Home / Suncorp Group / Determination 725528

Determination 725528

Impact damage claim partly accepted with $1,833.92 cash settlement offer

FirmSuncorp Group
Decided2020-11-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$29,642
Non-financial loss—
Amount claimed$29,642
SourceAFCA PDF

Summary

The complainants claimed for impact damage to their home after a vehicle hit a wall, and the insurer offered $1,833.92 and sought a further inspection while disputing the other cracking as settlement damage. AFCA found the insurer had not established the ground movement exclusion or prejudice from non-cooperation and ordered payment of $29,641.60 with interest and a contribution to expert report costs.

Once a valid impact claim was shown, the insurer had to prove the ground movement exclusion, and the preponderance of the complainants' expert evidence showed the damage was caused by impact.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionpay claimpay compensationpay interest

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 725528 Financial firm AAI Limited Determination | Case number: 725528 Page 2 of 16 Case number: 725528 29 October 2020 1 Determination overview 1.1 Complaint The complainants hold a home and contents insurance policy with the financial firm (the insurer). On 17 December 2019, the complainants lodged a claim for impact damage to their home after a vehicle was driven into a wall at the home. The insurer appointed an engineer, who assessed the damage to the home. The insurer says the assessment was not completed and it requires its engineer to re - attend for a second assessment. The complainants say the insurer’s en gineer completed the assessment and they provided the insurer with their own engineer’s reports and builder’s quote. The complainants say the insurer has sufficient information to decide. They require the insurer to accept their claim and pay $29,641.60 to resolve the claim. The case analyst provided the parties with a preliminary assessment on the issues in dispute. The preliminary assessment was in favour of the insurer. As the complainants have not accepted the preliminary assessment, the complaint has been referred to me for determination . 1.2 Issues and key findings Is the insurer entitled to decline the claim? No. The available information does not establish the insurer’s request for a further inspection is reasonable. As the complainants have not failed to cooperate with the insurer and the insurer has not established it has been prejudiced by the alleged non- cooperation, it is not entitled to decline the claim. Is the insurer’s cash settlement offer fair? No. As the available information does not establish, on the balance of probabilities, the claimed damage was caused by ground movement, the insurer’s offer is not fair, and it is to pay the complainants’ claim and the cost of the complainants’ expert reports. Determination | Case number: 725528 Page 3 of 16 1.3 Determination This determination is in favour of the complainants. Should the complainants accept this determination, then, within seven days of notification of acceptance, the insurer is to pay to the complainants:  $29,641.60 for the claimed repairs;  interest on $29,641.60 pursuant to S ection 57 of the Insurance Contracts Act 1984 (the Act) from 25 February 2020 (the date of its final decision) until the date of payment ;  the cost of the complainants’ expert reports , subject to satisfactory proof. If the complainants have already paid for the expert reports, the insurer is also to pay interest, pursuant to the Act, on the payments from the date the reports were paid for until the date of settlement. Determination | Case number: 725528 Page 4 of 16 2 Reasons for determination I have decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). I have considered all the material submitted by the parties, both before and after the preliminary assessment. I am satisfied that the documentation I have relied on has been provided to both parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. Further report and submissions after preliminary assessment After the preliminary assessment was rejected, the complainants provided a further report from their engineer and made further submissions in which they essentially reiterated their position. The insurer made no further submissions and provided no new material. 2.1 Is the Insurer entitled to decline the claim? Parties ’ submissions considered The insurer says it is entitled to decline the claim because its assessor wanted the engineer (CD) to re-attend to inspect the home, or for a second opinion to be obtained. The insurer says it requires this information to clarify if the cracking damage is from the impact (an insured event) or from ground movement (an excluded cause). The insurer says its assessor was not satisfied with CD’s report because the engineer was to provide commentary on if there was any damage caused by settlement and, if so, was the damage exacerbated by the impact. The insurer refers to external level surveys and the requirement to inspect other internal areas of the property. The insurer said it understands there was a disagreement with CD and , because of this, CD did not complete a full inspection and do a full level survey. Alternatively, the