Text of the determination
Determination
Case number 725654
Financial firm NM Insurance Pty Ltd
Determination | Case number: 725654 Page 1 of 10
Case number: 725654 17 August 2021
1 Determination overview
1.1 Complaint
The complainant has an All Risks Pleasure Craft policy with the financial firm (the insurer).
This provides cover for a 2012 Ferretti Cruiser (the vessel). In October 2018 the vessel
sustained damage after diesel spilled in the engine room.
The insurer accepted the claim and arrangements were made to transfer the vessel from
Sydney to Newcastle for repairs. In addition to the claim related repairs, the complainant also
arranged for non-claim related repairs and work to be done to the vessel.
The parties are in dispute regardi ng the extent of the insurer’s liability. Both the complainant
and the insurer are legally represented. For convenience, the complainant’s representative
and the insurer’s representative will be referred to as the complainant and insurer.
1.2 Issues and key findings
Has the insurer completed the claim related repairs?
Based on the available information, the insurer has established it has completed the claim
related repairs. Further, the insurer is not required to meet any of the demands or
declarations sought by the complainant in his correspondence dated 12 May 2021.
Is the insurer’s offer to return the vessel to Sydney fair?
Yes, the insurer’s offer to pay for the cost of a professional skipper and fuel costs is fair in all
the circumstances.
1.3 Determination
This determination is in favour of the insurer.
The insurer’s offer to return the vessel to Sydney is fair. Otherwise, the insurer is not required
to undertake any further action.
Determination | Case number: 725654 Page 2 of 10
2 Reasons for determination
2.1 Has the insurer completed the claim related repairs?
Circumstances of the loss and complaint
The complainant lodged a claim for damage that occurred when diesel spilled in the engine
room.
The insurer appointed loss adjuster (ML) to inspect and report on the cause. ML provided a
report dated 21 November 2018 that said the following of relevance:
the diesel tank was filled to capacity and the vessel was taken for a 2-hour trip and upon
return the complainant smelled oil in the engine
the complainant contacted the entity responsible for assembling and commissioning the
motors
on 24 October 2018 ML attended the vessel as fuel was being pumped out of the engine
room, noting diesel spatter over the generator and electrical components
the vessel was transferred to Newcastle for assessment and quotation
while in Newcastle, it was identified the cause of damage was a failed end valve in the
Racor primer hose
ML outlined the required repairs would include the following:
cleaning and dismantling the engine room, testing the fuel tanks and reassembly
mechanical repairs to test and repair mechanical components
electrical repairs for damage caused by the diesel contamination
The insurer says that between November 2018 and July 2019, most of the claim related
repairs were completed. This is supported by ML’s report dated 26 July 2019. In that report,
ML said the remaining repairs will be completed once the vessel was in the water. Further,
ML said that ongoing hard stand fees incurred while the vessel is in Newcastle will be the
complainant ’s responsibility. This is because the complainant had arranged for private works
to be done on the hard stand.
At a later point, the insurer said it completed most of the outstanding repairs.
Complainant seeking various remedies
The complainant has raised several issues regarding the insurer’s handling of the claim and
is seeking various remedies. These remedies are set out in his submission dated 12 May
2021 and are the following:
a declaration that the vessel has been in the care of the insurer since it (or its agent)
instructed the complainant to send it to Newcastle for review/repair
an order/direction for the claim works to be completed and the vessel returned to Sydney
with:
> a new tender (cost of about $80,000);
> repairs to the upholstery, engine bay and exterior hull paintwork (cost of $166,508);
> full tank of fuel in Sydney ($10,000)
an order/direction for the payment by the insurer to the complainant the sum of $158,150
which is comprised of:
> cost of mooring $18,150
> cost of finance $135,000
Determination | Case number: 725654 Page 3 of 10
> reimbursement of six months insurance premium $5,000
alternatively, a cash payment of $489,658 from the insurer to the complainant in full and
final satisfaction of the dispute and the insurer’s liability; and
an order that the insurer warrants the claim works for a period of twelve months from the
time of their completion.
Vessel was transferred by mutual agreement
The complainant says the insurer directed the vessel be transferred to Newcastle and this
has established a bailee/bailor relationship. Given this, the insurer is liable for all issues
identified by the complainant while the vessel was in Newcastle.
The complainant has provided two emails in support. The first is an email dated 24 October
2018 where ML provides the complainant with the boatyard’s (M) contact details in
Newcastle. The second is an email dated 31 October 2018 where M acknowledges receiving
the complainant’s vessel.
