Text of the determination
Determination
Case number 725398
Financial firm AAI Limited
Determination | Case number: 725398 Page 1 of 10
Case number: 725398 29 June 2021
1 Determination overview
1.1 Complaint
The complainant made a claim under her home insurance policy held with the financial firm
(insurer) after a heavy storm on 13 February 2020, during which a significant landslide
occurred at the rear of the insured home.
The insurer assessed the property and declined the claim on the basis the damage was to
retaining walls which were already in a state of deterioration, and which in any case were
specifically excluded from cover under the insured event of ‘storm’.
The complainant does not accept that. She says a tree collapsed and possibly caused the
damage to the retaining wall.
She is also unhappy with how the insurer managed the claim.
1.2 Issues and key findings
Is the insurer entitled to decline the claim?
The insurer is not entitled to decline the claim. That is because the evidence shows the
damage to the home was from an insured event, and was much broader than to the retaining
walls. The repair/reinstatement of the retaining walls is one of the fundamental elements of
the work necessary on the site to repair the overall property damage; it is not simply a case of
them needing individual or isolated repair. Because the claim should be accepted, the insurer
is also liable for other ‘additional features’ (such as temporary accommodation costs).
Is compensation for non-financial loss payable?
The available evidence indicates the insurer acted reasonably when engaging appropriate
experts to investigate the damage, including the complainant’s suggestion of impact from a
fallen tree. It also paid for a period of temporary accommodation for the elderly complainant
and her disabled husband (who has since sadly passed away), given reasonable concerns
the house was unsafe.
However, the claim was wrongly declined, and that meant the complainant and her husband
were subjected to a prolonged period of significant upset, uncertainty and disruption when
they were particularly vulnerable. That was exacerbated by the impact of Covid-19 on their
interim living arrangements. I consider compensation of $5,000 for non-financial loss is
warranted in the particular circumstances.
Why is the outcome fair?
The outcome is fair because the insurer has not shown that exclusions apply, or that it is
otherwise entitled to decline the claim. The evidence is clear that the damage to the insured
home was more extensive than that recognised by the insurer. Given the complainant’s
particular circumstances, the insurer’s denial of the claim caused her significant and
avoidable stress and inconvenience.
Determination | Case number: 725398 Page 2 of 10
1.3 Determination
This determination is in favour of the complainant.
The insurer is required to accept and settle the claim for storm damage, and cover applicable
‘ additional features ’ (including temporary accommodation), as set out in section 2.1 below
and otherwise in accordance with the policy terms and conditions.
It is also required to pay the complainant $5,000 compensation for non-financial loss.
Determination | Case number: 725398 Page 3 of 10
2 Reasons for determination
2.1 Is the insurer entitled to decline the claim?
Onus is on complainant to establish a valid claim
The complainant is represented in this complaint by a family member.
The complainant is required to show, on the balance of probabilities, she has suffered a loss
caused by a risk insured against under the policy. This is known as a valid or prima facie
claim.
Once she has established a valid claim, the insurer is liable for the loss unless it shows an
exclusion applies or it is otherwise entitled to deny the claim.
Policy covers ‘storm’
The policy covers the home for specific events listed in the product disclosure statement
(PDS) , including ‘storm’.
The PDS states on page 12 that ‘retaining walls which are located within the boundaries of
the insured address’ are covered as part of the home. The PDS defines ‘retaining wall’ as ‘a
wall, which is not part of the residential home, that holds back or prevents the movement of
earth ’.
In this case, there was obvious and very significant damage at the rear of the house from the
landslide, with the collapse of the embankment which includes several levels/retaining walls
on the slope down to a river. There was also visible damage to a support pole and cement
path at the rear of the house itself, where the underlying soil had been lost in the landslide
and where the insurer undertook some preliminary make safe work.
There is a general policy exclusion for earth/ground movement (including landslides, landslip,
mudslide). That exclusion applies except where the ground movement is specifically covered
under certain insured events, including ‘storm’.
In the policy, ‘loss or damage caused by a landslide or subs idence that occurs within 72
hours of, and directly because of, a storm and not because of erosion over time, structural
fault or design fault‘ is covered.
The evidence clearly establishes there was a storm, and a landslide/landslip which occurred
during or very soon after that storm event. That landslide damaged the home itself and the
adjoining embankment which incorporated the retaining walls.
I am satisfied the complainant has established a valid claim under the policy.