insurer said the complainants could provide their own engineer’s report. It relies on a policy term which says, when making a claim, an insured must allow the insurer to arrange for experts to assess the damaged home. The policy terms relied on by the insurer are set out in supporting section 3.2 of this determination. Determination | Case number: 725528 Page 5 of 16 The insurer recognises the complainants want as little inconvenience as possible in the claims process and was willing to offer a cash settlement for the assessed damage, or to progress the claim by way of another inspection. The insurer refers to the complainants’ engineer’s report (KB) and says it is prejudiced because it has not been able to fairly and completely the assess the extent of its liability, as CD has not been allowed complete access as appears to have been allowed to KB. As the engineers’ reports c onflict and because of the quantum of the claim, the insurer says it is appropriate to obtain a further expert opinion as to the nature and extent and causes of damage to, and the condition of, the home. The insurer has accepted the claim in respect of the impact event. In the absence of agreement to another assessment , the insurer was prepared to offer a cash settlement of the accepted damage in the sum of $1 ,833.92 , in accordance with the actionable quotation it had obtained. The complainants rejected the offer and say they will accept the lesser amount from their builder’s quotations in the amount of $29,641.60. The complainants dispute the assessor was un happy with CD’s report. They acknowledge the policy term but say they have cooperated with the insurer and the insurer has enough information from its own assessor, builder and engineer to decide. They also say:  there was no argument or interference with CD;  there was no damage to their home inside or outside before the impact;  the insurer wanted them to get their own independent report, which they did;  the insurer forfeited its right to a further inspection because it told the complainants to get their own engineer’s report , which they did. The parties have relied on extensive material from their own experts and from the insurer’s assessor. A summary of the material relied on by the parties is set out in supporting section 3.3 of this determination. Insurer not prejudiced by refusal to provide second inspection An insurer is entitled to investigate and determine the validity of any claim lodged and the extent of the loss. This may include reasonable requests for a range of information about the claim circumstances. The insurer must establish the requested information is relevant to its claims decision and it has been prejudiced by the refusal to provide the information. An insurer cannot refuse a claim simply because the insured has not provided something requested. Determination | Case number: 725528 Page 6 of 16 The policy requires the complainants to comply with reasonable requests for information made by the insurer about a claim. In the circumstances of this claim, I am not satisfied the insurer’s request for a further inspection is reasonable. I am not satisfied the complainants have failed to cooperate with the insurer and that the insurer has established it has been prejudiced by the alleged non-cooperation. This is because:  Even if there were “words” between CD and the complainants at the t ime of inspection of the complainants’ home, I accept CD’s report is comprehensive and CD has taken levels and photographs.  CD has a special paragraph in his report which refers to limitations and makes no comment about any limitations which took place at the time of inspection.  CD draws conclusions sufficient for the insurer to make a claims decision about the impact damage to the south eastern corner of the complainants’ home .  The insurer suggested the complainants obtain their own expert reports, which they have done.  In the assessment report of 12 August 2020, the assessor says she was satisfied with the CD report, but, as she found KB’s report insufficiently convincing, she recommended a partial settlement.  Although the assessor had criticism s of KB’s reports, the available information does not establish the assessor or CD was asked to comment on KB’s subsequent report. On the available information, and for the reasons stated, I am satisfied the complainants are not required to allow access to their home for a further report by CD or by another engineer. I am satisfied the insurer has sufficient information to assess the claim, based on the information that is available. The insurer has assessed the claim and offered a cash settlement. 