Home / Assetinsure Pty Ltd / Determination 716811

Determination 716811

Claim for lost rent, inspection time, temporary accommodation and excess after neighbour's excavation damage to insured building

FirmAssetinsure Pty Ltd
Decided2021-06-18
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$42,707
SourceAFCA PDF

Summary

After neighbouring excavation damaged the insured building, the complainants claimed $42,707.20 for lost rent, inspection time and temporary accommodation, and alleged inadequate repairs. AFCA found the claims outside the policy and the repairs not shown to be deficient, and made no order.

The insured bears the onus of showing a loss within the policy, and the policy does not cover temporary accommodation, inspection time or uninsured losses, while AFCA lacks jurisdiction over licensing offences.

Issues

Subjects and remedies

business interruptionhome or building damagesmall businessno remedy

Related

All Assetinsure Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 716811 Financial firm Assetinsure Pty Ltd Determination | Case number: 716811 Page 2 of 15 Case number: 716811 18 June 2021 1 Determination overview 1.1 Complaint The complainants held a business insurance policy with the financial firm (insurer) when their insured property was damaged during construction work on a neighbouring property. The insurer arranged for repairs to the footings and surrounding areas and in the building but refused to pay for time dealing with the claim and lost rent when one of the complainants relocated due to safety concerns. The complainants say:  the repairs are inadequate as the insurer engaged an unlicensed builder  the insurer‘s poor claims management necessitated the complainants to communicate with consultants and contractors requiring time and money to progress the claim  the insurer‘s loss assessor asked the complainants to oversee the rectifications  it was reasonable to relocate given safety concerns The complainants seek $42,707.20 for inspection fees and temporary accommodation costs while repairs were completed. Further, the complainants say the insurer must conduct a review of waterproofing, a storm water pipe, and the sewer mains. The complainants say these were not properly managed during repairs. The insurer disagrees saying it has already covered the complainants‘ full entitlement under the policy and denies the complainants‘ contentions. 1.2 Issues and key findings Is the insurer liable for the complainants’ claims? No, the complainants have not established an entitlement to these claims under the policy or because of the insurer‘s claims management and have not established an entitlement to further inspection or compensation. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action in relation to the claim or the complaint. Determination | Case number: 716811 Page 3 of 15 2 Reasons for determination 2.1 Is the insurer liable for the complainants’ claims? It is not in dispute that in April 2015, after heavy rain, work to an adjoining property exposed footings and steel screw piles under the insured property and caused cracking and other damage to the insured property. The cracking and other damage was repaired by the insurer‘s contractor. In a recovery action the insurer recovered most of these repair costs from the complainants‘ neighbour. This complaint is about various matters regarding the insurer‘s conduct as well as the policy response. The insurer is represented by its lawyer. For the sake of brevity references to and submissions by the lawyer will be referred to as the insurer. Available evidence does not establish Unit 9 was unsafe The complainants say the insured building was unsafe and so the complainant (DC) moved out of Unit 9. The complainants claim loss of rent of $27,000. The complainants refer to the photographs of the foundations. They say the foundations were greatly compromised and so DC was not prepared to risk living in Unit 9 until the remedial works to support the foundations were completed and signed off by an engineer. The complainants say they told the adjuster on site that it was potentially dangerous to remain in Unit 9 while it was uncertain whether the building would collapse. The adjuster does not agree. The insurer says there was never any indication the premises were unsafe for occupancy. It says the engineer engaged by them (KA) was extremely experienced and did not indicate the property was unsafe. It also says DC moved into another property owned by the complainants and so he did not occur any additional costs. While the complainants say they have the requisite expertise to comment on the safety of the building, they are not independent experts. They refer to numerous conversations they had with the council and other engineers about the safety of the building but have provided no corroborative evidence. They have the onus of proof to establish their loss but have provided no independent corroborative opinion about the safety of the building or the safety of Unit 9. I have considered KA‘s reports. They are comprehensive and supported by photographs. The reports and photographs provided by the parties do not support the contention Unit 9 was unsafe for occupancy. I am not satisfied the available evidence establishes the building was unsafe which warranted DC vacating Unit 9. Determination | Case number: 716811 Page 4 of 15 Rental invoice is not a claimable loss under the policy I am also not satisfied the complainants have shown the rental invoice can be claimed under the