Home / Hollard / Determination 713497

Determination 713497

Storm damage claim scope of works and cash settlement dispute

FirmHollard
Decided2021-05-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$19,911
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a February 2020 storm the insurer accepted part of the home damage and proposed a cash settlement. AFCA rejected the complainant's claim for the disputed cracking and found no unreasonable delay, but ordered the management fee and a 20% contingency to be paid, plus a reimbursement of make-safe costs.

The insured must prove that disputed damage was caused by the insured storm event, and the expert reports showed wear, tear and movement; the insurer may cash settle under the policy if it exercises that discretion fairly.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Hollard determinations · Find similar determinations

Text of the determination

Determination Case number 713497 Financial firm The Hollard Insurance Company Pty Ltd Determination | Case number: 713497 Page 2 of 12 Case number: 713497 14 April 2021 1 Determination overview 1.1 Complaint The complainant lodged a claim in February 2020, for storm damage under his home insurance policy underwritten by the financial firm (insurer). The insurer accepted the claim, however, a dispute arose and remains about the extent of damage from the event. The complainant says the insurer‟s scope of works (SOW) does not cover all damage from the event and maintains it should complete repairs rather than cash settle him for repairs. The insurer maintains its final SOW sufficiently meets its obligation in relation to the event related damage. The complainant also says the insurer handled his claim in an unprofessional manner and has intentionally and unreasonably delayed , causing him and his family significant stress and inconvenience. 1.2 Issues and key findings What is the extent of the insurer’s liability for building damage? The insurer‟s scope of works reasonably reflects the storm -related damage for which it is liable. The complainant has not shown other issues including water ingress from veranda and wall cracks at the property are a result of the storm event of February 2020 or is otherwise covered under the policy. The insurer is therefore entitled to rely on its SOW to settle the claim. The insurer is to settle the claim as set out in section 2.3 of this determination. Is the insurer required to increase its settlement for building repairs? I accept the insurer is entitled to rely on the scope of works and quotation from its claims manager (C) to cash settle the claim. However, I determine that the insurer should pay the management fee portion of the SOW as well as an additional 20% of the total amount, for contingencies. Is the insurer entitled to cash settle the claim? Yes, the policy allows the insurer to determine how the claim should be sett led. While the insurer appeared willing to conduct repairs earlier in the claim, as the claim progressed there has been a clear breakdown in relationship between the complainant and the insurer (including its service providers) with the complainant Determination | Case number: 713497 Page 3 of 12 alleging misconduct. In these circumstances, it is appropriate that the complainant be cash settled to conduct his own repairs. Is the insurer required to compensate the complainant? No, the insurer is not required to compensate the complainant. This is because the available information does not show any extended period of unreasonable/unjustified inaction by the insurer. Where there ha ve been delay, there is evidence that the complainant contributed to it. 1.3 Determination This determination is partly in favour of the complainant. The insurer is to settle the claim as set out in section 2, of this determination. Determination | Case number: 713497 Page 4 of 12 2 Reasons for determination 2.1 What is the extent of the insurer’s liability for building damage? Circumstances of the complaint The complainant lodged a claim for storm damage to the insured property during a storm event in February 2020. The insurer accepted the claim; it conducted „make - safe‟ and assessment to establish the extent of damage from the event. During this process, the complainant raised concerns about:  The make-safe completed by the insurer saying water was still entering the home  The insurer‟s decline of cover for cracking damage to areas of the home  The insurer‟s handling of the claim. The insurer subsequently agreed to cover some damage deemed to have been caused by the storm however, a dispute remains about:  the scope of works,  the insurer‟s decline of cover for cracking to eaves,  tile dislodged/cracked on balcony,  cracking to ceiling/bulkheads (around lining re-entrant corners) through the home and  water staining/damage to window reveals throughout the house, other than 2 bedrooms. The insurer says the complainant has not met the onus to establish the disputed damage was caused by the storm. It says the expert information shows the damage was not the result of a single storm event, rather it was pre-existing and caused by factors including gradual deterioration, wear, tear and ongoing movement. It says damage caused by these factors are excluded from cove r under the policy. Further, the insurer says it has handled the claim appropriately and did not unreasonably delay. It says factors including difficulty in arranging re-assessment with the complainant to determine cause of the disputed damage, and factors outside of its control such as the impact of COVID- 19 rules on its service providers‟ condition of attendance, as well as the complainant‟s own conduct have contributed to the overall time taken. The complainant maintains all damage claimed should be covered. He says the insurer ‟s make-safe attempts were inadequate and water continues to enter the home as it has not adequately identified the point of entry. The complainant says issues with the make- safe as well as the insurer‟s conduct have caused a great deal of stress and inconvenience