Home / IAG / Determination 726407
Determination 726407
Insurer declined subsidence-related building damage claim linked to 2017 water leak
Summary
The complainant claimed building damage from a 2017 water leak that the insurer denied as subsidence; AFCA found the 2017 leak likely caused the damage and the exclusion did not apply. The insurer must appoint an independent engineer and builder to scope repairs and then settle, with interest on cash settlement and $1,200 costs; negligence and non-financial loss were rejected.
On the balance of expert evidence the water leak was the proximate cause, so the subsidence exclusion did not apply, but the complainant did not prove prior negligence warranting payment above the building sum insured.
Issues
- Claim denial primary · upheld
“The insurer has not established the exclusion applies and is liable to meet the complainants claim”
- Repairs or contractors secondary · not upheld
“The panel is not satisfied the complainant has established the insurer acted negligently in the previous claim”
Subjects and remedies
home or building damagepay claimpay compensationpay interestreassess claim
Text of the determination
Determination
Case number 726407
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 726407 Page 2 of 9
Case number: 726407 5 March 2021
1 Determination overview
1.1 Complaint
The complainant held a home insurance policy with the financial firm (insurer) . He
lodged a claim on 1 June 2019 for damage to the building caused by a water leak in
2017. This leak was the subject of a prior claim settled by the insurer.
The insurer says the damage is upslope from where the leak occurred and unrelated.
Further, the cause of the damage is subsidence which is excluded from cover.
The complainant says the insurer’s repair work following the 2017 claim was
inadequate and negligent. He seeks the full replacement cost of the property and
compensation for the poor claims handling.
1.2 Issues and key findings
Is the insurer entitled to deny the claim?
The panel is satisfied that most likely the ongoing damage arises from the 2017
event. The insurer is to settle the claim as set out in section 2.2 of this determination.
How is the insurer to settle the claim?
As set out in section 2.2, the insurer is to appoint an independent engineer and
independent builder to prepare a scope of works and actionable quotation to repair
the building. The parties may then agree to cash settle the claim as set out in section
2.2 of this determination.
Is the complainant entitled to other costs?
The insurer is to pay $1,200 for professional costs incurred by the complainant in
pursuing the complaint. The complainant is not otherwise entitled to compensation.
1.3 Determination
This determination is in favour of the complainant.
Within 14 days of the complainant’s acceptance of this determination t he insurer is to
appoint an independent engineer and independent builder to prepare a scope of
works (SOW) and actionable quotation to repair the building. The parties may then
agree to cash settle the claim as set out in section 2.2 of this determination.
Pursuant to Rule D.5 of the AFCA rules the insurer is to contribute $1,200 to the
complainant’s professional costs incurred in this complaint.
Determination | Case number: 726407 Page 3 of 9
2 Reasons for determination
2.1 Is the insurer entitled to deny the claim?
Policy covers damage caused by water leaks
The policy provides cover for damage occurring because of a water leak. There was a
substantial water leak in 2017, where 135,000L of water were released into the
subfloor area of the property.
This large amount of water caused substantial changes in the soil moisture content
and ground movement. All the expert evidence agrees both heave and settlement are
likely in those circumstances.
There is no dispute that the property sustained damage from the 2017 event. The
insurer accepted liability for the identified damage at that time. In June 2019 the
complainant notified the insurer of further movement and cracking believed to be
related to the 2017 water leak.
The insurer agreed to cover damage related to movement caused by the 2017 event
near the rear two bedrooms and the bathroom. It otherwise declined liability for the
general movement and distress damage. The insurer relies on the policy exclusion for
subsidence to deny the remainder of the claimed damage. The relevant terms of the
policy are set out under section 3.1 of this determination.
Expert reports provide differing views as to proximate cause of damage
There are two arguments for how the damage occurred (water leak or subsidence).
Given the water leak could have caused subsidence, this is an argument of proximate
cause. A proximate cause is not necessarily the first, last or the sole cause of the
loss. It is the effective, dominant or operative cause of the loss.
There is no evidence to show there were any issues of cracking plaster or the doors
jamming prior to the current claim. There is also no damage of this nature noted in the
original claim in 2017. Further, the complainant denies there was any sign of the
disputed damage prior to the water leak.
T he complainant’s engineer (J B) considers the damage links back to the January
2017 water leak. JB explains how movement caused by the 2017 event would add
stresses to the home causing movement away from the original site of the water leak.
This is outlined in section 3.2 of this determination.
In brief, the roof as a connected structure, would have been affected by foundations
settling on only one side of the building and refer pressure to the interior where other
structural elements connect. To affect one part is to set into motion a chain of
movement to other attached parts. The foundations attach to the exterior walls, these
walls attach to the roof, the roof to the interior load bearing walls, and thereby to the
door frames and interior plaster. Once one part of the house moves, it is reasonable
Determination | Case number: 726407 Page 4 of 9
to expect other parts of the house which are connected will also be affected by the
same movement. The images JB supplied, showing how far out of plumb the floor
joists and interior load bearing walls are , make this explanation particularly
compelling.
