Home / Westpac / Determination 732523

Determination 732523

Storm damage claim: external render, floor and wall tiles, contents settlement and disposal costs

FirmWestpac
Decided2020-10-28
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$44,906
Non-financial loss—
Amount claimed$82,169
SourceAFCA PDF

Summary

The complainant claimed for storm damage to her home and contents, and the insurer disputed the external render, tiles and contents amounts. AFCA ordered payment of $44,905.70 for tiles, half the render repair and disposal costs, and no further contents settlement.

The storm was an insured event that caused the tile damage, and the insurer's expert evidence on tile cause was flawed, so the insurer must cover the tiles.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 732523 Financial firm Westpac General Insurance Limited Determination | Case number: 732523 Page 2 of 12 Case number: 732523 27 October 2020 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy with the financial firm (insurer) and lodged a claim water damage to the house and contents following a severe storm in early February 2020. The insurer accepted part of the claim, but a dispute exists as to the extent of the insurer ’ s liability. The complainant does not believe the accepted damage covers all the damage caused by the storm event. The complainant says the insurer should cover the cost of repairing the external render to three walls, replacing drummy tiles internally and externally, compensating for additional contents items and for disposal of damaged contents and decontamination of the shed. 1.2 Issues and key findings Is the insurer liable for damage to the rendering of the external walls? The Panel is satisfied the damage to the render of the three external walls is a combination of pre-existing and storm related damage. It fair in the circumstances that the insurer pays $5,437.50 being 50% of the cost to repair the rendering. Is the insurer liable for the cost of replacing the tiles? The panel is satisfied the internal and external ties were damaged in the insured event. The insurer is to pay the cost to replace the tiles as quoted at $30,250.00. Is the insurer required to provide any further settlement for contents? The panel is satisfied the settlement amount provided by the insurer meets its liability for the contents items damaged by the insured event. Is the complainant entitled to disposal and decontamination costs? The panel is satisfied the insurer is liable for the costs for disposal and decontamination of $9,218.20 as per the quote obtained by the complainant. 1.3 Determination This determination is substantially in favour of the complainant. The insurer is required to pay $30,250 to replace internal and external tiles, $5,437.50 for repairs to the external render and $9,218.20 for disposal and decontamination costs. The insurer is not required to pay anything further for contents. Determination | Case number: 732523 Page 3 of 12 2 Reasons for determination During the complaint process the complainant has been represented by her son. For the purposes of this determination, any reference to the complainant includes submissions made on her behalf. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This complaint has been expedited in accordance with the AFCA Rules and referred to a panel for determination. The panel includes the lead ombudsman, a member with significant industry experience and a member with considerable experience as a consumer representative. This determination follows consideration of all relevant information. It is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Is the insurer liable for damage to the rendering of the external walls? The property was damaged by stormwater runoff In early February 2020, Sydney experienced a significant weather event. Heavy rainfall occurred for several days, at or around the complainant’s property. Following this, the complainant lodged a claim for damage to her house and contents. There is no dispute that there was damage to the home and contents following the storm. The complainant says the property was inundated with around 500mm of stormwater runoff which flowed down the property like a river with water enteri ng the house during the event. The complainant says they tried putting towels down but could not hold the water back. There was water inundation to much of the internal flooring to the house, with water splashing beneath their feet. The insurer ’ s loss adjuster MK notes that severe storm activity occurred across New South Wales in February 2020 with widespread torrential rain, flooding and strong winds. MK says the complainant’s property sustained damage as a ‘direct result’. The insurer agreed to provide cover for some of the claimed damage in particular: a) The insurer covered replacement of floating floorboards b) Repairs in the bedrooms referred to by MK c) repairs to the outdoors shed d) repairs to rendering on the northern side of the house ($8,525). Determination | Case number: 732523 Page 4 of 12 e) during the complaint process with AFCA, it also provided cover for repairs to skirting boards and wall linings in the dining, lounge, hallway and entrance areas ($9,845). Experts disagree as to damage to rendering of three external walls The insurer declined to cover damage to the east, west and south external rendered walls, saying the expert evidence obtained does not support this was