to him and his family. Determination | Case number: 713497 Page 5 of 12 Policy covers loss or damage caused by storm T he complainant‟s policy covers loss or damage caused by an insured event that occurs during the period of cover. Insured events listed in the policy includes storm. Cover under the policy is subject to terms and conditions/exclusions set out in the policy documents being the policy schedule and product disclosure statements (PDS) combined. The onus is on the complainant to first establish, on the balance of probabilities, (that is, more likely than not) that all damage claimed falls within an insured event. It is only after this occurs that the insurer must establish an exclusion applies to defeat the claim (wholly or in part). The insurer does not dispute that a storm occurred and agreed to cover some damage. However, it says it declined cover for the disputed damage because:  the complainant has not shown it was caused by the storm,  there is evidence the damage is pre-existing, due to wear, tear, gradual deterioration and general movement (factors which are excluded from cover) The insurer also says its proposed settlement adequately covers repairs required for storm related/accepted damage. The questions that remain are whether:  the complainant has met the onus to show on balance, that the disputed damage was caused by the storm and if so,  has the insurer established a basis to decline cover for the damage? The insurer provided expert reports to support its position on SOW and disputed damage The insurer appointed assessor (C) to inspect and report on storm damage to the complainant‟s property. C, along with its roofer attended the premises on 24 March 2020. Following its inspection, C provided a report which included:  the complainant reported storm water entered the property, damaging ceilings, walls to bedroom (numbered 2), kitchen and lounge as well as to a shared fence that had started to lean.  confirmation that the cause of damage for the above is the storm event  a scope of works (SOW) for repairs to resultant water damage/staining to gyprock and wall and ceiling in three areas (above), cleaning, remove/replace 4 damaged special light, 1 Fluro dual light, 1 analogue camera including cable.  photographs showing cracked damage to balcony and porch/alfresco which were noted as unrelated to storm event C notes that its roofer did not find any damage to the roof which is recorded as being in good condition and concluded “ [d]amage to the house has occurred due to the large volume of water the roof received during the recent storm cell, in which the Determination | Case number: 713497 Page 6 of 12 strong winds have pushed the lead flashings up around the roof accessories and allowed water to enter the roof cavity. water has then travelled down brick cavities and into the concrete slab, which from there the water has travel. Gutters and valleys have als o overflowed during this event” . (Sic) C re-attended the insured property on 13 August 2020. After C‟s attendance, it provided a report which lists all damage which the complainant considers is a result of the storm and found:  cracking damage to alfresco not from storm and due to gradual wear and tear , Damage to lights in alfresco (beneath balcony) was suspected to be from leak however, C suggested that an engineer attend to establish cause.  dislodgement of skirting tiles from brick wall, cracked floor tiles and plasterboard ceiling on balcony as well as malfunctioning sliding door inconsistent with single storm event.  damage observed to sliding door jamb, architraves, wall cracking, hardwood window reveals/window, and linen door in bedroom 1 however, engineer attendance is recommended to determine cause.  damage to plasterboard walls from restorer cutting holes, however, engineer to determine cause of damage to sliding door jamb and architraves as well as ceiling and wall cracks need engineering assessment to determine causation.  damage to sliding door jamb, architraves and window reveal in bedroom 3. Engineer to determine cause.  engineer to determine cause of damage to eaves  en-suite 1 and 2 have damage to tiled wall and window reveal which do not appear consistent with storm event however, engineer to determine cause  cracking damage to entrance and hallway wall and ceiling as wells as damage to hardwood window reveal in entrance and sliding door jamb and architraves – engineer to determine cause  water damage to 1 alarm sensor at front entry confirmed by electrician The insurer obtained and provided a structural engineer‟s (SC) report on the cause of the disputed damage. The reports provided confirm SC conducted an inspection on 13 October 2020 and provided reports dated 21 & 27 October 2020. SC considered some damage to the living/kitchen ceiling lining, as well as rear bedroom window consistent with the claimed event. SC also found an en-suite window tiling reveal showed evidence of damage from long-term differential shrinkage or movement, however, concludes it is possible that the storm caused some damage to it. SC concluded the disputed damage was not caused by the February 2020 storm. I accept C and SC are suitably qualified to report on the cause and extent of damage to the insured property. I have carefully reviewed the reports provided and I am Determination | Case number: 713497 Page 7 of 12 satisfied the writers have reached conclusions following inspection and adequate analysis of available information, applying their expertise. For ease of reference, I will address the disputed damage in the following paragraphs under the headings ceiling/bulkhead cracks and general cracking, tile cracks around balcony balustrade, balcony sliding door and eaves. Ceiling/bulkhead cracks and general cracking SC confirms ceiling cracking to the bulkheads is mainly around its re-entrant corners and this “ is typical of the constrained response of building elements, in a configuration without movement control joints, as is the case here, to general building movement from changes in environmental conditions such