Text of the determination
Determination
Case number 717475
Financial firm Allianz Australia Insurance Limited
Determination | Case number: 717475 Page 1 of 8
Case number: 717475 19 July 2021
1 Determination overview
1.1 Complaint
The complainant lodged a claim for storm damage under his home insurance policy with the
financial firm (insurer).
The damage was mainly to the rear wall of his garage which was blown out during the storm.
The wall was constructed with asbestos material. Therefore, the insurer arranged for
asbestos removal/make-safe shortly after the claim was lodged.
Following its assessment, the insurer agreed to cover damage it considered was caused by
the storm. The insurer obtained a scope of works and quotes for repairs.
A complaint initially arose about the conduct of the insurer‟s contractors who were appointed
to remove asbestos from the premises. The complainant says the contractors did not
completely remove asbestos from the premises during their initial attendances. Further,
despite several subsequent attendances, asbestos has not been properly removed from the
premises.
The complainant is dissatisfied with the insurer‟s assessment that the garage is repairable.
The complainant says the garage should be demolished and rebuilt. He wants the insurer to
pay him the quote he obtained for this.
The complainant also says the insurer mishandled his claim.
1.2 Issues and key findings
Is the insurer required to increase its settlement amount?
No. The insurer is not required to meet the costs of rebuilding the garage. This is because the
available information does not show the garage needs to be rebuilt to repair the claim related
damage.
Is an award of compensation warranted?
Yes. T he insurer‟s contractors handl ed asbestos removal from the premises poorly. This
would have caused the complainant stress, inconvenience and interreference with his
expectation of enjoyment or peace of mind. The insurer should pay $2,000 in non-financial
loss.
1.3 Determination
This determination is partly in favour of the complainant.
The insurer is to pay $2,000 non-financial loss to the complainant. The insurer is to pay this
within 14 days of receiving notification that the complainant accepts this determination.
Determination | Case number: 717475 Page 2 of 8
2 Reasons for determination
2.1 Is the insurer required to increase its settlement amount?
Circumstances of the complaint
The insurer appointed assessor (CR) and builder (AB) to inspect and report on the cause and
extent of damage shortly after the claim was lodged. CR arranged make-safe including
removal of asbestos from the site.
The complainant says he raised concerns about the asbestos removal. This was after he
discovered asbestos in debris had been left in the garage by the insurer‟s contractor. The
insurer subsequently arranged for re-attendance by its contractor to address the asbestos
issue. The contractor attended to remove asbestos in March 2020.
The complainant remains dissatisfied with the insurer (and its contractor‟s) conduct. He says
the contractor‟s failure to properly r emove asbestos from the site in the first instance, and the
way the insurer handled this, has resulted in him losing confidence in them and their abilities.
Parties disagree about claims settlement
There is no dispute the complainant has a valid claim for storm. The core issue in this
complaint is the claim settlement and whether the insurer is liable for any further payment for
the storm damaged garage.
It should be noted that other items (such as mould and issues with main building) were
previously raised by the complainant and are mentioned in some reports. However, during a
conciliation held by AFCA, the complainant confirmed he is not pursuing a complaint in
relation to those items. He seeks settlement for the garage damage, based on his quote.
C omplainant says the insurer’s settlement is inadequate
The complainant disputed the insurer‟s accepted scope of work after he was made aware of
it. He subsequently obtained a repair quote from his own builder (GE) as well as a quote for
further asbestos removal for $51,480 and $12,540 respectively. He is seeking a cash
settlement of the quoted amounts.
After reviewing the quotes, the insurer expressed willingness to cash settle the claim.
However , it did not accept the complainant‟s repair quote . It says the quote incorrectly
includes demolition and rebuild of the garage which is not warranted due to the storm
damage.
To determine if asbestos material was disturbed by the storm and during the claim, the
insurer arranged for sampling/testing by hygienist „VA”.
