Partial refusal and underpayment of burst pipe water damage claim, and claim delay
Text of the determination
Determination
Case number 722291
Financial firm AAI Limited
Determination | Case number: 722291 Page 1 of 13
Case number: 722291 30 June 2021
1 Determination overview
1.1 Complaint
The complainant owns a house insured by the financial firm (the insurer) under a strata
insurance policy. In June 2019, the house was damaged by water from a burst pipe.
In July 2019, the complainant called the insurer to lodge a claim. The insurer said it would
follow up the matter with the owners corporation, but did not do so, and took no further action
until the complainant called again in March 2020.
In March 2020, the insurer inspected the house. The insurer said most of the water damage
at the house was caused by a leaking shower, which is excluded from cover under the policy.
The insurer offered to pay for the damage it accepted as being caused by the burst pipe.
The complainant says all of the damage was caused by the burst pipe, and should be paid for
by the insurer. She also seeks reimbursement for the cost of her expert reports, and
compensation for her non-financial loss (stress, inconvenience, and delay).
The insurer has offered to pay $5,943.73, being:
$4,393.73 for repairs
$550 for a building inspector’s report
$1,000 compensation for non-financial loss.
The complainant wants the insurer to pay $73,521, being:
$66,471 for repairs (including renovation of the bathroom)
$550 for a building inspector’s report
$1,500 for a second building inspector’s report
$5,000 compensation for non-financial loss.
1.2 Issues and key findings
Is the insurer required to increase its settlement offer ?
Yes. Water leaked from the shower, but this water only damaged the bathroom and the
subfloor directly under the bathroom. The water damage in the rest of the house was caused
by the burst pipe.
The best available estimate of the cost of repairing damage caused by the burst pipe is
$48,391.07. The insurer must pay this amount (plus interest) for repairs.
Is the complainant entitled to any other compensation ?
Yes. It was reasonable for the complainant to obtain expert reports, and the reports helped
the panel make this determination. The insurer should reimburse the complainant for the cost
of the reports.
The insurer took no action in relation to the claim until about eight months after it was lodged.
This caused an unusual degree of stress and inconvenience for the complainant. The
complainant is entitled to compensation for non-financial loss in the sum of $3,000.
Determination | Case number: 722291 Page 2 of 13
1.3 Determination
This determination is mostly in favour of the complainant.
The insurer must pay the complainant:
$48,391.07, plus interest from 11 August 2019, for repairs
$550, plus interest from 7 May 2020, for the first building inspector’s report
$1,500, plus interest from 16 November 2020, for the second building inspector’s report
$3,000 in compensation for non-financial loss.
Interest is to be paid at the rate determined under section 57 of the Insurance Contracts Act
1984 (Cth).
The insurer is not required to pay for the renovation of the bathroom.
Determination | Case number: 722291 Page 3 of 13
2 Reasons for determination
2.1 Is the insurer required to increase its settlement offer?
Complainant lodged claim under policy
On 3 December 2012, the insurer issued the policy to the owners corporation for the strata
title. The policy was renewed annually.
In May 2019, the complainant bought a house on the strata title, making her a beneficiary
under the policy.
In June 2019, a pipe burst under the complainant’s bathroom vanity. The complainant says
this caused water to rise above the skirting boards in every room of the house. She says she
tried to contact the insurer several times to report the incident.
On or about 11 July 2019, the insurer received a call from the complainant, who said she
wanted to lodge a claim. The insurer said it could not proceed with the claim because the
complainant was not a policyholder. It said it would contact a representative of the owners
corporation to confirm the complainant should be listed as a policyholder and the claim should
proceed. It did not contact the owners corporation, and did not take any further action until the
complainant called again on 17 March 2020.
House had pre-existing damage under bathroom
The complainant obtained a pre-purchase inspection report before buying the house. The
report was prepared by a building inspector (TK), who inspected the house on 6 April 2019.
The pre-purchase inspection report included photographs of stained flooring under the
bathroom. The report said:
the shower had leaked, and this had damaged the flooring
metal screws from the bottom of the shower rail had penetrated the waterproofing, tile
screed, and chipboard, and this had caused further leaks
the bathroom floor and waterproofing should be completely replaced.
Policy covers damage caused by burst pipe
Relevant sections of the policy are quoted in section 3.2 of this determination.
The policy is an ‘accidental damage’ policy, meaning it covers all accidental damage during
the period of insurance, unless it is specifically excluded. The insurer accepts that it is liable
for damage caused by the burst pipe in June 2019.
The policy specifically excludes cover for damage caused by a leaking shower. The insurer is
not liable for the damage under the bathroom identified in the pre-purchase report.
