Home / IAG / Determination 713569
Determination 713569
Cash settlement of sewerage water damage claim and temporary accommodation
Summary
The complainant's home was damaged by a sewerage escape and the insurer cash settled the building repairs. AFCA found the cash settlement fair but ordered the insurer to pay withdrawn temporary accommodation money, removal costs, half of mould remediation and $5,000 non-financial loss.
The insurer could cash settle rather than warrant repairs given pre-existing building defects, but it was bound by its accommodation offer that the complainant relied on.
Issues
- Claim amount dispute primary · not upheld“I accept that the insurer's cash settlement for building repairs is fair in the circumstances.”
- Poor claim handling secondary · upheld“The insurer is required to pay a further $17,092, this being the difference between the $19,015 it originally offered and the $1,923 subsequently paid.”
- Delay secondary · upheld“The insurer has settled the complainant for $5,000 for non-financial loss in recognition of the protracted claims experience.”
- Repairs or contractors secondary · upheld“The insurer is required to cash settle the complainant 50% of the reasonable cost to complete mould remediation to the house.”
Subjects and remedies
disabilityhome or building damagepay claimpay non financial loss
Related
Text of the determination
Determination
Case number 713569
Financial firm Insurance Manufacturers of Australia Pty Ltd
Determination | Case number: 713569 Page 2 of 15
Case number: 713569 23 December 2020
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy with the financial firm
(insurer). A claim was lodged against the policy for damage caused because of a
blocked sewerage pipe on 6 May 2019. The insurer accepted the claim and provided
temporary accommodation for the complainant and her family while the damage was
inspected and scoped on by experts.
The insurer ultimately decided to cash settle the complainant for the building damage
as it says there are pre-existing issues with the house which mean the insurer cannot
warrant the works and damage will continue to occur until these issues are rectified.
The complainant is dissatisfied with the insurer’s handling of the claim and the claim
outcome. She says she is not in a position to rectify pre-existing issues with the house
and she remains uncertain as to whether the insurer’s cash settlement is sufficient to
repair all the claim related damage. Additionally, she says the settlement provided by
the insurer for temporary accommodation was inadequate and not in line with an offer
it previously made to her. She has also raised concerns during the complaint about
mould remediation of her home and contents.
1.2 Issues and key findings
Is the insurer’s cash settlement for building repairs fair in the circumstances ?
Yes. The insurer has provided a cash settlement based on its scope of works,
inclusive of a 15% contingency amount. The complainant has not provided any
information to support that there are claim related repairs for which the insurer has not
provided indemnity. The insurer is to pay this amount if they have not already done
so.
Is the insurer required to cover further mould remediation?
Yes. The insurer is required to cash settle the complainant 50% of the reasonable
cost to complete mould remediation to the house. Contents items have already been
fully settled under another claim.
Is the insurer required to increase the temporary accommodation payment?
Yes. The available information shows the insurer agreed to pay $399 plus $199 per
night from 18 December 2019 to 14 December 2020 and the complainant accepted
this offer and made arrangements based on this. The insurer is required to cash settle
the complainant for the difference between this amount and what it has already paid
her for this period.
Determination | Case number: 713569 Page 3 of 15
1.3 Determination
This determination is partially in favour of the complainant.
Within 14 days of acceptance of this determination, the insurer is to:
pay the costs relating to the repairs, which has already been agreed to by the
insurer in the sum of $23,020.53
pay a further $17,092.00 for accommodation
pay 50% of the cost of mould remediation to the house
pay $675.00 removalist costs
pay $5000.00 non-financial loss, which the insurer offered (if it has not already
been paid)
Determination | Case number: 713569 Page 4 of 15
2 Reasons for determination
This complaint has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
The complainant has been represented by her solicitor during the complaint. For the
purposes of this determination, any reference to the complainant includes
submissions made on her behalf.
2.1 Is the insurer’s cash settlement for building repairs fair in the
circumstances?
Insurer arranged for experts to inspect the damage and provide a scope
Following the blockage of a sewerage pipe at the complainant’s property on 6 May
2019 the complainant lodged a claim under the policy. There is no dispute that an
insured event occurred, and that the complainant established a valid claim under the
policy.
The insurer accepted the claim and arranged for experts to provide opinion on the
extent of damage that was caused by the insured event and to provide a scope of
works upon which settlement could be based.