The available information shows VA found asbestos and lead from its sampling around the
garage . Based on VA‟s findings, t he insurer tried to arrange for its contractor „ FR ‟ to complete
additional asbestos abatement however, the complainant declined.
The insurer subsequently obtained a quote from FR for asbestos and lead abatement as
recommended by VA, for the garage only. The insurer proposed settlement of the claim
based on the scope of works and building quote it had obtained from AB as well as FR‟s
quotes. To settle the claim the insurer offered:
Determination | Case number: 717475 Page 3 of 8
a total of $16,380.49 for garage repairs based on AB‟s quote of $15,276.36, less $385
(rectification of existing wall deemed a defect/maintenance issues) plus 10% contingency.
a total of $2,215.51 comprising $1,464.10 for asbestos and lead abatement, $550 for
condition 2 cleaning plus a 10% contingency of $201.41.
The complainant rejected the offer. The complainant maintains the garage needs to be
rebuilt.
Insurer obtained building consultant input
The insurer appointed „CD‟ to provide a causation report. This was completed by a building
consultant. Available information shows CD was instructed to inspect and report on whether
the garage needs to be rebuilt due to the storm event and/or any event related asbestos
contamination.
After reviewing its expert report(s), including CD‟s , the insurer maintained its assessed scope
of works (SOW) and quote for garage repairs was sufficient.
I have carefully reviewed the causation report and subsequent clarifying email from CD. In
reaching its conclusion, CD says:
it reviewed reports/SOW/quote previously obtained by the insurer as well as the
complainant‟s bu ilding quote.
based on AB‟s report, the A/C damage was due to storm, however says:
> any roof damage (garage and main building) observed were maintenance issues
> interior water damage and hairline cracking in the main building observed was not
caused by the claimed storm event.
In relation to the complainant ‟s repair quote, CD opined that items included in the quote such
as plasterboard and roof panels are not incident related. CD produced a SOW for claim
related damage. This is limited to site preparation, termite protection, supply and installation
of single PVC down pipe to the corner of the garage, prepare and paint the 6m2 of external
fibre cement sheeting which has been replaced (as part of make-safe) to the rear of the
garage, removal of debris and clean up.
CD concluded that a rebuild of the garage, including carpentry and electrical provided for in
the complainant‟s quote , is not required due to the claimed incident. It says there was “only
minor damage to the garage” from the storm and while it was not able to inspect the garage
slab during its attendance, “it is unlikely that the damage highlighted on my report would have
significantly damaged the structural integrity of the slab”.
Further, CD says based on VA‟s report there is no current debris visible in garage. It also
notes:
further abatement/remediation and checks are recommended and provided for
there is no suggestion by VA that the existing slab should be demolished due to the
asbestos fragments identified.
No evidence garage rebuild is required due to claimed event or asbestos
The complainant suggests the garage should be demolished and rebuilt due to structural
issue (including from asbestos contamination).
I have carefully reviewed the complainant complainant‟s quote s and note:
the cause of damage is not mentioned
Determination | Case number: 717475 Page 4 of 8
the quote says, “Project Type: Removal & Construction of an existing garage as well as
repair to existing residence.”
the quote includes roofing and ceiling works which are not covered by the claim
Further, the complainant‟s asbestos removal quote assumes that the g arage is to be
demolished. For reasons set out, I am not persuaded the garage needs to be demolished.
The reports from AB (including photographs) and CR clearly shows the damage observed
shortly after the storm event was limited to garage downpipe, garage roller door, garage
sliding window, the air conditioning unit and some guttering.
AB‟s roof report does not show hail/storm damage to the roofing (garage or main building)
itself. Rather, it shows areas of pre-existing or maintenance related issues. This is not in
dispute.
On the available information, particularly the hygienists and CD‟s reports, the evidence does
not support a conclusion that complete demolition and rebuild of the garage is required due to
the storm or presence of asbestos/lead debris from that incident.
While the complainant maintains there was no pre-existing issues with the garage structure
and any structural damage is due to the claimed incident and asbestos, he has not provided
evidence (such as a report from a suitably qualified expert) to support this.
