Determination 722541
Storm damage building claim settlement method, termite damage and temporary accommodation
Summary
After a storm, termite and wood rot damage was found and the insurer had earlier paid $14,084 for floorboards. AFCA ordered a cash settlement based on an engineer's scope and a 20% uplift on the average quotes, temporary accommodation and expert costs, and $5,000 non-financial loss.
The insurer's failure to structurally dry the property in the earlier claim contributed to the damage, so it must complete an independent scope, cash settle with an uplift, and meet consequential costs.
Issues
- Claim amount dispute primary · upheld“the panel is satisfied that a cash settlement by the insurer of the complainant's entitlements is appropriate ... add a 20% uplift to the average of the two quotes obtained.”
- Poor claim handling secondary · upheld“The insurer failed to work with the complainant and assist him where possible, such as providing temporary accommodation.”
Subjects and remedies
home or building damagemental healthpay claimpay compensationpay non financial lossreassess claim
Related
Text of the determination
Determination
Case number 722541
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 722541 Page 2 of 8
Case number: 722541 27 January 2021
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm
(insurer).
The complainant lodged a claim on his policy following a storm event on or around 6
February 2020.
Investigation of the claim identified wood rot and termite infestation in some walls.
The complainant says this is a result of the failure of the insurer to structurally dry the
property after a storm event in December 2018.
The insurer accepted liability for the termite issue. However, the parties have not
agreed on a method to resolve the claim.
1.2 Issues and key findings
How should the building claim be settled?
The complainant’s builder says the property needs to be demolished and rebuilt.
However, the builder has not provided sufficient reasoning to support this position.
The insurer has not assessed the property regarding this. Therefore, the claim should
be settled as set out in section 2.1.
Should the insurer pay other costs?
Yes. The insurer should pay costs for temporary accommodation in the manner set
out in section 2.2.
The insurer is also to pay the cost of the complainant’s expert report upon
presentation of a paid invoice.
Is the complainant entitled to compensation for non-financial loss?
Yes. The insurer’s handling of the claim has cause d an unusual degree of stress,
inconvenience, or delay. The insurer should pay $5,000.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to do the following:
settle the claim as set out in section 2.1
pay additional temporary accommodation as set out in section 2.2
Determination | Case number: 722541 Page 3 of 8
pay the complainant’s expert report when presented with a paid invoice
pay $5,000 for non-financial.
Determination | Case number: 722541 Page 4 of 8
2 Reasons for determination
This complaint has been determined by a panel consisting of the pa nel chair
ombudsman, an individual with extensive experience in the insurance industry and an
individual with extensive experience in consumer claims.
The panel has considered all the parties’ submissions. However, in this determination,
the panel has only commented on submissions directly relevant to the outcome.
This determination is based on information submitted by the parties. Each party has
had an opportunity to review and respond to the other party’s submissions.
This determination is based on what is fair in the circumstances, having regard to any
relevant legal principles, industry codes or guidance, good industry practice, and prior
determinations of AFCA or its predecessors.
2.1 How should the building claim be settled?
There was an accepted insured event and liability was accepted by the insurer
The complainant’s home sustained loss and damage in December 2018, following a
significant storm.
The complainant holds a home and contents insurance policy with the financial firm
which covers ‘insured events’.
The insurer accepted liability for this claim and after assessing the property provided
the complainant with a cash settlement of $14,084, to replace the floorboards
throughout that part of the property which suffered damage.
The insurer did not remove the skirting or sections of plaster wall to inspect and allow
for drying of the internal structure.
Termite infestation likely caused by previous event
The complainant engaged the services of termite expert B to determine the cause of
the wood rot and termite infestation.
B concluded:
active termites found in the interior of the property with extensive damage
invasive testing required for likely concealed termites
degree of risk of termite infestation to overall property is considered extremely high
the entire extension including the bathroom and laundry needs to be demolished
and rebuilt; a termite chemical treatment will be required when this is at ground
level
Determination | Case number: 722541 Page 5 of 8
all flooring to be removed to existing house and a chemical treatment completed to
entire subfloor and then replaced.
The insurer engaged the services of building consultant C, which concluded:
when there is water ingress into a property of reasonable height, the wall linings
are removed to a height of approximately 200mm from the finished floor height to
allow for the drying out of the wall frames behind
as this was not undertaken during the initial event in 2018, water from this event
would have been entrapped in the wall cavity and not sufficiently dried out before
rectification works were undertaken
damages observed, although consistent with increased moisture content within the
wall cavity have a high probability factor that such damage commenced prior to
2018 event
therefore, we cannot fully discount the onset of the damage being pre -2018 storm;
however, due to restoration work by S, the exact time line for deterioration in un-
determinable.
The insurer acknowledges the process followed under 2020 claim, which included
removal of the skirting and part of the wall for structural drying, was no t completed
under the 2018 claim. Therefore, it is highly likely the property was not structurally
dried causing the attraction of the termites and subsequent damage.
Although C suggests this may have been occurring prior to the 2018 storm event, this
cannot be confirmed, and the insurer accepts liability based on the above reports.
Claim should be resolved this way
Having reviewed all the exchanged material the panel is not satisfied that it has
sufficient material to decide on the full extent of the insur er’s liability under the policy
and in respect to the claims.
The panel considers it is fair in all the circumstances the dispute be resolved in the
following way.
The parties are to engage an independent structural engineer to invasively inspect the
property and provide a full scope of works for all the required repairs. This should
include the shed and garage. The parties are also to engage an independent pest
controller.
The engineer should be one agreed to by the parties. This can be done by the
insurer, within 14 days of the complainant’s acceptance of this determination,
providing a list of three engineers from which the complainant can choose one.