The in surer’s building expert UB attended the property, and in its report dated 23 May
2019 it advised that due to the blockage in the sewerage pipe an overflow had
occurred causing part of the house to be inundated. UB reported that restorers had
already been appointed to carry out structural drying and water authorities had
unblocked the drains. UB also said the complainant advised that she had previously
experienced water issues causing damage in some of the same areas.
UB noted the topography of the land directed all water runoff towards the residence
and there was no external drainage in p lace. UB further noted the laundry/bathroom
extension was still in the process of being completed and did not comply with building
regulations as the eave gutter was still in place and there were uncapped open sewer
lines present at the rear of the property. UB says with the eave gutter still in place,
there is potential for overflow to occur during heavy rain and inundate the house. It
noted the rear bedrooms 1 and 2 exhibited lifting to the vinyl flooring, however it says
Determination | Case number: 713569 Page 5 of 15
it is not possible to determine if this damage was the result of the most recent event
or the previous event.
UB confirmed the uncapped sewer lines at the rear of the building were the source of
the water escape which caused the damage. It recommended hygienists carry out a
detailed clean of all sewerage affected areas and that a licenced plumber cap off the
open sewerage lines in compliance with plumbing code. It further recommended
rectification of the various building defects identified.
Plumbing expert TB was also engaged to inspect and comment on the cause of
damage and in its report dated 19 November 2019 it advised that it considered the
general condition of the property to be poor. TB was of the view the damage to the
property had occurred gradually and was caused by a lack of maintenance and
deterioration over time.
TB noted CCTV inspection of the sewer drains confirmed they were still blocked and
restricted and during the drainage flow test the drainage system was backed up. TB
said there appeared to have been some recent sewer drain alterations externally to
the bathroom including an over flow relief. Additionally, TB noted CCTV inspection of
the stormwater drains confirmed them to be blocked by tree root intrusion, in addition
to the drain having insufficient fall. It also said there were no subsoil drainage or
surface catchments around the perimeter of the property.
TB recommended installation of new stormwater drainage with adequate subsoil
drainage and surface catchments around the property, with sufficient fall, as well as
clearing of the sewer and stormwater pipes at the rear inspection points towards the
garage.
Subsequently, building engineer CF inspected the property and, in its report, dated 17
June 2020 it says complainant’s son who was present during the inspection reported
the bathroom and laundry had been built by volunteers who were supposed to have
obtained a permit. The complainant’s son was unsure if the bathroom had been
waterproofed prior to the installation of the tiles.
Upon inspection, CF noted that sections of the lower plasterboard wall lining, skirting
boards and timber door frames had been removed at the eastern end of the hallway
and in bedroom three, the original bathroom, the original laundry and the kitchen due
to the damage.
CF concluded that the building had sustained internal damage due to the escape of
liquid event where sewerage partially inundated the house. Like UB, CF considered
that there were multiple pre-existing building issues, particularly with the extension at
the rear of the house. It was CF’s opinion that the enclosed veranda, laundry and
bathroom were not built to code and have been constructed illegally. CF was of the
view that the damage to the house would not have occurred if the extension had been
built to code and the sewerage line had been upgraded at the time of construction.
Determination | Case number: 713569 Page 6 of 15
Insurer offered cash settlement given pre-existing building issues
The insurer accepts there was damage caused to the house as a result of an ins ured
event. However, based on the expert reports obtained, the insurer also considers that
there are pre-existing issues with the building relating to illegal works that have been
undertaken, and also general maintenance issues. Accordingly, the insurer sa ys it is
not in a position to arrange and warrant the works and that it must cash settle the
complainant instead.
Additionally, the insurer notes that complainant had a previous claim for water
damage in 2018 which was declined as it was determined that no insured event had
occurred. The insurer notes the complainant was advised that maintenance works
were required at this time and that she has not undertaken these works to date.
The insurer has provided a copy of a report from another building expert (JP) from the
2018 claim. In this report JP noted water damage to the same areas of the house for
which the complainant is now claiming. JP was of the opinion that no insured event
had occurred and like UB and CF noted multiple building defects which it says led to
the damage occurring.
Among the defects identified, JP noted that in the bathroom water from the walk-in
shower room escapes from the shower onto the concrete floor of the annex and there
are mats on the floor to absorb the excess water with water staining evident to the
bare unlined concrete floor. Further, JP noted the external ground level is higher than
that of the internal floor in the laundry addition at the rear of the property. JP also
noted the weatherboards have been stopped at the top of the concrete floor slab
when in fact they should overhang the top of the concrete by approximately 30mm to
prevent water entering the top of the concrete floor slab. JP considers that during
heavy rain this would allow water to enter. There were also some roof defects noted.
