Text of the determination
Determination
Case number 725528
Financial firm AAI Limited
Determination | Case number: 725528 Page 2 of 16
Case number: 725528 29 October 2020
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm
(the insurer).
On 17 December 2019, the complainants lodged a claim for impact damage to their
home after a vehicle was driven into a wall at the home.
The insurer appointed an engineer, who assessed the damage to the home. The
insurer says the assessment was not completed and it requires its engineer to re -
attend for a second assessment.
The complainants say the insurer’s en gineer completed the assessment and they
provided the insurer with their own engineer’s reports and builder’s quote.
The complainants say the insurer has sufficient information to decide. They require
the insurer to accept their claim and pay $29,641.60 to resolve the claim.
The case analyst provided the parties with a preliminary assessment on the issues in
dispute. The preliminary assessment was in favour of the insurer.
As the complainants have not accepted the preliminary assessment, the complaint
has been referred to me for determination .
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
No. The available information does not establish the insurer’s request for a further
inspection is reasonable. As the complainants have not failed to cooperate with the
insurer and the insurer has not established it has been prejudiced by the alleged non-
cooperation, it is not entitled to decline the claim.
Is the insurer’s cash settlement offer fair?
No. As the available information does not establish, on the balance of probabilities,
the claimed damage was caused by ground movement, the insurer’s offer is not fair,
and it is to pay the complainants’ claim and the cost of the complainants’ expert
reports.
Determination | Case number: 725528 Page 3 of 16
1.3 Determination
This determination is in favour of the complainants.
Should the complainants accept this determination, then, within seven days of
notification of acceptance, the insurer is to pay to the complainants:
$29,641.60 for the claimed repairs;
interest on $29,641.60 pursuant to S ection 57 of the Insurance Contracts Act 1984
(the Act) from 25 February 2020 (the date of its final decision) until the date of
payment ;
the cost of the complainants’ expert reports , subject to satisfactory proof.
If the complainants have already paid for the expert reports, the insurer is also to pay
interest, pursuant to the Act, on the payments from the date the reports were paid for
until the date of settlement.
Determination | Case number: 725528 Page 4 of 16
2 Reasons for determination
I have decided this complaint based on what is fair in all the circumstances, having
regard to legal principles, applicable industry codes or guidance, good industry
practice and previous relevant determinations of AFCA or predecessor schemes
(which are not binding). I have considered all the material submitted by the parties,
both before and after the preliminary assessment. I am satisfied that the
documentation I have relied on has been provided to both parties.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
Further report and submissions after preliminary assessment
After the preliminary assessment was rejected, the complainants provided a further
report from their engineer and made further submissions in which they essentially
reiterated their position. The insurer made no further submissions and provided no
new material.
2.1 Is the Insurer entitled to decline the claim?
Parties ’ submissions considered
The insurer says it is entitled to decline the claim because its assessor wanted the
engineer (CD) to re-attend to inspect the home, or for a second opinion to be
obtained. The insurer says it requires this information to clarify if the cracking damage
is from the impact (an insured event) or from ground movement (an excluded cause).
The insurer says its assessor was not satisfied with CD’s report because the engineer
was to provide commentary on if there was any damage caused by settlement and, if
so, was the damage exacerbated by the impact. The insurer refers to external level
surveys and the requirement to inspect other internal areas of the property.
The insurer said it understands there was a disagreement with CD and , because of
this, CD did not complete a full inspection and do a full level survey.
Alternatively, the insurer said the complainants could provide their own engineer’s
report.
It relies on a policy term which says, when making a claim, an insured must allow the
insurer to arrange for experts to assess the damaged home.
The policy terms relied on by the insurer are set out in supporting section 3.2 of this
determination.
Determination | Case number: 725528 Page 5 of 16
The insurer recognises the complainants want as little inconvenience as possible in
the claims process and was willing to offer a cash settlement for the assessed
damage, or to progress the claim by way of another inspection.
The insurer refers to the complainants’ engineer’s report (KB) and says it is
prejudiced because it has not been able to fairly and completely the assess the extent
of its liability, as CD has not been allowed complete access as appears to have been
allowed to KB.
As the engineers’ reports c onflict and because of the quantum of the claim, the
insurer says it is appropriate to obtain a further expert opinion as to the nature and
extent and causes of damage to, and the condition of, the home.
