The complainants' new storm water damage and mould claim was denied because the water entry was caused by a roof design defect rather than a storm-created opening. AFCA ordered the insurer to pay $5,000 as full and final settlement and rejected the other complaints.

The proximate cause of the new water entry was an inadequately sized box gutter and drainage design, which the policy excludes.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Westpac determinations · Find similar determinations

Text of the determination

Determination Case number 722849 Financial firm Westpac General Insurance Limited Determination | Case number: 722849 Page 2 of 12 Case number: 722849 11 March 2021 1 Determination overview 1.1 Complaint The complainants held a home and contents insurance policy with the financial firm (insurer) and lodged a claim on 23 December 2016 for storm damage to their property. The insurer accepted the claim, cash settling the sum insured for the contents, a portion of the building repairs and also proceeding with building repairs and mould remediation which concluded in September 2019. On 13 December 2019, the complainants contacted the insurer after water had again entered the property during a storm. The insurer assessed and denied the claim, saying there is no evidence of a storm created opening and the cause of damage is due to pre-existing maintenance and workmanship issues, which are excluded under its policy. The insurer also notes the complainants no longer had contents cover as it was exhausted and removed from the policy after the previous claim. The complainants dispute the outcome and seeks cover for damage to the building and contents. The complainants are also seeking compensation for non-financial loss and has raised concerns with repairs under the initial claim. 1.2 Issues and key findings Is the insurer entitled to deny the new claim? The insurer is entitled to deny the December 2019 claim, because the available information shows there was not a storm created opening and the proximate cause of the loss was a defect in design. Is the insurer entitled to deny the other issues raised? Yes, the insurer has provided evidence to show it has fairly settled the claim. However, it is fair the insurer honours its offer of $5,000 as full and final settlement. Are the complainants entitled to compensation? The complainants are not entitled to compensation. 1.3 Determination This determination is substantially in favour of the insurer. The insurer is to pay the complainants $5,000 as full and final settlement of the claim. Apart from the above, the insurer is not required to take any further action. Determination | Case number: 722849 Page 3 of 12 2 Reasons for determination This determination is based on information submitted by the parties. Each party has had an opportunity to review and respond to the other party‟s submissions. This determination is based on what is fair in the circumstances, having regard to any relevant legal principles, industry codes or guidance, good industry practice, and prior determinations of AFCA or its predecessors. 2.1 Is the insurer entitled to deny the new claim? Onus on complainants to establish claimable loss When making a claim, an insured party has the onus of establishing, on the balance of probabilities (i.e. that it is more likely than not), that they suffered a loss which is covered by their insurance policy. If a claimable loss is established, the onus shifts to the insurer to establish, on the balance of probabilities, the application of any condition or exclusion it relies on to reduce its liability. Policy coverage and relevant exclusions The cover provided by the policy is set out in the product disclosure statement (PDS) and the certificate of insurance. There is no dispute the insurer sent these documents to the complainants. The policy covers damage to the insured building and contents for insured events. The relevant event to the claimed circumstance is storm, which includes damage caused by a cyclone, hail, wind, snow or rain. The policy has the following relevant exclusions:  hail, wind, snow or rain entering the building through an opening not created by the storm or other insured event  defects in design, structure, materials, workmanship or construction,  failure to keep the property insured watertight, well maintained, structurally sound and secure Chronology of roof leaks, reports and repairs The complainants purchased the insured property in 2016 and the reinspection report notes the roof sheeting was asbestos, which the complainants changed to colourbond in October 2016. Determination | Case number: 722849 Page 4 of 12 The complainants lodged the first storm claim in on 23 December 2016 and the insurer assessed the roof initially through (TE) on 28 December 2016 and in summary says:  there is not enough gutter for the amount of water trying to escape.  the property just received a new roof, which deleted three gutters.  the pitch of the trimdeck sheets are also very flat, 1 -2 degrees.  maintenance issues identified were not enough guttering and recommended the complainants install a box gutter and sump. Following this advice, it appears the complainants arranged some form of rectification to the roof, however an invoice specifying the exact works has not been presented. In October 2018, the insurer was advised of a new leak in the same vicinity as the 2016 claim. The insurers builder (AJ) attended and says the roof had leaked above the lounge ceiling, requiring a make safe to this ceili ng. (AJ) reported the complainants engaged a contractor to carry out repairs to the guttering and downpipes following the 2016 claim, however the works which took place are not clear. The insurer arranged further assessment of the roof and on 23 October 2018, roofer (RP) in summary noted:  previous repairs and rectifications noted, some of which are of below average quality workmanship.  hole in ridgecap join noted, sealed whilst onsite.  foot traffic damage noted to numerous areas.  