Building damage claim settlement: repair vs rebuild of south wall panel, cash settlement, and additional costs
Text of the determination
Determination
Case number 716513
Financial firm AIG Australia Limited
Determination | Case number: 716513 Page 2 of 17
Case number: 716513 15 September 2021
1 Determination overview
1.1 Complaint
The complainants hold a strata insurance policy with the financial firm (insurer),
covering a small business commercial premises. The complainants are represented
by broker „ A ‟ , with the active involvement also of their strata manager. Any reference
to „ complainants ‟ in this Determination includes reference to the broker and/or strata
manager, as the context allows.
The complainants lodged a claim for building damage caused by a truck collision in
June 2019. The insurer accepted the claim, however the parties disagree about the
insurer‟s proposed settlement.
The complainants say the allowance for repairs to a wall panel on the southern side of
the building is insufficient to return the building to its pre-incident condition.
They also disagree with the insurer‟s estimated cost of repairs, with the insurer‟s
decision to cash settle and the offer amount. They want the insurer to authorise and
carry out the repairs, but under the management of their strata manager.
Additionally, the complainants seek:
indemnity for loss of rent/temporary accommodation
cover for other costs including professional fees, claims management fees (for the
strata manager ‟s time) and the cost of moving and storing owner‟s contents from
the affected unit
partial refund of premiums
compensation for the insurer‟s handling of the claim and complaint.
1.2 Issues and key findings
Is the insurer required to cover the cost to rebuild or repair the south wall?
The expert evidence indicates, on balance, the south panel of the building can be
adequately repaired; and does not require rebuilding. The insurer‟s liability is limited
to the cost of repairs.
Should the insurer cash settle the claim?
Having regard to the nature and extent of the damage, and given the deterioration in
the parties‟ relationship, it is fair and appropriate that the claim be cash settled.
Determination | Case number: 716513 Page 3 of 17
What is the insurer’s liability for loss of rent?
The insurer does not dispute that the complainants are entitled to this benefit under
the policy. The insurer is required to cover loss of rent for the period the building is
„ uninhabitable or unfit for its intended purpose, or „ access to the Building is prevented
as the result of an Incident ‟ , in accordance with the policy terms. The available
evidence is unclear as to the precise repair period during which the property could not
be used by the tenant. On the evidence, the Panel considers it fair and reasonable
that the insurer pays $4,380 for loss of rent, based on $730 per week for a repair
period of 6 weeks.
Is the insurer required to cover any other costs claimed?
The insurer is not liable for the complainants‟ claim management or expert report
fees, or for any premium refund. However, the insurer is required to pay for other
costs arising from the claim-related damage and covered under the policy, as
specified in sections 2.3 and 2.4 below, and including loss of rent and storage of
contents.
Is the insurer required to pay compensation for non-financial loss?
The insurer is not required to pay any compensation to the complainants. That is
because the available information does not establish, on balance, the insurer
unreasonably delayed or mishandled the claim. The time taken on this claim is largely
due to the ongoing dispute about the scope of cover following the incident.
Why is the outcome fair?
It is fair and appropriate that the insurer cash settle this claim, given the difficult
relationship between the parties. It is also fair that the cash settlement amount be
increased to take account of contingencies and other reasonable claim-related costs.
1.3 Determination
This determination is partially in favour of the complainants.
The insurer is required to cash settle the claim by paying a total of $164,237, which
represents the cost of building repairs, loss of rent and other relevant costs arising
from the claim-related damage, as set out and explained in sections 2.2 – 2.4 of this
determination below.
It is not required to take any other action.
Determination | Case number: 716513 Page 4 of 17
2 Reasons for determination
2.1 Is the insurer required to cover cost to rebuild or repair the south wall?
Policy covers cost of reinstatement
The complainants‟ policy covers their building (up to the sum insured) for accidental
loss or damage which occurs during the period of insurance. The basis of settlement
for property cover is set out on page 24 of the product disclosure statement (PDS):
6. Basis of Settlement
6.1 Reinstatement or Replacement
The basis upon which the amount payable to You is calculated will be the cost of
Reinstatement of the Property Insured damaged at the time of its Reinstatement,
subject to the following provisions and subject also to the terms, conditions and
limit(s) or sub-limit(s) of liability of the Policy:
> the work of rebuilding, or replacing, or repairing, or restoring or reinstating, as
the case may be…;
„Reinstatement‟ is defined in the policy. Where property is damaged (as opposed to
lost or destroyed) it means:
… the repair of the damage and the restoration of the damaged portion of the
property to a condition substantially the same as but not better or more extensive
than its condition when new.
