Home / Lloyd's / Determination 727220

Determination 727220

Disputed cyclone damage and quality of repairs under strata policy

FirmLloyd's
Decided2021-06-17
ProductGeneral Insurance · Strata
OutcomeFor the complainant in part
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

A strata owners corporation representative claimed cyclone Debbie damage and defective repairs. AFCA found the insurer must reattach roof battens and cash settle with a 20% contingency uplift, but rejected the claim for most of the roof and mould damage.

The complainant established a prima facie accidental batten claim, but the insurer showed exclusions for wear, corrosion, design and pre-existing mould for the balance.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimrepair or rectify

Related

All Lloyd's determinations · Find similar determinations

Text of the determination

Determination Case number 727220 Financial firm Lloyd's Australia Limited Determination | Case number: 727220 Page 2 of 18 Case number: 727220 31 May 2021 1 Determination overview The complainant is a representative of an owner‟s corporation which holds strata insurance in respect of a number of residential units underwritten by the financial firm (insurer). On 28 March 2017, the complainant lodged a claim for damage to the units from tropical cyclone Debbie. The insurer accepted the claim. A dispute has arisen over the extent of the damage due to the insured event and the quality of the insurer‟s repairs. 1.1 Issues and key findings Is the insurer liable for the disputed damage? On the information provided the Panel is satisfied:  The complainant has established a prima facie case  the insurer is responsible for reattaching the roof batons  the majority of the damage to the roof is excluded under the policy  the mould was pre-existing The insurer is to arrange an actionable scope of works, by an independent engineer, to reattach the roof battens and associated works. Due to the breakdown in the relationship between the parties the Panel is of the view this matter should be cash settled. The insurer is to uplift the amount determined by the scope of works by 20 % to cover contingencies. 1.2 Determination This determination is partially in favour of the complainant. Within 28 days of the complainant‟s acceptance of this determination, the ins urer is to arrange for an actionable scope of works, by an independent engineer, to reattach the roof battens and associated works. The insurer is to cash settle the claim and include a 20% uplift to cover contingencies. Determination | Case number: 727220 Page 3 of 18 2 Reasons for determination There has been a full exchange of material between the parties, and each party has had the opportunity to address the issues arising from that. Due to the nature of / complexities involved in this dispute, it has been referred to a Panel for determination. The Panel reviewed and considered all the material provided by the parties. While the parties raised various issues in their submissions, for the purposes of this determination, the Panel restricted its commentary to those issues which it considers directly relevant to the outcome. This determination follows consideration of all the information exchanged. It is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and previous AFCA decisions where applicable. 2.1 Is the insurer liable for the disputed damage? Onus on complainant to establish prima facie claim The policy covers „ accidental loss or damage ‟ to the insured property. The term is not defined in the policy. The Panel accepts accidental loss or damage is that which is caused unexpectedly or unintentionally. The complainant bears the onus to establish the disputed damage was caused accidentally. This is known as a prima facie claim. If she can do so, the onus of proof shifts to the insurer to establish the application of an exclusion or to show it is otherwise entitled to decline the claim. The insurer relies upon policy exclusions for claims arising out of:  fault, error or omission in design  wear and tear; gradual deterioration.  mildew, mould. Relevant policy provisions and a chronology of key documents and events are set out at section 3 of this determination. Cyclone Debbie damaged the insured units Around 28 March 2017, Cyclone Debbie damaged the insured property. The insurer arranged an assessment of the damage by a loss adjuster and a designated repairer although, beyond the loss adjuster's notes, no detailed assessment report was drafted. Determination | Case number: 727220 Page 4 of 18 The damage initially observed and addressed b y the repairer was described as follows:  rear elevation – 50 lineal metres damaged gutter – level I & 2 combined  front elevation – 6 lineal metres damaged gutter  Unit 1 – ceiling repair to lounge room and staircase ceiling, water staining to lounge, laundry, bathroom