Home / Lloyd's / Determination 727220
Determination 727220
Disputed cyclone damage and quality of repairs under strata policy
Summary
A strata owners corporation representative claimed cyclone Debbie damage and defective repairs. AFCA found the insurer must reattach roof battens and cash settle with a 20% contingency uplift, but rejected the claim for most of the roof and mould damage.
The complainant established a prima facie accidental batten claim, but the insurer showed exclusions for wear, corrosion, design and pre-existing mould for the balance.
Issues
- Claim denial primary · upheld“The insurer is responsible for reattaching the roof batons and the insurer is to arrange an actionable scope of works.”
- Inadequate claim investigation secondary · upheld“The Panel acknowledges the insurer failed, at first instance, to conduct and document a thorough assessment of the cause and extent of damage.”
- Repairs or contractors secondary · unclear“The complainant disputed the quality of the insurer's repairs, which the Panel did not decide as a separate issue.”
Subjects and remedies
home or building damagenatural disasterpay claimrepair or rectify
Related
Text of the determination
Determination
Case number 727220
Financial firm Lloyd's Australia Limited
Determination | Case number: 727220 Page 2 of 18
Case number: 727220 31 May 2021
1 Determination overview
The complainant is a representative of an owner‟s corporation which holds strata
insurance in respect of a number of residential units underwritten by the financial firm
(insurer). On 28 March 2017, the complainant lodged a claim for damage to the units
from tropical cyclone Debbie. The insurer accepted the claim.
A dispute has arisen over the extent of the damage due to the insured event and the
quality of the insurer‟s repairs.
1.1 Issues and key findings
Is the insurer liable for the disputed damage?
On the information provided the Panel is satisfied:
The complainant has established a prima facie case
the insurer is responsible for reattaching the roof batons
the majority of the damage to the roof is excluded under the policy
the mould was pre-existing
The insurer is to arrange an actionable scope of works, by an independent engineer,
to reattach the roof battens and associated works.
Due to the breakdown in the relationship between the parties the Panel is of the view
this matter should be cash settled. The insurer is to uplift the amount determined by
the scope of works by 20 % to cover contingencies.
1.2 Determination
This determination is partially in favour of the complainant.
Within 28 days of the complainant‟s acceptance of this determination, the ins urer is to
arrange for an actionable scope of works, by an independent engineer, to reattach the
roof battens and associated works.
The insurer is to cash settle the claim and include a 20% uplift to cover contingencies.
Determination | Case number: 727220 Page 3 of 18
2 Reasons for determination
There has been a full exchange of material between the parties, and each party has
had the opportunity to address the issues arising from that.
Due to the nature of / complexities involved in this dispute, it has been referred to a
Panel for determination.
The Panel reviewed and considered all the material provided by the parties. While the
parties raised various issues in their submissions, for the purposes of this
determination, the Panel restricted its commentary to those issues which it considers
directly relevant to the outcome.
This determination follows consideration of all the information exchanged. It is based
on what is fair in all the circumstances, having regard to the relevant legal principles,
terms of the policy, good industry practice including codes of practice and previous
AFCA decisions where applicable.
2.1 Is the insurer liable for the disputed damage?
Onus on complainant to establish prima facie claim
The policy covers „ accidental loss or damage ‟ to the insured property. The term is not
defined in the policy. The Panel accepts accidental loss or damage is that which is
caused unexpectedly or unintentionally.
The complainant bears the onus to establish the disputed damage was caused
accidentally. This is known as a prima facie claim. If she can do so, the onus of proof
shifts to the insurer to establish the application of an exclusion or to show it is
otherwise entitled to decline the claim.
The insurer relies upon policy exclusions for claims arising out of:
fault, error or omission in design
wear and tear; gradual deterioration.
mildew, mould.
Relevant policy provisions and a chronology of key documents and events are set out
at section 3 of this determination.
Cyclone Debbie damaged the insured units
Around 28 March 2017, Cyclone Debbie damaged the insured property. The insurer
arranged an assessment of the damage by a loss adjuster and a designated repairer
although, beyond the loss adjuster's notes, no detailed assessment report was
drafted.
