Home / Westpac / Determination 732523
Determination 732523
Storm damage claim: external render, floor and wall tiles, contents settlement and disposal costs
Summary
The complainant claimed for storm damage to her home and contents, and the insurer disputed the external render, tiles and contents amounts. AFCA ordered payment of $44,905.70 for tiles, half the render repair and disposal costs, and no further contents settlement.
The storm was an insured event that caused the tile damage, and the insurer's expert evidence on tile cause was flawed, so the insurer must cover the tiles.
Issues
- Claim denial primary · upheld“The panel is satisfied the internal and external tiles were damaged in the insured event. The insurer is to pay the cost to replace the tiles as quoted at $30,250.00.”
- Claim amount dispute secondary · upheld“The panel is satisfied the insurer is liable for the costs for disposal and decontamination of $9,218.20 as per the quote obtained by the complainant.”
- Inadequate claim investigation secondary · upheld“Given the insurer's reports from EI are flawed as reasoned above, the panel can only recommend what is fair in all the circumstances.”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
Text of the determination
Determination
Case number 732523
Financial firm Westpac General Insurance Limited
Determination | Case number: 732523 Page 2 of 12
Case number: 732523 27 October 2020
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm
(insurer) and lodged a claim water damage to the house and contents following a
severe storm in early February 2020.
The insurer accepted part of the claim, but a dispute exists as to the extent of the
insurer ’ s liability. The complainant does not believe the accepted damage covers all
the damage caused by the storm event.
The complainant says the insurer should cover the cost of repairing the external
render to three walls, replacing drummy tiles internally and externally, compensating
for additional contents items and for disposal of damaged contents and
decontamination of the shed.
1.2 Issues and key findings
Is the insurer liable for damage to the rendering of the external walls?
The Panel is satisfied the damage to the render of the three external walls is a
combination of pre-existing and storm related damage. It fair in the circumstances that
the insurer pays $5,437.50 being 50% of the cost to repair the rendering.
Is the insurer liable for the cost of replacing the tiles?
The panel is satisfied the internal and external ties were damaged in the insured
event. The insurer is to pay the cost to replace the tiles as quoted at $30,250.00.
Is the insurer required to provide any further settlement for contents?
The panel is satisfied the settlement amount provided by the insurer meets its liability
for the contents items damaged by the insured event.
Is the complainant entitled to disposal and decontamination costs?
The panel is satisfied the insurer is liable for the costs for disposal and
decontamination of $9,218.20 as per the quote obtained by the complainant.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is required to pay $30,250 to replace internal and external tiles, $5,437.50
for repairs to the external render and $9,218.20 for disposal and decontamination
costs. The insurer is not required to pay anything further for contents.
Determination | Case number: 732523 Page 3 of 12
2 Reasons for determination
During the complaint process the complainant has been represented by her son. For
the purposes of this determination, any reference to the complainant includes
submissions made on her behalf.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
This complaint has been expedited in accordance with the AFCA Rules and referred
to a panel for determination. The panel includes the lead ombudsman, a member with
significant industry experience and a member with considerable experience as a
consumer representative.
This determination follows consideration of all relevant information. It is based on
what is fair in all the circumstances, having regard to the relevant legal principles,
terms of the policy, good industry practice including codes of practice and prior
determinations where applicable.
2.1 Is the insurer liable for damage to the rendering of the external walls?
The property was damaged by stormwater runoff
In early February 2020, Sydney experienced a significant weather event. Heavy
rainfall occurred for several days, at or around the complainant’s property. Following
this, the complainant lodged a claim for damage to her house and contents.
There is no dispute that there was damage to the home and contents following the
storm. The complainant says the property was inundated with around 500mm of
stormwater runoff which flowed down the property like a river with water enteri ng the
house during the event. The complainant says they tried putting towels down but
could not hold the water back. There was water inundation to much of the internal
flooring to the house, with water splashing beneath their feet.
The insurer ’ s loss adjuster MK notes that severe storm activity occurred across New
South Wales in February 2020 with widespread torrential rain, flooding and strong
winds. MK says the complainant’s property sustained damage as a ‘direct result’.
The insurer agreed to provide cover for some of the claimed damage in particular:
a) The insurer covered replacement of floating floorboards
b) Repairs in the bedrooms referred to by MK
c) repairs to the outdoors shed
d) repairs to rendering on the northern side of the house ($8,525).
Determination | Case number: 732523 Page 4 of 12
e) during the complaint process with AFCA, it also provided cover for repairs to
skirting boards and wall linings in the dining, lounge, hallway and entrance areas
($9,845).
