Home / Suncorp Group / Determination 732663

Determination 732663

Defective repairs by insurer's builder following escape of liquid claim

FirmSuncorp Group
Decided2022-03-23
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$80,326
Non-financial loss$5,000
Amount claimed—
SourceAFCA PDF

Summary

The insurer's builder carried out repairs after a 2011 escape of liquid claim, and the complainants later disputed their quality. AFCA found the repairs faulty, rejected the insurer's settlement offer, and ordered a further cash settlement for repairs and temporary accommodation, expert fees, and non-financial loss.

Faulty repairs by the insurer's trades under a claim settlement make the insurer liable to rectify, with pre-existing excluded causes reflected in a reduced cash settlement figure.

Issues

Subjects and remedies

home or building damagethird party authoritypay claimpay compensationpay interestpay non financial loss

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 732663 Financial firm AAI Limited Determination | Case number: 732663 Page 1 of 8 Case number: 732663 21 March 2022 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the insurer. The complainants lodged a claim on 31 March 2011 for an escape of liquid from a leaking pipe. The insurer appointed builder (JL) to undertake the works which included re-stumping below the kitchen of the home. The complainants contacted the insurer on or around July 2018, regarding concerns with previous works completed. The complainants say the repairs were of poor quality and that works were not up to the minimum standard. The insurer appointed trades to assess the complainants ’ concerns and found that further rectification works were required and made an offer of settlement. This offer was rejected by the complainants as they did not believe the offer was adequate to rectify the issues. The complainants have also raised concerns regarding the validity of permits relied upon by JL to complete repairs, however, this matter is currently before the Victorian Building Authority and will not be the subject of this determination. The complainants have provided their own building consultant report and quote for rectification works and request the insurer accept this quote and provide settlement accordingly to resolve the complaint. 1.2 Issues and key findings Is the insurer is entitled to maintain its settlement offer? No, based on the evidence on file, the panel is not satisfied the insurer’s position is fair in the circumstances. The building consultant report provided by the complainants on 25 August 2021 is on balance, more persuasive and detailed in its reasoning as to why additional the works are required. The insurer is therefore required to settle the complainants for repairs in accordance with the provisions of this determination. Whether the complainants are entitled to any non-financial loss? Yes. The panel is satisfied that due to faulty repairs the complainants have suffered an unusual degree of stress and inconvenience above and beyond what is expected from an insurance claim. The panel is satisfied the complainants are entitled to non-financial loss. Why is the outcome fair? This outcome is fair because the insurer’s trades undertook repairs to the property to an unacceptable standard and the insurer and its trades should be held liable to rectify any issues which have arisen as a result. Determination | Case number: 732663 Page 2 of 8 1.3 Determination This determination is partially in favour of the complainants. The insurer is required to further settle the complainants the following:  $80,326.44 for repairs, including temporary accommodation  $2,585.00 reimbursement for the complainants ’ professional report provided by (SI)  $5,000 in non-financial loss for stress and inconvenience caused due to the faulty workmanship and delays. Determination | Case number: 732663 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer is entitled to maintain its settlement offer? Previous repairs, settlements & quotes In 2011, JL on behalf of the insurer, undertook repairs to the property because of a leak. The repairs included restumping underneath the kitchen and tiling to the kitchen and bathroom. The insurer says additional cracking and movement was claimed, however, this was not due to the insured event and that only retiling was required in the bathroom and laundry. A second claim was lodged by the complainants on 21 May 2014, for a leak behind a bathroom wall. T he insurer’s trade (P) , assessed the damage and provided a quote for $9,626.8. This quote was cash settled by the insurer. On or around 12 July 2018, the complainants raised concerns regarding the repairs undertaken by the insurer’s tra des and advised the following issues:   Tiled kitchen flooring not level;  Cracking to grout in the bathroom;  Front door not level;  Some cracking to ceiling cornices. The insurer arranged a dual assessment in which its trade JL accepted liability for the cracking grout in the bathroom however, it says the remainder of the issues raised by the complainants were due to long term movement. The insurer also appointed its engineer (MC) to review the complainants ’ concerns and found that cracking throughout the property indicated a long term, pre-existing movement issue, however, MC says works undertaken by JL appear to be of poor standard. MC ’s report also says it cannot see why restumping was required to the home and that works were not completed based on the advice of an engineer. Further documents were provided from JL for MC to review. MC concluded the leak would not have caused enough damage to require restumping. MC was, however, unable to ascertain whether the work had been completed in line with relevant industry codes and standards The insurer obtained a quotation for rectification works from builder (BB), in the amount of $54,709.64. These works