JP recommended these defects be rectified, along with installation of an extra
downpipe as currently the new roof area of the extension is discharging into the
existing quad gutter.
Complainant suggests there is further damage, unable to rectify defects
The complainant says she is unclear on exactly what maintenance works she is
required to undertake and has estimated these may cost as much as $60,000. The
complainant says it is not clear whether the plumbing works the insurer says are
required (as per TB’s report) are factored into the UB costing, of which $13,876.82
has been attributed to maintenance works and deducted from the insurer’s final cash
settlement.
The complainant also says the maintenance works most recently identified by CF are
different to those identified in the previous reports.
Additionally, the complainant has indicated in recent correspondence that there is
further damage. The complainant indicates that ‘underneath the flooring of the toilet
Determination | Case number: 713569 Page 7 of 15
room was damaged and there are still faeces in the outdoor pergola/decking area
which has not been cleaned’.
No evidence of further damage, cash settlement fair in the circumstances and
maintenance repairs are complainant’s responsibility
The insurer subsequently arranged further inspection of the property as the
complainant’s house was later ransacked (unrelated to the current claim – there is a
new, separate claim with the insurer for this). Th e insurer notes that upon UB’s
reattendance, no evidence of any concerns regarding sewerage at the property were
identified.
In an email to AFCA dated 26 August 2020, the complainant says she ‘does not
necessarily r eject the cash settlement offer… for the repair works – at this stage it is
just unclear whether the amount is sufficient … to complete the repairs.’
The complainant has not provided any evidence of damage beyond what was
reported in the insurer’s various reports nor has she obtained any expert reports of
her own.
While I acknowledge the complainant’s point that some of the maintenance works
identified by CF are different to those identified by UB, TB and JF, I nevertheless
accept that there is significant evidence of various building defects and maintenance
issues which could have contributed to the damage and will likely continue to do so
until they are repaired. These building and maintenance issues were not caused by
the insured event which is currently being claimed for. These issues are the
complainant’s responsibility to rectify and the insurer is not required to provide a full
scope on these works as they are not claim related.
This being the case, I am satisfied the insurer is entitled to exercise its option to cash
settle the claim rather than arrange and warrant the works. I also note that in an email
to AFCA dated 28 S eptember 2020 the complainant has advised they have ‘no issue
with being offered a cash settlement for the repairs’. Therefore, the issue to be
decided is whether or not the cash settlement which has been offered is fair in all the
circumstances.
The insurer has advised that the SOW submitted by UB 12 September 2019 totalled
$24,599.36 and this is the figure that was originally proposed to the complaina nt as a
cash settlement. However, it was later determined that $4,581.50 was included in this
amount for make-safe costs completed by UB at the property. The make-safe costs
are incurred by the insurer and not the complainant, so these were subsequently
removed. This leaves $20,017.85, and the insurer has added a 15% contingency
amount on top of this to allow for the transfer of risk in the complainant engaging her
own builders to complete the repairs. This brings the total cash settlement for building
repairs to $23,020.53.
Determination | Case number: 713569 Page 8 of 15
I note that in a submission dated the complainant has queried why the settlement
figure is $23,020.53 when in a previous submission the insurer stated a figure of
$23,821.24. I have reviewed the scope of works from UB and note that it totalled
$33,864.67, and when the $13,876.82 is deducted, this leaves $20,017.85. With the
15% contingency added I am therefore satisfied the final figure is $23,020.53 and the
insurer’s previous reference to $23,821.24 was a typo. I note the other referenc es to
the settlement figure made by the insurer refer to the figure of $23,020.53. The
insurer is to pay this amount, if it has not already done so.
The complainant has not provided any information to support that there are claim
related repairs which the insurer has not provided indemnity for or that the amount
offered is insufficient to complete the claim related repairs. In the absence of anything
to the contrary, I accept that the insurer’s cash settlement for building repairs is fair in
the circumstances.
I further note the insurer has settled the complainant for $5,000 for non-financial loss
in recognition of the protracted claims experience. I consider this fair in the
circumstances. The insurer says this sum was paid in December 2019. If this has not
been paid the insurer is to make this payment as part of this determination
2.2 Is the insurer required to cover further mould remediation?
Insurer says mould was remediated but reappeared due to pre-existing issues
The insurer advises that it has made two previous attempts to remediate mould at the
property, but the mould continues to reappear due to the noted building and
maintenance issues at the house which allow ongoing moisture entry.