2.2 Is the i nsurer’s cash settlement offer fair? Insurer does not dispute there is impact damage The complainants must establish, on the balance of probabilities, they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. The insurer does not dispute there is impact damage. I am satisfied the complainants have established a valid claim. Determination | Case number: 725528 Page 7 of 16 Expert reports considered Once so established, the onus shifts to the insurer to prove , on the balance of probabilities, that an exclusion applies if it seeks to deny or limit its liability for the loss. In the circumstances of the claim, the insurer must establish the claimed damage is caused by ground movement. The insurer relies upon its engineer’s report and the further assessment report, dated 12 August 2020. The insurer says KB provided no objective evidence, such as floor level surveys and does not provide any opinion as to whether the totality of the observed condition of the insured property was all caused by the claimed event. The insurer also says KB’s second report is vague, relies upon assumptions and reporting from the complainants and provides no objective evidence to support the expressed views. The floor level surveys taken by CD have not been addressed and there has not been consideration or review of the site conditions, as noted by CD. Insurer has not established damage caused by ground movement The insurer makes no comment on the report provided by KB after the preliminary assessment. Nor has the insurer acknowledged the opini on of the complainants’ builder (RS), who also supports the complainants’ position. I do not find CD’s report sufficiently compelling , in view of the three reports provided by the complainants’ engineer , which have not been commented on by CD. I do not consider the assessor’s opinion sufficiently weighty to rebut KB’s opinion. KB is a structural and civil engineer. I am satisfied he has the expertise to comment after two comprehensive inspections of the home. KB’s reports are supported by photographs. I do not accept the reports are vague and his opinion is unsubstantiated. KB has inspected the home twice, including most recently on 25 September 2020. He is unequivocal in his opinion, which is that the building is in good condition with no evidence of significant footing movement which would have contributed to the damage at the rear south eastern corner of the building where the impact occurred. He confirms all the claimed damage is consistent with impact from a motor vehicle. In the circumstances, I am satisfied the preponderance of the expert evidence is in favour of the complainants. I am not satisfied the insurer has established, on the balance of probabilities, the claimed damage was caused by ground movement. Determination | Case number: 725528 Page 8 of 16 Insurer to pay to the complainants $29,641.60 plus interest On the available information and for the reasons stated, the insurer is not entitled to decline the claim and offer only $1,833.92 . The complainants have obtained two quotations. One is for $31,150. The ot her is for $29,641.60. The complainants are prepared to accept the lesser quotation. Should the complainants accept this determination, then, within seven days of notification of acceptance, the insurer is to pay to the complainants $29,641.60. The insurer is also to pay interest, pursuant to Section 57 of the Insurance Contracts Act 1984 (the Act) from 25 February 2020 (the date of its final decision) until the date of payment. Insurer to pay for the complainants’ expert reports The complainants obtained three reports from KB and other expert opinion. Pursuant to the AFCA Rules, an insurer may be required to contribute to the complainants’ costs , up to $5,000. When considering whether to require the insurer to make a costs contribution, we consider the complexity of the complaint and whether the complainants needed to incur the costs to understand or establish their claim. In circumstances where the insurer had obtained expert opinion and invited the complainants to obtain an expert opinion, I am satisfied it is fair the insurer contributes to the costs of the expert reports obtained by the complainants. Should the complainants accept this determination, then, within seven days of notification of acceptance, the complainants are to provide to the ins urer proof of the cost of the reports (for example an invoice). Within seven days of receipt of the proof, the insurer is to pay for the expert reports, or reimburse the complainants for the cost of the reports. If the complainants have already paid for the expert reports, the insurer is also to pay interest, pursuant to the Act, on the payments from the date the reports were paid for until the date of settlement. Determination | Case number: 725528 Page 9 of 16 3 Supporting information 3.1 Our Approach It is an accepted principle of general insurance law that the insured bears the onus to establish, on the balance of probabilities, that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove, on the balance of probabilities, that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer’s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Impact We cover Loss or damage caused by impact at the insured address from:  watercraft, aircraft, motor vehicles or trailers; … General exclusions (Cont’d) You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Ground movement erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement… To process the claim, you must  allow us to inspect the damaged home and/or contents;  allow us to arrange for experts to assess the damaged home and/or contents and to quote on repair or replacement; … We choose how we settle home claims If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:  repair damage to your home;  rebuild your home;  pay you what it would cost us to repair or rebuild your home; Determination | Case number: 725528 Page 10 of 16 3.3 Material relied on by the parties Date Action Builder asse ssment report (KB) 8 January 2020  Attended and photographed with internal assessor and complainant to discuss the claim of impact damage to house.  