and bedroom 2 ceilings  Unit 2 – water staining to bedroom 1 and 2, bathroom and hallway ceilings, water staining to garage wall  Unit 4 – water staining to bedroom 1 and bathroom ceiling  Unit 4 carport – cracked block work repair & painting of garage wall  Unit 5 – water staining to bedroom 1 and 2 ceiling and bathroom ceiling  Unit 5 carport – cracked block work repair and painting garage wall  damage to a TV antenna. In mid-November 2017, at the request of the complainant, the loss adjuster re- attended the property to review additional issues, being:  mould on the eaves – which the adjuster said was unrelated to the cyclone  cyclone debris – which the insurer covered  impact damage to the boundary fence – a portion of which the insurer covered  tree impact damage to two roof sheets – which the insurer covered. The repairs (including variations) took place in mid and late 2017 and were finally completed in March 2018. In late 2018, the complainant told the insurer the roof was still leaking and decided to engage a builder, CC, to review the initial cyclone damage as well as the quality of the insurer‟s repairs. Complainant says insurer overlooked damage and its repairs were defective CC‟s report identified cyclone damage overlooked by the insurer‟s builder and defects in its repair work. The builder determined, among other things, that:  the original repairer overlooked significant damage to the roof sheeting (including denting, puckering, uplift), uplifted battens in the roof cavities and mould on the external eaves / soffits  the failure of the repairer to properly address the roof damage resulted in further water ingress and mould to the ceilings  there were various instances of defective repairs by the insurer‟s repairer (such as inadequate painting). Determination | Case number: 727220 Page 5 of 18 In general terms, these findings were affirmed by another builder engaged by the complainant, LB. The insurer then engaged an engineer, M, to assess the damage and repairs. Following this report, the insurer agreed to:  remedy defective guttering repairs  replace about 11 additional roof sheets  reclean and repaint ceilings in Units 1, 2, 4 and 5  repaint balcony boards of Unit 1  replace and repaint the water damaged ceiling in the bathroom of Unit 5  repaint the carport wall of Units 4 and 5. However, the insurer, relying substantially on M‟s engineering report found:  the balance of the disputed external roof damage was caused by corrosion, wear and tear, and defective construction  there is no damage to the battens  the internal mould is from water ingress over time due to the deterioration and poor design of the roof, exacerbated by inadequate internal ventilation  the mould on the eaves was not caused by the cyclone or inadequate repairs; rather, it was pre-existing  the galvanised metal flat bar strapping to the carport of Units 4 and 5 may be „unsightly‟ but it is not defective work. The complainant disputes this decision and wants this damage covered. Complainant has established prima facie claim The Panel has reviewed the available evidence and has determined, on the balance of probabilities, that the complainant has established a prima facie claim for accidental loss or damage under the policy. This is so for the following reasons. Firstly, there is no dispute the cyclone caused significant damage to the property, including the tearing away of the guttering, impact to the external roof sheeting, water ingress to numerous ceilings, the breaking away of the block wall from the carport, the lifting and flapping of the carport roof. The wind was sufficiently strong to have caused the initial damage. CC‟s report links the observed damage with the cyclone and/or deficiencies in the in surer‟s repairs. The report is reasonably detailed and supported by numerous photographs. Determination | Case number: 727220 Page 6 of 18 In relation to the external roof and batten issues, CC provided photographs to support his view that the damage was caused by the cyclone. The complainant has, in addition, provided photos of apparently uplifted roof screws and battens. In relation to the water ingress and mould issues, there is no dispute water entered during the cyclone event or that this water made its way from the roof into the ceilings of the various units, and it was those ceilings that subsequently developed mould. The insurer only undertook painting of the water-affected ceilings of the units (apart from Unit 1, which it repaired). T he complainant‟s evidence suggests that no water ingress / mould issues occurred prior to the cyclone. T he complainant‟s mycological expert, MT, notes that “the property presents a typical picture of cross fungal contamination after the initial remediation failed to completely remove all contaminants ” . In relation to the mould on the eaves / soffits, there is a