Determination | Case number: 727220 Page 4 of 18
The damage initially observed and addressed b y the repairer was described as
follows:
rear elevation – 50 lineal metres damaged gutter – level I & 2 combined
front elevation – 6 lineal metres damaged gutter
Unit 1 – ceiling repair to lounge room and staircase ceiling, water staining to
lounge, laundry, bathroom and bedroom 2 ceilings
Unit 2 – water staining to bedroom 1 and 2, bathroom and hallway ceilings, water
staining to garage wall
Unit 4 – water staining to bedroom 1 and bathroom ceiling
Unit 4 carport – cracked block work repair & painting of garage wall
Unit 5 – water staining to bedroom 1 and 2 ceiling and bathroom ceiling
Unit 5 carport – cracked block work repair and painting garage wall
damage to a TV antenna.
In mid-November 2017, at the request of the complainant, the loss adjuster re-
attended the property to review additional issues, being:
mould on the eaves – which the adjuster said was unrelated to the cyclone
cyclone debris – which the insurer covered
impact damage to the boundary fence – a portion of which the insurer covered
tree impact damage to two roof sheets – which the insurer covered.
The repairs (including variations) took place in mid and late 2017 and were finally
completed in March 2018.
In late 2018, the complainant told the insurer the roof was still leaking and decided to
engage a builder, CC, to review the initial cyclone damage as well as the quality of
the insurer‟s repairs.
Complainant says insurer overlooked damage and its repairs were defective
CC‟s report identified cyclone damage overlooked by the insurer‟s builder and defects
in its repair work.
The builder determined, among other things, that:
the original repairer overlooked significant damage to the roof sheeting (including
denting, puckering, uplift), uplifted battens in the roof cavities and mould on the
external eaves / soffits
the failure of the repairer to properly address the roof damage resulted in further
water ingress and mould to the ceilings
there were various instances of defective repairs by the insurer‟s repairer (such as
inadequate painting).
Determination | Case number: 727220 Page 5 of 18
In general terms, these findings were affirmed by another builder engaged by the
complainant, LB.
The insurer then engaged an engineer, M, to assess the damage and repairs.
Following this report, the insurer agreed to:
remedy defective guttering repairs
replace about 11 additional roof sheets
reclean and repaint ceilings in Units 1, 2, 4 and 5
repaint balcony boards of Unit 1
replace and repaint the water damaged ceiling in the bathroom of Unit 5
repaint the carport wall of Units 4 and 5.
However, the insurer, relying substantially on M‟s engineering report found:
the balance of the disputed external roof damage was caused by corrosion, wear
and tear, and defective construction
there is no damage to the battens
the internal mould is from water ingress over time due to the deterioration and poor
design of the roof, exacerbated by inadequate internal ventilation
the mould on the eaves was not caused by the cyclone or inadequate repairs;
rather, it was pre-existing
the galvanised metal flat bar strapping to the carport of Units 4 and 5 may be
„unsightly‟ but it is not defective work.
The complainant disputes this decision and wants this damage covered.
Complainant has established prima facie claim
The Panel has reviewed the available evidence and has determined, on the balance
of probabilities, that the complainant has established a prima facie claim for
accidental loss or damage under the policy.
This is so for the following reasons. Firstly, there is no dispute the cyclone caused
significant damage to the property, including the tearing away of the guttering, impact
to the external roof sheeting, water ingress to numerous ceilings, the breaking away
of the block wall from the carport, the lifting and flapping of the carport roof. The wind
was sufficiently strong to have caused the initial damage.
CC‟s report links the observed damage with the cyclone and/or deficiencies in the
in surer‟s repairs. The report is reasonably detailed and supported by numerous
photographs.
Determination | Case number: 727220 Page 6 of 18
In relation to the external roof and batten issues, CC provided photographs to support
his view that the damage was caused by the cyclone. The complainant has, in
addition, provided photos of apparently uplifted roof screws and battens.
In relation to the water ingress and mould issues, there is no dispute water entered
during the cyclone event or that this water made its way from the roof into the ceilings
of the various units, and it was those ceilings that subsequently developed mould.
The insurer only undertook painting of the water-affected ceilings of the units (apart
from Unit 1, which it repaired).
T he complainant‟s evidence suggests that no water ingress / mould issues occurred
prior to the cyclone. T he complainant‟s mycological expert, MT, notes that “the
property presents a typical picture of cross fungal contamination after the initial
remediation failed to completely remove all contaminants ” .