The insurer’s expert, GS, says the latest foundation movement is upslope from the
area of the 2017 leak and the foundations show no sign of effervescence. He
considers a lack of back-fill compaction around the stumps as the cause of the
subsidence. GS concludes that, were it not for the subsidence, the damage would not
have occurred. This is outlined in section 3.2 of this determination.
In response to JB’s report GS says the movement of the eastern wall is not
substantial and lacks the damage markers expected, if JB ’s findings were to be
accepted.
The panel notes GS ’s floor level survey shows drops of 25-30mm in the relevant
areas, which JB says is substantial movement. Images provided by JB show the floor
joists which are proximate to the water leak are no longer level. The panel accepts
that substantial movement has occurred.
The insurer’s geotechnical expert (SG) reports the property is well founded on stiff
clay soil, which contradicts GS ’s earlier hypothesis the stumps were inadequately
founded. The back fill was poorly compacted which allowed ready ingress for any
excess surface water. The report indicates moisture is still impacting on a row of
stumps.
The complainant’s builder noted that the assumption that the water will just flow away
due to the natural fall is not always the case. He considered it plausible that the strip
footing supporting the dwelling closest to the water leak would act as a barrier to the
water egress from beneath the house. With continual wetting, the water will naturally
flow left and right of the point of the leak running along the footing before being
absorbed back through the soils beneath the house. The water would need to reach
the founding depth of the footing before being able to escape and continue downhill.
Insurer has not established the exclusion applies
The lack of damage preceding the water leak indicates the footing system had the
necessary vertical support prior to the incident, despite the alleged issues with the
back-fill compaction. The latest damage and foundation movement has only occurred
after the leak. This strongly suggest the water leak is the source of the building
movement.
The panel is persuaded by the reports provided by the complainant that the ongoing
damage most likely relates back to the 2017 incident. The insurer has not established
the exclusion applies and is liable to meet the complainants claim.
Determination | Case number: 726407 Page 5 of 9
2.2 How is the insurer to settle the claim?
Insurer is entitled to rely on the policy wording when settling the claim
The policy provides the insurer with a discretion whether to repair, replace or cash
settle the cost to repair / replace the damage or if the insurer considers the building a
total loss, to pay the sum insured. In addition to the sum insured, the policy provides
other benefits including:
demolishing and removing debris
meeting building regulations
rebuilding fees such as engineering, architects and surve yors
temporary accommodation for up to 12 months
As the damage occurred as result of the water leak during the policy period in 2017,
this is the correct policy schedule to settle the complaint on. At that time, the building
sum insured of the policy was $267,750.
The complainants builder GN provided a scope of works and quotation of
$297,243.10 to complete the repair work to the property. This figure includes floor
coverings at a value of $25,941.30. The panel accepts this is part of the required
works. Floor coverings fall within the cover for contents and are subject to the
contents sum insured of $62,059.
Insufficient information showing insurer was negligent in previous repair
The panel is not satisfied the complainant has established the insurer acted
negligently in the previous claim and that he is entitled to a higher payment than the
sum insured for the building repairs.
The reports regarding the 2017 claim do not show the experts had foreseen there
were likely to be future issues, which the complainant alleges the insurer ignored.
There is also no information to show what alternative action could or should been
taken by the insurer have to prevent the current issue.
The complainant was also unaware of the ongoing damage despite living in the
property at the time. This makes the complainant’s argument less compelling.
In the absence of further evidence, the panel is not satisfied the argument for
negligence is made out. As such, the insurer is not required to cover the cost of the
repair of the property beyond the limits in the policy.
Insurer to assess extent of damage and obtain scope of works.
The only assessment on quantum are the quotes and scope of works provided by the
complainant. Based on these, the building would be a total loss and should be settled
for the sum insured plus the other benefits available under the policy including 12
months temporary accommodation.
Determination | Case number: 726407 Page 6 of 9
While it may be that a re-build would be more than the sum insured, the panel is not
satisfied that it is necessary for the building to be rebuilt.
In the panel views it as fair the insurer is given the opportunity to obtain a scope of
works from an independent engineer and an actionable quote from a builder to
complete the repairs. The insurer must appoint the independent engineer and
independent builder within 14 days of the complainant’s acceptance of this
determination.
The insurer may then determine whether to complete the repairs or elect to cash
settle the claim including the other benefits available under the policy. Should the
parties be unable to agree on a settlement figure then the matter can return to AFCA
for determination as to the amount.
Should the insurer elect to settle the claim for the building sum insured rather than
obtain a further scope of works it must include in any settlement the other benefits
available under the terms of the policy.