apron flashing at central area was lifted whilst onsite, revealing tears where sheets are turned -up. Due to 1 degree pitch, water can easily track through the tear and into ceiling cavity. The pictures do not show tear due to low light. Note; only one scribe was lifted to inspect, so tears may be present on other pans, however, the single tear noted was enough to cause water ingress.  the gutter below the solar hot water system has a high front without slots, so excess water can overflow back into ceiling cavity.  gutter to front left is holding water due to lack of downpipes, causing damage to timber facia and scope for water to overflow back into ceiling cavity. The insurer again accepted the resultant damage and were provided a copy of the complainants‟ invoice (11 February 2019) from roofer (MB), who the complainants engaged to carry out the recommended roof rectifications suggested by (RP). I t‟s unclear however what works exactly were completed. Determination | Case number: 722849 Page 5 of 12 On 13 December 2019, the complainants contacted the insurer after water had again entered their property during a storm. On 18 December 2019, the insurer appointed roofer (CJ) to assess who in summary says:  at the front of the building there has been an extension added in the form of a patio. As a result of this, the downpipes may have been removed and there is only now one downpipe access to take all the water.  The roof sheets on the main roof don't overhang into the gutter far enough, possibly allowing water to blow back into the soffit and building.  There are flashings on the front extension roof that are poorly installed.  When the rain is heavy the water would not be able to get away quick enough causing the front patio roof to fill up and overflow with water very quickly back into the ceiling. The insurer, this time, denied any further water damage to the property. It said there was no evidence of a storm created opening and the cause of damage was due to pre-existing maintenance and workmanship issues, which are excluded under the policy. Since bringing the complaint to AFCA, the insurer agreed to a further inspection and a forensic building report was prepared by (SG) who reported on 26 November 2020:  a review of Bureau of Meteorology rainfall data shows that 44mm of rainfall was recorded in the Urangan area on 14 th December 2019.  the flat roofed section over the upper level lounge room area where the water ingress has occurred is typical of that originally constructed over a veranda. Considering the design and construction of the flat roof as well as the low ceiling height in the lounge room, it would be reasonable to assume the possibility that at some stage in the past, there was an upper level veranda which over time has been enclosed to become the lounge room.  taking into consideration the re-installation of some guttering, the drainage modifications and additional flashings to the area where the flat roof joins the residence, I am of the opinion that the joint between the flat roof and the walls to the residence was also a contributing factor in the initial water ingress event.  I am also of the opinion that the box gutter to the flat roofed section has overflowed on multiple occasions over an extended period of time during heavy rainfall events.  In my opinion the design and construction of the box gutter is the major contributing factor to it overflowing. The box gutter is unable to cope with the high intensity rainfall events experienced in the area. (SG) provided further commentary which shows: 6.1. “If the roof has been built to relevant building codes and standards?” Determination | Case number: 722849 Page 6 of 12 Answer; The flat metal dek type roof sheets over the lounge room and the pitched corrugated Colorbond roofing to the surrounding roof section appear to be installed in accordance with manufact urer‟s recommendations and the relevant building codes and standards applicable at the time of installation. In my opinion, the replacement of the original Super-Six type Asbestos fibrous cement sheet roofing with corrugated ColorBond metal roofing sheets has not contributed to the water ingress issue. Sections of the guttering to the steeper pitched roof adjoining the flat roof do not comply with the AS/NZS 3500.5:2000, National plumbing and drainage, Part 5: Domestic installations; as the fall in places is flat or in the opposite direction. AS/NZS 3500.5:2000, National plumbing and drainage, Part 5: Domestic installations states in part; (b) a gradient in the direction of flow is either (c) 1:500 or steeper; or (d) flatter than 1:500; In my opinion the potential affected flow of rainwater in these gutters by the flat or incorrect fall is not a contributing factor to the box gutter overflowing, as ultimately the rainwater from the catchment area of these gutters will still end up in the box gutter. … 6.2. “Whether the storm water drainage on the roof is sufficient?” Answer: In my opinion No, the stormwater drainage to the flat metal roofed section over the upper level lounge room is not sufficient 6.4. Any other issues with how the roof has been built? Answer: In my opinion Yes. As noted above, the flat roofed section over the upper level lounge room was designed and constructed in a way that was typical for a roofed veranda attached to the outside of a residence. The rectification and modification works undertaken to the flat roof‟s box gutter and the surrounding guttering and flashings, in my opinion highlight the short comings of this design and construction method. Determination | Case number: 722849 Page 7 of 12 In consideration of all reports and in the absence of any reports to the contrary from the complainants I am satisfied, on balance, the evidence clearly shows the inadequately sized box gutter and inadequate drainage to the flat roof are the proximate cause of the continual cause of water entry during heavy rainfall at the property. Insurer is not liable for further water or mould related damage The insurers restorer (RR) provided a post remediation