A timeline of events provided by the insurer shows attempts to by a hygienist to clean
and remediate were undertaken on 11 June 2019 and again on 16 August 2019.
The insurer further says the complainant has been aware maintenance works were
required at the property since the declined 2018 claim for moisture ingress but that
she has not undertaken any maintenance works.
Contents items already fully settled
The complainant also raised concerns about mould remediation to contents items
during the complaint. I note the complainant’s house was subsequently ransacked
with contents strewn throughout the property.
A separate claim was lodged with the insurer for this, and ultimately the insurer cash
settled the complainant’s contents as a total loss. I consider this finalises the any
issues relating to contents. Further, this is a separate claim unrelated to the claim for
the sewerage escape which is the subject of this complaint. Therefore, issue to be
determined is whether the insurer should be liable for any further mould remediation
of the building.
Determination | Case number: 713569 Page 9 of 15
Subsequent expert inspection indicates mould still present in property
The insurer obtained a further report from mould specialist VS dated 2 April 2020. VS
said that upon entry to the property a malodour associated with unhygienic conditions
was noted.
VS noted no further remediation works had been undertaken since the previous
assessment and duplicate sampling confirmed areas previously tested still require
excess fungal particulate to be removed from exposed timbers and ‘minor remediation
works were required. VS also noted the timber framing within the remediation areas
does not appear to have been abrasively cleaned, however no visual fungal growth
was found to any of the affected building materials within the property.
VS reported that low to medium levels of fungal particulate were identified to the
surface samples and air sample analysis identified low levels of fungal activity in the
living room sample.
Concluding its report, VS recommended that remediation works should be conducted
to return the internal environment to a normal fungal ecology. Further, VS says that
prior to the commencement of any remediation works, all excess/elevated moisture
issues need to be identified and rectified.
Insurer required to cover mould remediation to the house
I note VS found further mould remediation is required, and also note its comment that
the timber framing within the remediation areas does not appear to have been
abrasively cleaned. I accept it is possible some of the mould caused by the insured
event has not been fully remediated despite previous attempts.
However, I am not satisfied that all the mould in the property is directly as a result of
the current claim. The water damage related to the current claim was only to a portion
of the property. I accept that the available information establishes there a multiple
building defects and maintenance issues not related to the current claim that could
have contributed to moisture and therefore mo uld in the property, and that until these
issues are rectified mould is likely to continue to reappear.
Based on the information provided, I consider it fair in the circumstances that the
insurer contributes 50% towards the cost of mould remediation to the building. The
insurer is to obtain an assessment for the total mould remediation to the property and
then is to pay the complainant 50% of that assessment.
The balance of any mould remediation is the responsibility of the complainant and
once the insurer has paid that sum, it is not required to undertake any further action.
Determination | Case number: 713569 Page 10 of 15
2.3 Is the insurer required to increase the temporary accommodation
payment?
Insurer provided temporary accommodation
Following the damage to the complainant’s premises, the insurer arrang ed temporary
accommodation. The complainant and her family were split into two accommodation
premises at the time of the damage. Subsequently, the complainant’s eldest son was
asked to leave his accommodation due to his behaviour.
The insurer has subsequently cash settled the complainant for a further 6 months
temporary accommodation which it says was sufficient. The insurer says that this was
provided in good faith in order to allow the complainant to attend pre-existing building
and maintenance issues, even though these issues do not relate to the insured event
which is the subject of this claim. Additionally, it says that the ongoing uninhabitable
nature of the complainant’s property is not as a result of the insured event.
Complainant dissatisfied with final settlement for accommodation
The complainant believes she should be entitled to further temporary accommodation
costs. The complainant says that the accommodation was insufficient, for an
insufficient period, and not to a standard that was acceptable.
The complainant notes she was asked to immediately leave the temporary
accommodation due to her son’s behaviour with no immediate alternative
accommodation in place suitable to her needs. The complainant recounts having then
lodged a complaint with the insurer on the same day.
Review of the insurer’s claim notes shows a note on 18 December 2019 at 11:34AM
which reads as follows; ‘ unsure why we have cancelled the families [sic]
accommodation, I have discussed the claim with my peers and we all agree the
[complainant] should be allowed to stay in their current accommodation until the 14th
[of] Januar y’. The not e goes on to say the insurer then called the complainant to offer
two options, one being the above, or the other being a cash settlement in lieu of
returning to the temporary accommodation. The note says, ‘ I advised [the
complainant] I will be happy to cash settle her for the [temporary accommodation]
stay $389 (per night) until the 14 th [of January 2020] and her sons stay $199 (per
night) until the 14 th [of January 2020].’