policy. The insurer‘s position that the loss is not claimable under the policy is preferred. The policy does not have specific cover for temporary accommodation during repairs. The cover does include business interruption at the insured address, subject to conditions and exclusions. This allows for cover of lost rent the business was collecting from the damaged property. To show the loss is claimable, the complainants must establish there was a loss of revenue to the business due to disruption caused by the event. The complainants claim $27,000 as DC moved to alternative accommodation. However, the information provided does not establish there was a business arrangement whereby DC provided revenue to the business in exchange for living in Unit 9. The complainants have not supplied a tenancy agreement showing there was an arrangement, and no other information is supplied showing there was any kind of revenue by the business which was lost because DC moved out of Unit 9. The document from a real estate agent (EL) shows rental estimates for units 1 through 7. This supports a view there was no rental agreement in place with the business for DC to live at Unit 9. Finally, the invoice for alternative accommodation does not form proof of lost rent at the business address. It only shows that DC has been invoiced for living in a different property managed by the complainants. If the complainants did not receive rent which might otherwise have been gathered for the business at the alternative accommodation address, it does not fall within cover as this address is not insured by the subject policy. Accordingly, on the information provided, and for the reasons stated, I accept the policy does not respond to this claim. Insurer not liable to pay $660 for moving furniture The complainants claim $660 for the cost of moving furniture from Unit 9 claiming the Unit was unsafe. As set out above, I do not accept the available material establishes the Unit was unsafe. Therefore, this claim fails as well. Policy does not provide cover for the cost of inspecting repairs The policy outlines the cover it offers. The policy does not provide the insured an entitlement to inspect repairs and claim expenses for time spent. The only other consideration is if the inspection was necessary to ensure the repairs meet the requirements of the policy. Determination | Case number: 716811 Page 5 of 15 The complainants say the insurer refused to organise an independent licensed engineer to do the remediation works to reinstate the support of the footings to save money. Instead, they say an unlicensed builder and his engineer undertook this reinstatement work. On that basis the complainants contend they were required to ensure the remediation work was done properly. The complainants also say they did this claimed work as advised by the adjuster. They claim their time spent inspecting the remedial works and other necessary works in the sum of $14,797.20. The insurer says it is a condition of the policy that the handling of the dispute with the neighbour is managed by their adjuster and that if these costs were required then the costs would need to be first ratified by the insurer. While acknowledging the complainants were justifiably interested in the work being undertaken, the insurer says the complainants were not asked to carry out an overview of the work, they were not advised they would receive any financial recompense for this activity and there is no recourse under the policy. The insurer says the earth near the screw piles supporting the i nsured building has been filled, compacted, and tested by the neighbour and engineers. They say the damage to the building has been rectified and the complainants have been fully indemnified in accordance with the terms and conditions of the policy for their loss. I accept the insurer has the right to determine how the claim will be settled, which in this case involved authorising the repair with the party responsible for the damage and ensuring the work was certified by an engineer. Available material does not show adjuster asked complainants to review repairs In June 2015 the local council provided a proposed work method statement for backfilling the eastern side of the insured building. Correspondence between various parties including the complainants, the adjuster and the complainants‘ broker shows the complainants wanted to ensure the repairs were carried out as per the council‘s work method statement. The complainants requested the works proceed on the basis a geotechnical engineer was engaged to oversee not only the certification of the works on completion but the actual rectification repairs. The complainants wanted an engineer to be engaged independently of the third-party engineer (GM) based on their assertion he had authorised the excavation works without shoring. Determination | Case number: 716811 Page 6 of 15 Having reviewed the correspondence, I am satisfied the adjuster agreed GM would appoint the geotechnical engineer and provide the complainants with the certificate. The adjuster communicated in this regard with GM. While the adjuster provided GM‘s email and telephone number, so the complainants could speak with GM and ―organise everything‖ , I am not satisfied this amounted to anything more than ensuring GM engaged a geo technical engineer at the neighbour‘s expense to provide a certificate on completion. Available information does not show independent engineer to oversee works The first report from the insurer‘s engineer (KA) indicates