That means the insurer is required to re-instate the damaged area of the
complainants‟ building substantially to its condition prior to the claimed incident.
Complainants want damaged south wall panel rebuilt
There is no dispute the complainants suffered loss as a result of a truck colliding with
the insured building. The central issues in dispute are whether the insurer‟s proposal
to cover the repair of, rather than to rebuild, the damaged south wall panel (the
disputed panel) is sufficient; and whether the insurer or the complainants should have
responsibility for carrying out the repairs (that is, whether a cash settlement to enable
the complainants to undertake that work themselves is appropriate, and if so, how
much that should be).
Repair of disputed panel is appropriate, based on expert evidence
Both the complainants and insurer have provided two structural engineers ‟ reports
considering whether the disputed panel requires rebuilding or can be adequately
repaired. The complainants ‟ reports are from engineers „ AC ‟ and „GM‟ and the
insurer‟s from engineers „S E ‟ and „AT‟. A summary of the key points in these reports
(among others) is provided in section 3.3 of this Determination.
Determination | Case number: 716513 Page 5 of 17
The insurer appointed SE to report on the damage and comment on the adequacy of
the scope of work for repairing damage caused by the vehicle impact. SE attended
the insured premises in July 2019. SE reported that they observed hairline cracks to
the disputed panel, but the cracks were to the surface and had not compromised the
panel. SE concluded that the panel can be repaired by filling with epoxy-type product
in line with the manufacturer‟s recommendations . It should be noted that SE mentions
the possibility that the cracks to the disputed panel „ will increase when adjacent panel
is being removed ‟ and that the appearance of repaired cracks may impact property
resale. That possible impact, however, is not a persuasive consideration in deciding
whether the disputed panel can be adequately repaired from a structural perspective.
After the complainants raised concerns about additional wall/panel cracks with the
insurer, the insurer instructed SE to reattend the premises, which they did on 25
September 2019. In their subsequent report, SE maintained the views expressed in
the initial report about the disputed panel: that is, that the panel was not structurally
impacted and can be repaired by filling cracks rather than rebuilding the entire panel.
The complai nants‟ engineer AC disagree s with SE‟s conclusion that structural
integrity of the disputed panel was not compromised. In their report, AC says the
cracks to the disputed panel (less than 1mm width):
are “in radiating pattern concentrated at corners of door opening – personal access
and large roller door”
the vehicle ‟s impact “resulted in high tensile stress concentrations at the corner
opening resulting in observed cracks”
“ large number of cracks and extent of openings has compromised structural
integri ty of panel” .
AC recommends complete replacement of wall panels on the south and south-east of
the building, as well as the front office area (lower level including awning). They say
this is required due to „ complete destruction and/or severe damage ‟ . However, AC
found cracking to other panels by filling with epoxy was sufficient.
Given the conflicting views of SE and AC, the insurer appointed AT to review and
provide a view on the disputed panel. In their report, AT compares SE ‟s and AC‟s
findings and concludes that the scope of repairs/works set out by the insurer ‟s
engineer, which allows for filling of cracks in the disputed panel, is sufficient to deal
with the damage. In reaching this conclusion, AT:
says specific photos from SE and AC show the cracks to the disputed panel are
minor, do not compromise its structural integrity and do not warrant its replacement
did, however, recommend a different product be used for filling the cracks, rather
than the epoxy as recommended by SE and AC.
The complainants subsequently provided a report from G M. GM‟s report says they
were asked to comment on the structural adequacy of the concrete panel on the
Determination | Case number: 716513 Page 6 of 17
south-eastern wall (disputed panel). GM concludes that the two concrete panels at
the south/south-east corner of the workshop should be replaced to ensure the
building remains in a sound structural condition, citing:
“ multiple impa ct fractures” on the inside face of the panel
“ possible design issue with the 125mm thick panel ”. It considers the thickness of
the panel (125mm) inappropriate for the elevation of the building
concerns that repairing cracks by filling with an epoxy may compromise future
resale of the building.