The insurer has accepted the claim in respect of the impact event. In the absence of
agreement to another assessment , the insurer was prepared to offer a cash
settlement of the accepted damage in the sum of $1 ,833.92 , in accordance with the
actionable quotation it had obtained.
The complainants rejected the offer and say they will accept the lesser amount from
their builder’s quotations in the amount of $29,641.60.
The complainants dispute the assessor was un happy with CD’s report. They
acknowledge the policy term but say they have cooperated with the insurer and the
insurer has enough information from its own assessor, builder and engineer to decide.
They also say:
there was no argument or interference with CD;
there was no damage to their home inside or outside before the impact;
the insurer wanted them to get their own independent report, which they did;
the insurer forfeited its right to a further inspection because it told the complainants
to get their own engineer’s report , which they did.
The parties have relied on extensive material from their own experts and from the
insurer’s assessor. A summary of the material relied on by the parties is set out in
supporting section 3.3 of this determination.
Insurer not prejudiced by refusal to provide second inspection
An insurer is entitled to investigate and determine the validity of any claim lodged and
the extent of the loss. This may include reasonable requests for a range of
information about the claim circumstances.
The insurer must establish the requested information is relevant to its claims decision
and it has been prejudiced by the refusal to provide the information. An insurer cannot
refuse a claim simply because the insured has not provided something requested.
Determination | Case number: 725528 Page 6 of 16
The policy requires the complainants to comply with reasonable requests for
information made by the insurer about a claim.
In the circumstances of this claim, I am not satisfied the insurer’s request for a further
inspection is reasonable. I am not satisfied the complainants have failed to cooperate
with the insurer and that the insurer has established it has been prejudiced by the
alleged non-cooperation. This is because:
Even if there were “words” between CD and the complainants at the t ime of
inspection of the complainants’ home, I accept CD’s report is comprehensive and
CD has taken levels and photographs.
CD has a special paragraph in his report which refers to limitations and makes no
comment about any limitations which took place at the time of inspection.
CD draws conclusions sufficient for the insurer to make a claims decision about the
impact damage to the south eastern corner of the complainants’ home .
The insurer suggested the complainants obtain their own expert reports, which
they have done.
In the assessment report of 12 August 2020, the assessor says she was satisfied
with the CD report, but, as she found KB’s report insufficiently convincing, she
recommended a partial settlement.
Although the assessor had criticism s of KB’s reports, the available information
does not establish the assessor or CD was asked to comment on KB’s subsequent
report.
On the available information, and for the reasons stated, I am satisfied the
complainants are not required to allow access to their home for a further report by CD
or by another engineer.
I am satisfied the insurer has sufficient information to assess the claim, based on the
information that is available. The insurer has assessed the claim and offered a cash
settlement.
2.2 Is the i nsurer’s cash settlement offer fair?
Insurer does not dispute there is impact damage
The complainants must establish, on the balance of probabilities, they have suffered a
loss caused by an event to which the policy responds. This is known as a prima facie
or valid claim.
The insurer does not dispute there is impact damage. I am satisfied the complainants
have established a valid claim.
Determination | Case number: 725528 Page 7 of 16
Expert reports considered
Once so established, the onus shifts to the insurer to prove , on the balance of
probabilities, that an exclusion applies if it seeks to deny or limit its liability for the
loss.
In the circumstances of the claim, the insurer must establish the claimed damage is
caused by ground movement.
The insurer relies upon its engineer’s report and the further assessment report, dated
12 August 2020.
The insurer says KB provided no objective evidence, such as floor level surveys and
does not provide any opinion as to whether the totality of the observed condition of
the insured property was all caused by the claimed event.
The insurer also says KB’s second report is vague, relies upon assumptions and
reporting from the complainants and provides no objective evidence to support the
expressed views. The floor level surveys taken by CD have not been addressed and
there has not been consideration or review of the site conditions, as noted by CD.
Insurer has not established damage caused by ground movement
The insurer makes no comment on the report provided by KB after the preliminary
assessment. Nor has the insurer acknowledged the opini on of the complainants’
builder (RS), who also supports the complainants’ position.
I do not find CD’s report sufficiently compelling , in view of the three reports provided
by the complainants’ engineer , which have not been commented on by CD. I do not
consider the assessor’s opinion sufficiently weighty to rebut KB’s opinion.