he approved the proposed works set out in the work method statement and considered it would be appropriate for an independent geotechnical engineer to certify the works. The complainants say they spoke with KA on the second site inspection, and he said the independent geotechnical engineer was to oversee the works. I do not accept the available information establishes KA considered the independent geotechnical engineer was required to supervise the remedial work. The complainants say taking soil samples is not certifying the works and contend an independent geotechnical engineer did not certify the works. As for the conduct of the insurer, I accept:  the local council provided a work method statement  the remediation works was undertaken as per the work method statement  GM is a civil and structural engineer and qualified to do the work  the work was certified by an independent geotechnical engineer  while GM engaged the geotechnical engineer, the available evidence does not establish the certificate was not independent of GM. In short, the insurer engaged an adjuster and an engineer and established a mechanism to ensure the neighbour‘s work was certified. I am not satisfied the complainants‘ claimed work was at the request of the insurer or was necessary or reasonable in the circumstances. Insurer did not agree to pay the complainants I do not accept it was reasonable for the insurer to pay professional fees to the complainants without prior agreement. The invoice supplied by the complainants is from another business the complainant and his business partner (DC) are directors of. No quotation was given to the insurer for the work nor acceptance by the insurer for the claimed costs. The complainants are directors of businesses and to proceed with work without first securing an agreement on payment of the work is not usual business practice. Determination | Case number: 716811 Page 7 of 15 I am satisfied it is reasonable for the complainants to have clarified their intentions to bill for the work prior to undertaking the work. I accept that a service provider would be unlikely to receive payment from another business entity for performing work without first securing at least an in-principle agreement for compensation. I am satisfied there was no agreement to pay the claimed costs nor does the policy respond to the claim. Available information insufficient to establish neighbour was unlicensed The complainants also say they were justified in their actions because the insurer agreed to a non-independent unlicensed builder to undertake repairs. They say the insurer contravened legislation for not engaging a licensed builder to do works on their residential building and for not providing the required compensation fund insurance. The insurer says its inquiries indicate the neighbour was a licensed builder. The insurer also argues the works were commercial and performed in accordance with the work method statement and the engineers confirmed the suitability of the works and GM supervised the works and arranged for the works to be certified. The complainants say they are licensed builders and members of the Housing Industry Association. They say the Association‘s legal department confirmed the works come under the Home Building Act and must be done by a licensed builder. Neither party has supplied documentary proof of the license status of the neighbour. To establish their contentions, the complainants have the onus of proof. On the available information I am unable to be satisfied the neighbour was an unlicensed builder and so I am unable to be satisfied the complainants‘ claim for costs is justified on this basis. As part of the outcomes sought from AFCA, the complainants seek criminal action against the insurer based on breach of the legislation for engaging an unlicensed builder. AFCA is a free service designed to determine if an insurer has met its obligations under the contract of insurance or has acted properly in the management of a claim. As set out above I am not satisfied from the available information the neighbour was an unlicensed builder. If he was unlicensed, then any consequences of this decision are not within the jurisdiction of AFCA but for other compliance bodies. Having reviewed all the available information and for the reasons stated I am satisfied the insurer is not obliged to pay the complainants‘ claimed costs. Determination | Case number: 716811 Page 8 of 15 Insurer not obliged to refund policy excess of $250 The complainants claim $250 excess. They say their broker advised they would be refunded the excess when the insurer made recovery because they were not at fault and the neighbour admitted liability. The insurer says its recovery action was compromised and did not include the excess or any obligation for the insurer to refund the excess. The insurer says it claimed damages in the amount of $87,637.13 which included the excess of $250. The insurer accepted a compromise of $80,000 in settlement of the claim, interest, and costs. The complainants say their claims were to be included in the recovery action against their neighbour. They say no mention was made they would have to pay half of the leg al fees until contacted by the insurer‘s lawyer later. The insurer says the policy does not require the insurer to pursue recovery of any uninsured loss at their cost. The lawyer advised the complainants‘ claims were unlikely to succeed. Nonetheless the insurer offered to include any claim for uninsured loss in its recovery claim. The