In response to the complainant’s position, the insurer provided a statement from ML. ML
stated at paragraph 44 of his statement the following:
A day or so later, I received a call back from the Insured who completed his
enquires regarding the personal hull repairs and repainting, that [M] ** and ** in
Newcastle would be the most suitable and most favourable site that could
accommodate all the repairs together in one boatyard. He made a decision to
have the IV lifted and repaired at [M] ** and Marina. The Insured asked, “Would
the Insurance company cover the cost of the skipper and fuel up there and back?”
I replied, “Subject to acceptance of Liabi lity, that can be incorporated into the
costs”. The Insured appeared happy with my response and he organised the IV
to be skippered to [M].
The panel has reviewed the two emails relied on by the complainant. Neither contradict ML’s
evidence. The first e mail simply shows that ML provided the complainant with M’s contact
details. The second email from M to the complainant states:
Thank you for instructing us with your boat and we appreciate your business.
This does not confirm the decision to choose M was unilaterally made by the insurer. This
correspondence is consistent with the proposition that M was mutually chosen.
Further, the following factors are inconsistent with the fact the insurer chose M unilaterally:
the complainant arranged for the vessel to be skippered to M
the complainant instructed M to undertake private works, and
when the vessel was transferred, the insurer had yet to make a decision to accept the
claim – this means it could not unilaterally direct where the vessel should be repaired given
indemnity has not been granted.
Therefore, while the panel acknowledges ML probably suggested M as an option to
undertake both the claim and non-claim relates to the repairs, the current information does
not show the decision to transfer the vessel to Newcastle was done unilaterally by the insurer.
Instead, the available information shows the decision was mutual with ML making the
arrangements with M.
Determination | Case number: 725654 Page 4 of 10
Given this, the panel does not accept there is any basis to say, or declare, that the vessel
was in t he insurer’s care during the whole time M had possession of the vessel.
The vessel had extensive pre-existing damage prior to the loss
The complainant says the insurer failed to return the vessel to its pre-claim condition.
In support of this position, the complainant provided an out of water survey of the vessel from
SM dated 4 October 2018. The complainant says the repairs conducted by the insurer have
not restored the vessel to this pre-claim condition.
The panel has considered this report. The survey identified various issues. This includes the
fact the starboard hull window requires replacement, the anodes and sail drive require
replacement and the cleats on the deck are missing.
During ML’s initial in spection, and as noted in report 1 (dated 21 November 2018), ML
identified extensive impact damage from stem to stern over the topsides, gunwales deck and
superstructure from the previous owner. ML also noted that the complainant reported the
engines had been reassembled and tested in Queensland.
Additionally, ML noted in report 10 (dated 26 July 2019) that the complainant was advised by
the mechanics that the vessel required new anodes and bellows and, failure to undertake
these repairs, would likely result in the vessel sinking.
In addition, ML notes in report 22 (dated 26 August 2020) that the vessel was subject to three
separate claims before being purchased. These claims were for:
16 February 2017 – motor damage due to water contamination
21 March 2017 – tender damage
14 June 2017 – hull damage
ML also noted the vessel was purchased by the complainant in a non-operational state and
that previous repairs were not undertaken by the previous owner for which they were cash
settled.
ML’s evidence about the boat’s condition is relatively consistent with the statements provided
by M as well as the mechanic and electrician who worked on the boat.
Based on the available information, the panel notes the following. Whilst the vessel may have
been an insurable item as noted by SM, this report does not show it was free from any pre-
existing issues. The survey report itself noted various issues that needed addressing. The
statements from the contractors who worked on the vessel, as well as ML, all consistently say
there were numerous, and extensive, pre-existing issues that needed addressing. This is also
consistent with the fact that there were various works undertaken during this claims history
which were not claim related.
Insurer has not delayed in completing the claim related repairs
As noted, ML provided his tenth report dated 26 July 2019. This report said that subject to
other works to be undertaken when the vessel was launched, ML was satisfied that the
insurance claim related repairs were otherwise completed.
This was supported by statements from the mechanical and electrical repairers, as well as by
M.
In report 14 (dated 10 February 2020), ML noted:
Determination | Case number: 725654 Page 5 of 10
the vessel was at M for the complainant’s own repairs on 23 January 2020 – this included
lifting the vessel out of the water onto the hard stand. This further expense was authorised
by the complainant and not ML
due to delays in having the non-claim related repairs completed, the completion of the
claim related repairs would be delayed
the house batteries had failed however, this was not due to the insurance claim but rather
their age.