plausible link with water from the cyclone event. However, the Panel has noted the photograph in M‟s report shows mould under the eaves from a sale photo taken in 2011-2012. The damage / rectification issues can be described as accidental damage, being unexpectedly or unintentionally caused, on balance, by either the cyclone or the repairer‟s negligence . For these reasons, the Panel is satisfied the complainant has established a prima facie claim for the disputed damage. The only exception to this is the flat bar strapping; the complainant has not provided sufficient evidence to establish the ostensibly „unsightly‟ appearance of the strapping amounts to poor workmanship requiring rectification. The onus now shifts to the insurer to establish the application of an exclusion or to show it is otherwise entitled to decline the claim. Insurer has not established all exclusions apply Having carefully reviewed the information provided by both parties, the Panel is not satisfied the insurer has fully discharged its burden to establish the exclusions it relies upon or that all the disputed damage was pre-existing. The insurer‟s submission rests heavily on the engineering report of M. The complainant‟s key expert evidence is the report of CC. The complainant also refers to the report of LB, but this report carries limited weight: LB does not distinguish between claim and non-claim related issues or provide a substantive causal analysis or photographs in support of his conclusions. The Panel acknowledges that M, being an engineer, is more formally qualified than CC, being a builder, to provide an analysis on certain aspects of causation. Determination | Case number: 727220 Page 7 of 18 For the reasons set out below, the available information does, on balance, substantially support the insurer‟s position. External roof damage and mould not consistent with cyclone The engineer says there is no evidence of wind damage to the sheeting, noting an absence of „lap lift or distortion‟. However, CC says the puckering and uplift is consistent with the effect of cyclone wind damage. The Panel has noted that the lower roof connection to the carport came loose and this section of roof was flapping around. M says further that roof screws were missing and concludes this is due to wear and tear. M also says there are some instances of non-compliant screw patterns. He adds further that the intersection between the upper roof and the veranda to Unit 1 is poorly designed / constructed and this, in combination with absen t roof screws, has „likely‟ led to water ingress. M asserts that the roof is in poor condition. The photographs provided appear to support M‟s assertion, and both CC and the loss adjuster found the roof to be in „average‟ and „ fair ‟ condition respectively. M inspected the building about 21 months after the initial event, so it is conceivable that some of what he observed may have developed during this time. However, the Panel is satisfied, on balance, that the roof was in poor condition prior to the cyclone. There is mention by M of debris in the roof valleys. Similarly, M speaks of „several‟ cable penetrations that leak. The complainant says the cable penetrations are only on the roof above Unit 6, which has had no resultant water ingress. However, the Panel is satisfied that leaks tend to travel and do not always impact directly below the entry point. It is clear the roof had a degree of wear and tear requiring maintenance, including corrosion to certain screws, deteriorated outer purlins and the other items noted by M. It does not, however, automatically follow that the deterioration caused water ingress or, if it did, that this ingress was the dominant cause of the damage in question. These matters are for the insurer to establish on the balance of probabilities. The complainant‟s mycological report does not add much weight to either party‟s position. The author tests the extent of mould around the property but does not provide a comprehensive analysis of its origin. The tests are limited to Unit 1. The report tentatively supports the complainant in that the expert suggests the mould is consistent with cyclone water ingress and a failure to remediate the mould initially. The insurer has pointed out mould was observed to areas not affected by cyclone water ingress and in the Panel‟s view does show, on balance, there were some pre- existing mould issues. Determination | Case number: 727220 Page 8 of 18 The Panel is of the view that M has demonstrated that the re was a degree of pre- existing mould present in the property and that maintenance or design issues contributed to this. The Panel acknowledges the insurer failed, at first instance, to conduct and document a thorough assessment of the cause and extent of damage – including mould. However, the Panel is satisfied that information and reports which have