Experts disagree as to damage to rendering of three external walls
The insurer declined to cover damage to the east, west and south external rendered
walls, saying the expert evidence obtained does not support this was caused by the
storm event.
MK noted the external rendered walls had begun to bubble and bulge and the
rendering was drummy ‘due to water inundation’. MK said lack of sufficient expansion
joints and installation preparation issues may also have contributed to the damage.
The insurer obtained a report from an engineer EI dated 21 May 2020. EI noted there
was no flood water high tide mark visible on the external walls of the main house and
that the rendered paint is blistering on the external north, south, east and west walls
of the house, ‘typically below the external vents’, which it says is below the level of the
damp course membrane. EI noted historic repairs works to the render/paint were
visible to the various external walls, including the to the northern wall for which the
insurer has accepted liability.
EI considered the damage to the rendering could be attributed to rising damp below
the level of the damp course membrane, possible issues with workmanship (though
EI offered no evidence to support this), historical repairs and a possible lack of
articulation joints (though again no evidence was provided to support this). EI says
the land generally slopes to the rear of the property and the front wall would likely be
most affected by stormwater exposure. EI was not persuaded stormwater exposure
was the cause of the damage to the north, south and east walls and this damage had
likely occurred over a long period of time.
The complainant ’s engineering expert OP reported finding evidence of stormwater
damage up to 1 metre high on all exterior walls. I n OP’s opinion this had caused the
cement render to debond and detach.
Damage to rendering likely to be both pre-existing and storm related
The panel acc epts the insurer’s point that the report from OP provides limited detail
as to how stormwater caused the damage to the rendering other than to say it has
caused it to debond and detach.
However, while EI says that the damage could be due to long -term rising damp, it has
not provided any substantive evidence to show long-term rising damp was a pre-
existing issue at the property.
EI accepted that paint and render on the northern wall had begun to bubble and peel
due to ‘rainwater getting in behind the paintwork’, however it is unclear as to why
Determination | Case number: 732523 Page 5 of 12
virtually identical damage to the remaining east, west and south walls has not been
accepted.
EI reasoned that the other walls would not have been as exposed to overland
waterflow. The panel is not persuaded by this. This is because the weather event in
Sydney in February 2020 was significant with large volumes of rainwater for several
days. The complainant reports his street was closed. The available information shows
water flowed through the property, past the house and down to the back of the large
block (which slopes slightly downhill) towards the shed where significant damage was
caused.
The panel accepts it is likely that all four external walls were affected by stormwater,
to some extent. The panel notes there is evidence of some previous external repairs
and accepts it is likely there was some existing damage to the rendering. In finding
this the panel notes the insurer has accepted the northern wall which is generally in a
similar condition to the remaining three sides of the house.
Insurer to pay 50% of the cost to repair the rendering
Given the nature of the event, the damage identified, and the information provided,
the panel considers it fair in the circumstances that each party bear 50% of the cost of
repairing the rendering.
The complainant obtained a quote for repairs to the rendering totalling $34,500. This
includes an allowance of $15,000 to apply two full coats of paint to the entire external
area of the house. The damage caused by the storm, as reported by the
complainant’s expert OP, is only to approximately 1 metre in height around the house.
The complainant says it will be not be possible to match the paint colour if painting is
only completed up to this height. The panel is not persuaded by this. Regardless, the
policy contains wording in the ‘how we settle your claim’ section which indicates
repairing undamaged areas of the house to create a uniform appearance is not
covered in most instances, and in the instances where it is covered (such as to tiled
or timber floor and wall coverings), only up to $1,000 cover is provided for this. This
does not include external painting. The policy wording in relation to this is contained
within section 3.1 of this determination.
The $19,500 within the complaina nt’s quote attributed to repairing the damaged
render also includes an allowance for three coats of paint. The insurer has already
paid $8,525 for repairs to rendering on one wall. Fifty percent of the balance
outstanding of $10,975 is $5,437.50. In the panels view it is fair the insurer pays the
complainant $5,437.50 towards the cost to repair the rendering.
Determination | Case number: 732523 Page 6 of 12
2.2 Is the insurer liable for the cost of replacing the tiles?
No dispute stormwater caused internal damage
Despite the report from EI there appears to be no dispute that water inundated the
interior of the complainant’s home.
MK says there was cupped floating flooring in the bedrooms as a result of rainwater
runoff flooding these rooms and the hallway showed ‘ minor mould staining above the
skirting line due to water inundation’ .
Experts disagree on the cause of damage to the tiling.
