Insurer declined cyclone claim for full replacement of upstairs particleboard flooring
Summary
The complainants claimed cyclone damage to upstairs particleboard flooring and sought $226,227.70 for full replacement. AFCA found the insurer liable only for localised repair and ordered it to obtain a quote and cash settle the repair cost, plus $2,000 for non-financial loss from delays.
The expert evidence showed the cyclone caused only localised water damage at the sliding doors, so the policy covers partial repair rather than full replacement, while claim delays warranted compensation.
Issues
- Claim denial primary · not upheld
“The insurer's liability is limited to sanding and partial replacement of the floor. The insurer is not liable to pay for a full replacement of the flooring.”
- Delay secondary · upheld
“the matter has spanned over three years, and caused significant stress and inconvenience to the complainants.”
Subjects and remedies
home or building damagenatural disasterpay claimpay non financial loss
Text of the determination
Determination
Case number 724686
Financial firm Defence Service Homes Insurance Scheme
Determination | Case number: 724686 Page 2 of 14
Case number: 724686 24 March 2021
1 Determination overview
1.1 Complaint
The complainants hold a home and contents policy with the financial firm (insurer).
The complainants submitted a claim for the damage with the insurer sustained
following Cyclone Debbie on 28 March 2017.
The insurer accepted liability and has cash settled the claim for $405,185.04. The
insurer has declined the claim for damage to the upstairs particleboard flooring and
say it was not caused by an insured event.
The complainants say the flooring must be replaced, was damaged during the
Cyclone and this should be covered under the policy. The complainants seek cover
for the cost to replace the flooring quoted at $226,227.70.
1.2 Issue and key findings
Is the insurer entitled to deny liability for replacement of upper level flooring?
No. The Panel damage to the upper particleboard flooring caused by the Cyclone was
limited to water ingress surrounding the external sliding door openings. The insurer ‟s
liability limited to sanding and partial replacement of the floor. The insurer is not liable
to pay for a full replacement of the flooring.
Are the complainants entitled to compensation for non-financial loss?
Yes. The complainants have suffered an unusual degree of inconvenience and time
taken to resolve the claim. It is fair in the circumstances the insurer pay $2,000
compensation for non-financial loss.
1.3 Determination
This determination is substantially in favour of the Insurer.
Within 14 days of the complainant‟s acceptance of this determination the insurer is to
obtain an actionable quote to the repair to the damaged flooring located at the sliding
door as set out in section 2.1 of this determination. The insurer can then cash settle
the complainants for the cost of repairs. The insurer is to also pay the complainants‟
$2,000 compensation for non-financial loss.
Determination | Case number: 724686 Page 3 of 14
2 Reasons for determination
The complainants have been assisted by a representative. Reference to submissions
by the complainants includes reference to the submissions by the representative.
There has been a full exchange of material between the parties and each party has
had the opportunity to address the issues raised.
The matter has been referred to a Panel for determination. The Panel comprises the
lead Ombudsman, a member with significant industry experience and a member with
considerable experience as a consumer advocate.
The Determination follows consideration of all relevant information. The determination
is based on what is fair in all the circumstances having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
prior determinations where applicable.
2.1 Is the insurer entitled to deny liability for replacement of upper level
flooring?
No dispute a storm event caused damage to the property
The complainants home policy provides cover for a series of listed events including
storm and rain as well as accidental damage subject to conditions and limitations.
The complainant‟s property was affected by Cyclone Debbie in March 2017. This is
not in dispute and a cyclone claim was accepted by the insurer.
The insurer has cash settled the agreed damage for $405,185.04. The remaining
issue in dispute is the damage to the particleboard flooring in the upstairs area of the
house, what is required to repair that damage and whether any policy exclusions
apply.
Experts’ reports disagree on the extent and cause of damage
Numerous expert reports have been exchanged and are summarised under section 3
of this determination.
