Determination 718178
Cash settlement amount for fire damage repairs
Summary
The insurer cash settled a fire claim under a home policy at $449,025.55 and the complainants disputed the scope and cost of repairs. AFCA required the insurer to include mould remediation in repair costs and raise contingencies from 10% to 20%, paying a further $43,202.96.
Once a claim is cash settled the risk of further costs transfers to the policyholder, so contingencies and mould remediation must be properly allowed for in the settlement.
Issues
- Claim amount dispute primary · upheld“Is the insurer required to increase its settlement offer? Yes, the insurer is required to increase its settlement offer.”
- Repairs or contractors secondary · not upheld“the panel is satisfied that the insurer's scope of works is adequate and so is the settlement”
Subjects and remedies
pay claim
Related
All Suncorp Group determinations · Find similar determinations
Text of the determination
Determination
Case number 718178
Financial firm AAI Limited
Determination | Case number: 718178 Page 1 of 9
Case number: 718178 3 August 2021
1 Determination overview
1.1 Complaint
The complainants hold a home and contents insurance policy with the financial firm (insurer).
On 30 May 2019, their home was damaged by fire. The complainants submitted a claim and it
was investigated and accepted.
The insurer has prepared a scope of works for rectification of the home and mould
remediation.
The insurer has settled the complainants based on the scope of works totalling $449,025.55
The complainants disagreed with the insurer’s scope of works and submitted their own quotes
for consideration. What remains in dispute is the quantum, as the complainants are seeking
additional compensation for the cost of repairs.
1.2 Issues and key findings
Is the insurer required to increase its settlement offer?
Yes, the insurer is required to increase its settlement offer.
The insurer is required to include the cost of mould remediation into the cost of repairs (which
was not done initially), before calculating the overall amount for contingencies.
The insurer is also required to increase its allocated contingency amount from 10% to 20% in
line with AFCA’s approach.
Why is the outcome fair?
The outcome is fair as all the available material has been considered and the outcome is
based upon that material.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer is to pay the complainants an additional $43,202.96
Determination | Case number: 718178 Page 2 of 9
2 Reasons for determination
2.1 Is the insurer required to increase its settlement offer?
Policy provides cover for fire related damage
The policy says it provides cover for a series of insured events including loss or damage
caused by fire (burning with flames).
Policy does not provide cover under some circumstances
U nder ‘general exclusions’ the policy does not provide cover for loss or damag e arising from
wear or tear, lack of maintenance, defects and structural or design faults.
The policy also says it does not provide cover for loss or damage arising from a policy holder
failing to take care of their home or contents. The policy says this means a policy holder must
keep their home and contents in good condition and well maintained, and to fix faults and
defects as soon as they become aware of them.
Policy has discretion as to how the insurer settles claims
The product disclosure statement (PDS) outlines how the insurer settles claims
How we settle your claim
We choose how we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we will decide if
we will:
repair damage to your home;
rebuild your home;
pay you what it would cost us to repair or rebuild your home;
pay you the sum insured for your home .
If we rebuild (or pay you what it would cost us to rebuild), we will do so on a ‘new
for old’ basis.
If we repair (or pay you what it would cost us to repair), we will at our option do so
on a ‘new for old’ basis or to a similar condition to what your home was in before
the loss or damage occurred.
Offers made by the insurer to resolve the complaint
The insurer has relied on advice from its builder (JLG) who identified pre-existing damage at
the property and recommended a cash settlement for the cost of repairs to finalise the claim.
Both parties have agreed to a cash settlement as an appropriate method of settlement.
However, there is an issue as to the scope of works and cost of repairs
Following its assessment, JLG provided a scope of work for the claim related repairs. The
Insurer requested JLG provide an estimate for the repairs while the complainants obtained
their own comparative quotes based on the same scope of work.
Determination | Case number: 718178 Page 3 of 9
The Insurer received a quote from JLG in the amount of $274,153.26.
The complainants provided a quote from repairer (SC) in the amount of $545,005.47 and a
second quote from repairer (ITC) in the amount of $538,400.47
Upon further review and discussion with the complainants, the scope of works was amended
and JLG provided an amended repair estimate in the amount of $280,129.61.
During AFCA’s initial review and based on the available information and negotiations with the
complainants, the insurer made a final offer of $449,025.55 to the complainants to settle for
the reasonable cost of repairs (what it would have cost the insurer to complete the repairs to
the property).
The final offer is made up of the following:
Revised building cost: $388,350.61
10% contingency: $38,835.06 (based on building costs)
Mould remediation: $21,839.88
Complainants say insurer should increase its settlement offer
The complainants submit the insurer’s scope of works has not included all damage requiring
rectification. As a result, the complainants have raised concerns regarding the scope of works
and cost of repairs.
