Home / IAG / Determination 728845
Determination 728845
Declined subfloor and masonry damage claim after water pipe leaks
Summary
The insured claimed for leak-related damage to the home, including a demand to rebuild. AFCA found the subfloor and masonry damage was caused by long-term rising damp and excluded, but ordered the insurer to pay $9,400 for front entry and subfloor repairs and $1,000 for delay.
The insured must establish a valid claim, and the insurer's expert evidence showed the damage resulted from long-term rising damp from poor ventilation and drainage rather than the pipe leaks, which is an excluded cause.
Issues
- Claim denial primary · not upheld“the insurer is entitled to decline the claimed damage... the claimed damage... arose from rising damp... excluded from cover”
- Claim amount dispute secondary · not upheld“The panel is satisfied the insurer is not required to make any further offer to settle the claim.”
- Delay secondary · upheld“the complainant has been inconvenienced due to the length of the claim response”
Subjects and remedies
home or building damagepay claimpay non financial loss
Related
Text of the determination
Determination
Case number 728845
Financial firm Insurance Australia Limited
Determination | Case number: 728845 Page 2 of 18
Case number: 728845 15 March 2021
1 Determination overview
1.1 Complaint
The complainant lodged a claim under his home building policy with the financial firm
(insurer) following the escape of water from leaking pipes at the home.
The insurer assessed the claim and identified evidence of rising damp along with
damage to masonry piers, brick walls and the front entry to the home. The insurer
says damage occurred due to site issues, poor ventilation and lack of a competent
damp course barrier. The damage to the front of the home is considered long term
and gradual. The insurer says the causes of damage are excluded from cover.
The complainant seeks the cost to demolish and rebuild his home and an additional
amount for potential damage in the future, should the home become unstable due to
the soil moisture changes. The complainant also seeks reimbursement for the cost of
obtaining an expert report and compensation due to the claims experience.
1.2 Issues and key findings
Is the insurer entitled to decline the claimed damage to the property?
Yes. The available information shows, on balance, the claimed damage and damage
to brickwork in the subfloor arose from rising damp, due to site issues, lack of
competent damp-proof barrier and poor ventilation. The damaged particle board is
from nail punctures. As these causes of damage are excluded from cover, the insurer
is entitled to decline the claimed damage.
The insurer‟s offer to contribute $9,400 to repair damage to the front of the home is
fair in all the circumstances.
Is the insurer required to reimburse the complainant for his expert report?
No. The report did not assist the complainant in establishing the claim should be met.
Is the complainant entitled to compensation?
Yes. The panel is satisfied the complainant has been inconvenienced due to the
length of the claim response. The insurer is to pay $1,000 compensation.
1.3 Determination
This determination is mostly in favour of the insurer.
Should the complainant accept this determination then within seven days of
notification of acceptance the insurer is to pay to the complainant:
Determination | Case number: 728845 Page 3 of 18
$9,400 for repairs
$1,000 for non-financial loss compensation.
Determination | Case number: 728845 Page 4 of 18
2 Reasons for determination
2.1 Is the insurer entitled to decline the claimed damage to the property?
Complainant must establish a valid claim
The complainant must establish any claimed loss or damage arises from an event
covered by the terms and conditions of the policy. This is known as a valid claim.
The Product Disclosure Statement shows the cover provided is for defined events.
This means the policy only responds where one or more of the listed events causes
damage to the insured property, subject to any exclusions.
Extracts from the relevant policy terms are set out in supporting section 3.3 of this
determination.
The complainant‟s claim relates to wat er damage to his property. He says this
occurred due to the escape of water from pipes which leaked under the home.
There is no dispute two leaks occurred and were repaired. Some damage was
identified by the insurer and although it denied liability for the damage, it made an
offer of $9,400 on a commercial basis to include damage to the front entry and
replacement of soil.
The complainant claimed $43,893 for the floor to be replaced and for the
reinstatement of degraded mortar. This amount was later increased substantially to
include the cost to replace foundations of underfloor brick piers, excavate and replace
sodden backfill and other building repairs. The complainant now claims full
replacement cost of the home, relocation costs and a provisional sum to allow for
increases in building costs due to the changes in the home‟s foundation conditions.
The policy provides cover for the insured event of „ water and oil leaks ‟ .In light of the
leak events which have occurred, the panel is satisfied the complainant has
established a valid claim. The complainant still must establish all the claimed damage
was caused by the leaking pipes.