In its report dated 13 May 2020 EI identified the tiles as ceramic and that ‘ ceramic
tiles gradually absorb atmospheric moisture over their lifetime and undergo slight
volumetric increases in their dimensions as a result, this is commonly known as tile
growth’.
EI says that as ceramic tiles expand, the adhesive bond to the floor can and fail due
to an increase in stresses caused by the expansion of tiles, resulting in tiles becoming
loose and drummy. EI refers to the Australian Standard for ceramic tile installation,
saying there is a lack of intermediate movement joints given the dimensions of floor
area that is covered by tiles inside the complainant’s house. EI considered this could
also have contributed to the drummy tiles.
In relation to the external tiles, the insurer has raised previous silicone repairs to a tile
on the front step. The complainant’s son has advised he underto ok this temporary
repair after the event to minimise the tripping hazard for his elderly mother.
OP attributed the drummy internal tiles in the hallway, kitchen, laundry and living
areas to excess moisture due to stormwater ingress, with 80% of the total area
affected. Likewise, OP considered debonded and drummy external tiles on the front
porch, front steps, side access steps and rear patio steps were due to stormwater
ingress with about 50% of the total area affected. OP also noted water damage to
skirting boards, plasterboard and mould growth identified in two west facing
bedrooms, the hallway, the lounge, and the rumpus room.
EI’s report is flawed
The complainant advises that the tiles are porcelain tiles, not ceramic tiles. The
complainant has provided a copy of the invoice from when the tiles were purchased,
along with photos of the packaging.
The panel is satisfied the tiles are porcelain not ceramic tiles. Porcelain tiles are water
resistant and have a much lower absorption rate than ceramic tiles. EI’s comments
relating to ceramic tile growth are not relevant.
The insurer has advised it offered to have a second engineer (L) attend to provide
opinion on the cause of the drummy tiles and the damaged rendering. Upon review of
Determination | Case number: 732523 Page 7 of 12
the insurer’s response to AFCA, the panel notes the insurer only arranged to have L
attend on 23 April 2020 as the complainant had requested EI’s attendance be
cancelled. The insurer reports that on 27 April 2020 it spoke with the complainant
again who requested L be cancelled and agreed to allow EI to attend as originally
planned.
The panel is not persuaded the insurer intended to have two separate engineers
attend for the purpose of obtaining a second opinion on the damage. It wasn’t until
later during the complaint process with AFCA that the insurer indicated a second
opinion from L was necessary.
This being the case, the panel does not consider the insurer has established that the
complainant’s refusal to allow L’s attendance has prejudiced its ability to assess the
cause of the drummy tiles or the rendering.
Insurer required to cover replacement of floor tiles
The panel accepts the insurer’s point that the complainant’s re port from OP is lacking
in detail and provides limited detail as to how water ingress caused the tiles to
become drummy, other than to say they debonded.
Given the insurer’s reports from EI are flawed as reasoned above, the panel can only
recommend what is fair in all the circumstances based on the information to hand.
There is no dispute an insured event occurred. The insurer has already accepted
cupping damage to floorboards in the bedrooms and repairs to skirting boards and
wall linings in the dining, hallway, lounge, and entrance areas.
It is not unreasonable to accept given the information exchanged that other flooring
throughout the house would also have been damaged by the stormwater ingress. The
panel accepts it is possible the underlying adhesive that adheres the tiles to the slab
was damaged or ‘debonded’ as suggested by OP.
While the insurer has suggested installation issues might have been a factor, its
expert did not remove any tiles to confirm how the tiles were originally adhered to the
concrete slab. Therefore, the panel is not persuaded there is any evidence to support
there were installation issues with the tiles. Once again, the panel notes EI’s assertion
about the Australian Standard for ceramic tiles is irrelevant given the complainant has
porcelain tiles.
In the absence of any other compelling information to show how else the tiles could
have become drummy, and consistent with the insurer’s approach to the floating
floors in the bedrooms, the panel considers it reasonable to conclude the drummy
tiles are a result of stormwater inundation. The panel is not satisfied the insurer has
established a reason why the drummy tiles should not be subject to cover as a result
of the insured event.
Determination | Case number: 732523 Page 8 of 12
The panel considers it fair in the circumstances the insurer accepts the cost of
replacing the internal and external tiles. The complainant has provided a quote for this
totalling $30,250 and the panel considers this to be fair in the absence of any
information to the contrary.
