Home / Suncorp Group / Determination 722620

Determination 722620

Dispute over insurer's settlement offer for ground movement and cracking damage to home after a leaking pipe

FirmSuncorp Group
Decided2021-02-04
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$30,608
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants disputed the insurer's settlement offer for cracking and movement damage to their home, which they attributed to a leaking pipe. AFCA found the leak was not the proximate cause, but varied the offer upward to $30,607.62, including a 15% allowance and fee reimbursements.

The complainants did not establish that the leak caused the foundation movement, so the damage was outside the policy, but the insurer's scope of works and additional benefits were increased as fair.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Suncorp Group determinations · Find similar determinations

Text of the determination

Determination Case number 722620 Financial firm AAI Limited Determination | Case number: 722620 Page 2 of 12 Case number: 722620 21 January 2020 1 Determination overview 1.1 Complaint The complainants have a listed events Home and Contents Insurance Policy with the financial firm (the insurer). On 1 August 2017, the complainants lodged a claim for damage to internal areas of the home as well as cracking damage to the driveway and masonry piers located at the rear of the property. The insurer initially declined the claim on the basis that the damage was not caused by a listed event under the policy. Subsequently, under AFCA complaint 632569, the insurer accepted the claim subject to further assessment and preparation of a scope of works. Following receipt of the scope of works, a separate complaint has arisen as the complainants disagree with the insurer’s proposal. During both AFCA complaints 632596 and 722620, the complainants have, at various times, been legally represented. Additionally, the complainants’ daughter has also represented and assisted them with the complaints. Where relevant, references to the complainant s’ representative s and daughter in this determination include references to the complainants. 1.2 Issues and key findings Is the insurer’s settlement offer fair? Yes. The available information does not show the movement and cracking damage throughout the property was caused by the leaking pipe or is otherwise covered by the policy. Therefore, subject to the insurer including an additional allowance of 15% for contingencies and variations, the insurer’s settlement is fair . 1.3 Determination This determination is substantially in favo ur of the insurer. Within 14 days of the complainants accepting the determination, the insurer is to pay to the complainants a total of $30,607.62, which is comprised of the following:  $22,032.71 based on its scope of works  $3,304.91 which represents a 15% allowance for contingencies and variations  $5,270.00 for engineering reports obtained by the complainant Otherwise, the insurer is not required to take any further action in relation to the claim . Determination | Case number: 722620 Page 3 of 12 2 Reasons for determination 2.1 Is the insurer’s settlement off er fair? Complainants must show a valid claim The initial onus is on the complainants to show, on the balance of probabilities, a loss claimed falls within the cover provided by the policy of insurance. This is known as establishing a valid claim. If the complainants can establish a valid claim, the onus transfers to the insurer to establish it is entitled to decline the claim. The complainants ’ policy covers loss or damage caused by an insured or listed event during the period of insurance. One of these events is escape of liquid. The policy defines an ‘incident’ as: a single event, accident or occurrence which you did not intend or expect to happen There is no dispute that a leaking pipe was identified at the property. However, the dispute is whether the leaking pipe has caused the movement and cracking damage throughout the property. The property has been subject to an escape of liquid event in 2017 The insurer engaged a builder (AB) to undertake make safe and initial inspection of the damage which included leak detection. AB noted:  pressure testing of the water mains failed - leak was located at the rear of the house approximately 15 metres away from the damaged piers  the ground movement causing the damage around the piers is unrelated to the burst water pipe  an engineer is required to determine the cause of the damage to the piers. The insurer appointed engineer (JH) to assess causation of the property damage. In its report, JH notes several existing cracks throughout the property that may be attributed to foundation movement with severe cracks to the masonry of the five brick piers on the rear patio as well as minor movement cracking to the concrete pavement. Internally cracking was observed to the plasterboard linings. To consider whether there was foundation movement, JH undertook floor level survey which shows:  the slab has incurred a level differential of approximately 53mm with the lowest point in the front right-hand corner of the building close to a ground spear pump Determination | Case number: 722620 Page 4 of 12  the differential levels in proximity to the source of the water leak near the ensuite indicate the foundations appear to have remained reasonably stable  the