caused by the storm event. MK noted the external rendered walls had begun to bubble and bulge and the rendering was drummy ‘due to water inundation’. MK said lack of sufficient expansion joints and installation preparation issues may also have contributed to the damage. The insurer obtained a report from an engineer EI dated 21 May 2020. EI noted there was no flood water high tide mark visible on the external walls of the main house and that the rendered paint is blistering on the external north, south, east and west walls of the house, ‘typically below the external vents’, which it says is below the level of the damp course membrane. EI noted historic repairs works to the render/paint were visible to the various external walls, including the to the northern wall for which the insurer has accepted liability. EI considered the damage to the rendering could be attributed to rising damp below the level of the damp course membrane, possible issues with workmanship (though EI offered no evidence to support this), historical repairs and a possible lack of articulation joints (though again no evidence was provided to support this). EI says the land generally slopes to the rear of the property and the front wall would likely be most affected by stormwater exposure. EI was not persuaded stormwater exposure was the cause of the damage to the north, south and east walls and this damage had likely occurred over a long period of time. The complainant ’s engineering expert OP reported finding evidence of stormwater damage up to 1 metre high on all exterior walls. I n OP’s opinion this had caused the cement render to debond and detach. Damage to rendering likely to be both pre-existing and storm related The panel acc epts the insurer’s point that the report from OP provides limited detail as to how stormwater caused the damage to the rendering other than to say it has caused it to debond and detach. However, while EI says that the damage could be due to long -term rising damp, it has not provided any substantive evidence to show long-term rising damp was a pre- existing issue at the property. EI accepted that paint and render on the northern wall had begun to bubble and peel due to ‘rainwater getting in behind the paintwork’, however it is unclear as to why Determination | Case number: 732523 Page 5 of 12 virtually identical damage to the remaining east, west and south walls has not been accepted. EI reasoned that the other walls would not have been as exposed to overland waterflow. The panel is not persuaded by this. This is because the weather event in Sydney in February 2020 was significant with large volumes of rainwater for several days. The complainant reports his street was closed. The available information shows water flowed through the property, past the house and down to the back of the large block (which slopes slightly downhill) towards the shed where significant damage was caused. The panel accepts it is likely that all four external walls were affected by stormwater, to some extent. The panel notes there is evidence of some previous external repairs and accepts it is likely there was some existing damage to the rendering. In finding this the panel notes the insurer has accepted the northern wall which is generally in a similar condition to the remaining three sides of the house. Insurer to pay 50% of the cost to repair the rendering Given the nature of the event, the damage identified, and the information provided, the panel considers it fair in the circumstances that each party bear 50% of the cost of repairing the rendering. The complainant obtained a quote for repairs to the rendering totalling $34,500. This includes an allowance of $15,000 to apply two full coats of paint to the entire external area of the house. The damage caused by the storm, as reported by the complainant’s expert OP, is only to approximately 1 metre in height around the house. The complainant says it will be not be possible to match the paint colour if painting is only completed up to this height. The panel is not persuaded by this. Regardless, the policy contains wording in the ‘how we settle your claim’ section which indicates repairing undamaged areas of the house to create a uniform appearance is not covered in most instances, and in the instances where it is covered (such as to tiled or timber floor and wall coverings), only up to $1,000 cover is provided for this. This does not include external painting. The policy wording in relation to this is contained within section 3.1 of this determination. The $19,500 within the complaina nt’s quote attributed to repairing the damaged render also includes an allowance for three coats of paint. The insurer has already paid $8,525 for repairs to rendering on one wall. Fifty percent of the balance outstanding of $10,975 is $5,437.50. In the panels view it is fair the insurer pays the complainant $5,437.50 towards the cost to repair the rendering. Determination | Case number: 732523 Page 6 of 12 2.2 Is the insurer liable for the cost of replacing the tiles? No dispute stormwater caused internal damage Despite the report from EI there appears to be no dispute that water inundated the interior of the complainant’s home. MK says there was cupped floating flooring in the bedrooms as a result of rainwater runoff flooding these rooms and the hallway showed ‘ minor mould staining above the skirting line due to water inundation’ . Experts disagree on the