What follows is a summary and outline of the complainants ’ concerns regarding areas of
damage and cost of repairs:
Kitchen
The complainants’ repairer (K) has allowed $22,850.00 (excluding GST) for “2Pac
Routed Doors, Drawers & Panels and Laminate Tops (2Pac head capping mould
included)
The insurer’s quote allowed $15,000 (excluding GST)
The complainants say the quote excludes appliances/sinks/plumbing/electrical etc
The complainants are asking for an additional allowance of the difference between the
two quotes totalling $8,635 (including GST) for kitchen cabinetry.
Joinery
The insurer has allowed $1,500 (excluding GST) for joinery including a walk-in robe
cabinetry, and two full wall fitted shelving units.
The complainants believe this allowance is grossly underestimated and would not
cover installation costs or supply of the units.
The complainants say their contents claim for furniture restoration with standalone
timber shelving unit appears comparable with the joinery replacement cost allowed for
in K’s quote (noted as joinery $11,055 including GST).
The complainants are asking for an additional allowance of the difference between the
two totalling $9,405 (including GST).
Roof:
The complainants say the main section of the roof has been largely destroyed by the
fire.
Determination | Case number: 718178 Page 4 of 9
As access to the outer roof spa ce has not been achievable (by the insurer’s engineers
and technicians) they do not believe it is possible to fairly determine if heat, smoke
and soot contamination has caused damage to the internal lining of the outer roof.
The complainants believe the current contingency allowance of 10% does not
sufficiently cover the risk of a full roof replacement if necessary (at a later stage)
Preliminaries Costing
The complainants say there has only been an allowance for 16 weeks for items in the
preliminaries (but the insurer has agreed to allow 30 weeks as being a more realistic
timeframe for work to be completed).
The complainants request an allowance of 30 weeks be made for these costings
The complainants are asking for an additional $1,586.20 (including GST) to the
preliminaries cost.
Contingency allowance
The complainants say due to the scale of the rectification project, and to ensure there
is suitable allowance for work being undertaken, there should be an increase in the
contingency allowance that was authorised.
The complainants are concerned there may be additional damage from inaction (e.g.
no make safe, no drying out, boarded up, exposure to elements, water ingress; mould
proliferation). They feel the full extent of this damage will not be uncovered until the
rectification process commences.
The complainants are asking for the contingency allowance to be increased from 10%
to 20%
Mould
The complainants question whether the insurer’s remediation quote from repairer (R)
is sufficient and is compliant to Australian standards, as technical detail could not be
provided when requested.
On this basis the complainants believe the contingency allowance should be
increased to allow for any issues which may arise at a later stage.
The complainants’ have also asked that the mould remediation allowance of
$21,839.88 be added to the revised building cost prior to calculating the contingency
Based on the information provided by the complainants, the additional amount they are
seeking is as follows:
Increase in contingencies from 10% to 20% - Additional 10% is $38,835.06 (based on
settled amount for repairs)
Cost of repairs (kitchen, joinery and preliminaries) total is $19,626.20 + (20% which is
$3,925.24)
Cost of mould remediation of $21,839.88 be added into the cost of repairs prior to
calculating the contingency. (20% is $4,367.90)
Total (cost of repairs and increase in contingence) is $66,754.40
Determination | Case number: 718178 Page 5 of 9
The panel notes the insurer has not provided a response to the complain ants’ submissions
and requests noted above.
The insurer is required to increase its settlement offer
The complaint has been determined based on what is fair in all the circumstances, having
regard to the relevant law, good industry practice, codes of practice and previous decisions
where applicable.
There has been a full exchange of all material information relied on for the purposes of this
determination and each party has had the opportunity to address any issues raised by the
other. All the material provided by the parties has been reviewed and considered.
There is no dispute that the repairs to the property can be completed, however, the insurer
and its builder recommended a cash settlement of the claim, after the builder identified pre-
existing damage at the property.
The complainants have agreed to a cash settlement, but there is a dispute regarding the
scope of works and the cost of repairs. As the two parties have not been able to come to a
resolution, the panel is satisfied a cash settlement of the claim is appropriate in this instance.
As noted above, what remains in dispute is the reasonable cost of repairs (quantum).
In October 2020, the insurer issued a payment to the complainants to settle the claim. This
was based on the scope of works prepared by its building experts and for the reasonable cost
of repairs.
Following the issue of the payment the complainants provided additional information seeking
further compensation for the cost of repairs to their property and possible contingencies
(issues that may arise)
A scope of works provides a general overview of the required works based on the available
information. However, the scope is subject to variations based on additional damages and
costs that may be incurred while repairs are undertaken.
Having considered all the exchanged material, the panel is satisfied that the scope of works
provided by the complainants and the insurer are very close in nature and there is not a great
deal of variation.
The panel acknowledges the complainants feel the scope of works and settlement amount
issued by the insurer may not be sufficient. However, the panel is not satisfied the
complainants have provided sufficient evidence as to why the scope would be unsatisfactory.