water leak ’ s influence on the foundation near the ensuite is negligible  the damage to the piers dissipates towards the end of the building with the most severe damage observed to the pier near the kitchen JH concludes the evidence including the level survey, shows the building is incurring foundation movement to the front right-hand corner of the dwelling. JH states this movement is likely caused by the ground spear pump which has induced ground shrinkage. In addressing whether the water leak has caused the claim damage, JH says this has had little impact on the foundations and the damage to the piers at the rear patio has been likely caused by stresses within the roof frame and pad footings. However, to confirm the above findings. JH recommended a hydrostatic test be carried out on all subsoil. DK and AB undertook a drainage investigation and CCTV inspection of the sto rm water and provided these findings to JH. In his supplementary report JH concluded the building movement was not related to the leaking water pipe or any undetected subsoil drainage. In addition, JH notes the building and related stresses imposed to the building were the result of building subsidence to the front, right hand corner and this was due to the induced ground shrinkage caused by the spear pump which is in close proximately to the foundations. T he complainants’ experts argue the leaking pipe is the proximate cause The complainants engaged geotechnical specialist (AW) who provided a report in response to JH’s findings. It is worth nothing both that AW and JH provide numerous reports in response to one another’s opinions. All reports have been exchanged. In his initial report dated 31 October 2017, AW disagrees with JH’s findings th at the spear pump had caused long term shrinkage and states the leaking pipe caused the damage to the property and says:  the pier close to the pump did not exhibit more damage than the piers further away  if the property had suffered from long-term settlement, cracking to the brickwork on the perimeter wall at the front of the property would be expected  water records evidence a significant increase between January and August 2017 and this increase would result in settlement of the wet soil and be the cause of the cracking damages. In October 2018 the complainants, via their legal representatives, provided the insurer with reports which included a further opinion from a geotechnical engineer (PE) as well as soil testing by (AP) and concrete scanning results (PC). Determination | Case number: 722620 Page 5 of 12 PC reports there is moisture in the ground near the rear of the property and voids in the ground around these areas have formed. PC concludes it was reasonable to assume that moisture and voids were caused by the burst pipe. AP says the soil is classified as slightly reactive to movement from moisture changes and is unstable. Finally, PE provided two further reports dated 20 June and 10 August 2018. PE concludes in its first report it would be reasonable to assume the burst pipe caused the movement and subsequent damage. In its second report PE notes:  the piers were damaged by foundational movement and not due to inadequate structural capacity or corrosion of the steel posts  the piers are less damaged further away from the site of the leak  the internal cracking damages appear to follow the same pattern  it is reasonable to assume the foundational movement occurred due to the water leak. AW provided further commentary with conclusions made by JH noting the water table is perched and the water from the leak would not drain into the true water table. Additionally, if the cause of the foundation movement was the spear pump, issues would have been identified in this area. Complainants experts do not alter insurer view AW’s findings were provided to JH for comment who noted that if the burst pipe was the cause of the movement there would be significant foundation movement in the area closest to the burst pipe, however, this was not supported by the result of the floor level survey. The reports of PE, AP and PC were also referred to JH who notes:  any water leaking into the soil would drain into the water table  the piers were damaged as a result of long term corrosion  the internal damage was a result of long-term differential movement  there was no evidence of movement to pathways, shed or pool in the area near the leak site JH concludes the leak did not undermine the property and the cause of the long-term movement is not known, however, the spear pump and nearby development are contributing factors. Additionally, JH noted that the soil density and bearing capacity would be most compromised near the leak site , however, there is no foundation movement in that area and as such it has not caused the foundation movement. Determination | Case number: 722620 Page 6 of 12 Additional engineering opinion supports the insurer’s po sition The insurer engaged engineer SB to undertake a new forensic assessment of the property. SB notes the water leak may have caused a reduction in bearing capacity of the site soils close to the location of the water leak, however, there has been no slab movement or building damage as a result. SB further notes:  the brickwork spalling to the rear veranda piers is a direct result of long-term corrosion  the slab is generally performing well, with the exceptio n of the eastern end of the