Noted major internal cracking to walls and ceiling in gym room and major brick wall movement to external, cracking to external eaves and sag to gym window.  Require structural engineer to report and scope damages. Asse ssment report 8 January 2020  Attended and photographed with builder and agreed engineer requi red to attend to report if the damage is caused by the impact and also to provide a scope of works for repairs. Asse ssment report 15 January 2020  Assessor arranged on site assessment with the complainants and engineer.  Assessor confirmed the reason for the Engineer is to confirm the SOW related to the impact event. Further to this Engineer to confirm if there are any other causations to the bowed external wall.  Male complainant advised he was unaware the appointment wou ld take 45 mins and he had arranged to be at an appointment. Due to the time restrictions, engineer has not carried out a full inspection to all internal walls and only viewed the cracking in the rear room in question.  Whilst on site, male complainant sai d he has had his own builders/engineers attend who state all damage is due to the impact. Engineer has advised the complainant here is settlement issues at the property as built on reactive soil. As the conversation became heated, engineer has left site.  Assessor has reiterated to the complainant that we agree there is impact damage however we need to ensure there is no other underlying issues to the brickwork.  Assessor has confirmed with the complainant once the report is received, will be in contact to discuss the outcomes and next steps. Insurer’s engineer report (CD) 22 January 2020  Inspected and photographed 15 January 2020.  Hous e 35 years old; lived in by insured since it was built and is in good condition with respect to its age.  Took levels, n oted property is considered to be on highly reactive clay soil.  Highly reactive sites can expect surface movement of between 40 - 75mm. Noted 50mm drop in levels. Therefore the settling measured and observed at the Determination | Case number: 725528 Page 11 of 16 Date Action house is not a failure of the footing syst ems and is to be expected.  Observations: Rear wall of the dwelling between the south - eastern corner and the north - eastern corner is observed to be bowing. This elevation has a differenc e in levels of approximately 50mm from one end of the wall to the othe r based on the relative level survey conducted. This indicates that foundation settlement has occurred and has resulted in the bowing observed. See Photograph 1.  Diagonal tapered cracking varying bet ween 4mm and 10mm was observed internally, specifically to the south - eastern corner/elevation of the room. This type of cracking is indicative of foundation settlement and the available evidence indicates this is not re lated to the vehicle impact. The cracking is adjacent to the south - eastern corner that the relative level survey found had dropped 50mm relative to the north - eastern corner of the same room. See Photograph 2 and Photograph 3.  A horizontal crack measured to be 10mm was observed origination from the south - eastern corner of the dwelling. Once again, this is indicative of foundation settlement due to the close proximity to the settled south - eastern corner of the dwelling which was verified by the relative lev el survey. See Phot ograph 4. The vehicle impact crushed and pierced the downpipe located at the - south - eastern corner of the dwelling. See Photograph 5.  Vehicle impact has resulted in the chipping of 2 bricks located approximately mid - way up the south - eas tern corner of the dwelling. The available evidence indicates the height and location of the bricks is in line with the vehicle impact event. See Photograph 6.  Step cracking to the external masonry was observed tapering off from the bottom corner of the window located along the south - eastern elevation of the dwelling. This type of cracking is indicative of foundation settlement and the available evidence indicates this is not related to the vehicle impact. See Photograph 7.  Foundation drought drying of reactive clay foundations is the cause of this damaging differential settlement in the south - eastern corner of the premises and this is supported by the chronology of the claim and recent drought conditions experienced in NSW over the last three (3) years which has been widely reported on by the Bureau of Meteorology.  A vertical crack was observed to a brick located below the eaves at the south - eastern corner of the dwelling. Determination | Case number: 725528 Page 12 of 16 Date Action This type of cracking is indicative of foundation settlement and the available ev idence indicates this is not relat ed to the vehicle impact. See Photograph 8.  Internal cracking to the plasterboard lining adjacent to the south east corner of the house is a res ult of foundation settlement.  Concluded: cracking observed internally to the p lasterboard wall lining adjacent to the south - eastern corner of the dwelling is the result of settlement as found by the relative level survey.  