Alternatively, the complainant can provide three choices for the insurer to choose one.
The engineer’s and pest controller’s costs are to be borne by the insurer.
Determination | Case number: 722541 Page 6 of 8
Once this engineer has been engaged and has co mpleted the scope of works, the
insurer must obtain at least one actionable quote from a panel builder and one from
an independent builder based on that scope of works. To clarify, an actionable quote
is one where the builder is prepared to do the works for the complainant.
The complainant is seeking a rebuild/repair of the property. However, he has advised
that he does not believe the engineers engaged by the insurer will be independent or
truthful in their reports.
The complainant has refused access to the property for inspection and assessment
by the insurer’s representatives.
The panel accepts that the insurer is e ntitled to investigate the claims to assess its
liability to the complainant under the terms of the policy. In the absence of sufficient
material to decide on the full extent of the insurer’s liability, the complainant is to allow
access in accordance with this determination.
Cash settlement
Noting that the complainant does not trust the insurer’s representatives and has
refused them access, the panel is concerned that an ongoing relationship between
the parties would be fraught with difficulty and likely to result in further disputes
between the parties.
The panel also notes that there are several issues at the home, including drainage
and floor levels, which would not be covered under the terms and conditions of the
policy.
In the circumstances of this claim and this complainant, the panel is satisfied that a
cash settlement by the insurer of the complainant’s entitlements is appropriate.
In reaching this conclusion, the panel acknowledges that a cash settlement means
the risk of repairs is transferred from the insurer to the complainant. Also, the life time
guarantee that the insurer would have been required to provide in relation to its
repairs is no longer applicable.
Further, whilst the invasive inspection to be carried out by the engineer would help to
eliminate concerns around unknown damage, the panel accepts that the full extent of
required repairs will not be known until those repairs have been undertaken.
In recognition of these issues the panel is satisfied that it is fair in all the
circumstances to add a 20% uplift to the average of the two quotes obtained.
The sum insured does not apply in the circumstances as the work required includes
rectification from the insurer’s previous errors under the 2018 claim.
If the parties are unable to agree on the final quantum, they can return to AFCA for a
decision on this point.
Determination | Case number: 722541 Page 7 of 8
2.2 Should the insurer pay other costs?
Temporary accommodation
The policy provides this benefit for temporary accommodation:
If a listed event causes loss or damage to your home and we agree you can’t live
in it and you need to move out so it can be repaired or rebuilt.
We pay this benefit on top of your Buildings sum insured.
Covered under Buildings Insurance
costs for temporary accommodation that we agree are reasonable and
appropriate for you, your family and your pets that you normally keep at
your site
any additional living expenses that we agree are appropriate
costs to remove and store your contents and then return them to your
home.
We pay these costs for the reasonable time we agree it should take to repair or
rebuild your home for up to 12 months from when the listed event took place.
As the current damage/issues at the property were contributed to by the insurer’s
errors under the 2018 claim, the insurer is liable to reimburse the complainant and his
family for the cost of temporary accommodation for the period required to complete
the repairs at the property.
The insurer is also to provide the complainant with temporary accommodation and
removalists costs for the period of the invasive inspection, should the complainant
wish to vacate the property during that process.
Should the period required for repairs, exceed 12 months, the maximum allowance
under the policy does not apply, as the accommodation is required due to the
insurer’s errors.
The insurer is to work with the complainant to assess the cost of suitable
accommodation as multiple factors will need to be considered, such as:
eight family members (six children)
three children with special needs
the need for the property to be close to the children’s scho ol(s)
the need for the property to likely be furnished as furniture in the complainant’s
home may be exposed to termites.
Determination | Case number: 722541 Page 8 of 8
Insurer to pay for cost of B’s report and treatment
The complainant paid for an expert report by B. The insurer is to reimburse this cost
upon presentation of an invoice.
B has also applied certain termite treatments at the property during the complaint at
the complainant’s expense. The insure r is to reimburse these costs upon presentation
of paid invoices.
2.3 Is the complainant entitled to an award of compensation?
AFCA may award non-financial loss compensation in certain circumstances
AFCA may award compensation up to $5,000 for each claim of non-financial loss
where a complainant has suffered an unusual degree or extent of physical
inconvenience, time taken to resolve the situation or interference with their
expectation of enjoyment or peace of mind.
Insurer to pay $5,000 non-financial loss compensation
The insurer offered an initial period of temporary accommodation of three days, which
the complainant rejected.
Once the insurer became aware of the significant mould, wood rot and termite issues
in the wall cavities, it did not present an offer of temporary accommodation until
approximately seven months later. This is also despite being aware of the
complainant’s personal circumstances, including havin g six children, three of whom
have special needs.
The complainant and his family spent months with exposed floors as approximately
85% of the flooring had been removed as part of the make safe.
The insurer attended the property no less than three times to assess. However, the
insurer never completed an invasive inspection to the property. Rather limiting the
assessments to the same areas, the extension only. This has resulted in the insurer
not currently possessing an invasive and complete scope of works. The insurer had
ample opportunity to complete this.
Based upon the above, it is clear the complainant has suffered an unusual degree of
stress and time taken to resolve his issues. The complainant has expressed how his
mental health has been significantly impacted, including a visit to the hospital.
The insurer failed to work with the complainant and assist him where possible, such
as providing temporary accommodation.
The panel is satisfied the insurer’s actions have resulted in an unusual degree or
extent of physical inconvenience, time taken to resolve the claim and interreference
with the complainant’s peace of mind. Therefore, the insurer is required to pay the
complainant $5,000, in recognition of this.