cause of damage to the tiling. In its report dated 13 May 2020 EI identified the tiles as ceramic and that ‘ ceramic tiles gradually absorb atmospheric moisture over their lifetime and undergo slight volumetric increases in their dimensions as a result, this is commonly known as tile growth’. EI says that as ceramic tiles expand, the adhesive bond to the floor can and fail due to an increase in stresses caused by the expansion of tiles, resulting in tiles becoming loose and drummy. EI refers to the Australian Standard for ceramic tile installation, saying there is a lack of intermediate movement joints given the dimensions of floor area that is covered by tiles inside the complainant’s house. EI considered this could also have contributed to the drummy tiles. In relation to the external tiles, the insurer has raised previous silicone repairs to a tile on the front step. The complainant’s son has advised he underto ok this temporary repair after the event to minimise the tripping hazard for his elderly mother. OP attributed the drummy internal tiles in the hallway, kitchen, laundry and living areas to excess moisture due to stormwater ingress, with 80% of the total area affected. Likewise, OP considered debonded and drummy external tiles on the front porch, front steps, side access steps and rear patio steps were due to stormwater ingress with about 50% of the total area affected. OP also noted water damage to skirting boards, plasterboard and mould growth identified in two west facing bedrooms, the hallway, the lounge, and the rumpus room. EI’s report is flawed The complainant advises that the tiles are porcelain tiles, not ceramic tiles. The complainant has provided a copy of the invoice from when the tiles were purchased, along with photos of the packaging. The panel is satisfied the tiles are porcelain not ceramic tiles. Porcelain tiles are water resistant and have a much lower absorption rate than ceramic tiles. EI’s comments relating to ceramic tile growth are not relevant. The insurer has advised it offered to have a second engineer (L) attend to provide opinion on the cause of the drummy tiles and the damaged rendering. Upon review of Determination | Case number: 732523 Page 7 of 12 the insurer’s response to AFCA, the panel notes the insurer only arranged to have L attend on 23 April 2020 as the complainant had requested EI’s attendance be cancelled. The insurer reports that on 27 April 2020 it spoke with the complainant again who requested L be cancelled and agreed to allow EI to attend as originally planned. The panel is not persuaded the insurer intended to have two separate engineers attend for the purpose of obtaining a second opinion on the damage. It wasn’t until later during the complaint process with AFCA that the insurer indicated a second opinion from L was necessary. This being the case, the panel does not consider the insurer has established that the complainant’s refusal to allow L’s attendance has prejudiced its ability to assess the cause of the drummy tiles or the rendering. Insurer required to cover replacement of floor tiles The panel accepts the insurer’s point that the complainant’s re port from OP is lacking in detail and provides limited detail as to how water ingress caused the tiles to become drummy, other than to say they debonded. Given the insurer’s reports from EI are flawed as reasoned above, the panel can only recommend what is fair in all the circumstances based on the information to hand. There is no dispute an insured event occurred. The insurer has already accepted cupping damage to floorboards in the bedrooms and repairs to skirting boards and wall linings in the dining, hallway, lounge, and entrance areas. It is not unreasonable to accept given the information exchanged that other flooring throughout the house would also have been damaged by the stormwater ingress. The panel accepts it is possible the underlying adhesive that adheres the tiles to the slab was damaged or ‘debonded’ as suggested by OP. While the insurer has suggested installation issues might have been a factor, its expert did not remove any tiles to confirm how the tiles were originally adhered to the concrete slab. Therefore, the panel is not persuaded there is any evidence to support there were installation issues with the tiles. Once again, the panel notes EI’s assertion about the Australian Standard for ceramic tiles is irrelevant given the complainant has porcelain tiles. In the absence of any other compelling information to show how else the tiles could have become drummy, and consistent with the insurer’s approach to the floating floors in the bedrooms, the panel considers it reasonable to conclude the drummy tiles are a result of stormwater inundation. The panel is not satisfied the insurer has established a reason why the drummy tiles should not be subject to cover as a result of the insured event. Determination | Case number: 732523 Page 8 of 12 The panel considers it fair in the circumstances the insurer accepts the cost of replacing the internal and external tiles. The complainant has provided a quote for this totalling $30,250 and the panel considers this to be fair in the absence of any information to the contrary. 