16 of 18 1 June 2017 2x property W proposed lot contract of sale signed 15 July 2017 1x property W proposed lot contract of sale signed 26 July 2017 Banker M emails Mrs J: Ongoing negotiations at this point with my credit manager, I am making progress however, should know more this afternoon or tomorrow. Banks are very hesita nt to extend funding without the needed pre sales, but I am making the case based on the strong security position with your other properties, an d how well the last stage sold. 27 July 2017 Banker M emails Mrs J, he states „on top of the $580K we are funding, what have you already spent on that block for development.‟ He also asks for „another copy of the costing‟s document‟. Mrs J replies the following day „I have attached an excel spreadsheet with what we have put into the development so far‟ 2 Augu st 2017 Credit memo submitted by Banker M for W loan. It states (page 12): Part of the development cash flow is a project managers fee which is $10k per month, which is paid to our customers. This is more than sufficient to cover interest costs for the dur ation of this transaction and sale of properties. Complainants signed a privacy and confidentiality consent form for the W loan application/variation 3 August 2017 B ank er M emails Mrs J and advises „release from [property W vendor] is in my possession. L ets sign some mortgages tomorrow?‟ 1x property W proposed lot contract of sale signed (total of five now obtained) 4 August 2017 Banker M emails Mrs J with an update on the application and requests a statement of position and evidence of the borrowers tax being up to date 7 August 2017 Banker M emails Mrs J advising of a temporary $50,000 on Company J account *532 Transfer of title for property W to Trustee *666 Mortgage *683 lodged on property W 14 August 2017 Letter of variation – W loan – $580,0 00 increase Mr J on behalf of Company J signed the letter of variation on for the loan amount of $580,000 13 Sep 2017 C aveat *963 cancelled 14 Sep 2017 Transfer of title for property W to Trustee *666 on 7 August 2017 withdrawn Determination | Case number: 733048 Page 17 of 18 T ransfer of title for property W to Company J ATF J Family Trust Mortgage *683 lodged on 7 August 2017 re - entered M ortgage *166 lodged on 14 September 2017 31 December 2017 Bank provide letter of advice extending G loan expiry to 31 December 2017 18 May 201 8 L oan *176 approved 4 June 2018 The bank sent Mr J an email stating that the funds provided in facility *176 were to be provided with additional conditions including BICOE (construction loan conditions). 12 June 2018 Loan *176 funds released 21 May 2018 G loan and W loan expiry date varied to 31 July 2018 20 July 2018 The G loan and W loan facilities closed 14 Sep 2018 The bank advised the complainants in an email: [the bank] does not lend funds for personal living expenses. 17 July 2020 Managing partner for the G branch stated in an email: We provided adequate funding as per the budget submitted, however customer failed adhere to the funding usage noting significant funds utilised for personal living expenses. Customer also failed to allow sufficient funds for works and did not get a QS report. 17 August 2020 Complainants‟ chronology document dated 27 August 2020, Mr J states: I was not receiving my project management fees that I needed for my personal expenses, loan fees and business expen ses. 6 October 2020 Complainants advise AFCA: [the bank] new my only source of income was from project management of the development but failed to include the $120,000 fees in the approved funding. [the bank] also approved a management fee back payment o f $30,000 (to the 1st May 2017) but failed to release those funds. … The project manager fee was omitted from the project expenditure (page 9) [of the credit memo] it was included in my personal earnings (page 14). 15 October 2020 The bank advised AFCA: T he $580k was based on costs associated with the as outlined in the application, which excluded personal costs – noting the customer refers to Determination | Case number: 733048 Page 18 of 18 these costs as Project management fees but they are a „cover‟ for personal expenses as he is the technically just managing his own business – not paying another employee as a project manager. 6.6 Relevant AFCA Rules Exclusions applying specifically to credit complaints C.1.3 AFCA must exclude: a) A complaint about the Financial Firm‟s assessment of the credit risk posed by a borrower or the security to be required for a loan unless the complaint is about: (i) Maladministration in lending, loan management or security matters; or (ii) the variation of a credit contract as a result of the Complainant being in financial hardship; 6.7 Relevant terms and conditions W loan terms and conditions 16.2 How [bank] will notify you of changes [Bank] will notify you of any changes it makes under clause 16.1 as follows: (a) [Bank] will give you: i. At least 30 days‟ prior written notice if [bank] introduces a fee, charge (other than a government charge) or premium, varies the method by which interest is calculated or varies the frequency with which interest is debited, unless [bank] cannot reasonably locate you; [Page 18 of W loan] Terms and conditions [bank] business products Variation and notice provisions 7.1 Changes [bank] may make: (a) In addition to the other changes [bank] may make to these terms and conditions, [bank] may change any other terms and conditions (including by imposing new fees or charges, changing the amount, type, or method of calculation of fees and charges payable). [bank] will make any changes in accordance with any applicable legislation and industry codes. If you do not accept any change we make, you can ask [bank] to close your account. You will need to pay any outstanding balance in order to do this. [Page 20]

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.