The Panel has carefully reviewed the expert evidence. The Panel notes the conflicting
views in AC and SE‟s report s about adequacy of proposed repairs to the disputed
panel, and the scope of works which the insurer seeks to use as a basis for its
proposed settlement.
The Panel is satisfied that the report from AT adequately addresses the differing
opinions. The Panel is persuaded by AT‟s conclusion that the disputed panel is
repairable and not structurally compromised as a result of the claimed incident.
While GM reiterates the findings in AC‟s report, it does not add much by way of
substantive evidence showing why it agrees with AC‟s conclusions. Rather, GM
seems to raise the questions about the design/thickness of the wall and future resale
in determining the disputed panel ought to be rebuilt (and those issues are not
matters for which the insurer is responsible under the policy or otherwise). It is also
relevant to note that there was reported evidence of pre -existing cracks and previous
repairs, and the comment that „no panels are pristine‟.
So , GM‟s report does not change the Panel ‟ s view that the insurer‟s scope of
works/repairs for the disputed panel and 75% of the cracking is adequate and fair in
the circumstances.
2.2 Should the insurer cash settle the claim?
The insurer obtained a quotation from the original builder (F) as well as two other
builders (H and B) for repairs in line with structural engineer SE‟s scope of works
(SOW). It says its proposed cash settlement of $120,739.48 excluding GST and
before the deduction of the $500 excess (offered on 19 March 2020) is based on F‟s
quote of 2 August 2019 even though that quote was higher than the other two. That
was because of F‟s knowledge of the building (as the original builder), and at the
strata manager‟s request .
The insurer maintains its proposed settlement based on F‟s quote ( adjusted for only
75% of the cracks, and substituting the mechanised sliding door with a standard
swing door, such as was originally there) is sufficient to complete repairs in line with
its SOW.
Determination | Case number: 716513 Page 7 of 17
The reason the insurer has given for wanting to cash settle the claim (so that the
complainants conduct the repairs themselves), is the difficulty the insurer and its
trades/representatives say they have had dealing with the strata manager in the
course of the claim. The insurer has stated „t he actions of the Insu red‟s representative
over the course of the claim has now made it untenable for [the insurer] to consider
being involved in the repair process ‟. This is supported by comments made by the
insurer‟s loss adjuster on several occasions about the „confrontational‟ approach of
the complainants‟ strata manager, and the corresponding concerns about the likely
difficulties in working effectively together were the insurer to then have responsibility
for carrying out the repairs.
The complainants have already express ed dissatisfaction with the insurer‟s assessor,
builders, engineers and repairers. The insurer has said the complainants also denied
access to the site for a requested further expert assessment. In requesting the insurer
undertake repairs, the complainants also wanted the strata manager to manage those
repairs on behalf of the insurer (and be paid by the insurer), which the Panel
considers may in itself create additional areas of contention between the parties, and
is not reasonable in the circumstances.
The Panel is satisfied the relationship between the parties has been difficult and is
likely to continue to be so. In the particular circumstances, the Panel considers that a
cash settlement is reasonable and appropriate, as it will allow the complainants to
proceed with the work under their direction and using their preferred service
providers.
AFCA‟s approach to cash settlements, however, involves taking account of
contingencies (possible additional costs, further unexpected damage), and ensuring
as far as reasonably possible that the cash settlement amount allows the
complainants to undertake the necessary claim-related repairs themselves (based on
an actionable quote).
The Panel appreciates the complainants‟ concern that the insurer‟s proposed cash
settlement amount may not be sufficient if additional repair issues arise. The Panel
acknowledges that F‟s quote , on which that cash settlement was based, is now over
two years old, and costs will likely have increased in that period (although it is also not
clear what, if any, repair work may by now have been carried out).
As well, the Panel notes that SE suggests in their report cracks might possibly
increase in the disputed panel when adjacent panelling is removed; and F noted it
may be unable to remove stains on concrete, and so additional work might be
required to scrape and repair.
The insurer has provided a detailed response to the complainants ‟ submissions
regarding individual aspects of their claim, as set out in a table provided in January
2021. That includes consideration of more recent (September 2020) quotes provided
Determination | Case number: 716513 Page 8 of 17
by the complainants for building repairs for which they are now claiming $260,936
(and superseding F‟s earlier quote) , as well as details of other claimed costs/losses.
