The complainant claimed for water damage to laundry and bathroom tiles and a pathway after a drain overflow. AFCA found the evidence inconclusive and the insurer's consultants inadequate, and ordered an inspection by an engineer before a final claim decision.

The complainant did not link the leak to the tile damage on balance, but the insurer's investigations were equally inadequate, so a further independent inspection is fair.

Issues

Subjects and remedies

home or building damagereassess claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 723060 Financial firm AAI Limited Determination | Case number: 723060 Page 1 of 5 Case number: 723060 12 May 2021 1 Determination overview 1.1 Complaint The complainant holds a home and contents insurance policy (policy) with the financial firm (insurer). On 16 December 2019, a claim was lodged for water damage to the insured property said to be due to broken pipes located under the home as well as overflow of water from the laundry drain whilst using the washing machine. The insurer has declined the claim. It says the complainant has not established, on the balance of probabilities, that the insured building has suffered any damage because of an insured event. Further, the cost to repair broken pipes is specifically excluded under the policy. The insurer has offered to arrange a further assessment of the insured building by an engineer of the complainant’s choosing in order to assist with conclusively establishing its liability under the policy, if any. 1.2 Issues and key findings Is the insurer liable to meet the claim in line with the policy provisions? No. The available information is not sufficient to determine liability for damage to the home. While the insurer is not liable for the cost to repair the broken pipe, its offer to appoint an independent engineer of the complainant’s choice to determine if the damage is related to the leaking pipes, is fair and reasonable in the circumstance. 1.3 Determination This determination is substantially in favour of the insurer. The insurer, given the available information, is not obliged to cover the cost to repair the drummy tiles or external side concrete pathway. Within 14 days of the complainant accepting this determination, the insurer is to arrange for a consultant of the complainant’s choosing (or one agreed to between the parties) to attend the insured property. This consultant is to complete a comprehensive and conclusive investigation into the cause of the drummy tiles based upon which a final claim decision is to be made by the insurer. If the parties are unable to agree on the claim decision after receiving this further report, the complainant may lodge a further complaint with AFCA. Determination | Case number: 723060 Page 2 of 5 2 Reasons for determination 2.1 Is the insurer liable to meet the claim under the policy? The policy is an insured events contract of insurance The policy covers the insured property against loss or damage caused by one or more the listed insured events. Cover under these benefits is subject to the conditions, limitations and exclusions specified in the PDS. This includes loss or damage to the insured building caused by an escape of liquid. This does not extend to repairing or replacing the damaged item (pipes) from which such escape of liquid occurs, as this specifically excluded from cover under the policy. It is established law that the insured has the onus to establish, on the balance of probabilities (that is, more likely than not) that the loss falls within the terms of the policy. Only once this has been established, will the onus shift to the insurer to establish, on balance, that it is not responsible to cover the claimant for the loss in line with a provision or exclusion present in the terms of the policy. The insurer is entitled to rely on the policy provisions The insurer provided the complainant with the relevant policy documentation including the PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on the policy provisions to assess its liability under the claim. The evidence from the consultants is inconclusive There is no dispute the insured building presents with damage in the form of drummy floor tiles in the laundry, bathroom and toilet areas as well as a separation of the external side concrete pathway from the main dwelling. The parties have both provided expert evidence in support of their positions. The complainant appointed consultants ‘NP’ after an overflow of water event within the laundry whilst using the washing machine. NP says the drummy tiles found in the laundry, bathroom and toilet (wet areas) are consistent with water damage caused by broken and blocked laundry drain pipes. NP also says the separation of the external concrete pathway from the main building is the result of the leaking pipes. The insurer’s appointed consultants ‘CR’, ‘SA’ and ‘IM’ have provided their opinion s regarding the cause and extent of the tile damage. The consultants confirmed the presence of drummy tiles, separation of the concrete pathway and damaged to drainage pipes for the laundry and bathroom. However, the insurer’s appointed consultants were not of the opinion the damage noted was because of the broken pipes. The consultants are of the view the drummy tiles are the result of poor or defective installation of the tiles in the wet areas i.e. a lack of adhesive resulting in their present condition over time. Also, that the slight movement of the side concrete pathway is consistent with normal movement and not an escape of liquid event. Having considered the reports from the various consultants, I am of the opinion: Determination | Case number: 723060 Page 3 of 5  NP’s information , although establishes the presence of damage in the form of drummy tiles and broken drainage pipe, does not conclusively establish a link between the two. There is no evidence of any testing of moisture levels between the location of the damaged tiles and the broken pipes  Similarly, there is an absence of persuasive information linking the movement of the side