Parties disagree on extent of damage caused by burst pipe
The parties appointed the following experts to inspect the house:
the insurer appointed a builder (RCC), who inspected the house on 18 March 2020
the complainant appointed a building inspector (TK), who inspected the house on 7 May
2020 (TK also did the pre-purchase inspection in April 2019)
the complainant appointed another building inspector (BI), who inspected the house on 14
November 2020.
Determination | Case number: 722291 Page 4 of 13
Having reviewed these experts’ re ports, the insurer says the following work is required to
repair damage caused by the burst pipe:
replacement of the bathroom vanity
replacement of water-damaged skirting boards and architraves in hallway
treatment of mould under flooring (excluding the flooring under the bathroom).
The complainant says the following work is required to repair damage caused by the burst
pipe:
renovation of the bathroom
replacement of flooring throughout the house
replacement of skirting boards throughout house
restoration of kitchen cabinets
treatment of mould throughout the house
temporary accommodation
repair of any additional damage that develops or is discovered during repairs.
Insurer not required to pay for bathroom renovation
In April 2019, TK’s pre -purchase inspection report said there was water damage under the
bathroom, and recommended the complete replacement of the bathroom floor and
waterproofing.
In May 2019, the complainant paid $1,000 for shower sealing, including the application of new
grout and caulk. However, she did not replace the bathroom floor or waterproofing.
The complainant says there is a dip in the bathroom floor that wasn’t there before the pipe
burst in June 2019. She says she lives alone and never uses the shower because she prefers
to take baths. She says any damage that occurred since she bought the house cannot have
been caused by a leaking shower.
RCC (in March 2020) and TK (in May 2020) did not mention damage to the bathroom floor. BI
(in November 2020) said the bathroom floor tile grout was cracked.
The insurer’s internal assessor said the grout cracked because the flooring had expanded
due to rot. BI said the grout cracked because the flooring had expanded due to water
absorption, but did not say whether this was because of a long-term leak or the burst pipe.
The cracking was not recorded until 17 months after the pipe burst, which indicates it was
more likely due to a long-term leak.
BI recommended a full renovation of the bathroom, including a new floor and waterproof
membrane. However, this work was already recommended by TK before the complainant
bought the house. The panel believes this work is required because of the pre-existing leak,
not because of the burst pipe. The insurer is not required to pay for this work.
Insurer must pay for flooring outside bathroom
TK (in March 2020) took photographs in the subfloor showing staining and mould on the
undersides of particle board floor sheets. There is a dark stain under the bathroom, and light
stains elsewhere. TK said the damage was caused by the burst pipe. TK did not mention its
pre-purchase inspection report, which had shown staining under the bathroom in April 2019.
BI said the staining under the bathroom was dark, indicating it occurred slowly over a long
period of time. In contrast, the staining elsewhere was light, indicating it occurred due to a
one-off event.
Determination | Case number: 722291 Page 5 of 13
The insurer’s internal assessor said the floorboards outside the bathroom were stained and
mouldy, and this could be attributed to water from the burst pipe.
The insurer’s assessor said the flooring was ‘water resistant’, and the staining outside the
bathroom was ‘ of no concern and not considered as damage ’. BI said particle board was
susceptible to moisture, and saturation followed by drying would have permanently deformed
the boards, making the floors uneven. BI said they observed ‘undulated’ floors throughout the
house outside the bathroom, and measured floor level deviations of up to 11mm.
The insurer’s assessor said the uneven floor was ‘[no] surprise with a house of this age … and
not related to the [burst pipe] event in any way. ’ The house was built in 2001. The insurer has
not said how much variation in floor level is expected in a house of this age, or whether the
variation measured by BI falls outside the expected range. The pre-purchase inspection
report did not mention uneven floors.
The panel is satisfied that the damage to flooring outside the bathroom was caused by water
from the burst pipe. The insurer must pay to repair or replace the flooring throughout the
house, except under the bathroom.
Insurer must pay for skirting boards throughout house
The complainant says water from the burst pipe rose above the skirting boards in every room
of the house. However, the insurer has only agreed to cover damage to the skirting boards in
the hallway just outside the bathroom.
RCC said there was water damage to flooring in the living room and all three bedrooms. This
range effectively covers the entire house.
TK said there were swollen skirting boards in the kitchen and lounge room. The kitchen and
lounge room are on the opposite side of the house to the bathroom.
BI said the water damage under the bathroom occurred slowly over a long period of time, and
water from this leak would not reach the kitchen and lounge room.