The claim notes show a further phone call at 2:03PM on the same day where the
complainant accepted the cash settlement offer in lieu of returning to the temporary
accommodation. The note says, ‘ I apologised for what she has been through and that
I am happy to settle her as per below * 18 December - 14 January $389 per night x 32
days: $12,448.00 * 18 December - 14 January $199 per night x 33 days $6,567.00.’
The complainant notes this constitutes a total sum of $19,015 being offered by the
insurer for the period from 18 December 2019 to 14 January 2020. The complainant
says she accepted this offer and moved into her mother’s property , even though it
Determination | Case number: 713569 Page 11 of 15
was much less suitable to her youngest son’s needs (who suffers from a disability) as
she considered the cash settlement would have been of great assistance to her. She
says she would not have turned down further temporary accommodation and moved
into her mother’s property had she not been offered and accepted the sum of $19,015
to do so.
On 24 December 2019, the insurer called the complainant to advise it had made the
decision not to pay the sum of $19,015 to the complainant and instead only paid the
sum of $1,923 for the period 18 December 2019 to 14 January 2020.
The complainant requests that she be paid the sum of $17,092 ($19,015 less $1,923
already paid) for the period 18 December 2019 to 14 January 2020.
Insurer says complainant is not entitled to any further accommodation costs
The insurer acknowledges that it initially made an offer to pay the complainant
$19,015 for temporary accommodation for the period 18 December 2019 to 14
January 2020. However, in its notice of response to AFCA dated 22 September 2020
it says it does not believe that this offer ‘ was a sensible offer to make given longer-
term accommodation would be required ’ and this amount was not calculated with a
long-term arrangement in mind. The insurer considers the amount of $1,923 that it
ultimately paid for this period is fair in the circumstances.
The insurer further notes it subsequently offered the complainant the equivalent of six
months’ rent at $400 per week totalling $8,800 for the period from 14 January 2020 to
14 June 2020. The notes the insured event occurred on 6 May 2020 and the policy
provides temporary accommodation for a maximum period of 12 months from the
listed event taking place. The insurer notes the settlement of $8,800 for 6 months
from 14 January 2020 goes beyond this.
Available information shows complainant made arrangements based on offer
While the insurer notes that the claim notes form 18 December 2019 indicate that the
complainant told the insurer she had already moved in with her mother at this point,
the complainant says this is misleading. She says that when she was evicted from the
temporary accommodation on short notice due to her son’s behaviour, she had to
move to her mother’s property as she had nowhere else to go and was mindful of her
disabled son having nowhere to live. She reports that her belongings were left at the
temporary accommodation.
The complainant says that as a result of accepting the offer of $19,015 made by the
insurer, she subsequently moved her and her family’s belongings out of the temporary
accommodation and in to her mother’s property. She reiterates that her mother’s
property was much less suitable to her son’s needs than the temporary
accommodation she had been staying in, and she would not have agreed to
permanently move out of the temporary accommodation and into her mother’s
property had she not been offered and accepted the sum of $19,015 for the period 18
December 2019 to 14 January 2020.
Determination | Case number: 713569 Page 12 of 15
I accept the complainant’s reasoning in this regard. There is no dispute the insurer
made an offer of $19,015 to which the complainant agreed, only to subsequently
withdraw the offer. The complainant has explained how she took action to move to
her mother’s property even though it was not suitable for her disabled son. I consider
this prejudiced the complainant. Accordingly, the insurer is required to pay a further
$17,092, this being the difference between the $19,015 it originally offered the
complainant for the period 18 December 2019 to 14 January 2020 and the $1,923 it
subsequently paid for the same period.
Regarding the $8,800 paid for a further 6 months accommodation from 14 January
2020, the complainant says that at no fault of her own, she is unable to complete the
maintenance work required of her by the insurer. She also says the insurer’s claim
notes show that it only ceased providing accommodation due to its allegation that she
was delaying completion of the maintenance work. She says this is not true.
Accordingly, she is seeking further accommodation costs for the period 15 July 2020
to present at the previous rate of $400 per week until the insurer puts her in a position
where she can attend to completing the maintenance work by submitting to her an
updated and fully costed scope of works in line with CF’s recommendations on
maintenance works.