I acknowledge the complainant’ s suggestion that it was the impact of a fallen tree which had
damaged the retaining walls. However the evidence does not support this, and I do not
consider it necessary to deal with that possibility any further.
Determination | Case number: 725398 Page 4 of 10
Insurer believes exclusions apply to entitle it to decline the claim
The policy contains other exclusions which apply to the specific listed events. Relevantly in
this case, the insured event of ‘storm’ excludes cover for retaining walls. The insurer submits
the claim can be declined since the damage was to the retaining walls.
The insurer has also pointed out that cover for the ‘ home ’ does not include ‘ loose or
compacted soil, lawn, artificial grass, gravel, pebbles, rocks or granular rubber; … plants,
trees and shrubs or hedges in the ground (unless covered under additional feature ‘Damage
to gardens and plants’, see page 34)’ .
As well, th e insurer believes, based on its experts’ reports (considered in detail below), that
the exclusion for gradual deterioration should apply, given the pre-existing condition of the
affected retaining walls.
Experts identified broad area of damage, not solely to retaining walls
In their assessment on 18 February 2020, the insurer’s builder RPF reported the ‘large
landslide’ at the rear of the property had mad e the ground unstable. The landslide was
estimated as being approximately 30m in length, running down to the river; with the top of the
landslide around 3-4m from the corner of the building.
RPF noted the veranda posts had moved (and had since been made safe); the concrete path
near the house had dropped; and ‘the retaining wall has been completely destroyed, and
other areas of the bank have come away slightly from the earth and are at risk of further
collapse’.
The damage to be repaired was summarised as being: the surrounding ground to the rear of
the property, veranda and support, concrete and pathway.
RPF recommended an urgent attendance by an engineer to assess and secure the ground.
They also noted that part of the landslide area was on adjacent council property (parkland),
and so suggested a council representative might also need to attend, but that does not
appear to have happened.
JHA, consulting engineers, inspected the site on 21 February 2020 and reported the landslide
had come within 1.2m of the rear left-hand corner of the back deck/veranda. They noted:
‘t he embankm ent directly behind the dwelling had been designed in terraces with 4
retaining walls of varying m aterials at each step. There were two large trees that have
been partially undermined and are at risk of slipping down the bank and potentially
causing further damage to the embankment and the dwelling...The retaining wall second
from the top is a timber retaining wall with a concrete footing that has cracked towards the
LH end. Several of the retaining walls have failed at the rear of the dwelling.’
In a supplementary report, JHA reiterated the retaining walls were in ‘a varied state of
deterioration’ , summ arising:
‘…it is our opinion that the embankment slipped (triggered by a rainfall event with stormwater
runoff discharging over and through the embankment) which undermined part of a retaining
wall which then failed which resulted in additional landslip etc as a domino type effect. ’
Photographs included in JHA’s report show extreme undermining of the concrete path
immediately under and adjacent to the deck/veranda area of the house, continuing down the
steep slope behind it.
Determination | Case number: 725398 Page 5 of 10
JHA concluded that, given the risk of further landslides and slippage, the house was unsafe
for occupancy. They said it was necessary to arrange testing by a licensed geotechnical
engineering company ‘ to gain a better understanding of the immediate risk to the dwelling
and also to help advise on the scope of remedial works required to guarantee the safety
of the dwelling ’.
In March 2020, the insurer’s assessor, PT, conducted a desktop assessment of the evidence
to date and said the claim should be declined since the damage was to retaining walls, and
therefore excluded. However, I am not satisfied that in his brief review PT took appropriate
account of the full scope and impact of the damage.
An inspection was then conducted on 30 March 2020 by geotechnical engineers, SS , ‘t o
comment on the likely cause/s of the ground subsidence, possible remedial options to
stabilise the failed embankment and to formulate a geotechnical investigation program to
assess subsurface conditions adjacent to the slip and to provide geotechnical
recommendations to stabilise and reinstate the slip. ’
SS identified several likely factors in the landslip/failure: the steepness of the embankment
slope; stormwater runoff/ discharge; and/or an inadequate and deteriorating retaining wall.
Their suggested ‘remedial options’ were:
construction of a suitable, engineer designed, retention system across the slip area
and appropriate backfilling to re-establish lateral support to the embankment
improved stormwater drainage at the rear of the property
remedial works to repair, reinforce or replace existing inadequate or deteriorated
retaining walls … elsewhere in the embankment.