The onus shifts to the insurer to establish it can rely on an exclusion or is otherwise
entitled to decline the claim in part or i n full.
Both parties rely on expert reports. Extracts from the relevant expert reports and
letters are set out in supporting section 3.2 of this determination.
Engineer says damage is long term
Upon lodgement of the claim, the insurer appointed builder „RI‟ to assess the damage.
RI requested the insurer appoint an engineer for an opinion. Engineer „IM‟ attended
the property on 14 June 2019, where the complainant confirmed two leaks from the
Determination | Case number: 728845 Page 5 of 18
water supply mains had occurred. The engineer reviewed water records which
suggested two separate water supply pipe leaks may have occurred in mid-2018.
A visual inspection of the subfloor identified long-term mortar degradation at various
locations within the perimeter walls and piers. IM says he was unable to see
competent damp proof barriers. He said deterioration was evident within the lower
courses of the piers and the walls which had occurred over a long time because of
rising damp due to the lack of competent damp proof barriers.
The complainant raised a concern the particle board flooring may have been affected
by the water leaks. IM identified nail punctures from the fibre cement underlay to the
particle board but no evidence of water damage.
A drainage channel was identified within the ground beneath the home . Later, this
was confirmed as a channel the complainant dug to assist with water draining away.
IM said much of the damage occurred prior to the purchase of the property in 2017.
IM concluded the water leaks under the home may have worsened the deterioration
of the piers and walls in some areas, but the leaks were not the original cause of the
damage.
The insurer considered the damage to the piers and subfloor was not caused by the
leaking pipes but by long-term deterioration. It declined the claim for this damage.
Complainant says IM’s report does not cover other possibilities
The complainant expressed concerns with IM‟s report. Amongst other submissions,
he says the report failed to consider the potential for hydrostatic pressure. He also
says IM failed to identify if a damp course would have prevented water soaking into
the subfloor brickwork.
The insurer arranged for a plumber (AP) to inspect and report and for IM to reinspect
in July 2020.
The plumber undertook several tests and said there were no rele vant leaks. He
estimated the damage had been there for two or three years. He recommended
additional ventilation be installed to the lower level. He said the damage noted shows
long-term exposure to moist soil and poor damp proofing and was not caused by
i solated contacts with water. The plumber also rejected the complainant‟s contention
the damage was caused by hydrostatic pressure.
IM re-attended with the complainant and reviewed material from the complainant
including the pre-inspection report provided in 2017. IM submitted a supplementary
report rebutting the complainant‟s contentions.
IM confirmed the role of a damp course is to isolate moisture. In this case, the
complainant says high levels of potable water freely accumulated up to 50mm deep
around piers and internal brick walls. IM confirmed while this was possible , and that
Determination | Case number: 728845 Page 6 of 18
any accumulation of water as described may have worsened the damage but was not
initiated by the leaks.
IM provided photographs in support of his contentions. He says the extent of
deterioration shown in the photographs would have taken extended time to occur and
would have almost certainly commenced prior to the two burst pipe events.
The complainant says IM also failed to consider the increase in humidity potable
water had on the flooring. IM confirmed the burst pipes did not contribute to an
increase in humidity, nor did they damage the particle board. IM confirmed the
damage to the flooring was nail punctures through the underlay and particle board.
After review of the compl ainant‟s material and reinspection, IM confirmed the
deterioration within the lower courses of the piers and walls had occurred over a long
period of time as a result of rising damp due to a combination of insufficient subfloor
ventilation, site drainage issues and lack of competent damp proof barriers.
The complainant raised concerns over the independence of and qualifications of IM.
The insurer confirmed IM is a degree qualified engineer working under direct
supervision of a registered engineer.
The pane l notes the complainant‟s concerns. However, the panel is satisfied IM has
undertaken several thorough inspections and provided coherent and comprehensive
reports supported by photographs.
The panel is satisfied the insurer is entitled to rely on the opinion of IM.
Pre-purchase inspection report does not identify rising damp
The complainant rejected the declinature of his claim and submitted his 2017 pre -
purchase inspection report by builder and pest inspector (EC). He relies on the fact
EC did not identify any evidence of rising damp when he inspected in 2017 prior to
the two water leaking events in 2018.