The complainants say the issue with the damage to the particle flooring and the hump
in the flooring was raised at the time of the claim in April 2017, but the insurer ‟ s
assessor refused to inspect the flooring. On 26 April 2017, the insurer‟s assessor A
noted:
“ a general hump which insured maintains has appeared since the cyclone in the
particleboard floor (due to pressures from the cyclone). This hump is located
directly outside the bathroom door in close proximity to the shower recess. Water
from cyclone did not reach this area and carpet is still intact. ”
Determination | Case number: 724686 Page 4 of 14
The insurer‟s engineer GT attended in June 2017 and reported the damage to the
floor is due to long term water damage which has resulted from a failure in the
bathroom‟s waterproof membrane. GT reported the issues are related to age or
workmanship and not the cyclone event. GT did not inspect the roof or under the
upper floor carpet.
GT later inspected the roof and under the carpet. On 14 November 2017 GT reported
that water likely did enter the roof during the cyclone event however found no
evidence to suggest that this was in large quantities. GT did not find the presence of
any mould. GT considered it possible the waterproofing in the bathroom could have
caused damage over time. On review of the Council building file, GT noted a
significant defect with the floor framing and believe this is more likely to be the
proximate cause of the bulging. GT considered the cyclone could not be the cause of
the damage to the particleboard upper flooring.
GG, the complainants engineer reported in August 2019 that having inspected under
the carpets he found water staining in the particle board floor by the adjacent windows
and sliding doors. GG considered water ingress because of the cyclone damaged the
particleboard flooring adjacent windows and sliding doors. The saturation of the
carpets has caused damage to flooring adjacent to these ingress points. GG
concluded the whole of the upper floor particleboard flooring would need to be
replaced.
GG did not provide detailed reasoning to explain why they have concluded the
flooring requires full replacement. It is also noted that GG makes no reference to the
Council building file in relation to the property.
Following these reports, the insurer instructed another engineer (FC) to report as to
the cause of the damaged particleboard and whether it required full replacement. FC
was provided all the reports from GT and inspected the damaged flooring.
FC found no structural damage or loss of structural integrity of the particleboard sheet
flooring that would require complete replacement. The only areas of particleboard
which were observed to have cyclone related damage were at the sliding doors,
where the flooring has been cut and fitted into and around these door openings. FC
says this was modest and very localised roof water ingress, and therefore it is not
plausible that wind driven rain reached across and exposed the entire upper floor to
rainwater.
FC says the damaged flooring is suitable for repair rather than full replacement if the
swelling is between 4-6mm. It is noted the complainant have provided photographs of
the gapping, several instances in which distortion exceeds 6 -8mm and in 1-2
instances, appears to be as much as 10mm showing 10mm in some places.
Conversely, FC reports measuring several locations to be less than 4mm. It is not
known when the complainants measured the flooring in comparison to FC. FC
considered the „hump‟ in the floor is a result of undersized floor joists combined with
Determination | Case number: 724686 Page 5 of 14
the resulting abrupt change in floor deflection between the single spanning floor joists.
This is reported as a latent building defect issue associated with the original
construction and was not caused or exacerbated by the cyclone.
Full replacement of upper flooring not warranted
Having weighed all available information contained in the expert reports, the Panel
accepts that while there is some damage to the particle board flooring it is not
necessary to replace the entire floor.
The Panel finds the report of FC to be most persuasive. FC reviewed all reports from
GG and GT. The floor was dry when assessed and extensive photographs provided.
FC met with the complainant‟s builder and acknowledged the carpet and particleboard
was in part wet. FC pas provided detailed reasoning relating to the discolouration and
swelling and raised issues of gapping and floor framing unrelated to the storm. FC
provides a plausible explanation regarding the extent of the cyclone related damage
to the flooring and repairs required.
The insurer ‟s liability is limited to sanding and partial replacement of the floor. The
insurer is not liable to pay for a full replacement of the flooring. The insurer is to obtain
an actionable quote from its builder to cover the cost of the repairs and can cash
settle the claim based on the quotation.
2.2 Is the insurer obliged to pay compensation for non-financial loss?
Complainants suffered excessive stress during claim processing
The complainants say he claim has been on-going since 2017 and there have been
significant delays in the handling of their claim. The complainants say the delays have
caused significant stress and inconvenience.
The complainants noted experts from the insurer and its representatives attended at
different inspections and were in contact to try and resolve the matter.
The panel considers the inconvenience to the complainants, although also
acknowledges the insurer‟s view that it made efforts to try and bring the matter to a
resolution.