as, but not limited to, variations in temperature and humidity”, SC says no construction joints were observed to the areas. Further, SC found general cracking around the home was not caused by the storm, but rather are a result of ongoing movement and generally within industry tolerance meaning they would not generally require repair Tile cracks around balcony balustrade SC found damage to the tiles “ consistent with long-term thermal contraction/ expansion of the tiles / slab relative to the balustrade, in combination with tile stresses during the original tile laying / cutting process ” and notes the pattern is something he often encounters and could not have been caused by any storm mechanism. Balcony sliding door Among other things, SC confirms damage to the sliding door could not have been caused by storm mechanisms. SC concludes the damage was the result of long term movement and wear and tear. Eaves SC concluded the:  the overflow slots to the guttering which were observed “ would prevent a back- charge of water to the eaves lining during intense rainfall events” and  the damage not consistent with single storm event Information does not establish entitlement to cover for disputed damage As stated , the complainant‟s on us to establish a valid claim, extends to showing on balance that all damage being claimed was caused by the storm event. On the available information, I am not satisfied the complainant has met this onus in relation to the disputed damage. Determination | Case number: 713497 Page 8 of 12 I have carefully reviewed information provided by the parties. I accept the reports (including photographs) show on balance that the damage was more likely than not the result of ongoing issues including wear, tear and movement rather than the storm event claimed. While the complainant clearly expresses his disagreement with the in surer‟s trades, assessment and findings (and alleges the insurer and its agents have been fraudulent), he has not provided reports from a suitably qualified builder or expert to show on balance that the disputed damage was a result of the single storm event claimed or any other information that may contradict the findings by the insurer‟s experts and/or support his position. Further, while the complainant suggests the insurer should have further investigated and determined reasons for continued water ingress into the kitchen, I am satisfied that the reports from C which incorporates observation/conclusion by its roofers is sufficient and additional attendances by the insurer was sufficient. In view of the above, I am satisfied that the insurer is not required to cover the disputed damage. 2.2 Is the insurer required to increase its settlement for building repairs? Proposed settlement largely meets insurer’s liability for storm related damage The insurer accepted liability for:  prepare (including scrapping, patching and sanding) and loungeroom ceiling linings. On available information the allowance seems to take into account the hole made in the kitchen ceiling lining for make-safe.  repair bedroom 1 sliding door and two hardwood window reveals  prepare (including scrapping, patching and sanding) and paint bedroom 2 wall  repair two en-suite window reveals  replacement of 4 damaged special light and 1 dual fluro light  remove and refit inoperable rear bedroom window  installation of new tiling to vertical window reveal in en-suite bathroom,  replacement of two damaged analogue cameras  replacement of 6 sensor LED lights The insurer proposed settlement based on C‟s scope of works for the above at a total of $12,660 (including GST). I note the insurer has not included a 19% management fee of $2,699.80, provided for in the SOW and quote to the proposed settlement. The total being $15,630.40. Determination | Case number: 713497 Page 9 of 12 The complainant has provided numerous submissions in which he disagrees with the scope and settlement amount proposed by the insurer. He maintains the insurer should amend the SOW to cover additional damage. The complainant was invited to provide information in support of his position, such as material from a suitably qualified person such as report, scope of works/actionable quotes and information that may contradict conclusions by C and SC about the cause of the disputed damage. He has not provided any information of this nature to date. I note that at a stage the complaint, the complainant had indicated he was obtaining a building consultant‟s report, however , he did not provide one citing cost and inability to find an expert that would agree to attend due to their (expert‟s) work for the insurer. Ther efore, the insurer‟s material is unchallenged. Further, the complainant‟s statements as to why he does not consider the insurer‟s SOW (matching paint colour, process of protecting lighting during painting process etc) is not supported by any evidence that what is provided for in C‟s SOW/quotation does not meet industry standard, would result in repairs being non-compliant, is not achievable s hould the claim be cash settled and does not meet the insurer‟s obligation under the policy terms. I am satisfied the insurer is entitled to rely on its SOW. The repairs included in the SOW are consistent with the claim-related damage identified in the expert reports. Further, it is unclear whether building/structure remediati on which the insurer‟s restoration company noted was required in May 2020 (for which it quoted $6,124.66 excl GST) covering bedroom, kitchen, and lounge has occurred. In the event that the remediation has not been carried out, the complainant is to obtain and provide an actionable restoration quote for the specified areas to the insurer. The insurer is to assess the quote and propose cash settlement for the remediation costs within 14 days of the complainant providing an actionable quote. 