included rectification of the front door frame and removal and replacement of ceramic floor tiles throughout the dwelling. BB was, however, unable to warrant the works due to movement issues in the home. The insurer reviewed the quote and adjusted the quote amount to $40,183.04 for works previously settled (bathroom). The complainants provided the following four quotes for repairs:  (SS) - $69,931.92  (CC) - $87,000.00  (MJ) - $128,652.24  (RE) - $148,005.00 The insurer says the quotes submitted do not provide a clear breakdown of costs for the areas being scoped, the meterage being quoted for and the materials being used. The insurer says some of the quotes included the rear bathroom which has previously been cash settled. Determination | Case number: 732663 Page 4 of 8 Sub-floor and movement issues Due to the concerns raised by the complainants regarding further movement to the home and additional damage as a result, the insurer appointed MC to conduct a further review. MC concluded the stumps under the kitchen were in good condition with no evidence of any moisture or moisture-related damage. The report confirms MC was unable to access the remainder of the home and could not comment on the condition of the stumps. The insurer requested MC provide further information for the following points:  Leaks identified at the property in 2019 and their potential contribution to movement;  Leaks identified at the property in 2012 and their potential contribution to movement;  Any other potential causes of movement;  Whether re-stumping was required to be completed? MC advised it was unable to find a definitive link between known leaks that had occurred at the property and ongoing ground movement. MC was of the opinion the movement was caused by the following:  The absence of appropriate external surface stormwater drainage systems to collect surface water run-off;  The presence of nearby trees;  Long term, age-related wear and tear of the structure;  The absence of articulation joints in the brickwork. MC advised that based on the nature of the leaks it would not generally require restumping of the home, however, as MC did not initially attend the property prior to restumping it is unable to comment of the condition of the stumps previously. On 19 May 2020, the insurer’s building coordinator and the complainants ’ trades undertook a site inspection to agree on a scope of works. Following this, the insurer provided a full and final settlement offer of $70,860.48, which was rejected by the complainants. The insurer offered an additional 10% contingency ($7,086.04) to try and resolve the matter, however, this was also rejected by the complainants. Complainants ’ expert report & insurer’s response The complainants provided their own report from a building consultant (SI) on 25 August 2021. SI had been provided with the information that had been gathered to date by both the complainants and the insurer. SI it found the following error and issues with the rectification works:  Incorrect stump sizes were installed  Excess spoil was not removed  Efflorescence on concrete stumps  Tiles: Intermediate Movement Joints Not Installed  Deviations of flooring  Waterstops Not Installed in bathrooms  Door Leaves Not Sealed  Exterior PVC pipe works not sealed  Exterior Masonry Cracks to Kitchen  Front Door Deviations Determination | Case number: 732663 Page 5 of 8 Based upon its findings above, SI made a range of recommendations to rectify the faulty repairs. The report recommends approximately 6 months of temporary accommodation for the repairs to be undertaken and has been factored into the estimate provided by S I due to the extent of works required. SI is of the opinion the home will not be habitable during this repair period. MC responded to the report from SI and says the leak from the dishwasher in 2011/2012 was for a relatively short period possibly a few hours and that a leak of this nature would not readily cause structural damage to the home and/or subfloor, and the structural movement/damage to the home can be considered a pre-existing issue. MC believes that JL undertook repairs to the home that were not related to the leak event and are considered building upgrades. Previous restumping at the property The exchanged material includes a building assessment report dated 29/06/2011, prepared by the insurer’s asses sor. That report details: On inspection of the property and in discussions with the IO (Insured Owner) the house has been restumped 6 years ago; this is visible. This area of Melbourne is known for poor soil quality which causing stumps to encounter movement. The movement of the current stumps appears to have been caused by the factors of the inundation of a large volume of water from the burst pipe causing the poor soil foundations to deteriorate. The panel is satisfied that the requirement for restumping 6 years prior to the 2011 loss event, supports MC’s position that there are other factors in play at the property. While the panel accepts that JL’s repairs have contributed to the current situ ation, there are additional excluded causes, such as:  Poor soil quality  The absence of appropriate external surface stormwater drainage systems to collect surface water run-off;  The presence of nearby trees;  Long term, age-related wear and tear of the structure;  The absence of articulation joints in the brickwork. The panel accepts that the property’s foundation s are likely influenced by seasonal changes and other factors, together with the impact of JL’s poor repairs. Resolution It is not possible to be precise as to the respective impact of the various causes, so the panel has arrived at what it regards as a fair and reasonable solution to a difficult question. The panel regards it as fair that the insurer is entitled to cash settle the complain ants’ claim. Because of the excluded causes that means the insurer’s