EC re-attended to inspect the home on 31 July 2019. The complainant questioned
whether EC had missed the rising damp. EC informed the complainant it had
undertaken a visual inspection of the sub-floor and did not observe evidence of rising
damp or mycelia in 2017.
EC was supportive of the complainant saying the rising damp was only evident in the
areas of the brickwork which had been in contact with the water from the 2018 leaks
and that the damage to the defective brickwork was recent.
Insurer considered an offer for front entry area
RI attended the property on 6 May 2020 and submitted a scope of works and quote
for damage to the front entry of the home.
Determination | Case number: 728845 Page 7 of 18
The quote provided the cost to remove and replace tiles at the front entry, and
potential floor joists if required. It also included the front wooden entry door, all
surrounds and the steel external doorframe. RI‟s cost for these repairs is $6,468.95.
RI also provided a provisional sum to supply suitable soil and fill the drain dug by the
complainant in the amount of $1,309.06.
Upon further review, the insurer offered payment for the above damage.
As set out above, the complainant rejected the offer as he did not consider this was a
full scope of works for damage to his home and potential damage in the future.
Rising damp occurs from all water
The complainant says there is a difference between potable water and surface runoff
water and says this has not been taken into consideration by the insurer or IM.
IM submitted a further report taking into consideration the concerns of the
complainant. IM reports both potable water and rainwater contribute similarly to rising
damp. IM says there is insufficient difference to distinguish the individual effect.
IM further reviewed the scope of works and disagreed that all damage is related to the
leaking pipes. IM is of the view the front entry and the lower level tiles are not cracked
from the water leak events under the home. IM relies on poor site drainage and poor
ventilation within the subfloor as contributing factors.
Geotechnical report does not assist complainant
The complainant is concerned his entire home will require demolishing due to the
severity of damage under the home.
He appointed a geotechnical engineer (BP) who took and tested four bore samples.
In a letter to the complainant BP said the location of the two leaks indicated this is the
possible source of the ongoing seepage through clay fissures but says his hypothesis
needs to be validated by his geotechnical investigations.
BP said the dry rot in the floor was probably due to poor ventilation before 2017.
Subsequently, two samples were taken from under the home, one at the rear of the
property and one near the front entry (near the site of the leaks).
BP says the laboratory results indicate the soil moisture content where the pipe leaks
were reportedly located are significantly higher than the area outside the building.
However, the surface sample taken at the rear of the home was found to be wetter
than those from beneath the home. BP says this may be from potential rainfall prior to
the fieldwork having been undertaken.
Determination | Case number: 728845 Page 8 of 18
IM reviewed BP‟s report. IM points out the soil samples were taken two years after the
leaking pipes were identified and repaired. IM submits the higher moisture recorded in
the front yard was because of ongoing watering of the lawn (which the complainant
denies). As the leaks have been repaired, IM suggested elevated levels of moisture
years later suggest moisture is more likely due to drainage issues.
BP says IM‟s interpretation is overly simplistic.
The complainant submits BP‟s report confirms the leaks in the subfloor have changed
the pre-existing condition of his home. He considers the leaks are reducing the
bearing capacity of the soil supporting the foundations.
The panel considers the material provided by BP is insufficiently compelling to rebut
the opinion of IM. BP posited in a letter that the two leaks in 2018 were the likely
source of ongoing seepage but in his report merely confirms the different variations in
moisture in the soil. BP does not adequately explain how the pipes leaking in 2018
have caused the present claimed damage. The panel considers BP is insufficient ly
persuasive referring only to the possibility that the flooding from the pipes may have
led to the softening of the founding strata which may result in footing settlement. BP‟s
report does not show, on balance, the home requires demolition because of the
leaking pipes in 2018.
The panel has carefully considered EC‟s 2017 prepurchase inspection report and the
letter from EC after he reinspected the property in July 2019. Whatever the value of
EC‟s opinion in 2019 in the face of the apparent assertion EC wa s liable for the cost
of repair, it is clear from the 2017 report that he only inspected the readily accessible
areas and that the overall condition of the property was average.
Critically, in relation to the subfloor area he said in 2017:
The underfloor ventilation appears to be inadequate. This may provide conditions
that could encourage decay of timber components. Upgrading of the ventilation is
required. Contact a licensed builder for advice and rectification.