lawyer provided a cost sharing agreement saying it was a standard agreement used where there are insured and uninsured losses. The lawyer recommended the complainants obtain independent legal advice on the prospects of their claims and on the terms of the agreement. The complainants said they were not obliged to contribute to legal costs believing the claims fell under the insurance policy. As set out above, I accept the claims are not covered by the policy. The insurer‘s lawyer contends the complainants‘ claims are uninsured losses and as they elected not to participate in the recovery action, they are estopped from holding the insurer liable. The available information establishes the complainants had the opportunity to include their claims in the recovery action but failed to do so. Their broker was aware in or about May 2018 that the insurer‘s recovery action had been completed. The broke r is the agent of the complainants. From that time, I accept it was open to the complainants to commence their own recovery action against the neighbour. The insurer has exercised its right to proceed with a recovery for the subrogated loss as per the policy terms. Having reviewed the policy, the insurer is not obliged to recover uninsured losses on behalf of the complainants. When recovering the repair costs the insurer decided not to pursue the uninsured loss as its lawyers indicated poor prospects for recovery. Determination | Case number: 716811 Page 9 of 15 I am satisfied the insurer may rely on its legal advice in determining the best way to approach and settle recovery. Accordingly, a decision to accept a portion of the loss to avoid legal fees is not unreasonable and is usual practice. The insu rer must not prejudice the complainants‘ right to recover this separately if it is not pursued jointly. The insurer has provided information showing it did not prejudice the complainants‘ option to separately proceed with recovery for the uninsured losses claimed. Considering the complainants declined to contribute to the cost of the recovery action, the insurer‘s actions were fair and in accordance with usual industry practice. The insurer has not recovered the cost of the excess incurred by the complainants. It was open to the complainants to pursue this and other uninsured losses. Based on the available information, and for the reasons stated, the insurer is not required to refund the complainants $250 excess. Insurer not required to take any further action in relation to the sewer, stormwater, or waterproofing The complainants say no inspections were made of the sewer main under the building. They also claim the stormwater pipe was damaged by the neighbour and the waterproofing to the side of the building was not reinstated properly. They say they told the adjuster about the sewer line and stormwater pipe and requested a plumber review to ensure no damage. The adjuster says she was unaware of any issues with the sewer line and that if there is any dam age to the stormwater pipes damaged by the neighbour‘s truck during the construction this has nothing to do with the claim or the excavation problem. The insurer says the stormwater pipe was repaired but if all repairs caused by the neighbour‘s actions w ere not completed, the complainants should not have signed the builder‘s release. The insurer also contends the complainants elected not to provide the insurer with any report or material supporting their claims as suggested by their broker. Having reviewed the available information and photographs relied on by the complainants, I am not satisfied the material provided is sufficiently persuasive to establish the complainants‘ contentions. The complainants say the restoration was incomplete or not like the previous design. However, the complainants have not supplied any inspection documents showing experts have reviewed the repairs and found them inadequate, nor the original documents relied upon in support of their position. Further, the complainants signed off on the repairs showing satisfaction with the repairs at the time of completion. Determination | Case number: 716811 Page 10 of 15 In his report of 1 March 2017 GM said the areas mentioned were not waterproofed or built in the manner described by the complainants. The policy does not cover repair work which restores the building to a state better than it was prior to the incident. Accordingly, on the available material and for the reasons stated, I am not satisfied the complainants have established the repairs are insufficient to meet the policy provisions. In all the circumstances, the insurer is not required to now conduct a further assessment that the complainants have not proceeded with themselves. Compensation under AFCA Rules is not warranted The complainants say the event was long, stressful and upsetting. AFCA will award compensation (capped at $5,000) if there has been an unusual degree or extent of physical inconvenience, time taken to resolve a complaint or interference with the complainant‘s expectation of enjoyment or peace of mind. AFCA takes a conservative approach to awarding compensation. We do not award compensation because the complainant has suffered some inconvenience and anxiety. AFCA expects complainants to be moderately robust and to bear the normal degree of inconvenience experienced when a problem occurs and to take reasonable steps to manage the situation. The damage occurred in April 2015. The claim was made in June 2015. Within days of making the claim, the insurer‘s loss adjuster