RCC said the water damage throughout the house was caused by a leak from the shower
base, which was still ongoing at the time of its inspection. However, they did not explain:
why they could not detect a leak in the shower base, despite extensive testing
how a leak from the shower base could have spread water throughout the house
why they thought the water from the burst pipe, which spread to every room in the house,
did not cause any damage.
The panel is satisfied that water from the burst pipe damaged skirting boards throughout the
house. The insurer must pay to replace the skirting boards throughout the house, not just in
the hallway.
Insurer must pay for kitchen cabinets
The complainant has provided photographs of a water-stained kitchen drawer.
RCC observed water damage to joinery in the kitchen. They said this damage was caused by
failed waterproofing in the bathroom. However, they did not explain how the slow leak from
the bathroom could have reached the kitchen, which is on the opposite side of the house.
BI said they did not know whether the kitchen cabinets had been damaged. BI said the
kitchen cabinets should be removed to determine whether they had been damaged.
Determination | Case number: 722291 Page 6 of 13
The panel is satisfied that water from the burst pipe damaged joinery in the kitchen. The
insurer must pay for this damage.
Insurer must pay for mould remediation
RCC said there was mould on the wall of the hallway outside the shower, and this was
caused by failed bathroom waterproofing.
TK said there was mould on the underside of the flooring throughout the house, and this was
caused by the burst pipe.
BI said there was black mould under the bathroom, which was likely caused by a slow leak,
and white mould under the rest of the flooring, which was likely caused by the burst pipe.
The insurer’s internal assessor said the floorboards outside the bathroom were stained and
mouldy, and this could be attributed to water from the burst pipe.
The panel is satisfied that the burst pipe caused mould growth at the house. The insurer must
pay the cost of mould remediation.
Complainant not required to contribute to cost of mould remediation
If mould remediation was required partly because of pre-existing mould growth at the house,
it would be fair for the insurer to deduct part of the cost of mould remediation from the
settlement.
The pre-existing water damage may have contributed to the mould growth. However, there
was no mould noted during the pre-purchase inspection. The house may not have developed
any mould damage if not for the water escaping from the burst pipe.
The insurer’s delay in responding to the claim may have caused mould to develop and
spread. When the complainant lodged the claim, the insurer failed to arrange make-safe work
which could have prevented mould growth. After the complainant lodged the claim, the
insurer took no action for about eight months. It is now two years since the house was
flooded, and it has not been professionally cleaned. This may have allowed mould to spread
throughout the house.
In the circumstances, the panel considers it fair to require the insurer to pay for mould
remediation without any deduction for pre-existing damage.
Insurer must pay for temporary accommodation
If an insured event makes a unit unliveable, the policy covers the cost of temporary
accommodation for the unit owner.
BI said the complainant would need temporary accommodation while the repairs they
recommended were carried out. The repairs BI recommended included a bathroom
renovation. As stated above, the bathroom renovation is required because of the pre-existing
leak, not because of the burst pipe.
The repairs required because of the burst pipe include mould remediation and the repair or
replacement of flooring throughout the house. The panel is satisfied that these repairs would
make the house unliveable, even without the bathroom renovation.
Determination | Case number: 722291 Page 7 of 13
Best estimate of cost of damage caused by burst pipe is $40,325.89
The complainant provided a quote dated 9 September 2020 for $29,260 (including GST) from
a repairer (TY). Most of the items in the quote relate to the burst pipe. The quote does not
incl ude a full bathroom renovation, but does include: ‘Level Flooring under bathroom doorway
and regrout tiles’. The quote does not specify the cost of this work.
The complainant provided an undated quote (said to be obtained on 13 October 2020) for
$64,471 (including GST) from another repairer (TG). The quote includes items relating to the
pre-existing leak (including a bathroom renovation) and items relating to the burst pipe
(including mould treatment and temporary accommodation).
TG allowed $20,779 (including GST) for a bathroom renovation, including a new shower,
bath, and waterproofing. The insurer is not required to pay for this work.
TG allowed $2,640 (including GST) for painting in the bathroom. The insurer is not required to
pay for this work.
TG allowed $4,840 (including GST) for demolition works in the bathroom and kitchen. The
insurer is not required to pay for demolition works in the bathroom. The insurer should pay
half of this item ($2,420).
The parts of TG’s quote relating to insured works total $38,632 ($64,471, less $20,779, less
$2,640, less $2,420).
The insurer provided a quote dated 10 December 2020 for items it accepted as being related
to the burst pipe. The quote totalled $4,393.73. The quote allowed $1,693.89 (including
builder’s margin a nd GST) for the replacement of the vanity. Other items in the quote are
included in TG’s quote.