The insurer has reiterated, in respect of the building repairs, that the replacement of
the disputed panel should not be included. The Panel agrees with that. The insurer
has responded to the complainants ‟ new quotes, by accepting it would allow an
amount of $118,739.48 for building repairs. The Panel considers, on balance, that is a
fair and reasonable basis for a cash settlement in the circumstances.
However, as explained above, to take account of contingencies and the time since the
quotes were obtained, the Panel considers it fair that the insurer pay the
complainants‟ $142,487 for building repairs (being $118,739 plus a contingency
margin of 20%).
Further additional costs included in the complainants‟ table, and the insurer‟s
response, are considered below.
2.3 What is insurer’s liability for loss of rent?
The complainants‟ policy provides „ additional benefits ‟ under Property cover. This
includes:
Following loss or damage by any cause not excluded, the following Additional
Benefits will be paid in addition to the Sum Insured …
3.1. Temporary Accommodation, Loss of Rent Receivable, Reletting Costs,
Maintenance Fees and Removal and Storage Costs of Lot Owners Contents.
We will pay, in total, for the following benefits 3.1 A-G, up to 15% of the Building
Sum Insured.
The available information shows the premises is rented out. As such the benefit for
loss of rent receivable applies. This cover is available including where:
„ a Lot/Unit or Common Area that is Rented or would have been Rented (and You
can verify this by way of lease or rental agreement), becomes uninhabitable, unfit
for its intended purpose… as a result of an Incident covered under Section 1 of the
Policy ‟.
The insurer does not dispute the complainant would be entitled to payment for this
additional cover. It estimates that component of the insurable repairs which would
make the unit unfit for its intended purpose would take 2 weeks, but has allowed
$2,920 for 4 weeks‟ temporary accommodation to allow for contingencies (calculated
at $730 per week, which is the rate claimed). The complainants, however, have said
the repairs would take 12 weeks, and so are claiming a total of $8,700.
The quote of one of the complainants‟ builders indicates the repair work would take
30 business days, although that has not been itemised so as to isolate those works
which would actually make the unit unusable by the tenant.
Determination | Case number: 716513 Page 9 of 17
In the particular circumstances, given the lack of clarity around likely relevant repair
times, the Panel considers it fair that the insurer pays 6 weeks ‟ loss of rent, being
$4,380.
2.4 Is the insurer required to cover any other costs claimed?
Contribution to costs of reasonable access to neighbouring lot is payable
SE commented the buildings‟ original panels were poured onsite and not pre -cast.
That would suggest possible issues with arranging access to pour new panels (east
side) where required, or at least to access neighbouring properties in order to carry
out repairs. The complainants claim $17,000 for those anticipated costs. As the
insurer is not liable for replacement of the disputed panel, and any access is therefore
likely to be less intrusive than if that were the case, the insurer has accepted $9,500
of those costs.
The Panel considers it fair that the insurer contributes $9,500 towards access costs.
Emergency repair costs and fencing locks accepted
The complainants have claimed, and the insurer has accepted, emergency electrical
repair costs of $370.
As well, the complainants claim, and the insurer has accepted, $130.91 as the cost of
locks for temporary fencing.
The insurer is required to pay those amounts.
Contribution to temporary fencing costs payable
The insurer says it has already paid for temporary fencing costs up to June 2020, and
that further delays are because of the complainants ‟ actions. However, given the
Panel did not consider the insurer‟s initial cash settlement was adequate, and the
complainants disputed that, it is not unreasonable that the insurer make a further
contribution to the fencing costs. The insurer is required to pay a further $1,000
towards those costs.
Policy cover for claim preparation costs does not apply in this case
„ Additional benefit s‟ under the compl ainants‟ policy includes cover for claim
preparation costs. The terms of cover for this benefit are as follows:
We will pay to You, the costs up to a limit of $50,000 per Incident, reasonably and
necessarily incurred with Our written consent, in the preparation of a claim following
loss or damage to Property Insured as a result of an Incident covered under Section 1
of the Policy.
The terms are clear that this benefit is payable where the costs were reasonably and
necessarily incurred with the insurer‟s co nsent.
Determination | Case number: 716513 Page 10 of 17
The complainants say the insurer should pay their strata manager for the time spent
dealing with the claim. They say the claim was complex and the strata manager had
to spend a significant amount of time due to the insurer‟s conduct of the matter.