In relation to the mould on the eaves / soffits, there is a plausible link with water from
the cyclone event. However, the Panel has noted the photograph in M‟s report shows
mould under the eaves from a sale photo taken in 2011-2012.
The damage / rectification issues can be described as accidental damage, being
unexpectedly or unintentionally caused, on balance, by either the cyclone or the
repairer‟s negligence .
For these reasons, the Panel is satisfied the complainant has established a prima
facie claim for the disputed damage.
The only exception to this is the flat bar strapping; the complainant has not provided
sufficient evidence to establish the ostensibly „unsightly‟ appearance of the strapping
amounts to poor workmanship requiring rectification.
The onus now shifts to the insurer to establish the application of an exclusion or to
show it is otherwise entitled to decline the claim.
Insurer has not established all exclusions apply
Having carefully reviewed the information provided by both parties, the Panel is not
satisfied the insurer has fully discharged its burden to establish the exclusions it relies
upon or that all the disputed damage was pre-existing.
The insurer‟s submission rests heavily on the engineering report of M. The
complainant‟s key expert evidence is the report of CC. The complainant also refers to
the report of LB, but this report carries limited weight: LB does not distinguish
between claim and non-claim related issues or provide a substantive causal analysis
or photographs in support of his conclusions.
The Panel acknowledges that M, being an engineer, is more formally qualified than
CC, being a builder, to provide an analysis on certain aspects of causation.
Determination | Case number: 727220 Page 7 of 18
For the reasons set out below, the available information does, on balance,
substantially support the insurer‟s position.
External roof damage and mould not consistent with cyclone
The engineer says there is no evidence of wind damage to the sheeting, noting an
absence of „lap lift or distortion‟. However, CC says the puckering and uplift is
consistent with the effect of cyclone wind damage. The Panel has noted that the lower
roof connection to the carport came loose and this section of roof was flapping
around.
M says further that roof screws were missing and concludes this is due to wear and
tear. M also says there are some instances of non-compliant screw patterns. He adds
further that the intersection between the upper roof and the veranda to Unit 1 is poorly
designed / constructed and this, in combination with absen t roof screws, has „likely‟
led to water ingress.
M asserts that the roof is in poor condition. The photographs provided appear to
support M‟s assertion, and both CC and the loss adjuster found the roof to be in
„average‟ and „ fair ‟ condition respectively. M inspected the building about 21 months
after the initial event, so it is conceivable that some of what he observed may have
developed during this time. However, the Panel is satisfied, on balance, that the roof
was in poor condition prior to the cyclone.
There is mention by M of debris in the roof valleys. Similarly, M speaks of „several‟
cable penetrations that leak. The complainant says the cable penetrations are only on
the roof above Unit 6, which has had no resultant water ingress. However, the Panel
is satisfied that leaks tend to travel and do not always impact directly below the entry
point.
It is clear the roof had a degree of wear and tear requiring maintenance, including
corrosion to certain screws, deteriorated outer purlins and the other items noted by M.
It does not, however, automatically follow that the deterioration caused water ingress
or, if it did, that this ingress was the dominant cause of the damage in question.
These matters are for the insurer to establish on the balance of probabilities.
The complainant‟s mycological report does not add much weight to either party‟s
position. The author tests the extent of mould around the property but does not
provide a comprehensive analysis of its origin. The tests are limited to Unit 1. The
report tentatively supports the complainant in that the expert suggests the mould is
consistent with cyclone water ingress and a failure to remediate the mould initially.
The insurer has pointed out mould was observed to areas not affected by cyclone
water ingress and in the Panel‟s view does show, on balance, there were some pre-
existing mould issues.
Determination | Case number: 727220 Page 8 of 18
The Panel is of the view that M has demonstrated that the re was a degree of pre-
existing mould present in the property and that maintenance or design issues
contributed to this. The Panel acknowledges the insurer failed, at first instance, to
conduct and document a thorough assessment of the cause and extent of damage –
including mould. However, the Panel is satisfied that information and reports which
have been provided, on balance, show the external roof damage and mould are not
consistent with having been caused by the insured event.
The complainant has recently requested that the mycological report be paid as part of
this determination.
