Home / Strata Community Insurance Agencies Pty Ltd / Determination 713478

Determination 713478

Cash settlement amount for fire and collision building damage; loss of rent and professional fees

FirmStrata Community Insurance Agencies Pty Ltd
Decided2021-03-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$30,654
Non-financial loss—
Amount claimed$315,767
SourceAFCA PDF

Summary

After a car struck and fire damaged a commercial building, the insurer cash settled $229,185.50 and the complainant sought a larger settlement, loss of rent and professional fees. AFCA ordered a 15% contingency addition of $30,654.29 with interest, and rejected the loss of rent claim.

The insurer's actionable quote was reasonable but omitted likely repair contingencies, while loss of rent failed because no tenancy existed at the date of loss.

Issues

Subjects and remedies

home or building damagemotor vehicle collisionpay claimpay interest

Related

All Strata Community Insurance Agencies Pty Ltd determinations · Find similar determinations

Text of the determination

Determination Case number 713478 Financial firm Strata Community Insurance Agencies Pty Ltd Determination | Case number: 713478 Page 2 of 10 Case number: 713478 25 February 2021 1 Determination overview 1.1 Complaint The complainant lodged a claim for building damage following a motor vehicle collision and fire at the insured address on 12 July 2019. The insurer accepted liability and cash settled the claim for $229,935.50 on 8 January 2020 as the complainant wanted to use his own builder. The settlement excluded damage to the tenant’s fit out and property as these items did not form part of the insured property. The complainant believes the cash settlement is insufficient. The complainant seeks an increase in the cash settlement to $315,766.93, compensation for claim delays, loss of rent and ongoing claims preparation costs. 1.2 Issues and key findings Should the cash settlement for the building damage be increased? The cash settlement for the building damage should be increased by 15% ($30,654.29) to include an allowance for the contingencies that are likely to arise in the repair process. Is the complainant entitled to settlement for loss of rent? The insurer is not liable for loss of rent as there was no tenancy agreement in place at the time of the loss. Is the insurer liable for further professional fees? The insurer has agreed to pay ongoing professional fees as outlined in section 2.3. 1.3 Determination This determination is partially in favour of the complainant. The insurer is to cash settle the complainant an additional $30,654.29 being a 15% increase in the cash settlement for the building damage to cover contingencies. Interest is payable on the amount from the 20 January 2020 until date of payment of the claim. Determination | Case number: 713478 Page 3 of 10 2 Reasons for determination There has been a full exchange of information between the parties and each party has had the opportunity of addressing the issues in dispute. This complaint has been referred for determination to a panel comprising the Lead Ombudsman, a member with extensive insurance experience and a member with significant experience as a consumer representative. The determination follows consideration of all relevant information. It is based on what is fair in all the circumstances having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. 2.1 Should the cash settlement for the building damage be increased? Insurer settled claim for cost to repair building damage This complaint arises from damage to a commercial Owners Corp building which was damaged after a car struck the building and the building was fire damaged on 12 July 2019. After investigation the insurer accepted liability in November 2019. The insurer indemnified the complainant for the make safe works and arranged a scope of works (SOW) for debris removal and building repairs. The insurer assessed the damage and offered to complete repairs. This offer was declined by the complainant as he wanted to use his own builders. The insurer agreed and paid the complainant $229,935.50 in January 2020. This was based on the actionable quote from its builder A, which included building repair costs of $204,361.97. The insurer settled the complainant the following:  Make Safe works completed by complainant’s builder M $4,898.25  Insurer’s building quote from A $204,361.97  Removal of debris by complainant’s trade N $10,775.28  Air conditioning and mechanical repairs per complainant’s trade C $9,900  Subtotal $229,935.50  Less $750 excess  Total $229,185.50 The complainant says the settlement for the building damage is not sufficient. He obtained an independent quote from IP for $315,766.93 based on a scope of works prepared by S. The complainant seeks the difference between the quotes provided by A and IP. Determination | Case number: 713478 Page 4 of 10 The insurer says the settlement represents the full cost of insurable works as S’s scope included items not covered by the policy including the tenan t’s fit out, the cost of removing further debris and tenant’s contents . Tenants fit out not covered under the policy The insurer says the following items formed part of the tenant’s fit out and property:  suspension of a metal ceiling grid and ceiling tiles;  ceramic floor tiles, timber substructure to ramped tile flooring, a nd concrete floors  a cool room  partition walls. The parties agree the policy does not cover the tenant’s fit out or property. However, the complainant says the retail lease was terminated on 10 July 2019. An abandoned goods notice was sent to the tenant on 11 July 2019, allowing two days (until the end of 13 July 2019) to remove all property from the lot. This did not occur. The complainant says the tenant ’s property became the landlord’s possessions when the lease expired and therefore fell under the definition of insured property. Transfer of ownership had not occurred as at the date of loss The lease agreement