KB is a structural and civil engineer. I am satisfied he has the expertise to comment
after two comprehensive inspections of the home. KB’s reports are supported by
photographs. I do not accept the reports are vague and his opinion is
unsubstantiated.
KB has inspected the home twice, including most recently on 25 September 2020. He
is unequivocal in his opinion, which is that the building is in good condition with no
evidence of significant footing movement which would have contributed to the
damage at the rear south eastern corner of the building where the impact occurred.
He confirms all the claimed damage is consistent with impact from a motor vehicle.
In the circumstances, I am satisfied the preponderance of the expert evidence is in
favour of the complainants. I am not satisfied the insurer has established, on the
balance of probabilities, the claimed damage was caused by ground movement.
Determination | Case number: 725528 Page 8 of 16
Insurer to pay to the complainants $29,641.60 plus interest
On the available information and for the reasons stated, the insurer is not entitled to
decline the claim and offer only $1,833.92 .
The complainants have obtained two quotations. One is for $31,150. The ot her is for
$29,641.60. The complainants are prepared to accept the lesser quotation.
Should the complainants accept this determination, then, within seven days of
notification of acceptance, the insurer is to pay to the complainants $29,641.60.
The insurer is also to pay interest, pursuant to Section 57 of the Insurance Contracts
Act 1984 (the Act) from 25 February 2020 (the date of its final decision) until the date
of payment.
Insurer to pay for the complainants’ expert reports
The complainants obtained three reports from KB and other expert opinion.
Pursuant to the AFCA Rules, an insurer may be required to contribute to the
complainants’ costs , up to $5,000.
When considering whether to require the insurer to make a costs contribution, we
consider the complexity of the complaint and whether the complainants needed to
incur the costs to understand or establish their claim.
In circumstances where the insurer had obtained expert opinion and invited the
complainants to obtain an expert opinion, I am satisfied it is fair the insurer contributes
to the costs of the expert reports obtained by the complainants.
Should the complainants accept this determination, then, within seven days of
notification of acceptance, the complainants are to provide to the ins urer proof of the
cost of the reports (for example an invoice). Within seven days of receipt of the proof,
the insurer is to pay for the expert reports, or reimburse the complainants for the cost
of the reports.
If the complainants have already paid for the expert reports, the insurer is also to pay
interest, pursuant to the Act, on the payments from the date the reports were paid for
until the date of settlement.
Determination | Case number: 725528 Page 9 of 16
3 Supporting information
3.1 Our Approach
It is an accepted principle of general insurance law that the insured bears the onus to
establish, on the balance of probabilities, that they have suffered a loss caused by an
event to which the policy responds. This is known as a prima facie or valid claim.
Once so established, the onus shifts to the insurer to prove, on the balance of
probabilities, that an exclusion applies if it seeks to deny or limit its liability for the
loss.
3.2 Relevant policy terms
The relevant policy extracts are referred to in the correspondence between the parties
and in the insurer’s Notice of Response. Both the policy document and the Notice
have been exchanged with the complainant.
Impact
We cover
Loss or damage caused by impact at the insured address from:
watercraft, aircraft, motor vehicles or trailers; …
General exclusions (Cont’d)
You are not covered under any section of this policy for damage, loss, cost or
legal liability that is caused by, arises from or involves:
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage
or any other earth movement…
To process the claim, you must
allow us to inspect the damaged home and/or contents;
allow us to arrange for experts to assess the damaged home and/or
contents and to quote on repair or replacement; …
We choose how we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we will decide if
we will:
repair damage to your home;
rebuild your home;
pay you what it would cost us to repair or rebuild your home;
Determination | Case number: 725528 Page 10 of 16
3.3 Material relied on by the parties
Date Action
Builder asse ssment report
(KB)
8 January 2020
Attended and photographed with internal assessor and
complainant to discuss the claim of impact damage to
house.
Noted major internal cracking to walls and ceiling in
gym room and major brick wall movement to external,
cracking to external eaves and sag to gym window.
Require structural engineer to report and scope
damages.
Asse ssment report
8 January 2020
Attended and photographed with builder and agreed
engineer requi red to attend to report if the damage is
caused by the impact and also to provide a scope of
works for repairs.