AFCA takes a conservative approach to awarding such costs and the Panel is of the
view that this report did not contribute to its finding.
The Panel does not order that the insurer should reimburse this report.
Batten uplift consistent with cyclone
The insurer did not inspect the roof cavities following the lodgement of the claim.
Subsequently M inspected the battens and said that there was no batten uplift. M did
provide photographs to show that some of the roofing attachments had missed the
battens.
However, the finding in relation to batten uplift is contradicted by the photographs
from CC and the complainant.
M suggests there may be some design / construction issues with the battens (such as
splitting, inadequate lap treatment and the nails from the roof missing the battens),
but does not explain the significance of such issues, and does not link them to the
batten uplift observed by CC. Moreover, in the absence of an analysis of the uplift,
M‟s observations about the other issues with the battens are questionabl e.
M does say that “f rom experience the batten will not lift from the truss before the
batten breaks ”, but this comment carries limited weight considering the batt en uplift
appears apparent from CC‟s photographs.
Wind speed analysis not determinative
The analysis of both the roof damage and batten uplift is affected by a consideration
of the likely wind speed / pressure engendered by the cyclone.
The builder CC does not deal with the matter, but M does. M draws on data from a
university research paper to conclude that:
The building was subject to relatively low wind speeds and pressures during
Cyclone Debbie. Active pressures during the storm were approximately 65% of
the magnitude of a design storm event …
Determination | Case number: 727220 Page 9 of 18
Wind speeds in the … area during Cyclone Debbie were less than the design
value applicable under current design codes. [The area] was subject to
approximately 80% of the V500 0.2sec Gust wind speed which is the basis of
design of structures under AS 1170.2. A wind speed of 80% of the design value
produces design pressures of the order of 65% of design pressures.
The Panel does not consider this analysis conclusive. Firstly, it is brief and apparently
only considers averages.
Secondly, M does not establish that AS 1170.2 was the applicable building standard
at the time this particular property was built. Neither does M establish whether or not
the property complied with AS 1170.2. Assuming the property was not required to –
and did not – comply with the standard, then even a wind speed of less than the
maximum under AS1170.2 may be capable of causing damage more severe than
otherwise expected.
Thirdly , even if the Panel accepts that the wind speed was “relatively low”, the
engineer does not explain the extent of damage that such wind could – or could not –
cause.
The Panel was swayed by the photographs which to some extent show separation of
the roof battens. On balance the Panel accepts that this could have occurred during
wind pressure from cyclone Debbie.
Although the parties dispute the extent of M‟s inspection of the roof cavities, it is not
necessary for the Panel to make a finding about this, since the Panel accepts there is
uplift and neither M nor the insurer has explained it.
Mould on eaves not consistent with cyclone and / or leaks from guttering
The insurer says the mould on the eaves / soffits pre-dates the cyclone.
The loss adjuster says they did not observe mould on the eaves during their
inspection on 28 April 2017, and neither did the repairer in their inspection on 8 May
2017.
M includes in his report a photograph which shows mould on the eaves. He says this
photograph is dated 2011-2012 and comes from an online advertisement for the sale
of one of the units at that time.
The complainant says the photograph referred to by the engineer is not in fact dated
2011-2012 but is rather a current photograph of the units used by the real estate
agent to advertise for rent.
The Panel is satisfied the insurer has established the mould on the eaves was pre-
existing and notes that the photograph of the property from 2011 still appears online.
Insurer to cover the claim – quantum of liability is to be assessed
For the reasons set out above, the Panel is satisfied:
Determination | Case number: 727220 Page 10 of 18
the complainant has established a prima facie claim for the disputed damage to the
roof battens,
the insurer is responsible for reaffixing the battens
but, the insurer has established that exclusions apply, or it is otherwise entitled to
deny the balance of the claim
There is insufficient information regarding the quantum of the loss for the Panel to
determine the issue. It must be assessed as part of the settlement process.
Within 28 days of the complainant‟s acceptance of this determination, appoint an
independent engineer to provide an actionable scope of works for the reaffixing of the
battens and any associated works.
The Panel accepts that there is a breakdown in the relationship between the insurer
and the complainant.
In the circumstance the insurer is to cash settle the claim. The insurer is to uplift the
amount by 20 % to cover contingencies.