mould assessment and clearance report on 9 August 2019 for the claim from 2016 and subsequent water entry in 2018 and prior to the new claim being lodged in December 2019. The insurer also confirmed the repairs to the property were completed by its builder (AJ) on 16 September 2019. I am satisfied this information shows the repairs were completed at this time and any new damage associated with the rainfall event and new claim lodged in December 2019 must be considered separately. The new water entry brought about new problems, including electrical issues and damage to contents and mould at the property. Any existing claim and repair quality issues will be addressed under section 2.2 of this Determination. Whilst the insurer accepted the previous claims for similar causes of damage, I accept generally the prior acceptance of claims does not bind an insurer to acceptance of future claims for similar losses. Each claim must be assessed on its individual merits and in the context of the specific circumstances at the time. Whilst there was a storm on 14 December 2019, this was not the proximate cause of the loss. The extensive roof reports show a continual problem with the design of the „flat‟ section of roof and the inadequate sized box gutter being the proximate cause of water damage. Damage caused in this manner is specifically excluded under the insurers policy. As a pre-requisite to claim for storm damage there must be a storm created opening, this is not the case. I further accept that the issues identified would be considered a design fault or defect. Damage caused in this manner is also excluded under the insurers policy. The insurer is therefore entitled to deny the claim for any new damage to the property, contents and including any mould related issues. 2.2 Is the insurer entitled to deny the other issues raised? Contents The complainants say they were told to store certain items outside, these items were later removed and disposed of. The complainants say had they known the items Determination | Case number: 722849 Page 8 of 12 wouldn‟t be replaced they would have attempted to salvage them. The complainants say the lounge was restored several times and is now falling apart. The complainants also raised the fact the insurer advised it is no longer covering contents. The policy reflects this on page 52 where it says: How your claim will affect your sum insured Total loss: If we pay a claim under part of the policy for the total sum insured, then your insurance cover under the relevant part of the policy will end, and no refund will be given. If you were paying by monthly instalments, the balance of your annual premium will be deducted from your claim. You ’ ll need to take out new insurance cover for any replacement property. The available information as reflected on the complainant‟s certificate of insurance shows cover was selected for a sum insured of $40,000 and the policy provided a safety net for up to 5% of the sum insured. The insurer confirmed it settled the complainants the maximum of $42,000 under its policy for the contents claimed and says its policy has a provision which says contents will be removed from cover if the sum insured is exhausted. The insurer also made a payment in excess of the contents sum insured for an amount of $5,427.85 for the replacement carpets. There is no evidence to show the insurers actions where unreasonable given it is likely the items disposed of where water damaged, and mould effected to the point they were no longer salvageable. The insurer paid in excess of the contents sum insured by a fair margin and is not required to make any further contributions to contents. The insurer is not liable for any new damage following the claim of December 2019.The insurer is entitled to deny the claim as mentioned early. The policy is clear that contents will be removed in the event they are paid out in full or as a total loss. The complainants will need to contact the insurer to discuss reapplying contents cover to their policy. Electrical and fridge The complainants raised the following concerns, saying:  (RR) damaged the security system during the removal stage and replaced it but the cables are now running on the exterior of the house. Determination | Case number: 722849 Page 9 of 12  there were 11 lights downstairs, there are now only 7.  there was meant to be an inspection hole in the ceiling downstairs.  the whole area was rewired and now they are without power downstairs.  the complainant advised his electrician advised something hit the feed wire and caused power to be lost to half the house, it appears the upstairs fridge was damaged this time. The contemporaneous emails and notes from the insures builder (AJ) shows it noted the following: Our electrician spoke to Mr insured about the wiring onsite and Mr insured said he would organise getting this rectified. It was only when the electrician returned to fit the switches back off they discovered that the owner did not do what they said they would do and the plasterer had re -sheeted the wall. I will have someone advise the insured again that an electrician is required to tidy the wires to complete the reconnect, the wires are old and brittle and too short to connect to the switches. A photograph was also provided. It showed the houses wiring to be in a dishevelled condition, not because of any of the insured events or the actions of the insurers contractors. The insurer also denies the whole area was rewired, saying this never formed part of the original scope of works. On the information provided there is no evidence the insurer ‟ s contractor caused the issues with the wiring. In relation to the new event, the insurer arranged a make -safe only, the insurer is entitled to deny this claim, therefore any further rectification required is the complainants ‟ responsibility. The insurer is unsure as to the number of downlights and has not provided commentary in relation to the wiring of the security system, this will be considered on how the claim should be finalised. Flooring and temporary step The available information shows the insurer cash settled the timber flooring on three occasions for a total sum of $28,465.78 and the complainants were to arrange the works themselves. The complainants say: Determination | Case number: 722849 Page 10 of 12  mould has contaminated a portion of timber flooring which was purchased from an unknown vendor and stored in the property.  