The insurer concedes some deficiencies in the earlier handling of the claim, but for
the most part its claims team responded to the complainants‟ requests in a timely
manner, actioned concerns and made the required payments regarding variations as
soon as possible.
While the panel notes the insurer was entitled to spend time on obtaining expert
reports and clarification, the matter has spanned over three years, and caused
significant stress and inconvenience to the complainants.
Determination | Case number: 724686 Page 6 of 14
Considering the claim processing, the length of time taken to resolve the complaint
overall, and the stress on the complainants, the panel considers the insurer is to pay
$2,000 in compensation for non-financial loss.
Determination | Case number: 724686 Page 7 of 14
3 Supporting information
3.1 Relevant policy provisions
Page. 16 Product Disclosure Statement:
6 Storm, snow or hail
What we insure you for
We insure you for loss or damage to the home caused by storm (including cyclone), snow
or hail.
By „storm‟ we mean a violent wind that may occur wit h thunder or heavy rain.
What we do not insure you for
We do not insure you for loss or damage caus ed by wind, rain, snow or hail entering the
home unless it enters because of structural damage to the home that is directly caused by
the storm, snow or hail.
7 Rain
What we insure you for
We insure you for loss or damage to the home caused by rain. Rain includes that part of
the rainfall that is not absorbed by the soil but runs off as surface water.
What we do not insure you for
We do not insure you for loss or damage caus ed by rain seeping into or ent ering the home
because of:
• defects in the structure or design of the home
• defects in building work done on the home
• an opening made in the home so that it could be added to, renovated, repaired or
modified
• failing to properly maintain the home.
Determination | Case number: 724686 Page 8 of 14
3.2 Relevant expert reports
Record Key points
Insurer’s Expert (A)
Loss Adjuster Report
26 April 2017
The upstairs flooring finish is carpet stuck onto particleboard
flooring. This presents in an aged but satisfactory condition from
where we can see it under the home (under kitchen area).
Under the bathroom cannot be seen from underneath as there is
suspended ceiling in this bedroom.
There is a general hump which ins ured maint ains has appeared
since the cyclone in the particleboard floor (due to pressure s
from the cyclone). This hump is located directly outside the
bathroom door in close proximity to the shower recess. Water
from cyclone did not reach this area and carpet is still intact.
this is more likely in our view to be related to a leak from the
shower recess or moisture over time from people walking out of
the bathroom wet, soaking the carpet and being absorbed by the
floor (due to its close proximity to the doorway) .
lifting the ca rpet in this area or exposing the ceiling underneath
this area will show the tracking of moisture to this part of the
floor from the bathroom.
Insurer’s Expert (GT)
Engineer Report
June 2019
The roof structure was not inspected as part of our review.
Bul ging to main bedroom floor – the observed damage is
located outside the first - floor bathroom. An approximate
assessment of the falls in adjoining ens uite was made by
observing the flow of a cup of water spilled onto the floor. The
water did not flow to the floor waste as would be expected to
occur. This lack of fall in the bathroom floor provides a
mechanism for any wat er that penet rates the waterproofing to
spread to other areas of the floor resulting in damage similar to
that observed.
We do not believe t hat this damage can be plausibly be
attributed to the cyclone event and is instead due to long term
water damage which has resulted from a failure in the
bathroom‟s waterproof membrane
We are of the opinion that the issues are relat ed to age or
workmanship and not the cyclone event.
We do not believe that damage to the interior of the residence
can be attributed to the cyclone … T he required conditions did
not exist inside the residence.
Insurer’s Expert (GT)
Engineer Report
24 October 2017
We suggest that the images which claim to show wat er damage
are reasonably consistent with what could be expected to have
occurred during the event; i.e. relatively small amounts of wind
driven water entering through gaps in cladding or flashings. We
are n ot convinced that the images show evidence of water
ingress in sufficient volume to have caused the damage to the
floor below the manhole; nor do we find it likely that this could
have occurred without resulting in staining to the ceiling or
Determination | Case number: 724686 Page 9 of 14
Record Key points
damaging ceili ng mounted fixtures.