In addition to this report, ML has provided further progress reports which outline the delays in
re-launching the vessel. This included availability of trades, natural disasters and, most
notably, the complainant’s delay in finalising his repairs.
The complainant states that due to the insurer’s delay, he took the opport unity to mitigate this
by doing other works. These were completed independent to the claim and did not cause or
contribute to any delays.
The available information does not support this. ML’s contemporaneous reports contradict
this. ML notes delays were experienced in the complainant finalising these private works or
failing to pay accounts associated with the private works. This was supported by statements
from M and the mechanic.
The panel acknowledges there had been some issues identified with the elect rician’s works
associated with the claim. The insurer rectified these by engaging another contractor (J). This
appears to have been done relatively promptly. However, the information does not show this
was the cause of the substantive delays. The available information shows the non-claim
related issues were causing most of the delay and remained outstanding after many months.
These outstanding works included the hydraulics system repairs and the Pasarelle
installation.
Therefore, based on the available information, which includes the numerous reports and
updates provided by ML as well as the other statements provided by the parties involved, the
panel is not persuaded the insurer has caused the delays. Instead, the available information
shows the delays were substantively caused by the non-claim related repairs.
Complainant is not entitled to various remedies sought
With this in mind, the panel notes the following regarding the outcomes sought by the
complainant.
For the tender, ML provided evidence saying he assessed this in March 2017 and the
damage he observed shortly after the claim was consistent with that damage. This was
supported by M’s statement. M said that when the tender was taken from the vessel, and
after it arrived in his boatyard, it was in a deteriorated state. The mechanic also supported
this. Whilst the complainant has produced a photograph of what he says is the tender, there
is no evidence of when this photograph is taken. No other evidence has been provided to
show the tender was in a good condition or been damaged following the claimed incident.
The survey report is silent on this.
Given this, the panel is not persuaded the tender was damaged by the claim or by the insurer.
The insurer is not liable for this.
For the upholstery, none of t he evidence shows this was part of the insurer’s authorised
repairs. No evidence has been provided to show this was damaged whilst the insurer
conducted the authorised repairs. Neither does the evidence show it was damaged from the
incident. The insurer is not liable for this.
Determination | Case number: 725654 Page 6 of 10
For the hull’s paintwork, the complainant has provided no evidence to show this was
damaged from the claim or during the claim related repairs. If it was damaged whilst in M’s
care, the panel is not satisfied the insurer is liable for this. This is because M was engaged by
the complainant for painting as part of the private works. Therefore, if the paintwork has not
been done to a workmanlike condition, then M is responsible for this as part of this private
arrangement.
With respect to the hard stand fees, the cost of finance and insurance premiums sought by
the complainant, the insurer is not liable for these. It is unclear how the cost of finance is a
loss. This was a cost incurred in purchasing the vessel. For the hard stand fees, the panel is
not persuaded the insurer has caused the delays. Therefore, it is not responsible for these
additional costs. For the insurance premiums, these were payable as the insurer was on risk
for any further loss or damage the vessel may have sustained that was covered by the policy.
In terms of providing a warranty for the claim related works, there is nothing in the policy that
states this. However, as the repairs were authorised by the insurer, it is fair for the insurer to
be responsible for any rectification that may be required if faulty workmanship is established
with the claim related repairs. This is also consistent with the General Insurance Code of
Practice. The panel notes that the current information does not show any faulty workmanship
with the completed claim related repairs.
2.2 Is the insurer’s offer to return the vessel to Sydney fair ?
Insurer has offered to reimburse the complainant for fuel and a skipper
The panel has considered the insurer’s offer to reimburse the complainant the cost of a
professional skipper to pilot the vessel back to Sydney as well as reimbursement for the cost
of fuel.
The parties agreed for the vessel to be transferred to Newcastle. This provided the insurer
with the opportunity to facilitate the claim related repairs.
Given this, and co nsidering the above, the panel accepts the insurer’s offer is fair in all the
circumstances. However, the panel does not accept the insurer is required to do anything
further regarding this claim.