provides that the tenant is to remove all tenant installations and tenant property when the lease comes to an end. Unless otherwise agreed or if not removed the property is considered abandoned and becomes the property of the landlord. Details are set out under section 3.2 of this determination. The lease was terminated early by the complainant due to non-payment of rent. The complainant sent instructions to the tenants on 11 July 2019 stating it had taken back the premises as of 10 July 2019. It said: As at this date, the landlord hereby gives you formal notice that you must collect your goods and belongings within two (2) days due to its perishability. Failing which your goods and belongings will be deemed abandoned and the goods will be disposed of. The tenant’s installations and property would not would not be considered abandoned until after 13 July 2019. The tenant’s belongings (including the refrigerators) had not become property of the complainant as they had not been deemed to be abandoned. The insurer is not liable to meet the cost of the damage to the tenan t’s property. Cash settlement should include allowance for contingencies The complainant rejected the insurer’s offer to complete the works preferring instead to provide an independent quote for cash settlement purposes. A side by side comparison of the quotes has been provided by the insurer. Excluding the items that were accounted for in the insurer’s settlement or form part of the Determination | Case number: 713478 Page 5 of 10 tenant’s fit out, the following items appear to be in dispute . The insurer’s comments are included in brackets: Demolition: o Demolish colorbond metal capping to the parapet walls 32lm (Allowed 13lm damaged, with generous provision for cuts included.) o Demolish colorbond metal sheets to the parapet walls 26sqm (Allowed for in Allwood Quote however only 8m x .8m services this area | 26sqm is unclear) o Demolish the metal box gutter, sumps & stormwater pipework 16lm (Only 8lm damaged behind parapet wall included in Allwood Quotation) o Demolish the set plasterboard ceiling to the bathroom amenities (Unnecessary) o Demolish the electrical fixtures & cabling including: cabling generally, recessed ceiling lights x 34m (Confined allowance included as 1) Predominantly tenant fit out 2) Claimed scope inflated and not reflective of extent of loss- proposal includes complete rewire of wiring which is operationally unaffected.) Carpentry: o Supply & install new door architraves to bathroom amenities (Confined allowance included prep and redecoration | Replacement exceeds necessary reinstatement) Roof and roof plumbing: o Supply labour and materials to install new Colorbond capping to the parapet wall structures 32lm (Confirmed allowed included 13lm replacement only. Inflated scope of works.) Electrical services: o Supply labour and materials to install new electrical fixtures and cabling (predominantly relates to uninsured property) Tiling and waterproofing: o Supply labour & materials to install new ceramic floor tiles 169sqm (Allowance for cleaning only) In the response of 31 August 2020, the complainant through a representative did not refute the above items. The representative simply reiterated the position that the complainant sought the difference between the scopes of works. In the absence of information to show the insurer’s scope was inconsistent with policy coverage, the panel is unable to say it was insufficient to reinstate the property in line with the terms of the policy. The insurer’s quote was actionable and intended to be actioned . The panel accepts however that there are unknown issues that are likely to arise in the repair process. These contingencies have not been accounted for in the insurers quote. The contingencies would likely have been identified by the insurers builder and paid for by Determination | Case number: 713478 Page 6 of 10 the insurer if the insurer had completed the repairs. In the circumstances the panel determines it is fair that to add 15% or $30,654.29 to the insurers builder A’s quote to cover the possible contingencies. Other damage The complainant requested reimbursement for removal of debris and says delays caused further damage to the roof due to deterioration. The insurer settled the complainant for removal of debris in January 2020. It has offered to review further invoices for removal of tenant’s contents. It says however that the complainant’s quotes do not allow for a specific amount for this. The panel accepts the insurer offer to review and reimburse the complainant upon presentation of a separate invoice detailing the items to be removed is fair in the circumstances. The repairs have not begun since the insurer settled the claim in January 2020. The delay is not due to the conduct of the insurer. The complainant could have commenced the repairs. The panel determines the insurer is not liable for deterioration caused by delaying repairs. 2.2 Is the complainant entitled to settlement for loss of rent? Policy covers loss of rent in certain circumstances The complainant claimed for loss of rent from the date of loss until completion of repairs saying the property could not be re tenanted in its damaged state. The policy covers for loss of rent in certain circumstances. The policy terms are set out under section 3.1 of this determination. The insurer says the policy required the complainant to provide evidence the property was to be leased at the time of the loss, that reasonable steps had been taken to find a tenant. It also said the complainant had not provided the amount being sought. The complainant agrees the tenant was being evicted as at the date of loss but says the insurer’s failure to discharge its obligations under the claim prevented repairs from being completed. Due to this, the property could not be re tenanted. Loss of rent not payable under policy as no tenancy agreement in place The lease agreement had ended at the election of the complainant. There was no tenancy on