Asse ssment report
15 January 2020
Assessor arranged on site assessment with the
complainants and engineer.
Assessor confirmed the reason for the Engineer is to
confirm the SOW related to the impact event. Further
to this Engineer to confirm if there are any other
causations to the bowed external wall.
Male complainant advised he was unaware the
appointment wou ld take 45 mins and he had arranged
to be at an appointment. Due to the time restrictions,
engineer has not carried out a full inspection to all
internal walls and only viewed the cracking in the rear
room in question.
Whilst on site, male complainant sai d he has had his
own builders/engineers attend who state all damage is
due to the impact. Engineer has advised the
complainant here is settlement issues at the property
as built on reactive soil. As the conversation became
heated, engineer has left site.
Assessor has reiterated to the complainant that we
agree there is impact damage however we need to
ensure there is no other underlying issues to the
brickwork.
Assessor has confirmed with the complainant once the
report is received, will be in contact to discuss the
outcomes and next steps.
Insurer’s engineer report (CD)
22 January 2020
Inspected and photographed 15 January 2020.
Hous e 35 years old; lived in by insured since it was
built and is in good condition with respect to its age.
Took levels, n oted property is considered to be on
highly reactive clay soil.
Highly reactive sites can expect surface movement of
between 40 - 75mm. Noted 50mm drop in levels.
Therefore the settling measured and observed at the
Determination | Case number: 725528 Page 11 of 16
Date Action
house is not a failure of the footing syst ems and is to
be expected.
Observations: Rear wall of the dwelling between the
south - eastern corner and the north - eastern corner is
observed to be bowing. This elevation has a differenc e
in levels of approximately 50mm from one end of the
wall to the othe r based on the relative level survey
conducted. This indicates that foundation settlement
has occurred and has resulted in the bowing observed.
See Photograph 1.
Diagonal tapered cracking varying bet ween 4mm and
10mm was observed internally, specifically to the
south - eastern corner/elevation of the room. This type
of cracking is indicative of foundation settlement and
the available evidence indicates this is not re lated to
the vehicle impact. The cracking is adjacent to the
south - eastern corner that the relative level survey
found had dropped 50mm relative to the north - eastern
corner of the same room. See Photograph 2 and
Photograph 3.
A horizontal crack measured to be 10mm was
observed origination from the south - eastern corner of
the dwelling. Once again, this is indicative of
foundation settlement due to the close proximity to the
settled south - eastern corner of the dwelling which was
verified by the relative lev el survey. See Phot ograph 4.
The vehicle impact crushed and pierced the downpipe
located at the - south - eastern corner of the dwelling.
See Photograph 5.
Vehicle impact has resulted in the chipping of 2 bricks
located approximately mid - way up the south - eas tern
corner of the dwelling. The available evidence
indicates the height and location of the bricks is in line
with the vehicle impact event. See Photograph 6.
Step cracking to the external masonry was observed
tapering off from the bottom corner of the window
located along the south - eastern elevation of the
dwelling. This type of cracking is indicative of
foundation settlement and the available evidence
indicates this is not related to the vehicle impact. See
Photograph 7.
Foundation drought drying of reactive clay foundations
is the cause of this damaging differential settlement in
the south - eastern corner of the premises and this is
supported by the chronology of the claim and recent
drought conditions experienced in NSW over the last
three (3) years which has been widely reported on by
the Bureau of Meteorology.
A vertical crack was observed to a brick located below
the eaves at the south - eastern corner of the dwelling.
Determination | Case number: 725528 Page 12 of 16
Date Action
This type of cracking is indicative of foundation
settlement and the available ev idence indicates this is
not relat ed to the vehicle impact. See Photograph 8.
Internal cracking to the plasterboard lining adjacent to
the south east corner of the house is a res ult of
foundation settlement.
Concluded: cracking observed internally to the
p lasterboard wall lining adjacent to the south - eastern
corner of the dwelling is the result of settlement as
found by the relative level survey.
Relative levels were taken along the Damp Proof
Course (DPC) around the location of the vehicle
impact and foun d difference in levels of approximately
50mm between the south - eastern corner and the
north - eastern corner of the rear room.
V ehicle impact damage is isolated to a downpipe and
a couple of chipped bricks approximately mid - way up
the south - eastern corner.