The complainants raised payment to the strata manager early in the claim process,
and the available information shows the insurer made it clear at all relevant times that
the claims preparation benefit would not be paid in the circumstances. It never
provided consent to such costs being incurred.
The Panel has reviewed the available information. There is a question as to whether
strata manager‟s involvement equates to „claims preparation‟. Even if it could be
argued that it does:
the complainant was represented by both a broker and a strata manager involved
in the claim process. There were regular communications between these
individuals and the insurer, with the former advocating the complainants ‟ position
arguably, the strata manager was performing a role which he is appointed to do in
the normal course of dealing with matters that relate to the owners‟ corporation .
The complainants have not provided any evidence or documentation to suggest
that dealing with the claim was outside of this role
the insurer clearly did not provide consent for such costs to be incurred, as
required by the policy.
In view of the above, the Panel does not accept the complainants are entitled to any
payment for claims preparation costs.
Policy allows for cover for professional costs
4 .2 Architect and Professionals‟ Fees
The reasonable cost of architects‟, surveyors‟ and consulting engineers‟ fees,
including all incidental costs, legal and other fees and clerk of works‟ salaries for
estimates, plans, specifications, quantities, tenders and supervision, necessarily
incurred in reinstatement of Property Insured, but not costs, fees and salaries for
preparing any claims hereunder.
This provision deals with professional costs in relation to repair or replacement of the
building following an insured event: they must be fees necessarily incurred to
reinstate property or conduct building works.
In its response to the complainants‟ table of claimed costs, the insurer confirms it is
prepared to allow $2,500 for an engineer to certify the final works to confirm all is
compliant (as it had already offered in its proposed cash settlement). The Panel is
satisfied that is fair and reasonable in the circumstances.
Determination | Case number: 716513 Page 11 of 17
AFCA can require insurer to contribute to certain professional costs
Under our Rules (Rule D5), AFCA may decide a financial firm is to contribute to the
professional costs incurred by a complainant in the course of a complaint. This is
normally capped at $5,000, unless exceptional circumstances apply. This can be
awarded when the costs were incurred by the complainants so they could understand
or establish their claim.
The i nformation provided shows the insurer accommodated the complainants‟ request
to have the original builder (F) and engineer involved in conducting the make-safe
and quoting for necessary repairs following the claimed incident.
The complainants were always entitled to obtain their own expert opinion about the
proposed repairs. However, the Panel does not consider the reports obtained by the
complainants assisted in establishing the claim or complaint.
In the circumstances, the insurer is not required to contribute to the costs incurred for
engineering reports/other professional input.
Removal and storage costs of lot/unit owner’s contents
The „additional benefits‟ provision of the policy also allows for the reasonable cost to
remove and store lot /unit owner‟s contents if , due to an incident under section 1 of the
policy (Property), the lot/unit is uninhabitable or unfit for its intended purpose from the
time of loss until the building is “deemed habitable” .
The Panel considers it fair and appropriate that the insurer pays removal and storage
costs of $3,870 as claimed, and as it has accepted in its comments on the
complainants‟ table of costs .
2.5 Is the insurer required to pay compensation for non-financial loss?
AFCA can award compensation for non-financial loss for an insurer‟s conduct in
certain circumstances. The maximum amount AFCA can award for non-financial loss
is $5,000 per claim (for complaints lodged with AFCA before January 2021). AFCA
will only award compensation for non-financial loss where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation or interference
with the complainant‟s expectation of enjoyment or peace of mind . Such awards are
also intended for individuals (rather than, for example, corporate entities).
In this case, the individual members of the owners‟ corporation have had the services
of their broker and strata manager in dealing with the claim. While the matter has
been protracted and challenging, the available information would suggest the actions
and operating style of the strata manager may have contributed to that. The insurer
has taken steps to respond to the complainants‟ concern and evidence, and although
its initial cash settlement was not adequate, it has not acted unreasonably overall. It is
to be expected that the complainants will have experienced some inconvenience and
Determination | Case number: 716513 Page 12 of 17
upset in the normal course of having to deal with a claim of this nature, but that does
not mean the insurer has done anything wrong.
The Panel is not satisfied, on the available evidence, compensation for non-financial
loss is warranted in the circumstances.