Although the complainant describes subfloor ventilation the panel is not persuaded of
its adequacy in view of the opinion of EC in 2017 and the opinion of IM in 2019 which
is supported by photographs.
Complainant says claim should be accepted due to identified damp course
In January 2021, the complainant provided photographs of the lower external
brickwork to the home. The complainant says these images show there is an active
damp course.
The complainant says the images confirm the insurer should accept his claim, provide
a full replacement, including relocation costs and compensation for the mental
anguish from the claim process.
Determination | Case number: 728845 Page 9 of 18
The insurer maintains even if there is a damp course present, this has been
ineffective and has not prevented or discouraged rising damp. Therefore, its position
that the damage is excluded remains unchanged.
The panel is not sufficiently persuaded by the recent photographs in view of the
mechanism of rising damp and the photographs provided by IM and the opinions of
both the insurer‟s plumber and engineer. The panel do es not know the context or
location of the images. The recent photographs are insufficient to show there was not
a competent damp course in place.
Further in view of the observations of EC in 2017 and IM in 2019, the panel is
satisfied on the balance of probabilities the claimed damage was caused by
insufficient subfloor ventilation which caused the rising damp, and which was
identified in 2017 and pre-existed the 2018 leaking pipe events.
Additionally, IM identified site drainage issues. The complainant identified recent
ingress after rainfall which is now several years after the leaks were repaired.
Having reviewed the available information, on balance the panel is satisfied the
insurer is entitled to decline the claimed damage and is not obliged to replace the
home.
Insurer’s offer to resolve the claim fulfils its policy obligation
The insurer offered a cash settlement of $6,485.95 to settle the claim with an
additional $1,309.06 to replace lost soil.
The insurer increased its offer to $9,400 allowing an uplift. This also included the cost
to replace the hot water unit (which was confirmed as showing rust around its base
due to it being installed in a damp environment).
Relying on IM, the insurer does not consider any of the damage to be related to the
leak events. However, it agreed to offer $9,400 to resolve the complaint as an act of
good faith to the complainant.
This offer was rejected by the complainant.
The insurer said it would withdraw the claim if it was not accepted within a certain
time frame. While parties disagree on what damage has occurred, in view of RI‟s
report and photographs and the location of the leaks the panel considers the offer is
fair in the circumstances. The panel finds IM is insufficiently persuasive as to why he
considers this limited damage was not caused by the leaking pipes in 2018.
Considering the opinion of both BP and IM, the panel is satisfied the claimed damage
to the floors was not caused by the leaks.
The complainant has not provided sufficiently compelling material to show the home
requires demolition due to any insured event.
Determination | Case number: 728845 Page 10 of 18
The panel acknowledges the complainant‟s concerns. However, on the basis of the
material provided and for the reasons stated, the panel is satisfied the insurer is not
required to make any further offer to settle the claim.
Should the complainant accept this determination then within seven days of
notification of acceptance, the insurer is to pay to the complainant $9,400.
2.2 Is the insurer required to reimburse the complainant for his expert
report?
Insurer is not liable for the cost of complainant’s report
The complainant is seeking $1,100 from the insurer for the cost of obtaining a
geotechnical report from BP. The complainant says this report has aided in his
attempt to have his claim accepted.
While there is no automatic right to professional costs, paragraph D.5 of the AFCA
Rules says AFCA may determine an insurer should contribute towards a
complainant‟s professional costs in pursuing a complaint.
As the panel does not accept this report has aided the complainant in having his claim
accepted, the panel is satisfied the insurer is not required to contribute to this cost.
2.3 Is the complainant entitled to compensation?
$1,000 compensation is warranted
AFCA takes a conservative approach to assessing compensation for non-financial
loss. In assessing whether to award compensation for non-financial loss, AFCA
expects complainants to:
be moderately robust
bear the normal degree of inconvenience experienced when a problem occurs,
and
take reasonable steps to minimise the inconvenience suffered.
The maximum AFCA can award for non-financial loss is $5,000. AFCA may award
compensation for non-financial loss where a complainant has suffered an unusual
degree of extent of physical inconvenience, time taken to resolve the situation or
interference with their expectation of enjoyment or peace of mind by the insurer.
During his submissions, the complainant raised concerns over the ongoing mental
anguish and hardship due to the prolonged claim process.
The panel notes the claim was lodged in January 2019 and the insurer provided its
final decision in February 2020, overturning its decision to partly accept the claim.