been provided, on balance, show the external roof damage and mould are not consistent with having been caused by the insured event. The complainant has recently requested that the mycological report be paid as part of this determination. AFCA takes a conservative approach to awarding such costs and the Panel is of the view that this report did not contribute to its finding. The Panel does not order that the insurer should reimburse this report. Batten uplift consistent with cyclone The insurer did not inspect the roof cavities following the lodgement of the claim. Subsequently M inspected the battens and said that there was no batten uplift. M did provide photographs to show that some of the roofing attachments had missed the battens. However, the finding in relation to batten uplift is contradicted by the photographs from CC and the complainant. M suggests there may be some design / construction issues with the battens (such as splitting, inadequate lap treatment and the nails from the roof missing the battens), but does not explain the significance of such issues, and does not link them to the batten uplift observed by CC. Moreover, in the absence of an analysis of the uplift, M‟s observations about the other issues with the battens are questionabl e. M does say that “f rom experience the batten will not lift from the truss before the batten breaks ”, but this comment carries limited weight considering the batt en uplift appears apparent from CC‟s photographs. Wind speed analysis not determinative The analysis of both the roof damage and batten uplift is affected by a consideration of the likely wind speed / pressure engendered by the cyclone. The builder CC does not deal with the matter, but M does. M draws on data from a university research paper to conclude that: The building was subject to relatively low wind speeds and pressures during Cyclone Debbie. Active pressures during the storm were approximately 65% of the magnitude of a design storm event … Determination | Case number: 727220 Page 9 of 18 Wind speeds in the … area during Cyclone Debbie were less than the design value applicable under current design codes. [The area] was subject to approximately 80% of the V500 0.2sec Gust wind speed which is the basis of design of structures under AS 1170.2. A wind speed of 80% of the design value produces design pressures of the order of 65% of design pressures. The Panel does not consider this analysis conclusive. Firstly, it is brief and apparently only considers averages. Secondly, M does not establish that AS 1170.2 was the applicable building standard at the time this particular property was built. Neither does M establish whether or not the property complied with AS 1170.2. Assuming the property was not required to – and did not – comply with the standard, then even a wind speed of less than the maximum under AS1170.2 may be capable of causing damage more severe than otherwise expected. Thirdly , even if the Panel accepts that the wind speed was “relatively low”, the engineer does not explain the extent of damage that such wind could – or could not – cause. The Panel was swayed by the photographs which to some extent show separation of the roof battens. On balance the Panel accepts that this could have occurred during wind pressure from cyclone Debbie. Although the parties dispute the extent of M‟s inspection of the roof cavities, it is not necessary for the Panel to make a finding about this, since the Panel accepts there is uplift and neither M nor the insurer has explained it. Mould on eaves not consistent with cyclone and / or leaks from guttering The insurer says the mould on the eaves / soffits pre-dates the cyclone. The loss adjuster says they did not observe mould on the eaves during their inspection on 28 April 2017, and neither did the repairer in their inspection on 8 May 2017. M includes in his report a photograph which shows mould on the eaves. He says this photograph is dated 2011-2012 and comes from an online advertisement for the sale of one of the units at that time. The complainant says the photograph referred to by the engineer is not in fact dated 2011-2012 but is rather a current photograph of the units used by the real estate agent to advertise for rent. The Panel is satisfied the insurer has established the mould on the eaves was pre- existing and notes that the photograph of the property from 2011 still appears online. Insurer to cover the claim – quantum of liability is to be assessed For the reasons set out above, the Panel is satisfied: Determination | Case number: 727220 Page 10 of 18  the complainant has established a prima facie claim for the disputed damage to the roof battens,  the insurer is responsible for reaffixing the battens  but, the insurer has established that exclusions apply, or it is otherwise entitled to deny the balance of the claim There is