Relative levels were taken along the Damp Proof Course (DPC) around the location of the vehicle impact and foun d difference in levels of approximately 50mm between the south - eastern corner and the north - eastern corner of the rear room.  V ehicle impact damage is isolated to a downpipe and a couple of chipped bricks approximately mid - way up the south - eastern corner.  S cope of works is provided following to rectify the damage as a result of the vehicle impact event discussed in this report which included: Remove and replace downpipe including 2 x downpipe clips at South - Eastern corner; Remove and replace 2 x standard b ricks at the South - Eastern corner located approximately mid - way up the wall. Refer to Figure 1 below and Allow to repoint 1.5 square metres of masonry around the impacted corner.  I nspection was carried out on 15 January 2020 and was limited to a visual and walk over examination of the site. This report has been prepared within the limitations imposed by visual access and walkover around (the site) and the findings are relevant to the dates of inspection. Asse ssment report 3 February 2020  Reviewed CD’s repo rt.  Based on the Int eraction between CD and the Insured on site, Assessor is not satisfied with the report provided by CD. CD were originally requested to provide commentary on if there were any damages caused by settling/movement and if there was, were t hey exacerbated by the impact?  Due to this, Assessor recommends another engineer to be appoint ed to attend site, inspect the impact area as well as complete a full level survey. Assessor requested the Engineer to comment on > What damages have been caused by impact? > Are there any damages caused by movement – If so, has the impact made them worse? > provide a full SOW for repairs to the damages caused by impact. Determination | Case number: 725528 Page 13 of 16 Date Action  Spoke to male complainant. Assessor has advised the Insured that not all requested information was included in CD’s report. It is on this basis we will be requesting another Engineer to attend site.  Male Complainant advised that he has already had another builder/Engineer review the property and they do not agree that it is movement. Assessor requested send this report in for review however Male Complainant declined. He advised he will await to see what our next Engineer report outcome is before he provides this.  Male Complainant asked what the Engineers would be doing when attending site, as Assessor wa s explaining this, Male Complainant expressed his dissatisfaction.  Assessor advised it would be requested for the Engineer to carry out external level surveys and to inspect the other internal areas of the property. Male Complainant advised there is no oth er cracking in the property, and he will not be allowing the Engineer or Assessor to go inside his house and believes this to be an invasion of privacy.  Assessor attempted to explain why this would be required however Male Complainant terminat ed the call t wice.  Assessor notes, a full internal review of the property is required to confirm if there is or isn’t any other evidence of settling in the property. A FULL inspection and assessment of the property is required as per the policy. Quote request 10 June 2020  Damaged Bricks and Downpipe from Impact Event Quotation 17 June 2020  Cost allowed based on information provided by CD to remove and replace the downpipe at south - east corner and remove and replace bricks at south - east corner $1,833.92 including GST and administration. Asse ssment report 12 August 2020  Assessor has been provided and reviewed a copy of the report from KB.  KB have noted it is their understanding the damage is the result of impact from a mot or vehicle. Assessor notes that this report d oes not provide any furt her information or evidence to support why they are of this understanding.  This report cannot be relied upon and there has been no evidence provided to support their findings. There is lack of detail outlining the cause of the crack ing sand movements to the southern and eastern walls of the dwelling. Determination | Case number: 725528 Page 14 of 16 Date Action  Assessor has always been satisfied with the CD report due to the compelling amount of evidence provided to support their findings. It was only due to the complainants’ dissatisfaction a second report request was suggested.  Although the complainant has provided a report from their own engineer, this cannot be used due to insufficient details.  Satisfied the claim is one for PARTIAL accept ance. Assessor acknowledges there have been some d amages to the property caused by the impact (down pipe, clips, chipped bricks and masonry) which has been quoted by KB for $1,833.92.  Assessor recommends all other cracking to the external/internal southern and eastern walls is not for acceptance on the b asis this has not been caused by any defined insured event and has in fact been caused by foundation settlement which is excluded. Complainants’ engineer (KB) Report 16 April 2020  Visual inspection by this structural and civil engineer 24 March 2020 .  Single story brick veneer construction with a conc rete foundation slab believed bearing on to clay.  