Then upon further review believed it would have been correct to decline the claim in
full. This process took considerable time before a decision was reached.
Determination | Case number: 728845 Page 11 of 18
The panel accepts this prolonged period has been an inconvenience to the
complainant and would have impacted his expectation of peace of mind.
Having reviewed the available material, the panel is satisfied it is fair the insurer pays
to the complainant $1,000 compensation for non-financial loss.
Determination | Case number: 728845 Page 12 of 18
3 Supporting information
3.1 AFCA approach
This complaint has not been the subject of a recommendation. Due to the nature of
the complaint, it has been referred directly to a panel for determination, in line with the
Operational Guidelines to the AFCA Rules. The panel consists of an Ombudsman
and two representatives with consumer and insurance e xperience.
The panel has decided this complaint based on what is fair in all the circumstances,
having regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor sc hemes
(which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other.
The panel has reviewed and considered all the material provided by the parties. While
the parties have raised numerous issues in their submissions, for the purposes of this
determination the panel has restricted its commentary to those issues that it considers
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie or valid claim.
Once so established, the onus shifts to the insurer to prove on the balance of
probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss.
3.2 Extracts from relevant expert reports
Record Key points
Prepurchase building
inspection report (EC)
9 May 2017
Report says it does not include an assessment of any aspect or
component that cannot be seen or that requires testing.
After inspection in the readily accessible areas the overall condition
of the building was average.
Site drainage – sufficient drainage at time of inspection.
Evidence of surface water. Damp areas.
Antcap and Underfloor ventilation appears to be inadequa te.
Upgrading of the ventilation is required.
Tax invoice complainant’s
plumber
5 February 2019
Replaced water main, dig up 7 tree stumps and re - run water to
kitchen and outside tap due to tee not found $2,100.
Insurer’s expert ( RI )
Report
28 June 2019
Photographed and inspected 6 May 2020 with complainant.
First attended in January 2019 in relation to an external water leak
and another leak at the front of the property which had been
Determination | Case number: 728845 Page 13 of 18
Record Key points
repaired. No further leaks.
Describes the damage point ed out by the complainant.
Refers to engineer‟s report and says the damage caus ed to the
brickwork is from rising damp and the pine board flooring damaged
from nail fixings to underlay puncturing flooring.
Recommended drainage be installed to stop water going int o the
subfloor and to install a damp proof course to the brickwork.
Cannot warrant repairs.
Scope of works described to entry step, subfloor and general items
$6,468.95.
Insurer’s expert ( RI )
Report
Cash settlement subfloor - to supply suitable soil under the house.
$1,309 06.
Insurer’s expert ( IM )
Report
28 June 2019
Photographed and inspected 14 June 2019.
Hous e is located on a site that slopes down gradually from the west
to the east. The paved covered patio near the front entry has been
built up to above the level of the subfloor vents.
Observed evidence of long - term mort ar degradation at various
locations within the perimeter build up walls and piers.
Inspected subfloor and saw moisture staining within the masonry
build - up wall beneath the studi o and entry.
Observed what appears to be a drainage channel within the ground
beneath the family room.
Timber floor beneath the studio showed evidence of nail punctures at
various locations – flooring not damaged by pipe leaks. D amage to
the flooring has occurred as a result of nail punctures when the fibre
cement sheet underlay was installed .
Reviewed water rec ords which suggest two separate water supply
pipe leaks might have occurred in mid - 2018 .
No competent damp proof barriers installed.
Deterioration evident wit hin the lower courses of the mas onry piers
and walls has occurred over a long period of time as a result of
“rising damp” due to the lack of competent damp - proof barriers.
While it is possible pipe leaks worsened the deterioration, the
damage w as not initiated by the leaks.
Much of the present damage could have occurred prior to the
insured‟s purchase of the property.
Letter from EC
19 August 2019
Reins pected wit h complainant 31 July 2019 as complainant claims
EC liable for costs incurred in rectifying present defects.
Prepurchase report relevant at the time of inspection only and
comprises a visual assessment of accessible areas.
Report did not cover or report on items listed in appendix D including
footing below ground, concealed damp proof course, concealed
plumbing and soil conditions.
Required to report on rising damp but only with regard to physical
signs of rising damp.