T he parts of TG’s quote relating to insured works ($38,632) plus the cost quoted by the
insurer to replace the vanity ($1,693.89) total $40,325.89.
Insurer must pay contingency for unseen damage
The policy says the insurer can settle a claim for building damage by repairing the damage, or
by paying the cost of repairs. The insurer has decided to settle the claim by paying the cost of
repairs.
AFCA considers that where an insurer settles a claim by paying the cost of repairs, it should
consider paying an allowance for:
the potential cost of repairing unseen damage that is uncovered during repairs
the loss of the insurer’s lifetime guarantee on repairs
the possibility that it will be more difficult, time-consuming, and expensive for the insured to
arrange repairs, because they do not have the insurer’s industry knowledge and
bargaining power.
Generally, AFCA considers that a reasonable allowance is likely to be between 5% and 25%
of the quoted cost of repairs.
BI said there may be unseen damage in the floors, walls, kitchen cabinets, and kitchen doors,
due to the burst pipe. The insurer’s assessor said there may be undiscovered damage in the
walls due to the pre-existing leak.
Water from the burst pipe penetrated the walls and floor of the house, causing mould growth.
There is a strong possibility of unseen damage throughout the house due to the burst pipe.
Determination | Case number: 722291 Page 8 of 13
There may also be unseen damage in the bathroom floor due to the pre-existing leak.
However, there is no evidence that the pre-existing leak damaged anything other than the
bathroom floor and the subfloor directly under it.
Given the strong possibility of unseen damage due to the burst pipe, the panel considers it
fair for the insurer to pay an allowance of 20% of the quoted cost of repairs.
Adding 20% to $40,325.89 yields a total of $48,391.07.
Insurer must pay interest
Section 57 of the Insurance Contracts Act 1984 (Cth) says an insurer must pay interest on a
claim settlement payment from the time it was unreasonable to have withheld payment. In the
circumstances, the panel considers this to be 11 August 2019, one month after the
complainant called the insurer to lodge the claim.
The insurer must settle the claim for building repairs by paying the complainant $48,391.07,
plus interest from 11 August 2019.
2.2 Is the complainant entitled to any other compensation?
Complainant entitled to reimbursement for expert reports
Under the AFCA Rules, we can require an insurer to contribute to the professional costs a
complainant incurred in making a complaint. Unless special circumstances apply, we cannot
require the insurer to contribute more than $5,000 to these costs.
In consid ering whether an insurer should contribute to a complainant’s costs, we consider
whether they were reasonably incurred, and whether they helped resolve the complaint.
The complainant appointed two building inspectors to inspect her home. Without expert
reports, it would have been difficult for the complainant to provide evidence to support her
claim. Appointing the building inspectors was reasonable in the circumstances, and their
reports helped the panel make this determination.
The complainant has provided:
an invoice dated 7 May 2020 showing TK charged $550 for their report
an invoice dated 16 November 2020 showing BI charged $1,500 for their report.
The insurer must reimburse the complainant for the cost of her building inspectors’ reports.
The insurer must also pay interest at the rate determined under section 57 of the Insurance
Contracts Act 1984 (Cth) from the dates of the invoices.
Complainant entitled to compensation for non-financial loss
Under the AFCA Rules, we can award up to $5,000 compensation for non-financial loss if a
complainant suffered an unusual degree of stress, inconvenience, or delay because an
insurer mishandled a claim.
We will only award this type of compensation if there has been an unusual degree of stress,
inconvenience, or delay. We will not award compensation for the usual amount of
inconvenience involved in making a claim. We will not award compensation for delays caused
by the complainant, or other factors outside the insurer’s control.
The insurer took no action in relation to the claim until about eight months after it was lodged.
Because of this delay:
Determination | Case number: 722291 Page 9 of 13
the insurer failed to arrange make-safe work which could have prevented mould
development
mould that developed after the event may have spread
experts did not inspect the damage until long after it occurred, which made it more difficult
to distinguish claim-related damage from pre-existing damage.
If the insurer responded immediately when the complainant lodged the claim, it would have
prevented the initial eight-month delay. It may also have prevented some of the disputes that
arose over the extent of the claim-related and pre-existing damages.
The complainant did not contact the insurer between July 2019 and March 2020. However,
the insurer told her it would not assist her because she was not listed on the policy, so she
had reason to believe contacting the insurer would not be helpful. The insurer also told her it
would follow the matter up with the owners corporation, which it failed to do. The complainant
is not to blame for the delay during this period.
The panel believes the complainant suffered an unusual degree of stress, inconvenience, and
delay because the insurer mishandled the claim. The panel considers it fair for the insurer to
pay the complainant compensation for non-financial loss in the sum of $3,000.