S cope of works is provided following to rectify the
damage as a result of the vehicle impact event
discussed in this report which included: Remove and
replace downpipe including 2 x downpipe clips at
South - Eastern corner; Remove and replace 2 x
standard b ricks at the South - Eastern corner located
approximately mid - way up the wall. Refer to Figure 1
below and Allow to repoint 1.5 square metres of
masonry around the impacted corner.
I nspection was carried out on 15 January 2020 and
was limited to a visual and walk over examination of the
site. This report has been prepared within the
limitations imposed by visual access and walkover
around (the site) and the findings are relevant to the
dates of inspection.
Asse ssment report
3 February 2020
Reviewed CD’s repo rt.
Based on the Int eraction between CD and the Insured
on site, Assessor is not satisfied with the report
provided by CD. CD were originally requested to
provide commentary on if there were any damages
caused by settling/movement and if there was, were
t hey exacerbated by the impact?
Due to this, Assessor recommends another engineer
to be appoint ed to attend site, inspect the impact area
as well as complete a full level survey. Assessor
requested the Engineer to comment on
> What damages have been caused by impact?
> Are there any damages caused by movement – If so,
has the impact made them worse?
> provide a full SOW for repairs to the damages
caused by impact.
Determination | Case number: 725528 Page 13 of 16
Date Action
Spoke to male complainant. Assessor has advised the
Insured that not all requested information was included
in CD’s report. It is on this basis we will be requesting
another Engineer to attend site.
Male Complainant advised that he has already had
another builder/Engineer review the property and they
do not agree that it is movement. Assessor requested
send this report in for review however Male
Complainant declined. He advised he will await to see
what our next Engineer report outcome is before he
provides this.
Male Complainant asked what the Engineers would be
doing when attending site, as Assessor wa s explaining
this, Male Complainant expressed his dissatisfaction.
Assessor advised it would be requested for the
Engineer to carry out external level surveys and to
inspect the other internal areas of the property. Male
Complainant advised there is no oth er cracking in the
property, and he will not be allowing the Engineer or
Assessor to go inside his house and believes this to be
an invasion of privacy.
Assessor attempted to explain why this would be
required however Male Complainant terminat ed the
call t wice.
Assessor notes, a full internal review of the property is
required to confirm if there is or isn’t any other
evidence of settling in the property. A FULL inspection
and assessment of the property is required as per the
policy.
Quote request
10 June 2020
Damaged Bricks and Downpipe from Impact Event
Quotation
17 June 2020
Cost allowed based on information provided by CD to
remove and replace the downpipe at south - east corner
and remove and replace bricks at south - east corner
$1,833.92 including GST and administration.
Asse ssment report
12 August 2020
Assessor has been provided and reviewed a copy of
the report from KB.
KB have noted it is their understanding the damage is
the result of impact from a mot or vehicle. Assessor
notes that this report d oes not provide any furt her
information or evidence to support why they are of this
understanding.
This report cannot be relied upon and there has been
no evidence provided to support their findings. There is
lack of detail outlining the cause of the crack ing sand
movements to the southern and eastern walls of the
dwelling.
Determination | Case number: 725528 Page 14 of 16
Date Action
Assessor has always been satisfied with the CD report
due to the compelling amount of evidence provided to
support their findings. It was only due to the
complainants’ dissatisfaction a second report request
was suggested.
Although the complainant has provided a report from
their own engineer, this cannot be used due to
insufficient details.
Satisfied the claim is one for PARTIAL accept ance.
Assessor acknowledges there have been some
d amages to the property caused by the impact (down
pipe, clips, chipped bricks and masonry) which has
been quoted by KB for $1,833.92.
Assessor recommends all other cracking to the
external/internal southern and eastern walls is not for
acceptance on the b asis this has not been caused by
any defined insured event and has in fact been caused
by foundation settlement which is excluded.
Complainants’ engineer (KB)
Report
16 April 2020
Visual inspection by this structural and civil engineer
24 March 2020 .
Single story brick veneer construction with a conc rete
foundation slab believed bearing on to clay.
Inspection of the building revealed damage to the rear
south eastern corner. Our understanding the damage
is the result of impact from a motor vehicle.
Dia gonal cracking in the external brickwork is evident
below the gym window in the southern side wall.
