Home / QBE / Determination 721743

Determination 721743

Claim declined for ceiling collapse damage

FirmQBE
Decided2021-02-21
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant's claim for ceiling collapse damage to his home was declined by the insurer on the basis of a faulty workmanship exclusion. AFCA found the insurer entitled to decline and made no order against it.

The insurer must prove an exclusion applies, and the proximate cause of the loss, poor installation of plasterboard adhesive, was excluded even though wind may have contributed.

Issues

Subjects and remedies

home or building damageno remedy

Related

All QBE determinations · Find similar determinations

Text of the determination

Determination Case number 721743 Financial firm QBE Insurance (Australia) Limited Determination | Case number: 721743 Page 2 of 8 Case number: 721743 21 February 2021 1 Determination overview 1.1 Complaint The complainant lodged a claim under his home insurance policy with the financial firm (insurer) for damage caused following the ceiling collapsing inside his home. The insurer says the ceiling collapsed due to poor installation of the adhesive on the plasterboard sheets. The insurer considers this to be faulty workmanship. It was noted that there were wind conditions which may have exacerbated the issue, however, it does not consider this to be the proximate cause of the damage. The insurer denied the claim because it says the circumstances of the loss are specifically excluded from cover under the policy. 1.2 Issues and key findings Is the insurer entitled to decline the claim? The insurer is entitled to deny the claim. The available information supports the proximate cause of damage is faulty workmanship which is specifically excluded from cover under the policy. 1.3 Determination This determination is in favour for the insurer. The insurer is not required to take any further action. Determination | Case number: 721743 Page 3 of 8 2 Reasons for determination 2.1 Is the insurer entitled to decline the claim? Complainant must establish a valid claim under the policy The complainant is required to show that, on balance, he has suffered a loss caused by a risk insured against under the policy. This is known as a valid claim. The policy provides cover for events which occur during the period of insurance. Insured events include ‘Storm, rainwater, flood or wind’. The certificate of insurance confirms that the complainant had also selected the optional extra cover for accidental loss or damage to the building. The cover is subject to terms and conditions including exclusions, limits and excesses. It is not in dispute there is damage to the home. The dispute relates to the cause of the damage. The complainant must establish the damage was caused by an insured event to which the policy responds to, or accidental loss or damage. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies, if it seeks to deny or limit its liability for the loss. The insurer must establish the damage was caused by a defect in an item, structural defects, faulty or poor workmanship or design. Circumstance of loss The complainant lodged a claim with the insurer on 8 April 2020, following the collapse of the ceiling in the lounge, kitchen and study area on the first floor. The complainant reported that it had been windy and raining the night before the damage occurred, on 8 April 2020. The builders (P) engaged by the insurer to complete the make safe, deemed the property to be uninhabitable. The complainant was provided with temporary accommodation from 9 April 2020 until 10 July 2020. At which point the i nsurer had trades attend the property to complete works to return the property to a condition where the complainant and his family may return. This meant that the smoke detectors and lights were re-fitted temporarily, and a thick black plastic installed where the ceiling was. The complainant says that as well as the damage to the ceiling caused by wind and rain, the ceiling collapsed onto the staircase hand railing, and this caused compression to the rest of the house, resulting in damage to other areas within the house. Determination | Case number: 721743 Page 4 of 8 Insurer’s experts say damage is due to faulty workmanship The insurer appointed P to assess the damage to the property and report on its cause. P’s report following inspection on 17 April 2020, reports that the damage was caused by a combination of wear and tear and possible high winds, it further noted no cracked roof tiles or storm created openings were sighted. Following this report, the insurer engaged engineers (EIS) to further investigate and establish the cause of damage. EIS attended on 22 April 2020. Its report is dated 23 April 2020, and states that:  the floor level surveys conducted of both the ground and first floor show settlement around the perimeter of the building and a foundation heave in the middle part of the building (kitchen) > the settlement is caused by uncapped ground against the perimeter of the building  the primary cause of the ceiling collapse is poor installation of the plasterboard adhesive  the residue adhesive to the underside of the timber trusses was noted to be spaced too far apart and not installed along the full width of the timber trusses underside, meaning: > the adhesive was either not applied correctly or the trusses were poorly prepared, resulting in the adhesive not sticking  remaining screws were noted in the trusses, where the screws had pulled through the plasterboard  a mild wind gust is the probable cause that initiated the damage but was not the proximate cause. Complainant disputed the engineer’s findings On 1 May 2020, the complainant was informed of the decision to deny the claim based on EIS ’s report. The complainant disagreed with the assessment and advised that when the make safe was completed, P informed him that there were cracked and slipped tiles on the roof. The complainant considers the cause of the damage could have been a result of wind and rain. The complainant provided photos showing the moved tiles to the insurer, these photos were provided to him by P. The photographs were provided to EIS and it responded on 8 May 2020, advising:  there was no internal ceiling upon the inspection. As such, the roof tiles were clearly visible. There were no gaps or sunlight to the extent of the photos provided noted upon inspection  on the date of loss, the Bureau of Meteorology reports the maximum wind speed of 30km/h, which it does not consider is high. While there were winds of 80km/h on 4 Determination | Case number: 721743 Page 5 of 8 and 5 April 2020, this is only 61% of the wind speed the house is designed to withstand  ground movement is not the proximate cause of the damage, but cannot be ruled out to have worsened the damage  the proximate cause is the poor installation of the adhesive to the ceiling plasterboard. The complainant disputed this information advising the inspection by the engineer was inadequate. The complainant