Generally we have observed that when wat er ent ers the ceiling
in significant volumes it mixes with dust (or other residue); this
solution then travels through the ceiling resulting in clear
staining to the internal finishes. In some b uildings the ceiling is
clean enough for this not to cause such obvious stains, but the
ingress of water is still clearly apparent. We do not believe that
any such observations have been made here.
Insurer’s Expert (GT)
Engineer Report
14 November 2017
Roof interior - Evidence of water ingress was observed in
several locations throughout the roof… we suspect this
deterioration is due to moisture ingress causing corrosion over a
long period of time.
Water staining was observed to the top surface of the plaster
ceiling lining in several locations.... We suspect that water is
able to enter at the ridge and drain ont o the ceiling at locations
where the sarking has deteriorated; we do not attribut e this
d eterioration to the cyclone.
There was no sign of any significant mould inside the roof cavity.
Although we have reported evidenc e of water ingress (water
staining), there was no evidence that plaster had became
saturated as a result; this indicates that w ater did not enter in
large volumes.
Bathroom floor hump ; there was some discoloration but no
evidence of actual moisture damage.
The floor framing was inspected from inside the garage …
based on obs ervations and a review of the structural
documentation w e believe there are issues with the floor framing
which significantly contribute to the hump observed.
it is the opinion of CCFNQ that water entering the ceiling cavity
during the cyclone has drained onto the timber particle board
floor and r es ulted in the observed damage. Although it is not
stated outright in the report, this conclusion depends on three
conditions holding true, namely :
- That water did enter the roof cavity,
- That water which entered the cavity drained through the
manhole causing the flo or below to become wet, and
- That the type of particle board used in the floor is susceptible
to water damage as would occur from an isolated single event.
we believe that water likely did enter the roof during the cyclone
event however we found no eviden ce to suggest that this was in
large quantities
Structatlor may be exposed to the weather tor up to 3 months .
… it is extremely unlikely that the floor would be damaged by
water in such a short period of time as has been reported,
regardless of whether it was exposed to water as claimed.
it is possible that a breakdown of the waterproofing may allow
moisture to penet rate the floor space and over a long period of
time this could result in damage. Although we still believe this is
possible (likely be a contr ibuting factor rather than the primary
issue), we have subsequently had the opportunity to review the
Council building file and have noted a significant defect with the
floor framing and believe this is more likely to be the primary
cause of the bulging.
Determination | Case number: 724686 Page 10 of 14
Record Key points
Insurer’s Expert
(FCE)
Engineer Report
3 March 2020
Except for flooring in extremely close proximity to external
sliding door openings, water exposure related discolouration of
the particleboard flooring generally did not appear to be
significantly concen trated or worse inside of external window
and door openings where maximum wind driven rainwater
ingress during the claimed cyclone event could be expected, nor
did the discolouration appear concentrated under or around the
central ridge of the roof. Instea d, fairly constant water exposure
related discoloration of the flooring was observed right across
the residence. The consistency of wat er exposure related
discolouration suggests the discoloration of the flooring to this
residence is predominately related to past weather exposure
during the original construction of the residence;
Internal Particleboard Flooring - Swelling
At sliding door locations, some extremely localised curvat ure,
stepping and water exposure related edge swell of the
particleboard flooring was observed to have occurred. We
believe this has been caused by the following:
Drying shrinkage in the early life of the residence and resulting
settling of the originally green or unseasoned structural timber
floor framing members. We believe t his has caused floor
sheeting to locally curl up (bed 1 & lounge) and vertically step up
to the small slithers of infill flooring (meals & bed 2) where the
edge of the floor sheeting is additionally supported by the
external clay block walls across the sli ding door openings;
By the particleboard flooring around the sliding door openings
having saw cut edges that will have exposed bare particleboard
timber fibres without the normal external water - resistant coating;
Exposure to rain during the original constr uction of the
residence;
The expected occurrenc e of cyclone Debbie related wind driven
rainwater ingress through the sliding doors
The local floor sheet edge lift and swell condition at the four
sliding door openings can be suitably resolved by replacing t he
tiny slithers of particleboard flooring inside the sliding doors to
the rear meals and bedroom 2 areas and by locally sanding the
floor edges around the four upper level sliding door open in gs to
bed 1, lounge, meals and bed 2.