Inspection of the building revealed damage to the rear south eastern corner. Our understanding the damage is the result of impact from a motor vehicle.  Dia gonal cracking in the external brickwork is evident below the gym window in the southern side wall. Noticeable movement and bowing are also evident in the rear eastern wall adjacent to the southern corner.  Movement and damage are also apparent in the timb er fascia and eaves soffit linings. Significant cracking is evident in the int ernal plasterboard wall linings at the rear of the southern side wall of the gym, most noticeably around the window.  Recommended listed rectification work be carried out to ensu re the structural adequacy of the building. Complainants’ engineer (KB) Report 1 0 August 2020  As noted in our (April) report, damage to the rear south eastern corner of the building was confirmed by the (male complainant) to be the result of impact from a motor vehicle. At the time of our inspection on 24.3.20 the vehicle had been moved.  Movement and bowing in the brick walls and damage to the timber fascia are indicative of an impact pushing the walls res ulting in the cracking noted in our original repo rt.  A visual inspection was also carried out around the external brickwork of the building to confirm any other signs of cracking or movement. No significant cracking Determination | Case number: 725528 Page 15 of 16 Date Action was evident in the brickwork, which indicated that footing movement has not been excessi ve and is unlikely to have contributed to the observed damage.  Movement in the building noted in our report is not believed to have resulted from footing movement in response to reactive clay foundation material.  T o the extent this report is based on visu al inspections, this report does not extend to any matters concealed or not reasonably apparent on a vis ual inspection. Complainants’ engineer (KB) Report 30 September 2020  A second visual inspection was made of the existing residence at the above address on 25.9.20 to determine condition of building with reference to the claimed motor vehicle impact.  Damage to the rear south eastern corner of the building was confirmed by t he (male complainant) to be the result of impact from a motor vehicle. At the time of our inspection on 24.3.20 the vehicle had been moved.  Building is believed to be approximately 40 years old and is single storey brick veneer construction with concrete strip footings and ground floor slab supported on perimeter brickwork and compacted filling.  Inspection of external brickwork did not reveal any significant cracking or signs of footing movement. Horiz ontal separation between front veranda slabs and adjac ent brick wall is not related to footing movement. No cracking was evident in brickwork supporting the veranda slabs.  Minor cracking and movement are evident in the roof eaves soffit linings. The movement is a result of shrinkage of the timber roof framin g and is not related to footing movement.  An inspection of the internal plasterboard wall and ceiling linings did not reveal any significant cracking which would indicate footing movement.  Consider the building is in good condition with no evidence of si gnificant footing movement which would have contributed to damage at the rear south eastern corner of the building.  S atisfied that movement and bowing of external brick walls, damage to the timber fascia and cracking in the internal plasterboard wall linin gs at the rear south eastern corner of the building, noted in our original report, is consistent with impact from a motor vehicle. There is no evidence of significant movement around the building which would indicate footing settlement resulting in the obs erved movement and cracking. Determination | Case number: 725528 Page 16 of 16 Date Action Complainants’ builder (RS) Report 13 May 2020  Quote to supply materials and labour to repair the damage to the south east comer of the house.  Damage was caused by a light truck ramming into the house. The truck pushed part of the south wall toward the corner and pushed the east wall onto a lean. This pushed the eaves out and put the roof out of alignment, cracking the internal wall out of alignm ent.  Repair and replace damaged gyprock sheeting and cornice. Replumb and refit window. Remove and reuse timber architrave around the window of the south wall as matching profile would no longer be available.  Remove 5 lineal metres of the sout h brick wal l and 4 metres of the east brick wall, clean bricks and relay, replace broken eaves sheet, remove and replace electricals, paint, remove and replace damaged gutter $31,150. Complainants’ builder (GM) Report Undated  Quoted $29,641.60 including GST for t he proposed repair works to the rear corner which includes:  Demolish the damaged wall from the side window to centre of rear wall, rebuild brickwork, remove and replace damaged eaves sheet, refix timber fascia, remove and replace damaged rear gutter and s ide downpipe, check the timber frame, repair the gyprock and electrician and painting. 3.4 Other relevant material considered and relied on  Parties’ submissions/emails and all attachments to all submissions/emails both before and after the preliminary assessment.  Parties’ expert reports.  Photographs.  Claim messages.  Correspondence between the parties