2.3 Is the insurer entitled to cash settle the claim? Policy allows insurer to decide how to settle claim While the complainant seems to have initially suggested cash settlement, he now wants the insurer to conduct the repair. Under the terms of the policy, if the insurer agrees to pay a claim, it will decide whether to repair/rebuild or pay the complainants what it would cost it (insurer) to repair/rebuild the home. I accept the insurer is entitled to exercise this discretion under the policy terms however, it is required to exercise such discretion fairly, reasonably and consistent with utmost good faith. The available information shows a breakdown in relations between the complainant and the insurer (including its service providers) with the complainant alleging misconduct and even fraud on their part. The history of complaints made by the Determination | Case number: 713497 Page 10 of 12 complainant through the claim process including about claim handling and conduct of the insurer‟s contractors , is evidence of a breakdown in relations/communication. In the circumstances, and considering I accept the insurer is not required to cover the disputed damage (repairs of which are likely to overlap), an exercise of the insurer‟s discretion to cash settle should it wish to do so , is reasonable. How the claim should be settled. The complainant has not provided any quotations for repairs, nor has he provided any expert report or other persuasive information to show the insurer‟s SOW is insufficient to complete accepted repairs. The insurer is entitled to cash settle the complainant the total amount in C‟s revised scope of works (including management costs). However, it is to make an allowance for the contingencies that may occur in the repair process by adding 20% contingency payment to account for transference of risk of repairs to the complainant. If the complainant accepts this determination, the insurer should pay a total of $18,756.48 (total quote of $15,630.40 + 20% contingency of $3126.08) within seven days of acceptance. Other matters This determination only addresses disputed building damage. I understand the complainant also made claims for items of contents which do not appear to form part of the dispute. Further, I note that in the insurer‟s response to the complainant by email dated 17 September 2020, it says “happy to accept these items for a cash settlement of $1,155.00 ” in response to the complainants request for re -imbursement for costs $880 and $275 (including GST) which he incurred from undertaking make-safe and/or make safe inspection to a sliding door and window. If it has not already done so, the insurer is to reimburse the complainant the amount it agreed to. 2.4 Is the insurer required to compensate the complainant? We can award compensation in certain circumstances Under AFCA‟s Rules, we may award an amount of compensation (capped at $5,000) for non-financial loss where a complainant has suffered:  an unusual degree or extent of physical inconvenience  time taken to resolve the situation  interference with their expectation of enjoyment or peace of mind. However, we expect a complainant to be moderately robust and bear the usual stress and inconvenience associated with an insurance claim. Determination | Case number: 713497 Page 11 of 12 The complainant says the insurer did not take steps to prevent water entry into the home and its delays have resulted in his family having to live in an unsafe situation, stress and inconvenience. No award of compensation is warranted in the circumstances I have reviewed the timeline in the insurer‟s file notes/reco rd and submission as well as information provided in both parties‟ submissions (including email correspondence). Having carefully reviewed this information, I do not consider the insurer unreasonably delayed or mishandled the claim. There is no record of extended periods of inaction by the insurer. Available information shows the insurer‟s c laims assessment company (C) made numerous attempts to contact the complainant and arrange re-assessment; it also shows different trades/experts were appointed to determine the extent of loss/damage to building and contents from the claimed storm event. While the complainant has questioned some of the records of contact by C (provided in the insurer‟s submissions) and says he cannot locate any evidence of said phone calls in his records, he has not provided his phone records to support this, rather he seems to demand that C provides its record. It is important to note that as the person making an allegation/claim it is up to the complainant to provide evidence to support the allegations; he has not done so. I am satisfied the time taken on this claim was due to a combination of factors including availability of the complainant, issues with organising reattendance of the insurer‟s trades /service providers due to the complainant being unavailable (for personal/health reasons), as well as COVID-19 related limitations. Available information shows the insurer requested several attendances/reattendances of the insured premises. I note the complainant considers the need for re-attendance arose because of inadequate make-safe and investigation by the insurer in the firsts instance; he seems to suggest this brings the insurer and/or its service providers competence to determine what is or is not incident related damage into question. I have considered this suggestion and do not agree. I accept the insurer was entitled to further assess the claim for additional damage and issues relating to its SOW raised by the complainant during the claims process. After carefully considering the parties submissions, I do not consider the overall time taken unreasonable. In the circumstances, an award of compensation for non- financial loss is not warranted. Determination | Case number: 713497 Page 12 of 12 3 Supporting information 3.1 Relevant policy terms Exclusions The following General exclusions apply to all covers under your policy. You are not covered for any loss or damage caused by or resulting from, or the costs incurred from or of: …  gradual deterioration, including wear and tear, rust, corrosion, depreciation, fading or deterioration from exposure to light; …

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.