SS also made recommendations for a further geotechnical investigation, and for the landslip
and immediate area to be surveyed by a registered surveyor.
To address SS’s comments above, and the insurer’s suggestion that gradual deterioration
was a factor in the retaining walls’ collapse, I note the evidence does not establish the
retaining walls themselve s were ‘inadequate’. I understand the house, and in all likelihood the
retaining walls too, were about 40 years old, the complainants had lived there for about 18
years, and there is nothing that indicates there were previous issues with the walls. Nor does
the evidence show the retaining walls were ‘deteriorated’ to the extent that their condition
made them unusually vulnerable to the extreme weather conditions of the claimed storm
event.
Likewise, while SS refers to installing ‘improved’ stormwater dra inage, I am not satisfied the
available evidence shows the pre-existing drainage had been inadequate or had contributed
in any way to the damage.
Evidence shows need for soil retention system, including retaining walls
While make safe work was carried out to support the veranda area soon after the event, that
is clearly an interim and insufficient remedy for the damage caused to the insured property,
including the embankment, from the storm and the associated landslide.
Based on the available evidence, I am satisfied that structural support in the form of a soil
retention system is necessary to repair the current damage and prevent further erosion at the
property. I also consider it reasonable to accept that SS’s ‘remedial options’ were not
proposed as alternatives, but as the appropriate and necessary combination of works
required to properly repair the damage caused by the landslide and to minimise the risk of
Determination | Case number: 725398 Page 6 of 10
future occurrences. Those works might also need to be augmented or varied, subject to the
findings of the further geotechnical investigation which SS also recommended, and which I
consider should be undertaken.
I appreciate that the retaining walls, in isolation, would be excluded from cover under the
insured event of ‘storm’ . However damage to the home is covered, and that damage includes
and extends beyond the veranda and concrete path which were clearly compromised when
the landslide caused supporting soil to be forced out from under the structure and down the
slope.
The minimal make safe at that corner of the veranda area did not address the full extent of
the underlying or potential further damage to the home (including on the foundations). As
noted by the experts, the land and house were at risk of further landslides/landslips, and the
property was unsafe for occupancy, which is why the complainants were moved straightaway
and provided with temporary accommodation at the insurer’s expense (which I understand
continued until the insurer eventually declined the claim).
Even if it was only the veranda and path that were damaged, proper repair could only be
effected by replacing and supporting the soil around and under that part of the home, and
indeed the soil further down the slope below it. To be clear, I do not accept that the carve-out
of ‘ loose or compacted soil ’ from cover for the ‘home’ applies in this context. That is because
the wording of that PDS provision includes reference to ‘ lawn, artificial grass, gravel, pebbles,
rocks or granular rubber …’ . I consider that can reasonably interpreted to mean cover does
not extend to more cosmetic or decorative treatments of the soil or garden areas, as distinct
from materials and configurations which are fundamental to the structural integrity and safety
of the home.
I am satisfied that the engineer’s recommended soil retention system, which necessarily
incorporates retaining walls and drainage work, is fundamental to the proper repair of the
insured property. It is not a case of the retaining walls being a distinct additional area of
damage requiring repair because of the landslide event; instead it is a case of the retaining
walls being an integral component of the repair methodology and outcome.
Insurer is not entitled to decline the claim
The purpose of the policy is to indemnify the complainants for loss or damage caused by an
insured event. I am satisfied the available information shows, on balance, the whole site is
unstable due to the significant landslide that occurred in the storm.
The insurer is liable under the policy for repair of the damage, which includes to the site itself.
That means the insurer is required to accept the claim and deal with it in accordance with this
determination and the remaining policy terms and conditions, including in respect of any
‘additional features’ available.
The evidence indicates that will require further geotechnical and surveyor investigations, as
recommended by SS and otherwise reasonably necessary, before a final scope of work can
be provided and repairs can commence.
It also appears that the effect of the landslide on adjacent land owned by the local council (or
some other third party) will also need to be addressed concurrently in order to allow for the
satisfactory repair of the complainants’ property. I understand the complainant has already
been in contact with the council. The insurer is required to liaise and work cooperatively with
those other parties, as necessary, to ensure it can meet its own obligations to the
complainant under the policy.