Interest is payable in accordance with section 57 of the Insurance Contracts Act 1984
(Cth) on any cash settlement from 24 June 2020 being the date of the decision to
decline the claim to date of payment
2.3 Is the complainant entitled to other costs?
Insurer to repay the complainant’s expert report cost
AFCA rule D.5 provides that AFCA can determine an insurer contribute up to $5,000
to professional costs incurred by a complainant in the course of a complaint.
The complainant incurred $1,200 professional costs when he organised an
independent engineer to provide an opinion on the cause of the damage. This report
had a substantial impact on the outcome of the complaint.
The panel determines the insurer is liable to contribute $1,200 to the complainant’s
professional costs.
Circumstances do not warrant compensation for non-financial loss
Under the AFCA Rules, we may also award compensation of up to $5,000 for non-
financial loss if, because of the insurer’s actions, there has been an unusual degree
or extent of:
physical inconvenience
time taken to resolve the situation or
interference with the complainant’s expectation of enjoyment or peace of mind.
Determination | Case number: 726407 Page 7 of 9
The panel accepts a claim is stressful and time-consuming, even if the insurer
handles the claim correctly. Complex claims such as this one may take considerable
time while multiple experts report on the cause of the damage.
While the panel agrees it took a prolonged period to finalise the matter, given the
complexity, the time taken was not unusual. In the circumstances the panel
determines the insurer is not liable to pay compensation for non-financial loss.
Determination | Case number: 726407 Page 8 of 9
3 Supporting information
3.1 Policy references
Insured event
Water and oil leaks
If loss or damage is caused by water or oil leaking or escaping from an item shown
here.
…
house gutters, drainpipes, or pipes
sanitary fixtures – for example, baths or toilets
Exclusion
What we don’t cover
…
subsidence or landslide unless it happens immediately as a result of:
an earthquake or explosion
a storm
a flood
rainwater run-off
storm surge
3.2 Summary from key expert evidence
Record Key points
Insurer’s engineer ( GS )
R eport
23 December 2019
S tump footings are subsiding with efflore scen c e showing on the
eastern side footings .
C ent re dwelling footings not showing efflorescence and are
upslope from the area of the leak .
P otential inadequate founding dept h of the footings .
I nsurer ’s expert ( SG )
Geotech nical r eport
1 April 2020
P ad i s well founded into nat ural clay soil .
B ack fill is poorly compacted allowing ready ingress of any excess
surface water .
M oisture content adjacent to stump is 33% when compared to
28% further aw ay suggesting water has entered .
M oisture content away from the affected areas 24.5% .
C omplainant ’s engineer ( JB )
R eport
23 July 2020
D ue to the leak observed in 2017 foundation settlements are
happening on the e ast side of the house .
T he roof is linked to the external walls meaning the roof is also
impacted .
T he roof bearing on internal walls is exerting pressure leading to
out of plumb walls and the internal wall and doorway damage .
L eaning walls will transfer the stress to other areas of the house
Determination | Case number: 726407 Page 9 of 9
Record Key points
and this will lead to cracks appearing in different locations .
Complainant ’s builder ( GN )
A ssessment r eport
11 September 2020
B ased on ex perience with similar events, I have observed water
from leaking pipes ponding up against the base brickwork of
footings.
W ater leak is the overwhelming factor given that SG is satisfied
with the founding depth and the subsidence is post the water leak,
no other obvious cause evident .
It is likely the cost to rectify the existing dwelling may exceed the
demolition and recons truction cost.
The estimated value of rectification is $350,000 - $450,000 .
Insurer’s engineer ( GS )
Letter
21 October 2020
E vidence does not support the theory that the perimeter wall is
resulting in distress to the central load bearing walls .
N o distress or movement related damage to the eastern wall of the
dwelling local to the previous pressure pipe leak .
S ubsided stumps beneath the centre of a dwelling is typical of
what occurs due to the long term deep drying from the low
humidity environment .
E videnc e of prior saturation of the nort h - east area of the subfloor
does no t influence the founding soils beneath the centre of the
dwelling .
J B conclusion also does not explain the subsided stumps sighted
beneath the centre of the dwelling, outside the influence of the
leak .
T apered cracking noted to the cent re of the dwelling was all
emanating from structural openings . One would ex pect the
opposite if pressure was coming via the roof structure .
Complainant’s engineer (JB)
Letter
11 November 2020
H ous e is not a rigid box, distress on side of the house may affect
other areas .
O nly internal load bearing walls sh ow signs of distress following a
major leak . It is a strong evidence of correlation between the two
events .
F loor level survey shows internal load bearing wall has moved
down by up to 30 mm and e astern wall has moved down by up to
25mm, which are both deemed significant movements .
R oof raft ers fixed to the eastern wall have moved transferring
stress on to internal load bearing wall .
This w ould l ead to out of plumb internal load bearing walls and to
additional pressure on foundations in the centre of the house,
where soil may settle and have lower bearing capacity, leading to
foundation movement, as shown on GS ’s floor survey .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.