In view of the above, I am not satisfied the garage needs to be demolished and rebuilt.
Insurer’s settlement is fair
I am satisfied the insurer‟s assessed SOW and quote from AB is consistent with the claim-
related damage identified i n the reports provided by the insurer‟s contractors /experts following
their assessment.
I am also satisfied FR‟s quote reasonably covers additional asbestos removal identified by
VA. I also note t he insurer‟s payment to the com plainant includes a 10% contingency added
to AB and FR‟s quote totals.
Given all this, I accept the insurer‟s offer is fair in all the circumstances .
2.2 Is an award of compensation warranted?
The complainant says the insurer mishandled the claim
The complainant has expressed dissatisfaction with the way the insurer managed his claim.
Among other things, the complainant says the insurer and its contractors:
failed to adequately complete the asbestos removal although numerous agents attended
the premises, and
put his and his family‟s saf ety at risk
He says the issues with the asbestos removal required him to constantly follow matters up
with the insurer, unreasonably delayed the resolution of his claim and caused stress and
inconvenience.
The complainant seeks compensation for his negative claims experience.
Determination | Case number: 717475 Page 5 of 8
Insurer does not dispute issues with asbestos abatement
The insurer says it recognises the complainant‟s concerns relating to the asbestos removal
from the property. It acknowledges the time taken after initial attendance and make-safe to
remove material from the garage and surround “was longer than expected”.
During a conciliation held by AFCA, the insurer further acknowledged its initial asbestos
removal was not completed as it should have been. However, it says after the complainant
raised further concerns about the adequacy of its asbestos removal, it authorised for a
hygienist to attend and conduct testing and was unable to get authority from the complainant
for the hygienist to attend until 20 May 2020.
Compensation may be awarded in certain circumstances
Under our Rules, the Australian Financial Complaints Authority (AFCA) may award
compensation for non-financial loss (capped at $5,000) where there has been an unusual
amount of:
physical inconvenience
time taken to resolve the situation
interference with a complainant‟s expectation of enjoyment or peace of mind.
AFCA takes a conservative approach to compensation and expects a complainant to bear a
normal degree of inconvenience during a claim
Compensation appropriate in the present circumstances
While the insurer recognises and acknowledges the issues with the asbestos removal, it
considers it has taken urgent steps to address the complainant‟s conce rns as soon as they
were raised and also offered urgent asbestos abatement a fter VA‟s inspection . However, the
complainant refused attendance by its contractors.
The undisputed chronology provided by the insurer does not show any lengthy periods of
inaction or unreasonable delay by the insurer. However, there is no dispute the asbestos has
not been properly removed by the insurer‟s contractors.
The insurer says after 27 May 2020, its contractors/trades “were ready willing and able to
arrange abatement works based on the report finding and scope of works discussed”
however the complainant did not agree to this.
I have reviewed the available information. I accept that while the insurer acted on concerns
raised by the complainant, the failure of its contractors to properly remove the asbestos was
below standard. Particularly given the known potential danger of disturbed asbestos material.
This failure would have caused and/or contributed to undue stress and inconvenience and
interfered with the complainant‟s expectation of enjoyment of peace of mind.
It is therefore fair in all the circumstances that the insurer pays $2,000 compensation non-
financial loss to the complainant.
Determination | Case number: 717475 Page 6 of 8
3 Supporting information
3.1 The AFCA process
AFCA’s approach is based on fairness
AFCA has determined this complaint based on what is fair in all the circumstances, having
regard to:
the legal principles
applicable industry codes or guidance
good industry practice
previous decisions of AFCA or its predecessor schemes (which are not binding).
The respective parties have completed a full exchange of the relevant information, and each
party has had the opportunity to address any issues raised. We have reviewed and
considered all of the information the parties have provided.
While the parties have raised a number of issues in their submissions, we have restricted this
determination to the issues that are relevant to the outcome.