Determination | Case number: 727220 Page 11 of 18
3 Supporting information
3.1 Summary of key information
Chronology of key events / documents
This chronology is a general summary of key events and documents in the claims
process. It does not record every document or instance of contact between the
parties.
Unless text appears in “quotation marks”, it has been paraphrased or represents the
comments of the AFCA Case Manager.
Abbreviations:
Com = the complainant or their representatives
FF = the insurer
SOW = scope of works
Document / event & date Details
Claim lodgement
28 Mar 2017
Tenants report wind - driven rain entering the property through
the windows and the roof space
Com attends on 30 March to find other damage, including
guttering blown off the rear of the property, carport damage,
impact from fallen trees to guttering and roof sheets
FF’s expert (loss adjuster)
Building asse ssment
28 Apr 2017
Initial attendance by loss adjuster who says they did not
identify any resultant damage "with regard to water ingress or
staining on the eaves"
No formal assessment report has been provided b eyond the
loss adjuster's notes
FF’s expert ( CQB)
Building asse ssment
8 May 2017
No formal assessment report has been provided b eyond the
loss adjuster's notes
Com requests reinspection
mid Oct 2017
Com requests reinspection of damage, including painting of
eaves due to mould, wash down of the property to clean
debris away, damage to the boundary fenc e, replacement of
extra roof sheets damaged by impact
FF’s expert ( CQB)
Re - asse ssment
25 Oct 2017
No formal assessment report has been provided b eyond the
loss adjuster's notes
Determination | Case number: 727220 Page 12 of 18
Document / event & date Details
FF’s expert s ( CQB and loss adjuster )
Re - asse ssment
25 Nov 2017
No formal assessment report has been provided, but the loss
adjuster says:
re mould on the eaves, this is not related to the ins ured event.
The loss adjuster inspected the property on 28 April 201 7 and
the builder inspected on 8 May 2017 and neither noticed
resultant damage / water ingress / staining on the eaves
the cyclone debris should be covered
a portion of the boundary fence damage should be covered
two additional roof sheets should be covered as they were
damaged by tree impact
FF’s expert ( CQB)
Re - asse ssment of unit 6
28 Nov 2017
Report is expressed to be “without prejudice”
“ On inspection of property I can confirm that all ceilings to
Unit 6 isn't consistent with Cyclone damage and in my
professional opinion it is clearly from wear and tear. ”
“Maintenance issues: Install an exhaust fan as Bathrooms are
particularly prone to moisture problems caused by high
humidity. Every time you run hot water, you creat e steam.
That steam penetrate s every crevice, and soon cools down
and turns to water resulting in condens ation and cause
damage to ceiling, cornices, walls, mould and mildew. ”
FF’s expert (loss adjuster)
Update
4 Dec 2017
Loss adjuster notes that repairs are mostly complete
FF’s exp ert (loss adjuster)
Update
14 Mar 2018
Loss adjuster notes that final variation repairs are complete
Com email to FF
Sep 2018
Com says roof of units still leaking since the repairs
Com email to FF
Nov 2018
New claim / complaint by Com re repairs
Com’ s expert ( CC )
Building asse ssment
12 Nov 2018
Summary of findings
“This Commercial Building Complex has sustained what is
described as an average quantity of high winds, impact
damage and water damage which includes to the following:”
Determination | Case number: 727220 Page 13 of 18
Document / event & date Details
Roof linings – units 1 - 6
> “Lower front elevation roof lifting and puckering of 30% of
all roof sheeting.
> Rear carport area roof lifting and puckering of 20% of all
roof sheeting.
> Upper level main building roof lifting and puckering of 30%
of all roof sheets.
> Randomly and to all roofs some lifted Screws, minor dents
and some scratches.”
Loft cavities – units 1 - 6
> “Approximately 23.333% average of all roof battens
identified high winds uplift ranging from 4mm to 10mm”
Inspection of insurer‟s repairs
Unit 1
> “a.) Painting of all ceilings of Lounge/Kitchen, Laundry,
Bedroom 2 and hallway performed were defective poor
workmanship and included roller marks and very thin one
coat paintwork.