the mould was caused by the insurers restorer (RR) by disconnecting the fridge causing it to leak.  they were exposed and became dirty by the trades. The insurer had its hygienist (VI) inspect the flooring and it noted mould to the boards, however it could not be certain it was caused by the insured event. The insurer, despite this, appointed its restorer (RA) to HEPA vacuum and clean the boards with a microfibre cloth with what it says was minimal moisture content. The complainants are adamant the insurers contractor caused the boards to swell and provided a report from floorer (AM) who initially advised:  the tongue and groove flooring would not come together.  the complainant advised (AM) that there had been mould on the boards and moisture from cleaning.  (AM) advised it could not guarantee the works due to potential delamination. (RR) provided a detailed response and co ntacted (AM) to clarify its statements, the available information shows:  (AM) made assumptions based on the complainant‟s description of the cleaning of the boards.  (AM) confirms there are two different profiles of timber flooring, one thin board width and a large board width, this is ultimately the reason the boards cannot be laid.  the complainant was unable to confirm with (AM) where the boards were purchased. Hygienist (VI) completed a sign off of the boards following (RR) completing the remediation and the available information shows the (RR) did not reattend the property following the boards being cleared for any mould contamination. Therefore, I am satisfied the available evidence shows the complainants purchased boards which are two different profiles, and this is the primary reason the flooring cannot be laid. There is no evidence the insurers actions or the events caused the inability to lay the flooring. The complainants are also claiming for additional flooring for tongue and groove style boards to the study. The insurer says the flooring was vinyl and was already settled appropriately. The complainants have not provided any evidence to refute this. The insurer is not liable for any further costs for the flooring. Determination | Case number: 722849 Page 11 of 12 Further, the complainants allege and provided photographs of a temporary step installed by the insurers builder (AJ) which they say has been installed incorrectly. However, the available information established this was not a part of the insured works and the modification arranged was organised between the complainant and (AJ) as private works. Within the many documents sent by the complainants, there is a screenshot of an SMS to (AJ)‟s builder which confirms this was arranged as private works. In summary it‟s not clear what works are faulty, and the insurer is not responsible for any private works and is not liable for any rectification of this step. How should the claim be finalised? The insurer is entitled to deny the claimed damage to the property, as the complainant has provided insufficient evidence to substantiate his claims. I am satisfied the new event is not covered as discussed early. However, I note it is likely a few smaller items, such as the electrical items and a contingency should be considered on the original settlements . The insurer made an offer of $5,000 towards these costs in its notice of response to AFCA, I consider it fair the insurer makes this payment to the complainant‟s as full and final settlement of the complaint. 2.3 Is the complainant entitled to compensation for non-financial loss? AFCA can award compensation in certain circumstances AFCA‟s Rules enable it to award compensation to a complainant for non -financial loss outside of the policy terms (capped at $5,000). Compensation for non-financial loss is limited. AFCA may decide an insurer should compensate a complainant for such a loss only where there has been:  an unusual amount of physical inconvenience;  time taken to resolve a situation; or  interference with the complainant‟s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to compensation for non-financial loss and expects complainants to be moderately robust and bear the usual degree of inconvenience when managing an insurance claim. Complainants seeks compensation for claims handling experience The complainants are seeking compensation due to the ongoing water damage and mould issues at the property, specifically mentioning the following:  repairs were meant to be a quick fix, but there is ongoing mould issues  no sign off of completed repairs and water again entered the property Determination | Case number: 722849 Page 12 of 12  being out of the house for months whilst repairs being completed  the difficulty of managing the claim with disabled children  vehicles left outside due to the having to store items in his shed  (RR) completing works only for (VI) to advise further works were required. I note the main cause of the issues noted by the complainants were the storms themselves. The reason for the hygienist and restorer having to reattend and address mould issues was due to the ongoing water entry at the property, which is a result of the condition of the roof, not the insures actions. I accept there were some delays, but overall it was a complex claim and the insurer continued to stay in contact with the complainants and arrange the appropriate trades as required. Issues relating to mould and the appropriate rectification can be difficult, however the insurer continued to work towards making the property habitable. The insurers offer of $5,000 is fair and is to be inclusive of any small portion of compensation.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.