slab which is borderline  the localised subsidence of the eastern end is a long-term issue related to fill settlement and is unrelated to the water leak and most likely pre-dates the event  the footing system movement is not ongoing  the internal damage is cosmetic and considered normal for a building of its age. In the absence of any significant footing system movement over the majority of the house slab, the water leak does not present a viable mechanism by which the cosmetic damage could have occurred . SB concludes the slab is currently performing well, noting this excludes the easternmost section which is borderline. Additionally, the levels indicate that the movement is not ongoing and any works to lift the slab may cause further internal damage to the property. On balance, the leaking pipe is not the proximate cause of the damage Having reviewed the exchanged evidence, the panel accepts the leaking pipe is not the proximate cause of the damage. The panel acknowledges the leaking pipe might have caused a reduction in bearing capacity of the site soils close to the location of the water leak, however, there has been no slab movement or building damage as a result. This is supported by the floor level surveys undertaken by JH and SB who conclude there are no patterns of movement in the vicinity of the leak. In addition to the floor level survey, the panel has regard for SB ’s conclusion in its supplementary report: It is illogical to conclude that the water from the leak could have traversed laterally through relatively free draining sandy soils, to the furthest point in the building, causing no movement damage on the way, and locally causing the eastern end to subside. This position is supported by JH, who assessed the property on numerous occasions prior to SB’s assessment. JH notes that the complainants’ geotechnical engineer, Determination | Case number: 722620 Page 7 of 12 AW, has failed to explain how the water from the leak could have travelled through the sandy soil, to the opposite side of the property and caused differential movement that occurred in the dwelling. The issues identified by both SB and JH are long-standing. This is consistent with the fact that brick piers exhibit significant corrosion. Additional SB notes that there is no requirement to underpin the slab because the slab has not subsided at the site of the leak. Therefore, the panel accepts that slab is performing well and while there was a leaking pipe, this is not the proximate cause of the damage. Rather, the proximate cause of the damage to the foundation is long-term settlement and the piers have been affected by long term corrosion. The i nsurer’s o ffer is fair While the insurer formed the view that it was not liable for the damage caused to the complainants’ property, it also engaged SB to provide a scope of works and quote in consideration of the additional benefits the policy provides the complainants. Such additional benefits (that are subject to policy limits) included ‘ other repair and rebuilding costs ’ and ‘exploratory costs where the leak is not covered under the insured event escape of liquid.’ SB allowed for:  the costs to replace the five brick piers and settle columns  patch and painting to the ceilings  replacement of approximately 7.5m2 of slate tiles. There is no evidence to show this scope of works is unreasonable. While the complainants have provided numerous scope of works and quote, these address items which are outside the insurer’s liability. In addition, the insurer is not required to reimburse the complainant for any of the professional fees they have incurred (i.e. legal fees) as the policy specifically excludes such items unless the insurer provides prior approval. In noting the above, the insurer indicated it was willing to consider reimbursing the complainants for:  PP invoice dated 1 February 2018 for $1,320  NJ invoice dated 20 March 2018 for $1,100  NJ invoice dated 20 March 2018 for $650 Such offer was made on the basis the invoices were made out to the complainants rather than their previous legal representative. The panel considers the insurer Determination | Case number: 722620 Page 8 of 12 should reimburse the complainants for these fees (together with the report fees of PE) as it has had the benefit of these reports in determining its position with respect to liability. In addition to the above additional reimbursements, in all the circumstances of this matter, the panel considers it is fair if an allo wance of 15% is made for contingencies and variations. Therefore, the panel considers it is fair to vary the insurer’s offer as follows: SB Quote $ 22,032.71 15 % Contingency $ 3,304.91 Sub total $ 2 5,337.62 PE invoices dated 28 June 2018 and 31 August 2018 $ 2,200.00 PP invoice dated 1 February 2018 $ 1,320.00 NJ invoice dated 20 March 2018 $ 1,100.00 NJ invoice dated 20 March 2018 $ 650.00 Amount due $ 30,607.62 Should the complainants accept this determination, then within 14 days of notification of acceptance, the insurer is to pay to the complainants $30,607.62 in full settlement of its liability pursuant to the claim and pursuant to this determination. The panel is satisfied that the complainants’ claim to have the leaking pipes replaced, given there have now been three leaks, is outside the coverage provided by the policy. The insurer is entitled to deny this aspect of the claim. Finally, the panel note s that the complainants’ submission in relation to the subsequent leak around the driveway on 19 July 2020, would be the subject of a separate claim, which the insurer has said it will investigate if lodged. Determination | Case number: 722620 Page 9 of 12 3 Supporting information 3.1 Our Approach This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the AFCA Rules. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss ’. 3.2 Relevant Policy Terms Page Product Di sclosure Statement 22 – Escape of Liquid We cover Loss or damage caused by liquid leaking, overflow ing or bursting from any of the follow ing: – refrigerators, freezers, dishw ashers and w ashing machines; – any drain, fixed pipes, roof gutters or guttering and rainw ater dow npipes, drainage and sew age systems; – fixed tanks; – sw imming pools or spas; – w aterbeds; Determination | Case number: 722620 Page 10 of 12 Page Product Di sclosure Statement – baths, sinks, toilets and basins; – fixed heating or cooling system; – w ater main, fire hydrant or w ater supply pipe; – an aquar ium. Page 23 – we do not cover – the cost of repairing or r eplacing the item from w hich the liquid escaped; – fixing leaks that have not caused per manent damage to your home Page 27 – other repair/rebuilding costs We cover When w e are rebuilding or repairing d amaged parts of you home, w e w ill pay the reasonable and necessary costs to: – o f any temporary w ork required to make the damage or destroyed home and insured address safe – for the services of professional, such as architects or surveyors, to repair or rebuild at the insured address – to make the damaged parts of you home comply w ith the current building regulations and law s Limits Classic Classic Extras Classic Advantages The most w e w ill pay for any one event is 10% of the home sum insured The most w e w ill pay for any one event is 15% of the home sum insured The most w e w ill pay for any one event is 20% of the home sum insured – Page 40 – exploratory costs where leak is not covered under insured event ‘Escape of liquid’ We cover If you have home cover w e w ill pay the cost to locate the source of liquid escaping or overflow ing at the insured address ad to repair and restore the damage to your home caused by our exploratory w ork if the escape of liquid first happens dur ing the period of insurance. If you make a c laim under this additional cover, no excess applies. Limits Classic Classic Extras Classic Advantages The most w e w ill pay is $1,500 for each The most w e w ill pay is $2,0 0 0 for each The most w e w ill pay is $2,500 for each Determination | Case number: 722620 Page 11 of 12 Page Product Di sclosure Statement incident incident incident Page 58 and 59 – General Exclusions You are not covered under any section of this policy for damage, loss, costs or legal liability that is caused by, arises from or involves: Consequential losses or extra costs follow ing an incident covered by your policy consequent loss (financial and non - financial loss) or extra costs follow ing an incident covered by your policy, such as: – l oss of income or w ages; – medical expenses; – loss or costs, including the cost of your time ( e.g. inconvenience), to prove your loss or to help us w ith your claim (e.g. telephone calls, postage); – the cost of your time (e.g. inconvenience); – cost of hiring appliances after yours suffer loss or damage; – professional, expert, legal, consulting or valuation costs unless yo u obtained our prior w ritten authority to incur these costs; – costs of replacing or reapplying pest control chemicals and baits in or around the insured address; – cleaning costs; – any costs related to stress or anxiety; – any costs not covered by your policy. Page 60 – General Exclusions You are not covered under any section of this policy for damage, loss, costs or legal liability that is caused by, arises from or involves: … Ground m ovement erosion, v ibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any other earth movement, but w e w ill cover landslide or subsidence that is specifically covered under the follow ing insured events: – ‘Stor m’ (see page 18); – ‘Flood’ (see p age 17); – ‘Earthquake and Tsunami’ (see page 19); Page 62 – General Exclusions You are not covered under any section of this policy for damage, loss, costs or legal liability that is caused by, arises from or involves: ... Wear, tear and gradual deterioration wear, tear, rusts, fading, rising damp, mould, mildew , corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as but not Determination | Case number: 722620 Page 12 of 12 Page Product Di sclosure Statement lim ited to: – tiles and their adhesive or grouting breaking dow n; – weathering of roof tiles or roof ridge capping; – gradual w eathering and breakdow n of bricks, mortar or concrete. Page 72 When we w ill repair or rebuild undam aged parts If w e cannot match the new mater ials w ith the undamaged parts, w e w ill only pay extra to create a uni form appearance w hen: … – floor covering are damage (inc luding titles) ; we w ill pay extra to replace continuous ly joined undamaged floor coverings of the same material in the same room, stairs, hallw ay or passagew ay* w here the damage occurred. 80 – Incident means a single event, accident or occurrence w hich you did not intend or expected to happen

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.