Internal Particleboard Fl ooring – Gapping
the gaps observed bet ween the floor sheets and the resulting
uneven movement of the unsupported floor sheet edges under
concentrated offset loading is a very long - term building issue
which has not been directly caused by or exacerbated by the
cyclone Debbie event.
We advise this issue could be readily resolved on site and
without needing to replace the flooring, by the installation of
solid timber blocking bet ween floor joists beneath the
unsupported edges of the floor sheets.
Existing floor framing
This is a latent defect in the original construction of the
residence that has not been in any way influenced by the
cyclone Debbie event. In our opinion the undersized floor joists
Determination | Case number: 724686 Page 11 of 14
Record Key points
combined with the resulting abrupt change in floor deflection
between the single spanning floor joists is the cause of a
claimed “hump” in the bedroom 1 floor just outside the
bathroom. This is again a latent building defect issue associated
with the original construction of the residence and will not have
been caused or exacerbated by the cyclone Debbie event.
How could water from the cyclone have possibly reached
all areas in the entire upper floor? Given the glazing of the
external doors and windows did not fail during the cyclone
Debbie event and only modest and very localised roof water
ingress occurred, it is not plausible that wind driven rain reached
across and exposed the entire upper floor to rainwater.
Why has a once off short - term water exposure damaged
floors at all? As the flooring generally remained in a fair
condition, it is our opinion that the flooring would have generally
remained protected by its normal water - resistant coating and
therefore would not be damaged from a single additional
exposure to rainwater. However, where the edges of t he floor
sheets have been cut to fit into and around the external sliding
door openings, the cut edges will have exposed raw timber that
is no longer protected by the original water resistant coating
applied over the floor sheeting. At these particular loc ations
only, we believe it is possible that the flooring would likely be
damaged from short term exposure to water, such as that which
is claimed to have occurred during the cyclone Debbie event.
Is there genuine event related cyclone damage to the
Struct aflor particleboard flooring inside the
windows/sliding doors? Yes. We believe there is highly
localised water damage inside the sliding door openings where
the flooring has been cut and fitted into and around these door
openings. This condition does not e xtend to window areas
where the flooring has not been cut in a similar fashion and is
offset from the external walls.
Is there any presence of long - term seepage through doors
generally due to maintenance issue s as di stingui shed from
cyclone damage? No. Al l external sliding doors are well
covered by the roofed patio areas and therefore would not
typically experience exposure to rainwater other than during
extreme storm events such as cyclone Debbie.
Is there presence of any actual structural damage to the
Structaflor given their built - in moisture re si stance
properties? No. We believe the particleboard flooring remains
structurally sound and any swelling of the particleboard sheet
edges remains within an allowable range that can be readily
addressed by simpl e floor sanding.
Is it possible to repair the damaged areas only? Yes. We
believe the event related water exposure to the particleboard
Determination | Case number: 724686 Page 12 of 14
Record Key points
flooring can be readily resolved by replacing the small slithers of
flooring installed inside of the sliding door openi ngs to the rear
meals and bedroom 2 areas and by sanding the floor to reduc e
the sheet edge lift and swell.
Insurer’s Expert
Engineer Email
19 July 2019
I see not hing in [GWG] reports that suggests I should review our
original conclusions.
[GWG] have made no reference to any research they may have
preformed to support their assessment on the need to replace
the existing floor sheeting
- staining does not necessarily mean structural impairment nor
continuing degradation
- there has been no cl ear definition on the extent of sheeting that
has been "damaged" and thus recommended for replacement.
[GWG] have made several statement's suggesting that certain
damage is relat ed Cyclone damage (such as the bulging wall
sheeting) without providing any m echanism to explain the
connection.
[GWG] appear to have glossed over the inadequate roof
sheeting fixings by calling them "unconventional".
[GWG] discussions with Mr H from the Cyclone Testing Station
with respect to sheeting side lap distortion appears to be not
entirely consistent with our own discussions with Mr Henderson
and sheeting manufacturers on this matter, particularly with
reference to water penetration.