insufficient information regarding the quantum of the loss for the Panel to determine the issue. It must be assessed as part of the settlement process. Within 28 days of the complainant‟s acceptance of this determination, appoint an independent engineer to provide an actionable scope of works for the reaffixing of the battens and any associated works. The Panel accepts that there is a breakdown in the relationship between the insurer and the complainant. In the circumstance the insurer is to cash settle the claim. The insurer is to uplift the amount by 20 % to cover contingencies. Determination | Case number: 727220 Page 11 of 18 3 Supporting information 3.1 Summary of key information Chronology of key events / documents This chronology is a general summary of key events and documents in the claims process. It does not record every document or instance of contact between the parties. Unless text appears in “quotation marks”, it has been paraphrased or represents the comments of the AFCA Case Manager. Abbreviations:  Com = the complainant or their representatives  FF = the insurer  SOW = scope of works Document / event & date Details Claim lodgement 28 Mar 2017  Tenants report wind - driven rain entering the property through the windows and the roof space  Com attends on 30 March to find other damage, including guttering blown off the rear of the property, carport damage, impact from fallen trees to guttering and roof sheets FF’s expert (loss adjuster) Building asse ssment 28 Apr 2017  Initial attendance by loss adjuster who says they did not identify any resultant damage "with regard to water ingress or staining on the eaves"  No formal assessment report has been provided b eyond the loss adjuster's notes FF’s expert ( CQB) Building asse ssment 8 May 2017  No formal assessment report has been provided b eyond the loss adjuster's notes Com requests reinspection mid Oct 2017  Com requests reinspection of damage, including painting of eaves due to mould, wash down of the property to clean debris away, damage to the boundary fenc e, replacement of extra roof sheets damaged by impact FF’s expert ( CQB) Re - asse ssment 25 Oct 2017  No formal assessment report has been provided b eyond the loss adjuster's notes Determination | Case number: 727220 Page 12 of 18 Document / event & date Details FF’s expert s ( CQB and loss adjuster ) Re - asse ssment 25 Nov 2017 No formal assessment report has been provided, but the loss adjuster says:  re mould on the eaves, this is not related to the ins ured event. The loss adjuster inspected the property on 28 April 201 7 and the builder inspected on 8 May 2017 and neither noticed resultant damage / water ingress / staining on the eaves  the cyclone debris should be covered  a portion of the boundary fence damage should be covered  two additional roof sheets should be covered as they were damaged by tree impact FF’s expert ( CQB) Re - asse ssment of unit 6 28 Nov 2017  Report is expressed to be “without prejudice”  “ On inspection of property I can confirm that all ceilings to Unit 6 isn't consistent with Cyclone damage and in my professional opinion it is clearly from wear and tear. ”  “Maintenance issues: Install an exhaust fan as Bathrooms are particularly prone to moisture problems caused by high humidity. Every time you run hot water, you creat e steam. That steam penetrate s every crevice, and soon cools down and turns to water resulting in condens ation and cause damage to ceiling, cornices, walls, mould and mildew. ” FF’s expert (loss adjuster) Update 4 Dec 2017  Loss adjuster notes that repairs are mostly complete FF’s exp ert (loss adjuster) Update 14 Mar 2018  Loss adjuster notes that final variation repairs are complete Com email to FF Sep 2018  Com says roof of units still leaking since the repairs Com email to FF Nov 2018  New claim / complaint by Com re repairs Com’ s expert ( CC ) Building asse ssment 12 Nov 2018 Summary of findings “This Commercial Building Complex has sustained what is described as an average quantity of high winds, impact damage and water damage which includes to the following:” Determination | Case number: 727220 Page 13 of 18 Document / event & date Details  Roof linings – units 1 - 6 > “Lower front elevation roof lifting and puckering of 30% of all roof sheeting. > Rear carport area roof lifting and puckering of 20% of all roof sheeting. > Upper level main building roof lifting and puckering of 30% of all roof sheets. > Randomly and to all roofs some lifted Screws, minor dents and some scratches.”  