builders could not warrant repairs Determination | Case number: 732663 Page 6 of 8 and noting, in the panel’s view, the reasonable mistrust the complainants have towards the insurer and its repairers, the panel is satisfied that it would not be fair to require the insurer to complete repairs. On the other hand, given that with a cash settlement, the risk of the repairs is transferred to the complainants, it is fair that sufficient uplift is included to account for this transfer of risk and contingencies associated with repairs. The panel regards the quotation from SI as a good starting point for the assessment of the cost of covered repairs. However, the panel notes that a 10% contingency and a 25% margin has been included in the quotation from SI. The panel does not agree that this is either fair or reasonable. The panel is satisfied a 20% uplift on the cost to repair the home, is fair and reasonable. Further, the panel notes that the quotation from SI includes an item for removal of furniture in the amount of $19,500.00, this amount greatly exceeds the quotation obtained by the complainants and the insurer. The panel considers it fair to allow $7,000.00 for this item. Regarding the need for restumping, the panel notes that the 2011 repairs were confined to an isolated area of the property and repairs were completed in that area. In those circumstances the panel does not accept that SI’s allowance of $40,000 for restumping should be allowed in full. The panel is satisfied it is fair that 25% ($10,000.00) of the quoted amount for restumping should be allowed. The quotation from SI, for repairs, before contingencies, margin and GST, is $138,581.00. From this amount the panel would reduce the amount for removal of furniture from $19,500 to $7,000 and the amount for restumping from $40,000.00 to $10,000.00. Leaving a total of $96,081.00. Add 10% ($9,608.10) for GST, total $105,689.10 for repairs. Add an uplift for contingencies of 20% ($21,137.82), total $126,826.92. The panel is satisfied that an allowance for temporary accommodation of 12 weeks at $290.00 per night, ($24,360.00) is fair and reasonably represents the likely repair period. Repairs plus temporary accommodation total $151,186.92. The panel notes that the insurer cash settled the complainant $70,860.48, based upon the quotation for repairs from BB. If this has already been paid by the insurer, this will reduce the further amount to be paid to the complainants. To finalise its obligations to the complainants, regarding the repairs and temporary accommodation, the insurer is to pay the further amount of $80,326.44. Given the claim will be cash settled, the insurer should pay interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) on the $80,326.44. Interest is payable from 21 August 2021, until payment is made. AFCA may award compensation for non-financial loss Under AFCA’s Rules, we may award compensation (capped at $5,400) for non -financial loss where a complainant has suffered an unusual degree or extent of physical inconvenience, Determination | Case number: 732663 Page 7 of 8 time taken to resolve the situation or interference with their expectation of enjoyment or peace of mind. Having reviewed the exchanged material the panel is satisfied that the faulty repairs of JL have contributed to the time taken to resolve the claim, together with interference to the complainants’ expectation of enjoyment and peace of mind. The insurer is to pay the complainants $5,000.00, for non-financial loss compensation. It is fair in the circumstances the insurer pays the complainants’ expert fees Under Rule D.5, AFCA may decide a financial firm contribute to the professional costs incurred by a complainant in the course of a complaint. These costs can be awarded if the complainant needed an expert to understand or establish their claim. These costs are normally capped at $5,000, unless exceptional circumstances apply. The complainant engaged SI to support his position. The panel accepts the complainants needed to engage SI on this issue and SI assisted the complainant in establishing case. Therefore, it is fair the insurer reimburses the complainants the cost of SI ’s reports subject to the complainants providing invoices in support. The insurer is to pay interest in accordance with the Act, on the established cost of SI’s report fees, from the date the complainants paid SI’ s fees, until the date the insurer reimburses this amount. 2.2 Why is the outcome fair? Explain why the outcome is fair This outcome is fair because the insurer’s trades undertook repairs to the property to an unacceptable standard and the insurer and its trade should be held liable to rectify any issues which have arisen as a result. Determination | Case number: 732663 Page 8 of 8 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all the information the parties have provided. While the parties have raised several issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome. A panel determined this matter Due to the nature of this complaint, we referred it to a panel for determination. The panel includes:  an ombudsman  a member with significant experience in consumer and small business advocacy  a member with extensive experience in the insurance industry. We assess complaints on available information and circumstances AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to require third parties to give evidence. When we assess complaints, we consider:  available documents  the recollections of the parties  all relevant circumstances. We give more weight to documents created at the time the events occurred. If there are no relevant documents, we will decide what most likely occurred based on the available information. If there are conflicting recollections and these are evenly weighted, we may find that a claim cannot be established.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.