After a car struck and fire damaged a commercial building, the insurer cash settled $229,185.50 and the complainant sought a larger settlement, loss of rent and professional fees. AFCA ordered a 15% contingency addition of $30,654.29 with interest, and rejected the loss of rent claim.
The insurer's actionable quote was reasonable but omitted likely repair contingencies, while loss of rent failed because no tenancy existed at the date of loss.
Issues
- Claim amount dispute primary · upheld
“The cash settlement for the building damage should be increased by 15% ($30,654.29) to include an allowance for the contingencies that are likely to arise in the repair process.”
- Claim denial secondary · not upheld
“The insurer is not liable for loss of rent as there was no tenancy agreement in place at the time of the loss.”
Subjects and remedies
home or building damagemotor vehicle collisionpay claimpay interest
Text of the determination
Determination
Case number 713478
Financial firm Strata Community Insurance Agencies Pty Ltd
Determination | Case number: 713478 Page 2 of 10
Case number: 713478 25 February 2021
1 Determination overview
1.1 Complaint
The complainant lodged a claim for building damage following a motor vehicle
collision and fire at the insured address on 12 July 2019.
The insurer accepted liability and cash settled the claim for $229,935.50 on 8 January
2020 as the complainant wanted to use his own builder. The settlement excluded
damage to the tenant’s fit out and property as these items did not form part of the
insured property.
The complainant believes the cash settlement is insufficient. The complainant seeks
an increase in the cash settlement to $315,766.93, compensation for claim delays,
loss of rent and ongoing claims preparation costs.
1.2 Issues and key findings
Should the cash settlement for the building damage be increased?
The cash settlement for the building damage should be increased by 15%
($30,654.29) to include an allowance for the contingencies that are likely to arise in
the repair process.
Is the complainant entitled to settlement for loss of rent?
The insurer is not liable for loss of rent as there was no tenancy agreement in place at
the time of the loss.
Is the insurer liable for further professional fees?
The insurer has agreed to pay ongoing professional fees as outlined in section 2.3.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is to cash settle the complainant an additional $30,654.29 being a 15%
increase in the cash settlement for the building damage to cover contingencies.
Interest is payable on the amount from the 20 January 2020 until date of payment of
the claim.
Determination | Case number: 713478 Page 3 of 10
2 Reasons for determination
There has been a full exchange of information between the parties and each party
has had the opportunity of addressing the issues in dispute.
This complaint has been referred for determination to a panel comprising the Lead
Ombudsman, a member with extensive insurance experience and a member with
significant experience as a consumer representative.
The determination follows consideration of all relevant information. It is based on what
is fair in all the circumstances having regard to the relevant legal principles, terms of
the policy, good industry practice including codes of practice and prior determinations
where applicable.
2.1 Should the cash settlement for the building damage be increased?
Insurer settled claim for cost to repair building damage
This complaint arises from damage to a commercial Owners Corp building which was
damaged after a car struck the building and the building was fire damaged on 12 July
2019.
After investigation the insurer accepted liability in November 2019. The insurer
indemnified the complainant for the make safe works and arranged a scope of works
(SOW) for debris removal and building repairs. The insurer assessed the damage and
offered to complete repairs. This offer was declined by the complainant as he wanted
to use his own builders.
The insurer agreed and paid the complainant $229,935.50 in January 2020. This was
based on the actionable quote from its builder A, which included building repair costs
of $204,361.97. The insurer settled the complainant the following:
Make Safe works completed by complainant’s builder M $4,898.25
Insurer’s building quote from A $204,361.97
Removal of debris by complainant’s trade N $10,775.28
Air conditioning and mechanical repairs per complainant’s trade C $9,900
Subtotal $229,935.50
Less $750 excess
Total $229,185.50
The complainant says the settlement for the building damage is not sufficient. He
obtained an independent quote from IP for $315,766.93 based on a scope of works
prepared by S. The complainant seeks the difference between the quotes provided by
A and IP.
Determination | Case number: 713478 Page 4 of 10
The insurer says the settlement represents the full cost of insurable works as S’s
scope included items not covered by the policy including the tenan t’s fit out, the cost
of removing further debris and tenant’s contents .