2.3 Is the insurer required to provide any further settlement for contents?
The complainant is seeking further settlement for contents items
The insurer has paid the complainant a total $141,372.26 for contents items damaged
and/or contaminated by mould due to the insured event. This includes further
amounts of $74,997.85 and $7,867.55 which were paid by the insurer on 16 July 2020
and 24 August 2020 respectively following ongoing negotiations between the parties.
Prior to these two most recent amounts being paid, the complainant advised he was
seeking a further $90,564.85 for contents items based on the remaining items not
finalised in the contents list provided by the insurer. This was based on his calculation
of ‘insured’s cost’ in the insurer’s contents sprea dsheet for items which were not yet
finalised prior to these two payments.
The panel calculated ‘insured’s cost’ for the 56 items which were not finalised in the
spreadsheet and can confirm these items total $91,065.85. Therefore, after the two
most recent amounts have been paid, the complainant is still seeking a further
$8,200.45.
However, this does not take into the account that the insurer had already made partial
payments for some of the items which were not marked as finalised, prior to the two
most recent payments. This includes a payment for some of these items totalling
$3,103 on 28 April 2020, and payment totalling $1,000 on 21 May 2020.
Insurer applied policy limits and subtracted amounts for overpayments
Additionally, the insurer has applied policy limits to some items. These items include
the toilet suite, large bathtub, vanity (two sinks), two large rotisserie spit roasters and
assorted lengths of timber. After the policy limits are applied, this reduces the amount
payable on these items by a total of $4,739.
The panel has reviewed the certificate of insurance and the PDS. The certificate of
insurance shows the complainant selected the quality care level of cover and having
reviewed the PDS the panel is satisfied the insurer has correctly applied the policy
limits in line with this level of cover.
The insurer also deducted what it says were overpayments for some items previously
paid for from its most recent settlement which was paid on 24 August 2020. The items
for which the insurer deducted amounts for overpayments were a Victa edge trimmer,
a 10-metre length of rope, a large Hitatchi angle grinder, a five-piece bathroom set, a
solid timber dining table and a five speaker and sub surround sound system. The
deductions for overpayments total $1,119.
Determination | Case number: 732523 Page 9 of 12
Complainant not entitled to any further settlement for contents items
The complainant does not consider the insurer is entitled to make deductions for
these alleged overpayments. The panel notes however, that on many of the items the
insurer has c overed, it has paid based on the complainant’s cost estimate s, not all of
which were verified with quotes, and which in many cases considerably exceeded
MK’s estimates.
On balance, the panel is satisfied the insurer has now paid a fair overall settlement
amount for all the contents damaged by the insured event. The insurer is not required
to make any further settlement for contents.
2.4 Is the complainant entitled to disposal and decontamination costs?
Complainant is seeking cover for disposal and decontamination costs
The complainant is seeking cover for disposal of damaged and mould contaminated
contents and decontamination of the shed after the contents are removed.
Attached to an email dated 31 July 2020, the complainant provided a scope of works
and quote from restoration expert PR totalling $6,562 (excluding GST). The total
amount including GST would be $7,218.20. It was noted by PR within the quote that
‘an accurate cost cannot be forwarded for disposal fees at this point a s fees are
based on weight of disposal. It is envisaged … that costs could be an [sic] excess of
$1,500.00 - $2,000.00 for total disposal.’
In the same email, the complainant advised the estimated weight of items to be
disposed of was five tonnes and their local tip charges between $400 to $1,700 per
tonne. The complainant is seeking a further $2,000 for ‘additional tip fees’.
The scope of works within PR’s quote also contained an allowance for ‘application of
anti- microbial to affected surfaces’. This constitutes the decontamination costs the
complainant is seeking.
Insurer believes it can complete work for less than amount quoted by PR
The insurer obtained an opinion on these costs from its assessor MK. MK advised in
an email ‘The quoted amount seems to be high as disposal s hould only take one day,
for our office to provide a comparison quote it might take a few days and I’m not sure
how much time you have available.’ MK also stated ‘alternative [sic] we are more than
happy to complete the disposal and provide an invoice on c ompletion.’
Based on this response from MK, the insurer says it is willing to arrange for MK to
undertake this work and believes it can be done for less than the amount quoted by
PR.
Insurer required to accept complainant’s request for disposal and clean-up
The relationship between the complainant and the insurer and its assessor MK
appears to have deteriorated and based on various correspondence to AFCA, the
Determination | Case number: 732523 Page 10 of 12
complainant has lost trust in the process. This being the case, having the insurer
arrange M K to attend the complainant’s property again and undertake the works does
not seem to be a viable option.