We i nspected the subfloor areas and saw no rising damp to the brick
Determination | Case number: 728845 Page 14 of 18
Record Key points
foundations when we ins pected in May 2017.
Since our ins pection there have been two significant water leaks in
2018 and 2019 from the mains water supply at the left - hand front of
the property .
Rising damp was only evident in the areas of the brick foundations
which have been in cont act with the water from the leaks. Leaks
added elevated humidity to subfloor.
Defective brickwork and subsequent moisture related defects in the
subfloor are rece nt and occurring since the water leaks. We would
expect to observe additional areas of the brick foundations to have
deteriorated had the rising damp occurred over time longer than
since the water leaks.
EC takes no responsibility for the defective materi als that now exist
as a result of rising damp or poor ventilation.
Insurer’s plumber ( AP )
Report
13 July 2020
Investigat ed leaks 8 July 2020.
Downpipes were leaking in some areas due to poor installation and
lack of maintenance but leaks not near affec ted areas.
Hot water service not installed on an approved basis and drain line
has not been terminated in accordance with Australian Standards.
HWS showing signs of rust around its base because it was installed
in a damp environment with inadequate ventilation.
Chec ked recent repair of incoming water main. Copper waterline
passing through brick work is starting to corrode and is not lagged
where it is in contact with mortar.
Described nail penetrations causing damage in front bedroom.
Describes moderate damage throu ghout the low - level subfloor.
Estimated damage present for two or three years.
Tested and said no leaks were present at time of inspection.
Caus e of damage age wear and tear.
Recommend additional ventilation be installed to the lower level of
the prope rty and the water line showing signs of corrosion is
replaced.
Insurer’s plumber ( AP )
Report
4 February 2020
Commented and rebutted complainant‟s assertions.
Had there been a competent damp proof barrier installed it would‟ve
prevented the trans fer of moisture from the free water and soil below.
Hydrostatic pressure has not caused damage.
Deterioration seen would‟ve taken an extended period of time to
occur and almost certainly commenced prior to the two first pipe
events. Deterioration shows long - term exposure to moist soil and
poor damp proofing not isolated contacts with water.
Floor no t damaged by increase in humidity.
Determination | Case number: 728845 Page 15 of 18
Record Key points
Insurer’s expert ( IM )
Report
6 August 2020
Attended 8 July 2020 and reviewed material from complainant,
plumbers and pre - inspection report.
Both rainwat er and tap - water contribut e similarly to the “rising damp”
issue s, including those evident within the insured building‟s lower
level masonry walls.
Water quality from kitchen tap is within guidelines.
Flaking or spalling of brickwork is most commonly caused by
brickwork absorbing moisture through consistently wet soil , or “rising
damp” from soil moisture due to poor site drainage and/or lack of
ventilation within the subfloor over a long period of time.
Subfloor ventilation is insufficient for the insured building and the lack
of subfloor ventilation holes in the inter nal subfloor walls has
restricted the cross ventilation in the subfloor space which has
contribut ed to the moisture build up within the subfloor area.
Complainant advised they dug out the drainage channel under the
house; channel is away from the location of the pipe leak.
Improvements to the site drainage should be considered to prevent
ongoing and future events of water entering the subfloor space, and
to prevent water accumulating around mas onry piers and walls.
Reviewed Scope from R. Cracking damage to entry floor tiles or the
corrosion of the lower level steel door not caused by leak.
D eterioration evident wit hin the lower courses of masonry piers and
walls has occurred over a long period of time as a result of “rising
damp” due to a combination of insufficient subfloor ventilation, site
drainage issues, and a lack of competent damp - proof barriers within
the masonry walls .
No evidence that the reported damage to the flooring, front tiles or
steel frame door hav e occurred due to any single insurable event.
Complainant’s expert ( BP )
Letter
1 September 2020
Inspected 1 Sept ember 2020.
Foundation material highly reactive clay soil.
Location of the two leaks indicat es this is the likely source of ongoing
seepage through the clay fissures.
Under porch likely to be saturated from two water leaks. Unlikely rain
seepage is a cause. Check downpipes in the area.
Dry rot in the floor probably due to poor ventilation 1987 – 2017.
My hypothesis needs to be validated by geotechnical investigation as
to the nature of the soils under the porc h area and rec ommend
borehole be sunk in this area.