2.3 Is the insurer required to provide any further settlement for contents? The complainant is seeking further settlement for contents items The insurer has paid the complainant a total $141,372.26 for contents items damaged and/or contaminated by mould due to the insured event. This includes further amounts of $74,997.85 and $7,867.55 which were paid by the insurer on 16 July 2020 and 24 August 2020 respectively following ongoing negotiations between the parties. Prior to these two most recent amounts being paid, the complainant advised he was seeking a further $90,564.85 for contents items based on the remaining items not finalised in the contents list provided by the insurer. This was based on his calculation of ‘insured’s cost’ in the insurer’s contents sprea dsheet for items which were not yet finalised prior to these two payments. The panel calculated ‘insured’s cost’ for the 56 items which were not finalised in the spreadsheet and can confirm these items total $91,065.85. Therefore, after the two most recent amounts have been paid, the complainant is still seeking a further $8,200.45. However, this does not take into the account that the insurer had already made partial payments for some of the items which were not marked as finalised, prior to the two most recent payments. This includes a payment for some of these items totalling $3,103 on 28 April 2020, and payment totalling $1,000 on 21 May 2020. Insurer applied policy limits and subtracted amounts for overpayments Additionally, the insurer has applied policy limits to some items. These items include the toilet suite, large bathtub, vanity (two sinks), two large rotisserie spit roasters and assorted lengths of timber. After the policy limits are applied, this reduces the amount payable on these items by a total of $4,739. The panel has reviewed the certificate of insurance and the PDS. The certificate of insurance shows the complainant selected the quality care level of cover and having reviewed the PDS the panel is satisfied the insurer has correctly applied the policy limits in line with this level of cover. The insurer also deducted what it says were overpayments for some items previously paid for from its most recent settlement which was paid on 24 August 2020. The items for which the insurer deducted amounts for overpayments were a Victa edge trimmer, a 10-metre length of rope, a large Hitatchi angle grinder, a five-piece bathroom set, a solid timber dining table and a five speaker and sub surround sound system. The deductions for overpayments total $1,119. Determination | Case number: 732523 Page 9 of 12 Complainant not entitled to any further settlement for contents items The complainant does not consider the insurer is entitled to make deductions for these alleged overpayments. The panel notes however, that on many of the items the insurer has c overed, it has paid based on the complainant’s cost estimate s, not all of which were verified with quotes, and which in many cases considerably exceeded MK’s estimates. On balance, the panel is satisfied the insurer has now paid a fair overall settlement amount for all the contents damaged by the insured event. The insurer is not required to make any further settlement for contents. 2.4 Is the complainant entitled to disposal and decontamination costs? Complainant is seeking cover for disposal and decontamination costs The complainant is seeking cover for disposal of damaged and mould contaminated contents and decontamination of the shed after the contents are removed. Attached to an email dated 31 July 2020, the complainant provided a scope of works and quote from restoration expert PR totalling $6,562 (excluding GST). The total amount including GST would be $7,218.20. It was noted by PR within the quote that ‘an accurate cost cannot be forwarded for disposal fees at this point a s fees are based on weight of disposal. It is envisaged … that costs could be an [sic] excess of $1,500.00 - $2,000.00 for total disposal.’ In the same email, the complainant advised the estimated weight of items to be disposed of was five tonnes and their local tip charges between $400 to $1,700 per tonne. The complainant is seeking a further $2,000 for ‘additional tip fees’. The scope of works within PR’s quote also contained an allowance for ‘application of anti- microbial to affected surfaces’. This constitutes the decontamination costs the complainant is seeking. Insurer believes it can complete work for less than amount quoted by PR The insurer obtained an opinion on these costs from its assessor MK. MK advised in an email ‘The quoted amount seems to be high as disposal s hould only take one day, for our office to provide a comparison quote it might take a few days and I’m not sure how much time you have available.’ MK also stated ‘alternative [sic] we are more than happy to complete the disposal and provide an invoice on c ompletion.’ Based on this response from MK, the insurer says it is willing to arrange for MK to undertake this work and believes it can be done for less than the amount quoted by PR. Insurer required to accept complainant’s request for disposal and clean-up The relationship between the complainant and the insurer and its assessor MK appears to have deteriorated and based on various correspondence to AFCA, the Determination | Case number: 732523 Page 10 of 12 complainant has lost trust in the process. This being the case, having the insurer arrange M K to attend the complainant’s property again and undertake the works does not seem to be a viable option. The insurer has agreed to cover as a total loss contents valued in excess of $140,000. Proper disposal of these items to the complainant’s local tip w ill likely incur significant costs, particularly given some of the contents to be disposed of are large equipment items associated with curing of meats on a large scale, as per the initial report from MK. Additionally, the panel accepts that the shed area will need to be cleaned/decontaminated after disposal works are complete given the degree of stormwater inundation that occurred in the shed. The panel also notes that MK did not complete a quote for the works and as such it is unconfirmed as to whether MK could in fact complete the work for less than the amount quoted by PR. The complainant’s quote from PR is therefore the only actionable quote provided to AFCA for these works. This being the case, on balance the panel considers it fair the insurer settles the complainant $9,218.20 (this is the quoted amount of $7,218.20 inclusive of GST plus an additional $2,000 for disposal to the tip). Determination | Case number: 732523 Page 11 of 12 3 Supporting information 3.1 Policy wording Product disclosure statement (PDS) page 3: 3 General exclusions. The subsection headed Maintenance and building on page 2 is deleted and repalced with the following, so that your policy does not cover any loss or damage that is caused by or arises from: Maintenance and building.  defects in design, structure, materials, workmans hip or consstruction,  failure to keep the property insured watertight, well maintained, srtructurally sound and secure. For example: - a storm can highlight defects rather than cause them, and - damage due to lack of maintenance or which happens gradually is not covered,  failure to undertake building work that a relevant authority required you to undetake before the loss or damage occurred, or  obtaining permits or permissions to replace structures that were erected by you illegally or without planning permission. The subsection headed Wear and tear, and environmental conditions on page 12 is deleted and replaced wit h the following, so that your policy does not cover anyt loss or damage that is caused by or arises from: Wear and tear and environmental conditions.  wear and tear, gradual deterioration, or fading,  rust, corrosion, oxidisation, mould, mildew or atmospheric conditions,  earth or soil movement (other than earthquake) including landslide, subsidence, erosion or heave,  settling expansion, shrinkage or vibration,  actions or movements of the sea or high water (other than storm surge and tsunami),  hydrostatic pressure, or  tree roots. The following subsection is added after the subsection headed Common property on page 13: Consequential loss. In addition to the above types of loss and damage, oyur policy does not cover consequential loss of any kind. PDS page 5: The final paragraph under the subsection headed Storm – Not covered on page page 20 is deleted and replaced with the following: Loss or damage caused by or resulting from:  gradual deterioration from hail, wind, snow or rain,  hail, wind, snow or rain entering the building: - while construction work, alterations or additions are being carried out, - as a result of door, windows or other man-made openings not being closed, or - through an opening not created by the storm or other insured event,  water seeping or running through or down the sides of earth or earth fill htat is up against your building, or  actions or movements of the sea or high water (oth er stan storm surge and tsunami). PDS page 17: Insured events. Determination | Case number: 732523 Page 12 of 12 Depending on whether you have Building cover or Contents cover, will insure your building and/or contents at the site against loss or damage caused by the following events if the occur during your period of insurance. ... PDS page 20: Storm. Covered. Loss or damage caused by storm, including cyclone, hail, wind, snow or rain. Not covered. Loss or damage caused by:  storm for a period of 48 hours, or  cyclon for a period of 5 days, from the dat e cover was initially provided by us, iunless the policy is repacing another policy with the equivalent storm or cyclone cover and there has been no gap in cover and no change to the sum insured, or you have entered into a contract to purchase the property and the risk has been passed to you as purchaser. Loss or damage to:  gates, fences, or freestanding walls that were not in good condition proior to damage occurring,  retaining walls, paths, driveways, bridges or landscaping,  fabric awnings, blinds or shade sails, unless professionally installed and less than 5 years old,  plastic liners or covers for swimming pools or spas,  water in swimming pools or spas, or  external paint or coatings caused by rain. PDS page 50: 7.3 How we settle your claim. Repairing or replacing. When we agree to pay a claim for loss or damage: ... PDS page 51: If the loss or damage:  involves wall coverings, floor coverings or window coverings that are present in more than one room of the home, we’ll only repair or replace those wall coverings, floor coverings or window coverings in the room or rooms, hall or passageway where the damage occurred. However, if such loss or damage involves tiled or timber floor or wall coverings, we’ll only pay up to a maximum of $1,000 to match undamaged tiled or timber wall or floor coverings in the room or rooms, hall or passagewy where the damage occurred to create a uniform appearance.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.