2.6 Other matters
The complainants have requested a partial refund of premiums paid for the applicable
policy period saying:
the policy was up for renewal in December 2019 while the present claim remained
unresolved
the premium had increased by approximately 50% at each renewal since the
ongoing claim was lodged (2019/20 and 2020/21 periods)
they were unable to seek alternative cover due to the ongoing claim.
The Panel does not agree the complainants have shown a basis for requiring the
insurer to refund premiums. The complainants have had the benefit of cover for the
period in which the claimed incident occurred a nd during subsequent renewal periods.
Under our Rules, AFCA cannot review claims about premiums an insurer charges
unless there is evidence that the premiums were incorrectly calculated or based on
incorrect information. There is no suggestion the premiums charged at the renewals
in question were based on incorrect information or calculation.
The insurer is not required to refund premiums paid.
2.7 Why is the outcome fair?
It is fair and appropriate that the claim be cash settled, but that the settlement amount
be adjusted to allow for contingencies. The outcome of this complaint is also fair in
that (based on the available evidence) it allows for the inclusion of other costs to
which the complainants are entitled under the terms of the policy.
Determination | Case number: 716513 Page 13 of 17
3 Supporting information
3.1 Process
AFCA’s approach to this complaint
This complaint has been determined based on what is fair in all the circumstances,
having regard to the legal principles, applicable industry codes or guidance, good
industry practice and previous decisions of AFCA or its predecessor schemes (which
are not binding).
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised. All of the
provided information has been reviewed and considered. The parties have raised
numerous issues in their submissions to AFCA. However, commentary in this
determination is restricted to those issues considered relevant to the outcome.
This matter was determined by a panel
Due to the nature of this dispute, it has been referred to a panel for determination.
The panel comprises the lead ombudsman, a member with significant experience in
consumer and small business advocacy and a member with extensive experience in
the insurance industry.
How we assess complaints
AFCA is not a court of law. We do not have the power to take or test evidence on
oath, or to require third parties to give evidence. When we assess complaints, we
consider available documents, the recollections of the pa rties, and all relevant
circumstances. We give more weight to documents created at the time the events
occurred. If there is no relevant documentation, we will decide what is most likely to
have occurred based on the information provided to us. If there are conflicting
recollections and these are evenly weighted, we may find that a claim cannot be
established.
3.2 Extracts from expert reports
Record Key points
financial firm’s expert ( S E )
Engineer‟s r eport
16 - 07 - 2019
site visit on 12 July 2019
OBSERVATION & RECOMMENDATION
Entrance - c oncrete panel
Observation
> Hairline cracks above personnel door on the internal face of panel which
appear recent to h ave been caused by the impact
> surface cracks, structural integrity of the panel not compromised “ however,
they do need to be filled with an epoxy resin to prevent moisture ingress.
Repairs will involve filling the cracks with an epoxy product ” .
Determination | Case number: 716513 Page 14 of 17
Record Key points
Recommendation
> Repair using injectable epoxy resins products. “[N…AP] paste should be
applied to the concrete first and allowed to cure before the crack is
injected”.
> “ Work should be carried out in accordance with the
m anufacturer‟s data sheet and recommendations” However possible:
- crack size will increase when adjacent wall panel is removed
- visible crack ing may be an issue for resale
- additional damage may occur during repairs of adjacent panel …
Impacted panel
> „ external concrete panels are fixed into the ground slab… removal of any
external panels will also involve cutting away a section of the ground slab.
The new section of concrete ground slab must be tied into the external
panel as well as the remaining slab on ground ‟ .
> „ Existing panels are tilt up panels that are approximately 8 m wide - they are
not precast panels. There may be some opportunity to pour new tilt up
panels on the adjacent property and crane these panels into position. If this
is not possible, precast panels will need to be used. These panels are
typically 3.5 to 4 m wide. The use of these panels will also necessitate
additional steel braci ng to the top of the wing wall panel ‟ .
financial firm’s expert (AS)
Assessor‟s report 8
13 - 08 - 2019
“ received the requested three quotes with the highest being submitted by
[ F …] the original builder who was of the opinion that the front tilt up panel of
the building with the fine hairline crack should not be repaired but replaced to
give the owner of the unit comfort rather than a repair. The Engineer said the
only reason it requires any attention is to ensure there is no moisture into the
concrete panel itself and after a repair the area could be painted.”