> b.) Boards to balcony relaced have not been repainted to
match that of th e remaining balcony decking”
Unit 2
> “c.) Painting of all ceilings of Lounge/Kitchen, Bedroom 1,
Bedroom 2, Bathroom and hallway performed were
defective poor workmanship and included roller marks and
very thin one coat paint work.
> d.) Both the Lounge room and Bedroom 2 ceilings also
have mould staining reappearing which was defective
repairs performed now requiring the entire removal and
replacement of all affected mould damaged ceiling sheeting
and total painting.”
Unit 3
> “No internal repairs performed.”
Unit 4
> “Painting of all ceilings of Bedroom 1 and Bathroom
performed were defective poor workmanship and included
roller marks and very thin one coat paintwork.
> f.) Use of metal galvaniz ed flat bar strapping was
considered unsightly and not the appropri ate repairs
performed.
> g.) I do not believe a quantity of 24M² of painting to the
carport wall has been performed rather a patching only of a
smaller quantity only has been performed of approximately
6 - 8M².”
Determination | Case number: 727220 Page 14 of 18
Document / event & date Details
Unit 5
> “h.) Painting of all ceilings of Bedroo m 1, Bedroom 2 and
Bathroom performed were defective poor workmanship and
included roller marks and very thin one coat paintwork.
> i.) Bathroom ceiling has mould staining that has returned
which indicates poor workmanship performed during the
repainting of ceiling, now requires the ceiling to be removed
and replaced and painted.
> j.) Use of metal galvanized flat bar strapping was
considered unsightly and not the appropriate repairs
performed.
> k.) I do not believe a quantity of 24M² of painting to the
carpo rt wall has been performed rather a patching only of a
smaller quantity only has been performed of approximately
6 - 8M².”
Unit 6
> “No internal repairs performed.”
General
> “l.) Eaves guttering replaced does see all joints or joins
leaking during rain periods and is considered poor defective
workmanship.
> m.) All eaves and soffits around the building with the
exclusion of the Unit One balcony are now suffering from
extreme mo uld staining and are now required to be
removed and replaced and painted.”
Conclusions
“In conclusion, I consider this Commercial Building Complex
has sustained an average quantity of Tropical Cyclone
Debbie damage that included high winds, impact damage and
water damage, which as they have been left with damaged
roofing, this Property and Buildings have become far worse
with time since the initial event of TC Debbie. ”
“This Commercial Property has sustained damage to all
areas as described in the Report D etails above, and I do not
consider that there are any pre - existing problem issues which
have had seen any consequences on the now obvious and
full extent of TC Debbie damage.”
FF’s expert (M)
Engineering asse ssment
23 Jan 2019
Summary
Inspection is sa id to have been undertaken in Dec 2018
“ The building was subject to relatively low wind speeds and
pressures during Cyclone Debbie. Active pressures during
the storm were approximately 65% of the magnitude of a
design storm event. ”
“ The building is in poor condition. The roof screws show
extensive corrosion and in some cases have corroded
through providing no restraint. The screws at the outer edge
Determination | Case number: 727220 Page 15 of 18
Document / event & date Details
of the roof are in the worst condition. It is estimated that 10%
of the screws are loose or provide little restraint. ”
Wind speed
„ Wind speeds in the … area during Cyclone Debbie were less
than the design value applicable under current design codes.
[The area] was subject to approximately 80% of the V500
0.2sec Gust wind speed which is the basis of design of
structures under AS 1170.2. A wind speed of 80% of the
design value produces design pressures of the order of 65%
of design pressures. ‟
Roof cladding
“ The roof cladding has been damaged locally due to impact.
Part of the impacted roof has been replaced , part remains to
be replaced. ”
“ The cladding has not been subject to lap lift or distortion due
to wind pressure, with no evidence of overall wind damage
observed. Replacement of the roof cladding is not required
beyond local damaged areas. An estimate of the effected roof
sheeting is < 10% of the total roof area to the upper and
lower roof. The issue of the det eriorated outer purlin
throughout the roofs needs to be addressed as a
maintenance issue as the roof may be unstable during future
heavy winds. ”
“The intersection between the upper roof and the veranda to
unit 1 is poorly designed/constructed. The roof pitch to the
veranda roof is very flat and water has penetrated under the
upper lap and likely into the roof cavity. The screws at the
connection ha ve been corroded over a long period of time
and several have been lost having corroded through.”
