Water damage claim for drummy tiles and pathway movement
Summary
The complainant claimed for water damage to laundry and bathroom tiles and a pathway after a drain overflow. AFCA found the evidence inconclusive and the insurer's consultants inadequate, and ordered an inspection by an engineer before a final claim decision.
The complainant did not link the leak to the tile damage on balance, but the insurer's investigations were equally inadequate, so a further independent inspection is fair.
Issues
- Claim denial primary · unclear“The available information is not sufficient to determine liability for damage to the home.”
- Inadequate claim investigation secondary · upheld“I believe the appointed consultants have failed in their responsibility to complete adequate investigations into the cause and extent of the damage.”
Subjects and remedies
home or building damagereassess claim
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 723060
Financial firm AAI Limited
Determination | Case number: 723060 Page 1 of 5
Case number: 723060 12 May 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy (policy) with the financial firm
(insurer). On 16 December 2019, a claim was lodged for water damage to the insured
property said to be due to broken pipes located under the home as well as overflow of water
from the laundry drain whilst using the washing machine.
The insurer has declined the claim. It says the complainant has not established, on the
balance of probabilities, that the insured building has suffered any damage because of an
insured event. Further, the cost to repair broken pipes is specifically excluded under the
policy.
The insurer has offered to arrange a further assessment of the insured building by an
engineer of the complainant’s choosing in order to assist with conclusively establishing its
liability under the policy, if any.
1.2 Issues and key findings
Is the insurer liable to meet the claim in line with the policy provisions?
No. The available information is not sufficient to determine liability for damage to the home.
While the insurer is not liable for the cost to repair the broken pipe, its offer to appoint an
independent engineer of the complainant’s choice to determine if the damage is related to the
leaking pipes, is fair and reasonable in the circumstance.
1.3 Determination
This determination is substantially in favour of the insurer.
The insurer, given the available information, is not obliged to cover the cost to repair the
drummy tiles or external side concrete pathway.
Within 14 days of the complainant accepting this determination, the insurer is to arrange for a
consultant of the complainant’s choosing (or one agreed to between the parties) to attend the
insured property.
This consultant is to complete a comprehensive and conclusive investigation into the cause of
the drummy tiles based upon which a final claim decision is to be made by the insurer. If the
parties are unable to agree on the claim decision after receiving this further report, the
complainant may lodge a further complaint with AFCA.
Determination | Case number: 723060 Page 2 of 5
2 Reasons for determination
2.1 Is the insurer liable to meet the claim under the policy?
The policy is an insured events contract of insurance
The policy covers the insured property against loss or damage caused by one or more the
listed insured events. Cover under these benefits is subject to the conditions, limitations and
exclusions specified in the PDS.
This includes loss or damage to the insured building caused by an escape of liquid. This does
not extend to repairing or replacing the damaged item (pipes) from which such escape of
liquid occurs, as this specifically excluded from cover under the policy.
It is established law that the insured has the onus to establish, on the balance of probabilities
(that is, more likely than not) that the loss falls within the terms of the policy.
Only once this has been established, will the onus shift to the insurer to establish, on balance,
that it is not responsible to cover the claimant for the loss in line with a provision or exclusion
present in the terms of the policy.
The insurer is entitled to rely on the policy provisions
The insurer provided the complainant with the relevant policy documentation including the
PDS and certificate of insurance (COI). Therefore, I accept the insurer is entitled to rely on
the policy provisions to assess its liability under the claim.
The evidence from the consultants is inconclusive
There is no dispute the insured building presents with damage in the form of drummy floor
tiles in the laundry, bathroom and toilet areas as well as a separation of the external side
concrete pathway from the main dwelling.
The parties have both provided expert evidence in support of their positions. The complainant
appointed consultants ‘NP’ after an overflow of water event within the laundry whilst using the
washing machine.
NP says the drummy tiles found in the laundry, bathroom and toilet (wet areas) are consistent
with water damage caused by broken and blocked laundry drain pipes. NP also says the
separation of the external concrete pathway from the main building is the result of the leaking
pipes.
The insurer’s appointed consultants ‘CR’, ‘SA’ and ‘IM’ have provided their opinion s regarding
the cause and extent of the tile damage. The consultants confirmed the presence of drummy
tiles, separation of the concrete pathway and damaged to drainage pipes for the laundry and
bathroom.
However, the insurer’s appointed consultants were not of the opinion the damage noted was
because of the broken pipes. The consultants are of the view the drummy tiles are the result
of poor or defective installation of the tiles in the wet areas i.e. a lack of adhesive resulting in
their present condition over time. Also, that the slight movement of the side concrete pathway
is consistent with normal movement and not an escape of liquid event.