We assess complaints on available information and circumstances
AFCA is not a court of law. We do not have the power to take or test evidence on oath, or to
require third parties to give evidence.
When we assess complaints, we consider:
available documents
the recollections of the parties
all relevant circumstances.
We give more weight to documents created at the time the events occurred. If there are no
relevant documents, we will decide what most likely occurred based on the available
information.
If there are conflicting recollections and these are evenly weighted, we may find that a claim
cannot be established.
3.2 Expert report
Record Key points
Determination | Case number: 717475 Page 7 of 8
Financial firm’s expert (VA)
Hygienist report
18 - 06 - 2020
conducted assessment on 27 May 2020 following complaint of
incomplet e asbestos removal abatement
provided assessment on mould/moisture within the main building (not
claim related)
concluded “Asbestos - containing building materials and lead - based
paint are present on the exterior of the property as debris resulting
from the storm”
reco mmended in relation to asbestos:
“Due to the identification of ACM and lead - paint fragments on the
ground around the Garage and to the backyard, further abatement
works are recommended. Visible fragments of cement board require
careful collection from the areas with soil. Vacuuming of the concrete
pad with HEPA filtration would collect any residual small cement board
fragments as well as paint chips. Collection of paint chips from soil
may not be feasible and may require removal of the top layer of soil.
A ll remediation and abatement works should be conducted by an
accredited, suitably qualified and experienc ed remediator, employing
methods in accordance with the following reference or equivalent:
- Work Safe NSW Code of Practice: How to Safely Remove
Asbestos 2016;
- Managing asbestos in workplac es compliance code 2018;
- Removing asbestos in work places compliance code 2018.
- AS/NZD 4361.2: 2017 Guide to Hazardous Management, Part 2:
Lead paint in resid ential, public an commercial buildings.
…
Sampling of settled dusts within the Garage is recommended to ensure
that there is not residual as bestos fibres present that would create
potential exposures to occupants.”
Determination | Case number: 717475 Page 8 of 8
Financial firm’s expert (CD)
Caus ation report
18 - 06 - 2020
appointed to inspect premises and review information to confirm
among other things
> whet her there is any structural damage to garage, if so,
> whet her it is due to the storm event claimed
> whet her any roof damage (building and garage) that can reasonably
be attributed to the storm event
> whet her storage of debris, consisting of material cont aining
asbestos, in the garage has res ulted in the garage being
contaminated and, as a result, must be demolished and re - built or
can be repaired
> scope of works for damage reasonably attributable to the storm
event
attended premises on 27 May 2020
reviewed building quotes of AB and GE, A/C as well as hygienist (FR)
report
Concluded:
> evidence of maintenance issues with roof (garage and main building)
identif ied in AB‟s reports
> observed minor internal water damage and hairline cracking to main
building which are not related to storm
> AB‟s report confirms A/C damage due to storm
> considers “[ v] arious items included in the Scope of Works prepared
by [AB] and [GE] do not pertain to the resultant damage of a storm
event”. Examples of items given are plasterboard and roof panels in
GE‟s report.
> produced scope of works for garage damage attributable to storm
event limited to
- site preparation
- termite protection
- Supply a nd install single PVC down pipe to the corner of the
garage
- Prepare and paint the external fibre cement sheeting whic h has
been replaced to the rear of the garage (6m2)
- clean - up, removal of debris
Financial firm’s expert (CD)
Email/statement
24 - 06 - 2020
In response to clarification sought by the insurer, CR says:
“full replacement of the garage is not required. We note only minor
damage to the garage” from storm event
it was “not able to inspect this but it is unlikely that the damage
highlighted on my re port would have significantly damaged the
structural integrity of the slab”.
Carpentry, internal lining and roofing - rebuild not required.
Electrical – not required.
Based on hy gienist report there is no current debris visible in garage
and further abat em ent/remediation and checks recommended, no
suggestion by hygienist that the existing slab should be demolished.