Loft cavities – units 1 - 6 > “Approximately 23.333% average of all roof battens identified high winds uplift ranging from 4mm to 10mm”  Inspection of insurer‟s repairs  Unit 1 > “a.) Painting of all ceilings of Lounge/Kitchen, Laundry, Bedroom 2 and hallway performed were defective poor workmanship and included roller marks and very thin one coat paintwork. > b.) Boards to balcony relaced have not been repainted to match that of th e remaining balcony decking”  Unit 2 > “c.) Painting of all ceilings of Lounge/Kitchen, Bedroom 1, Bedroom 2, Bathroom and hallway performed were defective poor workmanship and included roller marks and very thin one coat paint work. > d.) Both the Lounge room and Bedroom 2 ceilings also have mould staining reappearing which was defective repairs performed now requiring the entire removal and replacement of all affected mould damaged ceiling sheeting and total painting.”  Unit 3 > “No internal repairs performed.”  Unit 4 > “Painting of all ceilings of Bedroom 1 and Bathroom performed were defective poor workmanship and included roller marks and very thin one coat paintwork. > f.) Use of metal galvaniz ed flat bar strapping was considered unsightly and not the appropri ate repairs performed. > g.) I do not believe a quantity of 24M² of painting to the carport wall has been performed rather a patching only of a smaller quantity only has been performed of approximately 6 - 8M².” Determination | Case number: 727220 Page 14 of 18 Document / event & date Details  Unit 5 > “h.) Painting of all ceilings of Bedroo m 1, Bedroom 2 and Bathroom performed were defective poor workmanship and included roller marks and very thin one coat paintwork. > i.) Bathroom ceiling has mould staining that has returned which indicates poor workmanship performed during the repainting of ceiling, now requires the ceiling to be removed and replaced and painted. > j.) Use of metal galvanized flat bar strapping was considered unsightly and not the appropriate repairs performed. > k.) I do not believe a quantity of 24M² of painting to the carpo rt wall has been performed rather a patching only of a smaller quantity only has been performed of approximately 6 - 8M².”  Unit 6 > “No internal repairs performed.”  General > “l.) Eaves guttering replaced does see all joints or joins leaking during rain periods and is considered poor defective workmanship. > m.) All eaves and soffits around the building with the exclusion of the Unit One balcony are now suffering from extreme mo uld staining and are now required to be removed and replaced and painted.” Conclusions  “In conclusion, I consider this Commercial Building Complex has sustained an average quantity of Tropical Cyclone Debbie damage that included high winds, impact damage and water damage, which as they have been left with damaged roofing, this Property and Buildings have become far worse with time since the initial event of TC Debbie. ”  “This Commercial Property has sustained damage to all areas as described in the Report D etails above, and I do not consider that there are any pre - existing problem issues which have had seen any consequences on the now obvious and full extent of TC Debbie damage.” FF’s expert (M) Engineering asse ssment 23 Jan 2019 Summary  Inspection is sa id to have been undertaken in Dec 2018  “ The building was subject to relatively low wind speeds and pressures during Cyclone Debbie. Active pressures during the storm were approximately 65% of the magnitude of a design storm event. ”  “ The building is in poor condition. The roof screws show extensive corrosion and in some cases have corroded through providing no restraint. The screws at the outer edge Determination | Case number: 727220 Page 15 of 18 Document / event & date Details of the roof are in the worst condition. It is estimated that 10% of the screws are loose or provide little restraint. ” Wind speed  „ Wind speeds in the … area during Cyclone Debbie were less than the design value applicable under current design codes. [The area] was subject to approximately 80% of the V500 0.2sec Gust wind speed which is the basis of design of structures under AS 1170.2. A wind speed of 80% of the design value produces design pressures of the order of 65% of design pressures. ‟ Roof cladding  “ The roof cladding has been damaged locally due to impact. Part of the impacted roof has been replaced , part remains to be replaced. ”  “ The cladding has not been subject to lap lift or distortion due to wind pressure, with no evidence of overall wind damage observed. Replacement of the roof cladding is not required beyond local damaged areas. An estimate of the effected roof sheeting is < 10% of the total roof area to the upper and lower roof. The issue of the det eriorated outer purlin throughout the roofs needs to be addressed as a maintenance issue as the roof may be unstable during future heavy winds. ”  “The intersection between the upper roof and the veranda to unit 1 is poorly designed/constructed. The roof pitch to the veranda roof is very flat and water has penetrated under the upper lap and likely into the roof cavity. The screws at the connection ha ve been corroded over a long period of time and several have been lost having corroded through.”  “The vallies on the upper roof were partially filled with debris which may cause the valley to block during a heavy storm with resulting water entry to the ro of cavity.”  “T here are several penet rations in the upper roof that have been made to allow communications cables to pass through. The holes have been sealed with flexible sealant. The arrangement currently leaks and should be fixed as a maintenance item.” Mouldy eaves  “ The eaves were mildewed. It was reported by the owners of the property that the mildew was not noticed prior to the cyclone. The mildew was present prior to the cyclone and was observed immediat ely after the event. Photographs were observe d on the internet when unit 2 was placed on the market in 2011 - 12. The photograph indicates strong mildew staining to the lower and upper level eaves. ” Roof cavity Determination | Case number: 727220 Page 16 of 18 Document / event & date Details  “ The roof cavity on four of the five units was inspected. Approximately 80% of the roof cav ity on the four units was inspected. Access to the remaining 20% was restricted. In the whole of the area of the units viewed there was no sign of batten lift. The battens are screwed and are hardwood, fixed to hardwood trusses. From experience the batten will not lift from the truss before the batten breaks. ”  “ Two battens were observed split over the truss. It appeared that the split was long term. ”  “T here were instances of the roof screws missing the batten. ” Internal areas  “ An inspection of the internal area of each unit, other than Unit 2, was undertaken. Water had entered the units during the cyclone. Internal areas had been cleaned and re - paint ed following the cyclone. Several areas have at a later point been affected by mould. These areas should be t reat ed and re - painted. The mould may re - occur because of the problems with roof security resulting from lack of maint enance. ” FF’s expert ( CQB ) Rectification quote 29 Jan 2019 Repair quote and SOW following recommendations in M’s engineering report Com’ s expert (MT) Mycological report 22 July 2020  Report on the mould issues in Unit 1.  “ property presents a typical picture of cross fungal contamination after the initial remediation failed to completely remove all contaminants . Even so cont amination levels are low in most areas, the shift in species range clearly indicates an indoor source of mould cont amination.” Key policy provisions Insuring provision – Accidental damage at the property WHAT‟S COVERED Your Buildings and Common Contents that are at the Location. They are covered against accidental loss or damage. Specific exclusions WHAT‟S NOT COVERED Determination | Case number: 727220 Page 17 of 18 This section does not cover any claims of any kind whatsoever directly or indirectly relating to, arising out of or in connection with: … (2) Fault, error or omission in design. (3) Gradual deterioration. … (5) Loss or damage that arises from: … [d] Insects, mildew, Mould, rot or vermin. … [f] Latent, structural or inherent defect. [g] Wear, action of light. General exclusions This policy does not cover any claims of any kind whatsoever directly or indirectly relating to, arising out of or in connection with: … Mould The presence, growth, proliferation, spread or activity of a biological agent, including but not limited to, mould, fungus, spores, mildew, mushrooms, yeast, or biocontaminents or any by- products therefrom (hereafter “Mould”). This exclusion shall apply notwithstanding there are perils other than biological agents which may have actually or allegedly, in whole or in part, directly or indirectly, contributed concurrently or consecutively or in any sequence to a loss. If the claim includes any item of damage in relation to Mould, We agree to only indemnify for that portion of the damages that does not arise by reason of Mould, either directly or indirectly. In the event a claim includes an item of damage for Mould We are only obligated to indemnify for a portion of the cost of defending the claim having regard to the portion of the damages that consists of Mould and the cost of remediating the Mould as compared with the damage or cost not attributable to Mould. Determination | Case number: 727220 Page 18 of 18 Extra benefits In addition to the Sum Insured stated on Your Certificate, We will also pay You for the following extra benefits. … (4) Claim Preparation Costs We will pay for those reasonable costs that You incur in providing the claim details that We need. The most that We will pay under this benefit is $30,000. (10) Finding the Cause of Loss or Damage We will pay the cost of finding the cause of loss or damage that is covered by this section. The cost must be reasonable. The most that We will pay under this benefit is $5,000.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.