and engineer attended and inspected the site and provided reports. The engineer attended again in August 2015. Scopes of work and quotations for repairs were provided. Once the remedial works were completed by the neighbour, the insurer accepted the builder‘s quotation and authorised repairs. I n May 2016 the complainant signed the builder‘s release. I acknowledge insurance claims can be stressful and cause inconvenience. In all the circumstances of this claim I do not consider there was an unusual degree of time taken to resolve the claim. I do not consider an award of compensation is warranted. Determination | Case number: 716811 Page 11 of 15 3 Supporting information 3.1 Our Approach As advised to the parties, we have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the AFCA Rules, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a recommendation and has proceeded directly to determination. This complaint has been determined based on what is fair in all the circumstances, having regard to legal principles, applicable industry codes or guidance, good industry practice and previous relevant determinations of AFCA or predecessor schemes (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities that they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie or valid claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Relevant policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the insurer‘s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Making a Claim You must follow these procedures if something happens during the policy period which causes loss or damage or injury which may give rise to a claim. If You do not follow these procedures, We may refuse Your claim or reduce the amount which We pay You. Conditions Precedent to Your Rights to claim under this Policy: When an Insured Event happens which causes loss or damage to Property insured by this policy, or when an event occurs which is likely to give rise to a claim against You (the Occurrence), You must immediately give written notice to Us of that Occurrence. Determination | Case number: 716811 Page 12 of 15 Upon request from Us, You will provide to Us or to Our representative at Your expense all such information as You reasonably can in respect of that Occurrence and of the resulting loss or damage. Furthermore, You will use Your best endeavours to identify the party or parties responsible for any loss or damage arising from or in connection with the event and will assist Us as far as possible in obtaining from that party compensation for or contribution to any loss or damage. Whether or not We have fully reimbursed You for Your loss, You will at Our request and at Our expense exercise in Your name any rights of action which You may have relative to the claim against any Third Party and co-operate with Us in the pursuit of those rights. At Our request, You will complete and return to Us a Claim Form as incorporated in this Policy. If any claim, writ or summons or any other written demand, proceeding or complaint is served upon You, You must immediately forward that document to us. Excess means the amount, specified in the Policy Schedule, payable by You for each claim made under this policy, including all costs and fees incurred in investigating and defending each claim. To avoid any doubt, the Excess is costs- inclusive unless otherwise stated in the Policy Schedule. General Conditions Applicable to all Sections 12. Subrogation If we settle any claim under the terms of this Policy, then: a) Subject to any statute, We have the same rights of recovery or enforcement from other parties or salvage on the Insured Property that You would otherwise have had, but for the settlement of the claim under the terms of this Policy; and b) We are entitled to use Your name in any proceedings to recover or enforce any entitlement We have as a result of settling any claim under the terms of this Policy; and c) You are required to provide every reasonable assistance in any such recovery or enforcement action until We say that process is finished. Section 1 – Property Cover If there is Loss or Damage to which this Policy Section applies, We will, at our option, either pay You or pay on Your behalf, the ‗Reinstatement or Replacement Value‘ or We will pay You the ‗Indemnity Value‘. Unless otherwise stated in the Policy Schedule, claims will be settled on the basis of Reinstatement or Replacement. Determination | Case number: 716811 Page 13 of 15 Reinstatement or Replacement Value Reinstatement or Replacement Value means the current cost which would be incurred, at the time and place of the event giving rise to the Loss or Damage, in the reinstatement of the Insured Property lost, destroyed or damaged including professional fees reasonably incurred to pay for architects, surveyors, solicitors, consulting engineers following Loss or Damage by an Insured Event and subject to the following provisions and the terms, conditions and limit(s) or sub limit(s) of liability of this Policy. Reinstatement means: Where Insured Property is lost or destroyed: in the case of a building, the rebuilding of it or in the case of other property, the replacement of it by similar property: in either case in a condition equal to, but not better than its condition when it was new. Where Insured Property is damaged: the repair of the damage and the restoration of the damaged portion of the property to a condition substantially the same as, but not better than its condition when it was new. Indemnity Value means: The cost to