Complainant ’ s
Expert (GG)
Engineer Report
23 January 201 8
Wind entering the roof cavity was evident due to damage to
sarking, this appears to be approximat ely in the position where
water ingress was observed in the living room ceiling area.
extent of damage to the roof is limited to roof sheeting, barge
flashings and the front guttering.
The roof of this residenc e does show effects from Tropical
Cyclone Debbie with regards to impact damage and scratching
from flying debris, at least 12 roof sheets show damage from
impact and scratching.
During the inspection it w as noted that some connections of the
timber floor framing to the bearer and pole plate were deficient
and would have allowed additional movement during Tropical
Cyclone Debbie than would normally occur.
Wind driven rain, was the cause of water ingress int o the
residence, through side lap buckling and overlap of the
verandah and main roof sheeting. Windows also allowed wat er
ingress
The displacement of the floor and wall adjacent the stairs needs
further investigation to determine the cause of the damage. W e
agree wit h [GT] that the extent of water ingress in these areas to
cause this damage does not appear evident.
This office did conduct an in - roof and on - roof inspection. The
hardwood roof framing and hold down did not appear
compromised from the in - roo f inspection. The on - roof
inspection did show damaged sheets from impact and
scratching from windblown objects during Tropical Cyclone
Determination | Case number: 724686 Page 13 of 14
Record Key points
Debbie. The guttering along the front of the residence was
missing
Complainant ’ s Expert
(GG)
Engineer Report
8 August 2018
The out of level of the stairs from the lower level to the upper
level and the bowing of the wall, does not appear to be from
raking of the building due to no evidenc e of horizontal cracking
in the external masonry walls. Internal linings would need t o be
removed to determine if damage was pre - existing or from
structural members being compromised during Tropical Cyclone
Debbie
The probability of [stairs, bulging wall, bulging bedroom floor,
cracking to cornices and separation of cabinetry] damage
resul ting from the cyclone is highly likely and could be
considered consistent with the effects of internal increased
pressures experienc ed in a cyclonic event.
Complainant ’ s Expert
(G G)
Engineer Report
15 April 2019
An inspection of the upper level flooring was undertaken once
the floor covering was removed. Water staining in the particle
board floor is evident adjacent windows and sliding doors.
Swelling at joints of the particle board and bowing in the flooring
was evident.
An inspection of wall framing at the rear of the shower was
undertaken to determine if any water ingress damage resulted
from a leaking shower. No evidence of leaks around the shower
area was detected
The extent of damage to the particle board flooring is mainly
adjacent windows and slid ing doors as this was the access point
of water ingress during Tropical Cyclone Debbie. Carpets being
saturated has caused damage to flooring adjacent the access
points nominated above.
High wind forces and heavy rain during Tropical Cyclone Debbie
resulte d in water ingress through seals and drainage tracks in
the windows and external sliding doors.
This office is under the opinion that in order to certify the flooring
and floor framing the particle board flooring would need to be
replaced.
Recommended pr oposed works:
- Remove particle board flooring on the upper level and
replace;
- Inspect external masonry at the top corners on the western
gable during roof and soffit remedial works.
Complainant ’ s
Expert (GG)
Engineers Report
24 September 2019
Re .[GWG] have made no referenc e to any research they have
performed to support their assessment on the need to replace
the existing floor sheeting” The staining is an indic ation where
ingress of water did occur. Staining was evident adjacent most
windows and extern al glass sliding doors. The photos and
attachments in Appendix B and C indicate it did necessarily
mean structural impairment occurred.
Re “ There has been no clear definition on the extent of sheeting
Determination | Case number: 724686 Page 14 of 14
Record Key points
that has been “damaged and thus recommended for
replac ement .” Removal of damaged sheets at these locations
and where saturated carpet existed, covered the majority of the
upper floor level. It would be expected to be more economical (a
builder would need to confirm) too remove all sheets and
replace, than try ing to save part sheets in different areas in
which solid blocking would have to be installed between the
existing joists at joint locations.
[GT] again states… that the internal ceiling and wall sheeting
damage may appear similar in nature to that of the external
areas which he agrees is cyclone relat ed.
In our opinion no evidence has been submitted by [GT], only his
opinion, whic h in some cases contradicts his opinion, to dispute
the findings of our report. We have attached literature in the
appendix of this response to verify our conclusions.