I am not persuaded by this reasoning. As noted in sections 2.1 and 2.2 above, I
consider there have been ongoing building and maintenance issues at the property
for some time which the complainant has been reasonably aware of. As stated above,
these issues are not related to the insured event which is the subject of the current
claim, and it is not the insurer’s reasonability to organise a fully costed scope of works
for these pre-existing building and maintenance issues.
I am not satisfied that the complainant could not have undertaken the repairs during
the period of time that the insurer has already provided temporary accommodation
for. I consider the $8,800 the insurer has already paid for the 6-month period
commencing 14 January 2020 onward is fair in the circumstances.
Further costs raised by the complainant
The complainant has also advised that she spent $675 in moving costs when she was
forced to move out from the temporary accommodation at short notice due to her
son’s behaviour , and she would like to include the receipt for this cost with the rest of
her bills/invoices that the insurer has already agreed to reimburse her for.
The insurer has not provided any explanation as to why it should not cover this
expense, so in the absence of anything to the contrary I consider it fair in the
circumstances the insurer covers this.
Additionally, the complainant says that after one of the subsequent ransacks, the
insurer’s assessor asked her to arrange clean up of the mess that was created by the
ransack before the assessor could complete her assessment of the contents. She
says she paid approximately $1,000 for the clean-up, and she would like to include
Determination | Case number: 713569 Page 13 of 15
the receipt for this cost with the rest of her bills/invoices for reimbursement by the
insurer.
I note the ransacking of the complainant’s prop erty is the subject of a new claim with
the insurer and is not being considered under this AFCA complaint. Accordingly, I will
not make a determination on this issue, however the insurer is advised to consider the
complainant’s request on its merits.
Determination | Case number: 713569 Page 14 of 15
3 Supporting information
3.1 Policy wording
Product disclosure statement (PDS) page 33:
Water and oil leaks
If loss or damage is caused by water or oil leaking or escaping from an item shown here.
Covered
water leaking or escaping from:
- house gutters, drainpipes or pipes
- sanitary fixtures – for example, baths or toilets
- appliances – for ex ample, washing machines or dishwashers
- waterbeds
- aquariums
- water tanks
- swimming pools
- oil leaking from a fixed heating system or sealed po rtable heater
- costs to locate the cause of damage (if we agree to pay thes e costs before you make any
arrangements).
Not covered
water leaking or escaping from a shower recess of base
costs to repair or replace the item that the water or oil leaked or escaped from
PDs page 45:
Temporary accommodation for home owners
If a listed event causes loss or damage to your home and we agree you can’t live in it and you
need to move out so it can be repaired or rebuilt.
We pay this benefit on top of your Buildings sum insured
Covered under Buildings Insurance
costs for temporary accommodation that we agree are reasonable and appropriate for you,
your family and your pets that you normally keep at your site
any additional living expens es that we agree are appropriate
costs to remove and store your contents and then ret urn them to your home.
We pay these costs for the reasonable time we agree it should take to repair or rebuild your home
for up to 12 months from when the listed event took place
Conditions
you must have lived in your home permanently before the listed event took place
we must agree to pay the costs before you make any arrangements
we won’t cover costs caused by unreasonable delays in repairing or rebuilding your home.
PDS page 71:
We will choose to settle your claim for loss or damage to your home or 'other benefits' in one of the
following ways:
1. Arrange for repairers, builders or suppliers to repair or rebuild your home.
If you agree, we can arrange for our preferred repairers, suppliers or builders to repair or rebuild
your home.
2. Pay you the reasonable cost to repair or rebuild your home.
We can choose to:
pay you
pay your nominated repairer, supplier or builder, or
provide you with store credits from one of our nominat ed suppliers.
Determination | Case number: 713569 Page 15 of 15
For example, we may pay you directly when:
you decide not to repair or rebuild your home, or
you don’t start repairing or rebuilding your home within 6 months from when the damage takes
place, or within any longer period we agreed to in writing.
3. Pay you the buildings sum insured
We may do this when we consider your home to be a total loss or when we choose to do so.
If we pay you the Buildings sum insured, then your policy ends and you don’t get a refund of your
premium.
We will continue your liability cover (see pages 49 to 51) for up to 6 months from when the listed
event took place. However, liability cover will end during this period if:
construction starts at your site, or
you sell the land, or
you take out a new Buildings Insurance policy for your site.
4. Paying for other benefits
If we agree to pay you for 'other benefits', then we will choose the method of settlement.
We provide examples of how we calculate claims under Buildings Insurance – see pages 79 to 82.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.