“The vallies on the upper roof were partially filled with debris
which may cause the valley to block during a heavy storm
with resulting water entry to the ro of cavity.”
“T here are several penet rations in the upper roof that have
been made to allow communications cables to pass through.
The holes have been sealed with flexible sealant. The
arrangement currently leaks and should be fixed as a
maintenance item.”
Mouldy eaves
“ The eaves were mildewed. It was reported by the owners of
the property that the mildew was not noticed prior to the
cyclone. The mildew was present prior to the cyclone and
was observed immediat ely after the event. Photographs were
observe d on the internet when unit 2 was placed on the
market in 2011 - 12. The photograph indicates strong mildew
staining to the lower and upper level eaves. ”
Roof cavity
Determination | Case number: 727220 Page 16 of 18
Document / event & date Details
“ The roof cavity on four of the five units was inspected.
Approximately 80% of the roof cav ity on the four units was
inspected. Access to the remaining 20% was restricted. In the
whole of the area of the units viewed there was no sign of
batten lift. The battens are screwed and are hardwood, fixed
to hardwood trusses. From experience the batten will not lift
from the truss before the batten breaks. ”
“ Two battens were observed split over the truss. It appeared
that the split was long term. ”
“T here were instances of the roof screws missing the batten. ”
Internal areas
“ An inspection of the internal area of each unit, other than
Unit 2, was undertaken. Water had entered the units during
the cyclone. Internal areas had been cleaned and re - paint ed
following the cyclone. Several areas have at a later point
been affected by mould. These areas should be t reat ed and
re - painted. The mould may re - occur because of the problems
with roof security resulting from lack of maint enance. ”
FF’s expert ( CQB )
Rectification quote
29 Jan 2019
Repair quote and SOW following recommendations in M’s
engineering report
Com’ s expert (MT)
Mycological report
22 July 2020
Report on the mould issues in Unit 1.
“ property presents a typical picture of cross fungal
contamination after the initial remediation failed to completely
remove all contaminants . Even so cont amination levels are
low in most areas, the shift in species range clearly indicates
an indoor source of mould cont amination.”
Key policy provisions
Insuring provision – Accidental damage at the property
WHAT‟S COVERED
Your Buildings and Common Contents that are at the Location. They are covered
against accidental loss or damage.
Specific exclusions
WHAT‟S NOT COVERED
Determination | Case number: 727220 Page 17 of 18
This section does not cover any claims of any kind whatsoever directly or
indirectly relating to, arising out of or in connection with:
…
(2) Fault, error or omission in design.
(3) Gradual deterioration.
…
(5) Loss or damage that arises from:
…
[d] Insects, mildew, Mould, rot or vermin.
…
[f] Latent, structural or inherent defect.
[g] Wear, action of light.
General exclusions
This policy does not cover any claims of any kind whatsoever directly or indirectly
relating to, arising out of or in connection with:
…
Mould
The presence, growth, proliferation, spread or activity of a biological agent,
including but not limited to, mould, fungus, spores, mildew, mushrooms, yeast, or
biocontaminents or any by- products therefrom (hereafter “Mould”). This exclusion
shall apply notwithstanding there are perils other than biological agents which
may have actually or allegedly, in whole or in part, directly or indirectly,
contributed concurrently or consecutively or in any sequence to a loss.
If the claim includes any item of damage in relation to Mould, We agree to only
indemnify for that portion of the damages that does not arise by reason of Mould,
either directly or indirectly.
In the event a claim includes an item of damage for Mould We are only obligated
to indemnify for a portion of the cost of defending the claim having regard to the
portion of the damages that consists of Mould and the cost of remediating the
Mould as compared with the damage or cost not attributable to Mould.
Determination | Case number: 727220 Page 18 of 18
Extra benefits
In addition to the Sum Insured stated on Your Certificate, We will also pay You for
the following extra benefits.
…
(4) Claim Preparation Costs
We will pay for those reasonable costs that You incur in providing the claim
details that We need. The most that We will pay under this benefit is $30,000.
(10) Finding the Cause of Loss or Damage
We will pay the cost of finding the cause of loss or damage that is covered by this
section. The cost must be reasonable. The most that We will pay under this
benefit is $5,000.