repair, replace or rebuild the Insured Property to a condition the same as or similar to but not better than the condition immediately prior to the Loss or Damage (ie: less depreciation with adjustment being made for wear and tear and age. The rate of depreciation will vary with the particular circumstances applying to the Insured Property). Insured Events This Policy Section covers the Insured Property against: 1. Accidental Damage Any accidental, sudden, unforseen and unintended damage to Insured Property but does not include: t) Consequential Loss of any kind; Section 2 – Business interruption Cover If Your Business is interrupted or interfered with as a result of Loss or Damage occurring during the Period of Insurance, to Insured Property under any of the following sections of this Policy:  Section 1 — Property; or  Section 3 — Theft (of Property other than Money) Determination | Case number: 716811 Page 14 of 15 for which a claim has been paid or liability admitted, or such claim would have been paid or liability admitted but for the application of an Excess, We will pay You up to but no greater than the Sum Insured for each respective Item as set out in the Policy Schedule and in accordance with this Policy Section, for:…. 3.3 Material relied on by the parties Record Key points Third party engineer letter (GM ) 1 April 2015  Refers to construction compliance certificate and inspection 27 March 2015.  Describes site at neighbour‘s property and says western boundary stormwat er easement has been shored with timber piles and is stable.  All soils have erosion hazard. Eastern side of site is to be covered with plastic to protect against erosion. Daily inspe ction of the cut batters are to be carried out.  Provided the structure is subject to normal loading for the site I certify that the existing temporary batters will be satisfactory for the proposed usage until retaining walls are completed. Engineering rep ort (KA) 23 June 2015  Inspected site 19 June 2015 with complainants and photographed site and liaised with adjoining site‘s structural engineer (GM).  GM prepared a report 1 April 2015 saying excavation did not require shoring but after heavy rainfall the excavation started to collapse resulting in undermining of the ground which was below the western edge of building B (subject site) and exposing of som e screw piles.  Identified damage including cracking and leaking in shop 7 and crack in the kerb on the northern side.  Noted concern regarding structural int egrity of the screw piles.  GM prepared work method statement for filling the ground in the vicinit y of the screw piles including the removal of temporary shoring and the compaction and testing of the back fill.  While proposed works appear adequate, appropriate for an independent geot echnical engineer to certify the works.  Once backfilling works complet ed and certified by geotechnical engineer rec ommend repairs in relation to cracking, leaking etc. Engineering report (KA) 31 August 2015  Re - inspected and photographed site with complainants.  Ground around the screw piles reinstated. Works completed under GM supervision. Backfilling tested by geotechnical engineer engaged by GM.  Further cracking damage identified some of which is pre - existing but likely undermining of the footings has worsened the pre - existing damage and caused the other damage.  To reduce risk of further damage and to allay concerns of complainants regarding the structural integrity of the screw piles, and although work method statement for reinstatement of the ground around the piles appears adequate, we had rec ommended that the works be certified by an independent geot echnical engineer. Determination | Case number: 716811 Page 15 of 15 Record Key points  Now screw piles reinstated we say to reduce the risk of further damage and to allay the concerns of the complainant about the structural adequacy of the screw piles, we recommend a structural certification be obtained from GM.  Once confirmed backfill arou nd screw piles completed and adequately compacted describes how damage should be reinstated. Third party engineer email (GM ) to third party 1 March 2017  Third - party engineer reviewed reports and photos from insurer‘s engineer and adjuster.  Refers to cra cking damage and says cracking was pre - existing and refers to allegation by complainants that waterproofing compromised and says seepage through the wall was a pre - existing problem.  As for internal wet areas on western wall GM refers to conversations with complainants during construction activities in relation to seepage problems in the western wall but did not inspect issue as complainants refused access.  November 2015 complainants asked to inspect subsoil drainage pipes next to western wall and GM refers to photographs which show two subsoil drainage pipes with a brick wall behind which was not waterproofed.  Complainant complained waterproofing has been compromised during construction but GM says further excavation showed waterproofing was not completed to the base of the wall – says he invited complainant to look at excavation prior to backfilling but they did not inspect the excavation.  Annotated photographs provided in support of report. 3.4 Other relevant material considered and relied on  p arties‘ submissions/emails and all attachments to all submissions/emails.  adjuster reports  expert reports  photographs  correspondence between the parties and their agents and other third parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.