Complainant’s expert ( BP )
Report
20 October 2020
Carried out geotechnical investigation to assess the quantitative
differenc es in moisture across the site. Sunk 4 bores.
Moisture content testing indicates the bores drilled beneat h the
residence and in the area adjac ent the water pipe leak near the front
porch (Bores 2 to 4) are typically between approximately 2% and 6%
wetter than the samples from Bore 1, taken outside to the rear of the
property.
The near surface sample taken from Bore 1 was found to be wetter
Determination | Case number: 728845 Page 16 of 18
Record Key points
than those taken from beneath the building, potentially due to rainfall
in the days before the fieldwork was carried.
Discusses results and laboratory testing and concludes possible tha t
the flooding from the pipe rupture may have led to some
softening of the founding strata, which may result in so me additional
future footing settlements, under the weight of the existing structure.
Insurer’s expert ( IM )
Report
26 October 2020
Reviewed material from complainant including BP‟s report. These
four soil samples were taken on 25 September 2020, more than two
years aft er the burst pipes were reportedly identified and
subsequently repaired (February and August 2018).
This suggests the higher levels of soil moisture recorded on the front
yard (BH4) and beneath the building (BH2 & BH3) are unlikely to be
a co nsequence of solely water leakage from the burst pipe events.
Rather, it is more likely the slightly higher moisture recorded within
the front yard (BH4) is due to ongoing/ regular wat ering of the lawn
following its redevelopment in around late 2018/early 2019. Regular
watering the front lawn could also cause water to flow downslope
toward the building and likely into the building‟s subfloor area due to
waterproofing deficiencies and due to poor site drainage.
Material suggests moisture inc reas e is an ongoi ng problem even in
the absence of reported pipe leaks. Elevat ed levels of moisture 2
years later suggests moisture is more likely due to drainage issues.
As such, it remains our opinion that the deterioration evident within
the lower courses of masonry pie rs and walls beneath the house had
occurred over a long period of time as a result of “rising damp” due to
a combination of insufficient subfloor ventilation, site drainage issues
and a lack of compet ent damp - proof barriers, rather than occurring
as a resu lt of any single pipe leakage event.
No new information changes our previously reported opinions about
the cause of damage.
Letter from BP
6 November 2019
Reviewed insurer‟s engineer‟s report for complainant and says there
has been an overly simple interpretation and comparison of the
permeability of the site soils at the bores.
Concludes soils beneath the building have very approximately one
third of the b earing capacity and are below what would normally be
designed for in the instance of a residential structure constructed
over controlled fill. Having said that, says we do not have dat a from
the time of construction for comparison .
3.3 Extracts from relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties
and in the insurer‟s Notice of Response . Both the policy document and the Notice
have been exchanged with the complainant.
Water and oil leaks
…
Determination | Case number: 728845 Page 17 of 18
If loss or damage is caused by water or oil leaking or escaping from an item
shown here.
Covered
‒ water or oil leaking or escaping from:
• gutters, drainpipes or pipes located at or on the site
• water mains or water supply pipes
• sanitary fixtures – for example, baths or toilets
• appliances – for example, washing machines or dishwashers
• waterbeds
• aquariums
• water tanks, or
• swimming pools
‒ oil leaking from a fixed heating system or sealed portable heater
‒ landslide or subsidence that happens immediately as a direct result of a water or oil leak
referred to above
‒ costs to locate the cause of damage (if we agree to pay these costs before you make any
arrangements).
Not covered
‒ loss or damage caused by:
• storm, flood, rainwater run-off, storm surge or actions of the sea
• water leaking or escaping from a shower recess or shower base
• erosion, deterioration, collapse, shrinkage or any other earth movement
‒ costs to repair or replace the item that the water or oil leaked or escaped from.
General Exclusions for all cover and benefits
These exclusions apply to all covers and benefits under your policy.
What we don’t cover
Loss, damage, injury or death arising from:
‒ Rust, corrosion, gradual deterioration, depreciation, wear or tear …
Maintaining and occupying your home
Determination | Case number: 728845 Page 18 of 18
We don‟t cover loss, damage, injury or death arising from:
‒ Faulty design or workmanship
Incident is a single occurrence, or a series of occurrences arising out of the one
event.
3.4 Other relevant material considered and relied on
Parties‟ submissions/emails and all attachments to all submissions/emails.
Parties‟ expert reports.
Photographs.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.