foot. As there was no agreement in place at the time of the loss the panel is satisfied the insurer is not liable under the terms of the policy for the claimed loss of rent. Determination | Case number: 713478 Page 7 of 10 Insurer is not liable for indirect loss The complainant says had the insurer adequately assessed and settled the claim, it would have been able to have all works completed and the premises returned to a condition suitable to be leased. AFCA may look at direct or in direct financial loss suffered due to the insurer’s actions or delays. Given there was no tenancy agreement at the time of loss, and no information has been provided to show the property was to be re let, any potential loss of rent due to insurer delays would be categorised as indirect financial loss. AFCA may award indirect financial loss to a maximum of $5,000 where it considers an insurers actions have caused or contributed to that loss. The insurer had settled the complainant for the damage in Januar y 2020. It had offered to complete the repairs. Prior to the settlement the insurer had engaged with the complainant and had investigated the claim. It did not unreasonably delay the investigations. While there may have been some delays in the investigation and assessment of damage the insurer ’ s conduct was not egregious. The panel determines the insurer is not liable for the indirect loss claimed. 2.3 Is the insurer liable for further claims preparation costs? Insurer liable for further professional fees The policy says: Professional fees We will pay up to $50,000 for the reasonable cost of professional fees and other expenses You necessarily incur with Our written consent in the preparation of a claim under Section 1 and when applicable Sections 8, 10 and 11. The complainant claimed for claims preparation costs due to the involvement of loss adjusting firm L, environmental consultant E and builder S. The insurer says it accepted these costs in good faith and, as at July 2020, had settled the complainant for E and S as well as costs to date from L. The complainant says the insurer incorrectly allocated settlement amounts for E and S to claims preparation rather than professional fees, and ongoing claims preparation costs are being incurred. The panel accepts these costs would be more appropriately categorised as professional fees and should not reduce any separate cover for claims preparation. On careful examination of the policy however, no separate provision is made for claims preparation costs. Determination | Case number: 713478 Page 8 of 10 Based on the policy wording, the panel accepts amounts payable to E, S and L are appropriately categorised under the heading Professional fees and are subject to the policy limit of $50,000. E and S’s costs have been paid. Given the ongoing service being provided by L, the insurer is to continue reimbursing its reasonable professional fees up to the policy limit in accordance with the terms set out in the policy. Determination | Case number: 713478 Page 9 of 10 3 Supporting Information 3.1 Relevant Policy terms Insured Property (a) Building means: building or buildings as defined by the Strata Schemes Management Act, Strata Titles Act, Community Titles Act or similar legislation applying where Your Building is situated, including: (i) outbuildings; (ii) Fixtures and Structural Improvements including fencing, gates, paths and roadways, retaining walls, awnings, external blinds and signs; (iii) tennis courts, in-ground swimming pools and spas; (iv) fixed or built in plant, equipment and appliances; (v) floor coverings but excluding carpets (whether fixed or un-fixed) and Floating Floors; (vi) …… Loss of rent 1. (a) Rent When the Common Area or a Lot has been leased out, or can be substantiated by means of a signed agreement that the Common Area or Lot would have been leased out, We will pay You and/or the Lot Owner for the Rent that is lost or would have been lost if the Common Area or Lot is made unfit to be occupied for its intended purpose by: (i) Loss or Damage that is admitted as a claim under Section 1; or (ii) reasonable access to or occupancy of the Common Area or Lot is prevented by damage from an Event claimable under Section 1 happening to other property in the immediate vicinity. We will pay: - under (a) (i) from the time of the Event until the time the Common Area or Lot is relet following completion of rebuilding, repairs or Replacement provided You or they demonstrate that all reasonable actions have been taken to obtain a new Tenant (if applicable); or - if Your Insured Property is not rebuilt or replaced, for the time it would have reasonably taken to rebuild or replace Your Common Area or Lot up to a maximum of twelve (12) months; Determination | Case number: 713478 Page 10 of 10 - under (a) (ii) from the time of the Event until the time when access to the Common Area or Lot is re-established. 3.2 Tenancy Agreement GENERAL AGREEMENTS BETWEEN LANDLORD AND TENANT 5.1 When the term ends, the tenant must – 5.1.1 return the premises to the landlord clean and in the condition required by this lease, and 5.1.2 remove the tenant's Installations and other tenant's property from the premises and make good any damage caused in installing or removing them. If the tenant leaves any tenant's installations or other tenant's property on the premises after the end of the lease, unless the landlord and tenant agree otherwise – 5.1.3 all items of tenant's installations and tenant's property will be considered abandoned and will become the property of the landlord, but the landlord may remove any of the tenant’s installations or other property of the tenant and recover the costs of removal and making good as a liquidated debt payable on demand; and 5.1.4 the parties intend that clause 5.1.3 operate in relation to tenant's installations and tenant's property in place of any legislation that might otherwise apply to goods remaining on the premises.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.