Outcome is fair in the circumstances
The complainant suffered losses because of an event covered under the insurance policy.
She is entitled to be compensated for those losses by the insurer.
The panel is satisfied that this determination provides the fairest possible outcome, based on
the available information.
Determination | Case number: 722291 Page 10 of 13
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
A panel determined this matter
Due to the nature of this complaint, we referred it to a panel for determination. The panel
includes:
an ombudsman
a member with experience in consumer and small business advocacy
a member with experience in insurance.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
Determination | Case number: 722291 Page 11 of 13
3.2 Relevant policy terms
What you are covered for (page 13 )
Building cover
When we insure your building, we will cover it for accidental loss or damage at the insured address
in the period of insurance prov ided that the loss or damage is not excluded and subject to the
conditions of your policy.
Accidental loss or damage
Accidental loss or damage is loss or damage that was not intentional and includes loss or damage
from the incidents shown on pages 14 to 21. The loss or damage we don’t cover under your policy is
shown:
in the tables shown on pages 14 to 21;
in the ‘General exclusions’ on pages 39 to 44;
in the ‘We do not cover’ sections in additional features on pages 22 to 27; and
in the ‘We do not cover’ sections in the additional covers on pages 28 to 35.
Escape of liquid (page 19)
We cover L oss or damage caused by escape of liquid.
We do not cover wear and tear, or loss or damage by the escape of liquid occurring as a result
of a gradual proc ess of leaking, splashing, dripping or overflowing over a
period of time when you could reasonably be expected to be aware of this
condition;
the cost of repairing or replacing the item from which the liquid escaped;
…
loss or damage to, or caused by, a leaking shower floor or base, shower
cubicle walls, shower glass screening or doors;
…
broken, worn or aged tiles or grouting in walls in bathrooms, kitchens or
laundries unle ss the damage is caused by liquid leaking from pipes in walls
or floors (not forming part of a shower cubicle wall, floor or base);
loss or damage caus ed by wear, tear, rust, fading, rising damp, mould,
mildew, corrosion, rot;
…
Temporary accommodation for unit owners (page 24)
Determination | Case number: 722291 Page 12 of 13
Temporary accommodation for unit owners (page 24)
We cover When an ins ured incident damages a unit in your building to the extent that the
unit owner cannot live there, and we agree, we will pay the unit owner’s
reasonable temporary accommodation costs for the time it will take to repair or
rebuild the unit to a liveable condition. We will also pay for temporar y
accommodation for the unit owner’s domestic pets in a commercial boarding
establishment for the same period that we pay for the unit owner’s temporary
accommodation.
The most we will pay for is:
up to 4 weeks in short term accommodation agreed to by us ( e.g. standard
rates for a hotel, motel or serviced apartment), then if necessary up to
another:
> 48 weeks in residential accommodation of a similar standard to the unit that
has been damaged in the incident.
We will also pay the reasonable and necessary cos ts for:
redirection of the unit owner’s mail from the insured address for up to 52
weeks;
utility connection costs at the temporary accommodation residence;
assistance with bond payment if required, however any amount we pay in
bond is recoverable from the unit owner by us. We may deduct this amount
from any amount payable to the unit owner.
The most we will pay for all claims under this feature in relation to the same
insured incident is 10% of the building sum insured and the longest period that
can be cl aimed for is 52 weeks.
We do not cover Temporary accommodation costs:
…
beyond the period it should reasonably take to replace or repair the unit so
the unit owner can live there again;
…
General exclusions (pages 39 – 44)
You are not covered under any section of this policy for damage, loss, cost or legal liability that is
caused by, arises from or involves:
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or should reasonably have known
about) a nd did not fix before the loss or damage occurred (e. g. if there are signs that a defect
previously caused damage, we will not pay a later claim for further damage from this defect).
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising d amp, mould, mildew, corrosion, rot, action of light, atmospheric or
climatic conditions or gradual deterioration such as, but not limited to :
tiles and their adhesive or grouting breaking down;
weat hering of roof tiles or roof ridge capping;
gradual weathe ring and breakdown of bricks, mortar or concrete.
Determination | Case number: 722291 Page 13 of 13
How we settle your claim (pages 49 – 50)
We choose how we settle building claims
If we agree to pay a claim for loss, theft or damage to your building, we will decide if we will:
repair damage to your building;
rebuild your building;
pay you what it would cost us to repair or rebuild your building;
pay you the sum insured for your building;
give you a voucher, store credit or stored value card for the amount it would cost us to repair or
rebuild an item .