F‟s quote “ also includes a couple of items that we have some concern with.
They are quoting an automatic electric door in the shop front that was
destroyed but at the time of our initial inspection the re was no indication of
any motor or door operating mechanism. Queries with the company who
carried out removal of the debris was that there was no evidence of that type
of door on the front of the building.
In addition, the [F] quote also includes roller shutters whereas the building
had no evidence of roller shutters and only window grilles. We have written to
[ F ] requesting details of confirmation of those items but the extra shutters
and/or grilles is part of the business fit out as far as we are conce rned and
not part of the Strata‟s responsibility. ”
“ [F] – Initial builder of the building and using their first claim submission with
the work as quoted on the Engineer‟s specification - $108,858.25. This noted
there was no guarantee they could remove stains on the concrete and there
would likely be additio nal works to scrape and repair the concrete. … The
builder also believes to give the owners piece of mind the cosmetic cracking
would not cause any structural damage in the future, replacement of the front
panel is an extra $24,706.33, which increases thei r quote to $133,564.58. ”
financial firm’s expert (AS)
Assessor‟s report 9
19 - 08 - 2019
A resume of deductions from the [ F ] quoted amount of $108,858.25 (Inc
GST) are as follows: -
• Security grilles/shutters $9,574.40 Inc GST
• Floor coverings needing to be removed and replaced $5,139.20 Inc GST
• Retrofitted automatic sliding door $5,000.00 Inc GST
TOTAL $19,713.60 Inc GST
Therefore, the adjusted figure with the above - mentioned deductions is
$89,144.65 including GST.
Determination | Case number: 716513 Page 15 of 17
Record Key points
financial firm’s expert (AS)
Assessor‟s report 10
09 - 09 - 2019
“ We are still having difficulties in progressing this claim with a challenging
Property Manager and Unit Owner.
When all quotes were evaluated, the Insured‟s preferred builder was slightly
higher in specification after removing business fit out items. We approached
the business insurer, [ CM ] through their Adjuster and thought he had agreed
to accept those items valued at $19,713.60 under the [CM] co ver.
We, as had been agreed offered cash settlement to the Insured as “financing”
rather than authorising repairs with the Strata Manager and Uni t Owner is
likely to remove builder‟s performance issues and other such like issues.
However, we have been advised today by the Broker that the Insured have
had the deducted items rejected by [CM] and the reason being that they are
permanent installed ite ms as lot owner‟s fixtures and covered by the
[business owner‟s/tenant‟s] policy, which they have from the Strata Manager.
The [ C M] policy has an exclusion for any property otherwise insured. The
other Adjuster has not contacted us or suggested initially there would be any
issue with the items that we were suggesting would be for [CM] .
Subject to a formal valid rejection being made available we believe you may
have to accept these items.
However, one of the items is contentious and that is the change for original
specification of the office entry door from standard hinged to a motorised
sensor operated sliding door. This area was badly smashed but there was no
evidence of motor, door track sensors or electrical connection at our first
inspection with the truck still at final resting point over the debris.
The contractor who cleared the debris has said there was no debris they
removed to indicate there was an automatic door and we will need that
provided.
The [ C M] Adjuster during discussion indicated the business owner appeared
to be embellishing the items he wished to claim from the incident.
The Strata Manager is trying to say that he is entitled to be paid “extra costs”
being incurred in sorting out problems at $150.00 per hour however the
Broker has b een “fielding” these approaches. ”
financial firm’s expert (S E )
Engineer‟s report
07 - 10 - 2019
reattended premises on 25 September 2019
r eview ed and reported on additional cracking to western side of the building
and cracking to the concrete panel to the right of the roller door.
Cracking - Western wall
OPINION
„ If this crack had been formed by the impact, we would have expected it to
have occurred on the external face of the panel. I.E. The force from the
impact would have been transferred through into the first - floor concrete slab
and then directed outwards into the concrete panel creating tension in the
external face and compression in the internal face. As the tensile strength of
concrete is less than the compr essive strength, cracks are more likely to
occur in the tensile zone. ‟
„n evertheless, there is a slight possibility that the crack was caused by the
impact, or was an existing crack made worse ‟ .