provided further photos (including exterior photos) which he says show gaps and some cracks in roof tiles. The insurer emailed EIS asking for a response to the complainant ’ s concerns. EIS responded to the complainant’s concerns on 13 May 2020, noting that:  the photographs did not change EIS’ opinion on the cause of damage  EIS were onsite for 1.5 hours and conducted a thorough assessment  a ladder was used to inspect the internal roof cavity, framing and adhesive, it was also able to inspect the roof tiles from the underside. A supplementary report was completed by EIS On 15 May 2020, the EIS advised that he wanted to re-attend the property to measure the thickness of the gyprock (plasterboard) from the ceiling and noted it was still at the property. Following this attendance, EIS provided a supplementary report dated 18 May 2020. The report stated:  plasterboard ceiling was directly fixed to the timber  the truss spacing supporting the ceiling was 600mm  the plasterboard was 10mm. The report noted that the above did not comply with the Australian Standards (AS) 2589 Gypsum Linings — Application and finishing . Specifically, section 3.5.2.1 - Framing Spacing, as the plasterboard was 10mm and the truss spacing supporting the ceiling was 600mm, to be in line with AS2589 Gypsum Linings the spacing should not exceed 450mm. The report further noted:  the adhesive at some locations on site had fully bonded to the underside of the truss, while at other locations the adhesi ve had only stained the timber. > Indicating poor adhesion was made at the time of installation, with the common cause of this being poor surface preparation. Determination | Case number: 721743 Page 6 of 8 EIS noted that this is not complaint with Section 4.4.3.2.2 - Preparation of the AS2589 Gypsum linings, which states surfaces of the gypsum plasterboard and framing members shall be free from dust, dirt, grease, surface moisture (such as dew) and any other foreign matter detrimental to the adhesive bond prior to the application of the adhesive. The report also outlines that under Section 4.4.3.2.4 - Application of Adhesive to Ceiling Framing, states daubs of adhesive approximately 25 mm in diameter by 15 mm high shall be applied to the framing members at a maximum. EIS noted:  depending on the plasterboard width, the fastener fixing should with a combination of daub adhesive and screws in particular patterns with 230 mm between the daubs and 200 mm between the daubs and screws.  the pattern of the fixings was highly variable. Some lengths were compliant while other fixing arrangement had spacings that far exceeded the requirements  note 1 of Section 4.4.3.2.4, states that care should be taken to prevent fixing through adhesive daubs, however there were fixings through the adhesive daubs noted on site, at some locations. EIS further noted that the gyprock acrylic stud adhesive is distinct due to its blue colour. However, it had identified that as well as blue adhesive, an orange adhesive was used on site. It was not clear why multiple products were used, although it could possibly be that a gyprock masonry adhesive was used by mistake. Following this report, the complainant was contacted on 21 May 2020 and advised the claim would be denied as the damage was caused by the poor installation of the adhesive, as such the insurer maintained it was entitled to deny the claim based on the exclusion:  a defect in an item, structural defects, faulty or poor workmanship or design. Complainants expert evidence does not assist him The complainant engaged engineers TCE to inspect and report on the cause of damage. The report provided by TCE is dated 31 July 2020 and states:  it attended on 24 July 2020 to inspect, a temporary ceiling of thick black plastic sheet made the roof largely inaccessible due to safety issues and risk of accident  the complainant informed TCE of some broken tiles which were visible at the time of the ceiling collapse and not mentioned in the EIS report  TCE broadly agrees with the findings of EIS as noted in their report dated 26 June 2020, which highlights poor installation of plasterboard adhesive as the primary cause of the ceiling collapse, however indicates that it’s not uncommon for ceilings to collapse due to a combination of several reasons and existing defects, in this case water ingress may have been the contributing factor. Determination | Case number: 721743 Page 7 of 8 Information shows the proximate cause of the damage to be the poor installation of the adhesive to the plasterboard ceiling Having considered the available information, including several photos, both of the interior and exterior of the roof, provided by the complainant, while the wind in the days prior may have been a factor contributing to any damage, I am not satisfied that the information shows that this is the proximate cause of the loss and damage. Further, whilst the complainant ’ s engineer TCE advised that water ingress may have been a contributing factor, I am not persuaded by this argument as the available information does not suggest that the plasterboard, insulation or trusses had been subject to any water ingress or water staining. In my view, the proximate cause of the loss was the poor workmanship in the fixing of the ceiling. Without this poor workmanship, I am not satisfied that the loss and damage would have occurred. The insurer is entitled to decline the claim The policy excludes cover for damage caused by a defect in an item, structural defects, faulty or poor workmanship or design. The available material supports that poor installation of the ceiling plasterboard is the proximate cause of damage and while the wind event may have contributed to the damage, it was not the proximate cause. As this cause is specifically excluded from cover under the policy, the insurer is entitled to rely on its policy exclusion to deny the claim. Determination | Case number: 721743 Page 8 of 8 3 Supporting information 3.1 Our Approach This complaint has been determined based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA where applicable. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. 3.2 Proximate cause Case law establishes:  the proximate cause of loss is the dominant (or effective or operative) cause of the loss, whether or not the cause is last in time or the sole cause.  where several causes operate at the same time, each cause must be examined for the qualities of reality, predominance and efficiency as the active, efficient cause that sets a relevant chain of events in action.  If one cause results in harm in any case, a nd the other would not in the absence of the first, the first is the proximate cause.  a common-sense approach is taken to determine proximate cause. 3.3 Relevant extracts from supplimentary EIS report The relevant extracts are referred to in the supplimentary engineer ’ s (EIS) report dated 18 May 2020. The EIS supplimentary report has been exchanged with the complainant.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.