Determination | Case number: 725398 Page 7 of 10
Complainant entitled to temporary accommodation benefit under the policy
As already noted, the policy also provides certain ‘additional features’. That includes
temporary accommodation costs (up to a certain limit) when an insured event damages the
home to the extent that the insured cannot live there, and the insurer agrees to pay
reasonable temporary accommodation costs for the time it will take to repair or rebuild the
home to a liveable condition.
In this case, the insurer had already agreed to pay for the complainant’s temporary
accommodation until it reached a claims decision, which is fair and appropriate in the
circumstances. It is not clear how much has since been paid or when payments stopped; nor
is it clear what the complainant’s current accommodation arrangements are.
However, since the claim should have been accepted in the first place, I am satisfied the
insurer is still liable for temporary accommodation (and associated) costs up to the applicable
policy limits and subject to the relevant conditions for Classic cover – but with those
monetary and time limits to be calculated from the date the previous temporary
accommodation payments ceased.
2.2 Is compensation for non-financial loss payable?
Under the AFCA Rules, we can award up to $5,000 compensation for non-financial loss. We
will only award this type of compensation if the complainant suffers an unusual degree of
stress, inconvenience, or delay because of the insurer ’s handling of t he claim.
We recognise that making a claim can be stressful and time-consuming, even if the insurer
handles the claim correctly. We will not award compensation for the ordinary degree of
inconvenience that comes with making a claim.
Complainant entitled to compensation
The claim was notified to the insurer on 13 February 2020, and a claims decision was
communicated to the complainants on 17 April 2020. In the meantime the insurer had
arranged for a number of inspections and expert reports, given the serious and potential
ongoing impact of the landslide. The complainant was concerned that the insurer delayed in
letting her know the retaining wall would not be covered, however I consider the time taken
was not unreasonable given the number and type of investigations required to assess the
damage. The issue was, however, the fact the claims decision was a denial.
She was also unhappy the insurer did not deal with the owner of the adjoining land (either
local or State government authorities). However, I have seen nothing to show the insurer said
it would deal with those other bodies. Instead a letter from the insurer to the complainant
(dated 16 April 2020) made it cle ar that it was providing her with the various experts’ reports
to enable her to deal with the relevant authorities, as necessary. So the insurer was not acting
inconsistently with the decision it had reached about the claim; but again, that decision was
not the correct one. The insurer has since confirmed that ‘ it will readily [contact the local
council or state government bodies] in circumstances where it is deemed appropriate’; and as
noted above, I consider that will now be necessary.
The fact remains the claim was declined when that should not have been the case. As a
result, the elderly complainant and her late husband had the significant and protracted upset
and uncertainty surrounding the future of their home, and indeed themselves. This was only
worsened by the impact of Covid-19 on their living arrangements, and with the sad passing of
the complainant’s husband during that period.
Determination | Case number: 725398 Page 8 of 10
In the particular circumstances, I consider an award of $5,000 compensation for non-financial
loss is fair and appropriate.
2.3 Why is the outcome fair?
The outcome is fair as the evidence shows the property was damaged beyond merely the
retaining walls. The insurer has not shown exclusions apply to entitle it to decline the claim.
Because the insurer incorrectly declined the claim, the complainant has suffered a significant
degree of upset, uncertainty and inconvenience in circumstances (including her age and
health and that of her late husband) which have made her particularly vulnerable.
Determination | Case number: 725398 Page 9 of 10
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Relevant policy provision
Temporary accommodation when you have home cover (p 28)
When an insured event damages your home to the extent you cannot live there, and we
agree, we will pay for your reasonable temporary accommodation costs for the time it will take
to repair or rebuild your home to a liveable condition …
The most we will pay for is:
up to 4 weeks in short term accommodation agreed to by us (e.g. standard rates for a hotel,
motel or serviced apartment), then if necessary up to another:
48 weeks in residential accommodation of a similar standard to your home if you have Classic
or Classic Extras cover; …
We will also pay the reasonable and necessary costs for:
Determination | Case number: 725398 Page 10 of 10
– redirection of mail from the insured address for up to 12 months if you have Classic or
Classic Extras cover …;
– utility connection costs at the temporary accommodation residence;
– relocation of your contents to and from the temporary accommodation residence if you have
contents cover under this policy;
– assistance with bond payment if required, however any amount we pay in bond is
recoverable from you by us. We may deduct this amount from any amount payable to you...
sic Advantages
The most we will pay under this feature [Classic cover] is 10% of your home sum insured and
the longest period you can claim for is 12 months.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.