On this basis the panel is satisfied that the insurer’s scope of works is adequate and so is the
settlement issued to the complainants for the reasonable cost of repairs (what it would have
cost the insurer to complete the repairs to the property).
For the sake of clarity, the panel confirms that the insurer is not required to pay for the
additional repairs claimed by the complainants.
However, the panel believes it is fair that the insurer is required to increase its settlement
offer based on the amount it has allowed for contingencies.
The policy says in the instance where the insurer chooses to cash settle a claim, it will only
pay the policy holder what it would cost the insurer to undertake the repairs. However, when a
claim is cash settled all the associated risk is transferred onto the policy holder.
Determination | Case number: 718178 Page 6 of 9
On this basis, the panel agrees with the complainants that it is fair to include the cost of
mould remediation into the cost of repairs (which was not done initially), before calculating the
overall amount for contingencies.
The panel also consider it appropriate under the circumstances that the insurer increases its
allotted contingency amount from 10% to 20%, due to the extent of required repairs and the
transfer of risk. This increase is in line with AFCA’s approach to these types of matters.
Therefore, the insurer is required to increase its settlement amount, and pay the complainants
an additional $43,202.96 ($38,835.06 + $4,367.90).
2.2 Why is the outcome fair?
This outcome is fair because both parties have had the opportunity to provide information to
support their position. Accordingly, all the available material has been considered and the
outcome is in line with AFCA’s approach to these types of matters and what is fair under the
circumstances to both parties.
Determination | Case number: 718178 Page 7 of 9
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all the information the parties have provided.
A panel has determined this complaint. The panel consists of the panel chair ombudsman, a
representative with extensive experience in the insurance industry and a representative with
extensive experience in consumer claims.
While the parties have raised several issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
3.2 Relevant policy sections
Section
What you are covered for –
Insured events
Fire
We cover
Loss or damage cause d by fire (burning with flames)
We do not cover
Loss or damage arising from:
– heat, ash, soot and smoke when your home or contents has not
caught on fire unless it is
caused by a burning building within 10 met res of the insured
address;
– arcing, scorching or cigarette burns unless a fire spreads from the
initial burn spot;
– pollution or vapour from a home heat er or a cooking appliance
unless a fire spreads from the
initial source.
How we settle your claim We choose how we settle home claims
If we agree to pay a claim for loss, theft or damage to your home, we
Determination | Case number: 718178 Page 8 of 9
will decide if we will:
– repair damage to your home;
– rebuild your home;
– pay you what it would cost us to repair or rebuild your home;
– pay you the sum insured for your home.
If we rebuild (or pay you what it would cost
us to rebuild), we will do so on a ‘new for old’ basis.
If we repair (or pay you what it would cost us to repair), we will at our
option do so on a ‘new for
old’ basis or to a similar condition to what your home was in before
the loss or damage occurred.
We may offer you a voucher, store credit or stored value card for the
amount it would cost us to repair or rebuild an item.
Your re sponsibilities You must:
– keep your home and contents well maintained and in good
condition. For what we mean by
‘good condition’, see ‘Words with special meanings’ on pages 79 to
81;
– maintain locks or alarms in good working condition, especially if
we relied on burglary security
and monit ored smoke detectors being installed when accepting your
insurance;
– take all reasonable care to prevent theft, loss, damage or legal
liability;
– follow all the terms and responsibilities set out in your policy;
– provide honest and complete information for any claim, statement
or document supplied to us;
– ensure that your home complies with loc al government or other
statutory requirements at all times.
Not meeting your responsibilities
If you do not meet your responsibilities, it may lead us to do one or
both of the following:
– reduce or refuse to pay your claim;
– cancel your ins urance policy.
General exclusions You are not covered under any section of thi s policy for
damage, loss, cost or legal liability that is
caused by, arise s from or involve s:
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or
should reasonably have known
Determination | Case number: 718178 Page 9 of 9
about) and did not fix before the loss or damage occurred (e. g. if
there are signs that a defect
previously caused dam age, we will not pay a later claim for further
damage from this defect).
[…]
Failing to take care of your home or contents
your failure to:
– take reasonable care of your home or unit and contents;
– keep your home or unit and contents in good condition and well
maintained. For the meaning of
‘good condition’ see the ‘Words with special meanings’ section on
pages 79 to 81;
– fix faults and defects as soon as you become aware of them.
[…]
Wear, tear and gradual deterioration
wear, tear, rust, fading, ri sing damp, mould, mildew, corrosion, rot,
action of light, atmospheric or
climatic conditions or gradual deterioration such as but not limited to:
– tiles and their adhesive or grouting breaking down;
– weathering of roof tiles or roof ridge capping;
– gradual weathering and breakdown of bricks, mortar or concrete.