Determination | Case number: 725654 Page 7 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with significant experience in consumer and small business advocacy
a member with extensive experience in insurance industry
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 725654 Page 8 of 10
3.2 Relevant information reference and relied on
Record Key points
Complainant Vessel
Asse ssment (SM)
Report
4 October 2018
Hull Anode: Due for replacement
Sail Drive: Arneson due for replacement
Cleats: Boarding plat form cleats missing
1. Antifouling and surfac e drive coatings required
2. Replace anodes
3. Repair starboard impact damage
4. Hull window is on order and scheduled for replacement
5. Starboard engine has just completed a full rebuild.
6. Keep all maintenance records and receipts in the unlikely event
of a claim
The Hull has been built to current professional standards and has
been well maintained. The defects aforementioned should be
attended to at the soonest opportunity. The above vessel is
s tructurally sound and in my opinion is an insurable item. This
report reflects and expresses the opinion of SM. All reasonable
attempts to detect any defects present, however, there may exist
hidden or latent defects, or those that cannot be discovered
wit hout interfering with the vessels structure. This report is given
without prejudice and is for the exclusive use of [the complainant]
and no responsibility will be accepted for any other party without
the written consent of the undersigned
Insurer Loss Adjuster (ML)
Report # 1
21 November 2018
the vessel had extensive impact damage from stem to stern over
the topsides, gunwales deck and superstructure from the previous
owner
the diesel tank was filled to capacity and then taken for a 2 - hour
trip to Manly and back. Upon return he smelled oil in the engine
room and called the MTU specialist in Queensland that assembled
and commissioned the motors
we conclude that due to the failed end valve in the Racor primer
hose, fuel will flow into the engine room up u ntil the fuel height in
the tank drains to the same height as the tail of the primer hose.
The rate of flow is sufficient to drain 1400 litres of fuel in a short
period. The height of the Racor filters would be approximately
equal to 1800 litres of fuel in the tank
w e await quotes for repairs from Midcoast for the cleaning up,
dismantling of the engine room, testing of the fuel tanks and
reassembling the engine room. EP for the mec hanical works to
repair and test all mechanic al components and SME for the
el ectrical components damaged by the diesel contamination
Determination | Case number: 725654 Page 9 of 10
Record Key points
Insurer Loss Adjuster (ML)
Report # 10
26 July 2020
this now leaves the commissioning of the mechanical components
when the vessel is launched
the hard stand fees to your office will cease as the close of
business this afternoon. Midcoast has been advised and he has
advis ed the Insured
the vessel repairs not associated with the claim have not been
completed and the vessel cannot be returned to the water
the surface drives require servicing. This r equires anodes and
new bellows. The mechanics alerted the Insured some month ago
provided a quote, then requested a deposit for part, your Insurer
has failed to aut horis e or pay for this work to date.
it is the opinion of the mechanics that the vessel s hould not be put
back into the wat er until the work is performed as the bellows will
fail and the vessel will sink.
the repairer will formally advise the Insured to ensure that failure
to do the work will not result in further claim against your office or
the repairer.
Insurer Loss Adjuster (ML)
Report # 14
10 February 2020
t he vessel has been drawn from the water by Midcoast Boatyard
for owner’s mechanical work on the 23/01/2020 for installation of
drive service kits by his chosen repairer Diesel Engines and
Repairers. The Insured authorised this lift. Our office was not
consulted, and it was only after the lift that we discovered that the
electrician was u navailable until the week of 10/02/2020 for
completion of the Ins urance work .
t he repairer has stated that after a very protracted delay in having
these repairs authorised and parts paid, he was not willing to
make 2 trips to then come back to commission the remains of the
Insuranc e work
d ue to the protracted delays in having the vessels drives serviced
a nd repaired, the Marine Electrician could not c ome back to the
vessel until 10/02/2020 due to ot her work commitments. He also
required the vessel in the water to complete plumbing work to the
chiller unit and genset and to complete wiring up and
commission ing of the new components in the engine room for
commissioning. The electrician could not complete his work while
the vessel was on the hardstand
t he Insurer would not pay for the lifting and launch as this was not
required for completion of the outstandin g work; all our work is in
the water only
Insurer Loss Adjuster (ML)
Report # 22
26 August 2020
the vessel was purc hased by your Insured as a nonoperational
vessel in poor condition. The previous owner did not repair the
mechanic al components after being cash settled. Hull repairs
have largely been not performed and those that were in a non -
professional manner had failed
Determination | Case number: 725654 Page 10 of 10
Parties Submissions
Repairer Witness Statements
COI
PDS
Loss adjuster reports 1 to 23
.