Having considered the reports from the various consultants, I am of the opinion:
Determination | Case number: 723060 Page 3 of 5
NP’s information , although establishes the presence of damage in the form of drummy tiles
and broken drainage pipe, does not conclusively establish a link between the two. There is
no evidence of any testing of moisture levels between the location of the damaged tiles
and the broken pipes
Similarly, there is an absence of persuasive information linking the movement of the side
concrete pathway to the damaged pipes or to show this slight movement is excessively
more than what would normally be expected for a building of this age (approximate build
1994)
The report from CR says it is possible moisture under the slab from the damaged pipes
may be considered a cause for the drummy tiles but that this is not the only possibility. Age
and poor installation are also possible causes but then provides no evidence in support of
these opinions
CR recommends the wet area floors would need to be accurately mapped to determine if
moisture has caused the drummy tiles. CR’s evidence falls short of providing any
supporting or conclusive information for the damage
The insurer appointed SA (plumbers) which provided a report dated 20 February 2020. SA
identified some minor leaks in the shower and basin plumbing as well as confirmed the
damage to the laundry and bathroom waste pipes. SA confirms presence of drummy tiles
in the wet areas, however, provides no opinion on the cause for the damage
IM (Engineers) attended the insured property on 22 February 2020. IM formed the opinion
the damaged drainage pipes located outside the insured building did not the cause the
dummy tiles or slight movement of the concrete pathway
IM makes several references to the Australian Standards (AS) regarding ceramic tile
installation requirements, however, does not make the AS available nor has it identified
what year or version of the AS apply to the insured building
There is no evidence IM’s removed, sighted or tested the tiles adhesive or installation
method. IM says moisture from the minor leaks in the bathroom and laundry plumbing
would travel down vertically and not horizontally to affect the tiles. However, IM completely
overlooks or has failed to acknowledge and comment on the flooding event in the laundry
due to an overflow of the drain
There is no evidence of IM or the insurer arranging accurate moisture mapping of the wet
areas as recommended by CR.
Having considered the available information, I am not persuaded by the opinions’ provided by
the various consultants. This is because none of them have provided any persuasive
evidence in support of their opinions, whether this be to establish a valid claim or the
application of a policy exclusion.
References to poor building practices and the AS, do not assist the insurer’s position as it has
not provided these standards for consideration nor is there any evidence showing these AS
referred to apply the time the insured building was constructed. Moisture mapping
investigations recommended by CR do not seem to have been completed. There is no
evidence of any testing completed to the tiles or their installation other than the consultants
tapping and confirming they are drummy.
Given the information before me at this time, I am not satisfied the information exchanged is
sufficient to determine whether the damage is related to the leaking pipes. I believe the
appointed consultants have failed in their responsibility to complete adequate investigations
into the cause and extent of the damage.
Determination | Case number: 723060 Page 4 of 5
The insurer’s offer to appoint a further expert is reasonable
During the AFCA review process, the insurer offered to arrange for a further assessment of
the damage to be completed by an engineer of the complainant’s choosing. The complainant
was to provide the insurer with the details of this consultant, however, despite reasonable
opportunity to do so this did not occur.
Given the failure of the previously appointed consultants to complete adequate investigations,
the insurer’s offer to arrange a further inspection by the complainant’s preferred engineer is
fair in the circumstances. A complete and comprehensive investigation into the cause and
extent of tile damage is necessary.
Accordingly, I determine the complainant is to provide the insurer with the requested contact
details of her preferred engineer within 14 days of accepting this determination. The insurer is
to contact this consultant within seven says of being provided the requested contact details
and arrange an inspection of the insurer property.
If the complainant is unable to identify a preferred engineer, the insurer is to provide the
complainant with the details of three engineers from which the complainant can select one to
undertake the inspection. The insurer is to consider and inform the complainant of its position
under the claim based on this additional final inspection report.
Why is the outcome fair?
The available evidence shows an escape of liquid event occurred, which is an insured event,
however the information from the complainant does not reasonably link the event to the
damaged tiles nor is it clear the damage is unrelated to the escape of liquid . The insurer’s
investigations are equally poor and inconclusive.
Given this, it is fair in the circumstances, for a final inspection and investigation to be
arranged so an informed decision can be reached regarding the parties’ obligations and
entitlements under the policy. It would not be fair to require the insurer to cover the claimed
damage or for the complainant to be denied cover at this stage, because of the inconclusive
investigations by all the consultants.
Determination | Case number: 723060 Page 5 of 5
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.