The insurer has agreed to cover as a total loss contents valued in excess of
$140,000. Proper disposal of these items to the complainant’s local tip w ill likely incur
significant costs, particularly given some of the contents to be disposed of are large
equipment items associated with curing of meats on a large scale, as per the initial
report from MK. Additionally, the panel accepts that the shed area will need to be
cleaned/decontaminated after disposal works are complete given the degree of
stormwater inundation that occurred in the shed.
The panel also notes that MK did not complete a quote for the works and as such it is
unconfirmed as to whether MK could in fact complete the work for less than the
amount quoted by PR. The complainant’s quote from PR is therefore the only
actionable quote provided to AFCA for these works.
This being the case, on balance the panel considers it fair the insurer settles the
complainant $9,218.20 (this is the quoted amount of $7,218.20 inclusive of GST plus
an additional $2,000 for disposal to the tip).
Determination | Case number: 732523 Page 11 of 12
3 Supporting information
3.1 Policy wording
Product disclosure statement (PDS) page 3:
3 General exclusions.
The subsection headed Maintenance and building on page 2 is deleted and repalced with the
following, so that your policy does not cover any loss or damage that is caused by or arises from:
Maintenance and building.
defects in design, structure, materials, workmans hip or consstruction,
failure to keep the property insured watertight, well maintained, srtructurally sound and secure.
For example:
- a storm can highlight defects rather than cause them, and
- damage due to lack of maintenance or which happens gradually is not covered,
failure to undertake building work that a relevant authority required you to undetake before the
loss or damage occurred, or
obtaining permits or permissions to replace structures that were erected by you illegally or
without planning permission.
The subsection headed Wear and tear, and environmental conditions on page 12 is deleted and
replaced wit h the following, so that your policy does not cover anyt loss or damage that is caused
by or arises from:
Wear and tear and environmental conditions.
wear and tear, gradual deterioration, or fading,
rust, corrosion, oxidisation, mould, mildew or atmospheric conditions,
earth or soil movement (other than earthquake) including landslide, subsidence, erosion or
heave,
settling expansion, shrinkage or vibration,
actions or movements of the sea or high water (other than storm surge and tsunami),
hydrostatic pressure, or
tree roots.
The following subsection is added after the subsection headed Common property on page 13:
Consequential loss.
In addition to the above types of loss and damage, oyur policy does not cover consequential loss of
any kind.
PDS page 5:
The final paragraph under the subsection headed Storm – Not covered on page page 20 is
deleted and replaced with the following:
Loss or damage caused by or resulting from:
gradual deterioration from hail, wind, snow or rain,
hail, wind, snow or rain entering the building:
- while construction work, alterations or additions are being carried out,
- as a result of door, windows or other man-made openings not being closed, or
- through an opening not created by the storm or other insured event,
water seeping or running through or down the sides of earth or earth fill htat is up against your
building, or
actions or movements of the sea or high water (oth er stan storm surge and tsunami).
PDS page 17:
Insured events.
Determination | Case number: 732523 Page 12 of 12
Depending on whether you have Building cover or Contents cover, will insure your building and/or
contents at the site against loss or damage caused by the following events if the occur during your
period of insurance.
...
PDS page 20:
Storm.
Covered.
Loss or damage caused by storm, including cyclone, hail, wind, snow or rain.
Not covered.
Loss or damage caused by:
storm for a period of 48 hours, or
cyclon for a period of 5 days,
from the dat e cover was initially provided by us, iunless the policy is repacing another policy with
the equivalent storm or cyclone cover and there has been no gap in cover and no change to the
sum insured, or you have entered into a contract to purchase the property and the risk has been
passed to you as purchaser.
Loss or damage to:
gates, fences, or freestanding walls that were not in good condition proior to damage occurring,
retaining walls, paths, driveways, bridges or landscaping,
fabric awnings, blinds or shade sails, unless professionally installed and less than 5 years old,
plastic liners or covers for swimming pools or spas,
water in swimming pools or spas, or
external paint or coatings caused by rain.
PDS page 50:
7.3 How we settle your claim.
Repairing or replacing.
When we agree to pay a claim for loss or damage:
...
PDS page 51:
If the loss or damage:
involves wall coverings, floor coverings or window coverings that are present in more than one
room of the home, we’ll only repair or replace those wall coverings, floor coverings or window
coverings in the room or rooms, hall or passageway where the damage occurred.
However, if such loss or damage involves tiled or timber floor or wall coverings, we’ll only pay
up to a maximum of $1,000 to match undamaged tiled or timber wall or floor coverings in the
room or rooms, hall or passagewy where the damage occurred to create a uniform
appearance.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.