„ In our view repairs to this crack would be similar to those in the concrete
panel to the right of the opening roller door opening. I.E. crack injection. ‟
Notes evidence of previous similar repairs to western panel
Cracking – concrete panel (entrance to workshop/right of roller door)
OPINION
Determination | Case number: 716513 Page 16 of 17
Record Key points
recommended repair unchanged from earlier report
„ c racks are in the surface of the concrete and have not compromised the
structural integrity of the panel; however, they do need to be filled with an
epoxy resin to prevent moisture ingress. Repairs will involve filling the cr acks
with an epoxy product. ‟
product information and data sheets provided which shows „ a similar repair
strategy has been previously adopted on other cracked panels, including the
panel in question. This appears to have been part of previous maintenance
w orks completed before the impact event ‟ .
Conclusion
evidence of previous repair (filling of cracks) prior to incident which appears
to have been part of prior maintenance
„ there is a slight possibility that the impact has caused, or increased the width
of, a crack in the western concrete panel near the soffit o f the first - floor
concrete slab. This crack should be repaired in a similar method to the cracks
in the panel to the right of the entry roller door. (Injection with epoxy repair
mortar.) ‟
„the cra cking to the panel to the right of the entry door and our opinion
remains that these cracks can be repaired via epoxy injection. Data sheets of
appropriate products are attached ‟ .
review of the remaining concrete panels show the crack injection repair
method has been used prior to the incident on panels to the northern
elevation „ where cracks that pre - existed the impact have not been repaired ‟ .
Complainant’s expert (AC)
Engineer‟s report
15 - 01 - 2020
OBSERVATIONS & FINDINGS
Observation and findi ng for areas of damage including:
> East face wing wall (south end) – completely destroyed by vehicle impact
and complete replacement of panel recommended
> south face external wall (disputed panel) access door:
- Man y slight cracks (less than 1mm width) “in radiating pattern
concentrated at corners of door opening – personal access and large roller
door”
- vehicle impact “ resulted in high tensile stress concentrations at the corner
opening resulting in observed cracks” - large number of cracks and extent
of o penings has compromised structural integrity of panel”
- “Recommendation: Non - repairable. Complete replacement of panel
required” …
CONCLUSION
In summary recommends disputed panel be replaces “due to complete
destruction and/or severe damage”
Complainant’s expert (AC)
Engineer‟s comment
06 - 04 - 2020
in relation to S‟s opinion on south wall reiterates finding in his report. Says
„ Photos 6 clearly shows a number of cracks radiating from the top of the roller
door opening which are concentrated at the corner of the opening. Clearly,
due to the pattern and extent of cracking the most probable explanation is
vehicle impact. … I still stand firm with my findings that the large number of
cracks and extent at the corner opening has compro mised the structural
integrity of Panel P5A. It is non - repairable and complete replacement is
strongly recommended. ‟
„ epoxy filling will involve grinding out the cracks. Grinding out that number of
cracks in close proximity particularly at the corner open ing will further
compromise the structural integrity of the P5A panel and is ill advised. ‟
financial firm’s expert (AT) main difference in S E and AC‟s opinion relate to:
Determination | Case number: 716513 Page 17 of 17
Record Key points
Engineer‟ s statement
09 - 06 - 2020
1. condition and remediation of souther n wall (PSA in structural drawing)
2. additional cracks which the complainants say was caused during the
claimed incident
Expressed the view that the insurer‟s SOW is sufficient .
… cracks in the southern wall are „ minor and assessed as not compromising
the structural integr ity of the panel ‟. The damage does not warrant
r eplacement of the southern wall panel
recommends cracks to southern wall panel be filled with a low - viscosity
polyurethane - based sealant „ injected in accordance with the manufacturer‟s
recommendations ‟ .
Comp lainant’s expert ( GM )
Engineer‟s r eport
20 - 08 - 2020
reviewed structural adequacy of the concrete panel on the south - eastern
wall.
says the south - eastern concrete panel was severely damaged by the vehicle
impact
“Due to the multiple impact fractures” on the inside face of the panel and
“possible design issue with the 125mm thick panel” … concludes that the two
concrete panels at the south/ south - east corner of the workshop should be
replaced to ensure the building remains in a sound structural condition.
In relation to repairing cracks by filling with an epoxy notes concerns are
“that a future on sale of the building may be compromised due to the
presence of the repaired cracking”.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.