concrete pathway to the damaged pipes or to show this slight movement is excessively more than what would normally be expected for a building of this age (approximate build 1994)  The report from CR says it is possible moisture under the slab from the damaged pipes may be considered a cause for the drummy tiles but that this is not the only possibility. Age and poor installation are also possible causes but then provides no evidence in support of these opinions  CR recommends the wet area floors would need to be accurately mapped to determine if moisture has caused the drummy tiles. CR’s evidence falls short of providing any supporting or conclusive information for the damage  The insurer appointed SA (plumbers) which provided a report dated 20 February 2020. SA identified some minor leaks in the shower and basin plumbing as well as confirmed the damage to the laundry and bathroom waste pipes. SA confirms presence of drummy tiles in the wet areas, however, provides no opinion on the cause for the damage  IM (Engineers) attended the insured property on 22 February 2020. IM formed the opinion the damaged drainage pipes located outside the insured building did not the cause the dummy tiles or slight movement of the concrete pathway  IM makes several references to the Australian Standards (AS) regarding ceramic tile installation requirements, however, does not make the AS available nor has it identified what year or version of the AS apply to the insured building  There is no evidence IM’s removed, sighted or tested the tiles adhesive or installation method. IM says moisture from the minor leaks in the bathroom and laundry plumbing would travel down vertically and not horizontally to affect the tiles. However, IM completely overlooks or has failed to acknowledge and comment on the flooding event in the laundry due to an overflow of the drain  There is no evidence of IM or the insurer arranging accurate moisture mapping of the wet areas as recommended by CR. Having considered the available information, I am not persuaded by the opinions’ provided by the various consultants. This is because none of them have provided any persuasive evidence in support of their opinions, whether this be to establish a valid claim or the application of a policy exclusion. References to poor building practices and the AS, do not assist the insurer’s position as it has not provided these standards for consideration nor is there any evidence showing these AS referred to apply the time the insured building was constructed. Moisture mapping investigations recommended by CR do not seem to have been completed. There is no evidence of any testing completed to the tiles or their installation other than the consultants tapping and confirming they are drummy. Given the information before me at this time, I am not satisfied the information exchanged is sufficient to determine whether the damage is related to the leaking pipes. I believe the appointed consultants have failed in their responsibility to complete adequate investigations into the cause and extent of the damage. Determination | Case number: 723060 Page 4 of 5 The insurer’s offer to appoint a further expert is reasonable During the AFCA review process, the insurer offered to arrange for a further assessment of the damage to be completed by an engineer of the complainant’s choosing. The complainant was to provide the insurer with the details of this consultant, however, despite reasonable opportunity to do so this did not occur. Given the failure of the previously appointed consultants to complete adequate investigations, the insurer’s offer to arrange a further inspection by the complainant’s preferred engineer is fair in the circumstances. A complete and comprehensive investigation into the cause and extent of tile damage is necessary. Accordingly, I determine the complainant is to provide the insurer with the requested contact details of her preferred engineer within 14 days of accepting this determination. The insurer is to contact this consultant within seven says of being provided the requested contact details and arrange an inspection of the insurer property. If the complainant is unable to identify a preferred engineer, the insurer is to provide the complainant with the details of three engineers from which the complainant can select one to undertake the inspection. The insurer is to consider and inform the complainant of its position under the claim based on this additional final inspection report. Why is the outcome fair? The available evidence shows an escape of liquid event occurred, which is an insured event, however the information from the complainant does not reasonably link the event to the damaged tiles nor is it clear the damage is unrelated to the escape of liquid . The insurer’s investigations are equally poor and inconclusive. Given this, it is fair in the circumstances, for a final inspection and investigation to be arranged so an informed decision can be reached regarding the parties’ obligations and entitlements under the policy. It would not be fair to require the insurer to cover the claimed damage or for the complainant to be denied cover at this stage, because of the inconclusive investigations by all the consultants. Determination | Case number: 723060 Page 5 of 5 3 Supporting information 3.1 The AFCA process AFCA’s approach is based on fairness AFCA has determined this complaint based on what is fair in all the circumstances, having regard to:  the legal principles  applicable industry codes or guidance  good industry practice  previous decisions of AFCA or its predecessor schemes (which are not binding). The respective parties have completed a full exchange of the relevant information, and each party has had the opportunity to address any issues raised. We have reviewed and considered all of the information the parties have provided. While the parties have raised a number of issues in their submissions, we have restricted this determination to the issues that are relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.