Noticeable movement and bowing are also evident in
the rear eastern wall adjacent to the southern corner.
Movement and damage are also apparent in the timb er
fascia and eaves soffit linings. Significant cracking is
evident in the int ernal plasterboard wall linings at the
rear of the southern side wall of the gym, most
noticeably around the window.
Recommended listed rectification work be carried out
to ensu re the structural adequacy of the building.
Complainants’ engineer (KB)
Report
1 0 August 2020
As noted in our (April) report, damage to the rear south
eastern corner of the building was confirmed by the
(male complainant) to be the result of impact from a
motor vehicle. At the time of our inspection on 24.3.20
the vehicle had been moved.
Movement and bowing in the brick walls and damage
to the timber fascia are indicative of an impact pushing
the walls res ulting in the cracking noted in our original
repo rt.
A visual inspection was also carried out around the
external brickwork of the building to confirm any other
signs of cracking or movement. No significant cracking
Determination | Case number: 725528 Page 15 of 16
Date Action
was evident in the brickwork, which indicated that
footing movement has not been excessi ve and is
unlikely to have contributed to the observed damage.
Movement in the building noted in our report is not
believed to have resulted from footing movement in
response to reactive clay foundation material.
T o the extent this report is based on visu al inspections,
this report does not extend to any matters concealed
or not reasonably apparent on a vis ual inspection.
Complainants’ engineer (KB)
Report
30 September 2020
A second visual inspection was made of the existing
residence at the above address on 25.9.20 to
determine condition of building with reference to the
claimed motor vehicle impact.
Damage to the rear south eastern corner of the
building was confirmed by t he (male complainant) to
be the result of impact from a motor vehicle. At the
time of our inspection on 24.3.20 the vehicle had been
moved.
Building is believed to be approximately 40 years old
and is single storey brick veneer construction with
concrete strip footings and ground floor slab supported
on perimeter brickwork and compacted filling.
Inspection of external brickwork did not reveal any
significant cracking or signs of footing movement.
Horiz ontal separation between front veranda slabs and
adjac ent brick wall is not related to footing movement.
No cracking was evident in brickwork supporting the
veranda slabs.
Minor cracking and movement are evident in the roof
eaves soffit linings. The movement is a result of
shrinkage of the timber roof framin g and is not related
to footing movement.
An inspection of the internal plasterboard wall and
ceiling linings did not reveal any significant cracking
which would indicate footing movement.
Consider the building is in good condition with no
evidence of si gnificant footing movement which would
have contributed to damage at the rear south eastern
corner of the building.
S atisfied that movement and bowing of external brick
walls, damage to the timber fascia and cracking in the
internal plasterboard wall linin gs at the rear south
eastern corner of the building, noted in our original
report, is consistent with impact from a motor vehicle.
There is no evidence of significant movement around
the building which would indicate footing settlement
resulting in the obs erved movement and cracking.
Determination | Case number: 725528 Page 16 of 16
Date Action
Complainants’ builder (RS)
Report
13 May 2020
Quote to supply materials and labour to repair the
damage to the south east comer of the house.
Damage was caused by a light truck ramming into the
house. The truck pushed part of the south wall toward
the corner and pushed the east wall onto a lean. This
pushed the eaves out and put the roof out of
alignment, cracking the internal wall out of alignm ent.
Repair and replace damaged gyprock sheeting and
cornice. Replumb and refit window. Remove and reuse
timber architrave around the window of the south wall
as matching profile would no longer be available.
Remove 5 lineal metres of the sout h brick wal l and 4
metres of the east brick wall, clean bricks and relay,
replace broken eaves sheet, remove and replace
electricals, paint, remove and replace damaged gutter
$31,150.
Complainants’ builder (GM)
Report
Undated
Quoted $29,641.60 including GST for t he proposed
repair works to the rear corner which includes:
Demolish the damaged wall from the side window to
centre of rear wall, rebuild brickwork, remove and
replace damaged eaves sheet, refix timber fascia,
remove and replace damaged rear gutter and s ide
downpipe, check the timber frame, repair the gyprock
and electrician and painting.
3.4 Other relevant material considered and relied on
Parties’ submissions/emails and all attachments to all submissions/emails both
before and after the preliminary assessment.
Parties’ expert reports.
Photographs.
Claim messages.
Correspondence between the parties