Tenants fit out not covered under the policy
The insurer says the following items formed part of the tenant’s fit out and property:
suspension of a metal ceiling grid and ceiling tiles;
ceramic floor tiles, timber substructure to ramped tile flooring, a nd concrete floors
a cool room
partition walls.
The parties agree the policy does not cover the tenant’s fit out or property. However,
the complainant says the retail lease was terminated on 10 July 2019. An abandoned
goods notice was sent to the tenant on 11 July 2019, allowing two days (until the end
of 13 July 2019) to remove all property from the lot. This did not occur.
The complainant says the tenant ’s property became the landlord’s possessions when
the lease expired and therefore fell under the definition of insured property.
Transfer of ownership had not occurred as at the date of loss
The lease agreement provides that the tenant is to remove all tenant installations and
tenant property when the lease comes to an end. Unless otherwise agreed or if not
removed the property is considered abandoned and becomes the property of the
landlord. Details are set out under section 3.2 of this determination.
The lease was terminated early by the complainant due to non-payment of rent. The
complainant sent instructions to the tenants on 11 July 2019 stating it had taken back
the premises as of 10 July 2019. It said:
As at this date, the landlord hereby gives you formal notice that you must collect your
goods and belongings within two (2) days due to its perishability. Failing which your
goods and belongings will be deemed abandoned and the goods will be disposed of.
The tenant’s installations and property would not would not be considered abandoned
until after 13 July 2019. The tenant’s belongings (including the refrigerators) had not
become property of the complainant as they had not been deemed to be abandoned.
The insurer is not liable to meet the cost of the damage to the tenan t’s property.
Cash settlement should include allowance for contingencies
The complainant rejected the insurer’s offer to complete the works preferring instead
to provide an independent quote for cash settlement purposes.
A side by side comparison of the quotes has been provided by the insurer. Excluding
the items that were accounted for in the insurer’s settlement or form part of the
Determination | Case number: 713478 Page 5 of 10
tenant’s fit out, the following items appear to be in dispute . The insurer’s comments
are included in brackets:
Demolition:
o Demolish colorbond metal capping to the parapet walls 32lm (Allowed 13lm
damaged, with generous provision for cuts included.)
o Demolish colorbond metal sheets to the parapet walls 26sqm (Allowed for in
Allwood Quote however only 8m x .8m services this area | 26sqm is unclear)
o Demolish the metal box gutter, sumps & stormwater pipework 16lm (Only 8lm
damaged behind parapet wall included in Allwood Quotation)
o Demolish the set plasterboard ceiling to the bathroom amenities (Unnecessary)
o Demolish the electrical fixtures & cabling including: cabling generally, recessed
ceiling lights x 34m (Confined allowance included as 1) Predominantly tenant fit
out 2) Claimed scope inflated and not reflective of extent of loss- proposal
includes complete rewire of wiring which is operationally unaffected.)
Carpentry:
o Supply & install new door architraves to bathroom amenities (Confined allowance
included prep and redecoration | Replacement exceeds necessary reinstatement)
Roof and roof plumbing:
o Supply labour and materials to install new Colorbond capping to the parapet wall
structures 32lm (Confirmed allowed included 13lm replacement only. Inflated
scope of works.)
Electrical services:
o Supply labour and materials to install new electrical fixtures and cabling
(predominantly relates to uninsured property)
Tiling and waterproofing:
o Supply labour & materials to install new ceramic floor tiles 169sqm (Allowance for
cleaning only)
In the response of 31 August 2020, the complainant through a representative did not
refute the above items. The representative simply reiterated the position that the
complainant sought the difference between the scopes of works.
In the absence of information to show the insurer’s scope was inconsistent with policy
coverage, the panel is unable to say it was insufficient to reinstate the property in line
with the terms of the policy.
The insurer’s quote was actionable and intended to be actioned . The panel accepts
however that there are unknown issues that are likely to arise in the repair process.
These contingencies have not been accounted for in the insurers quote. The
contingencies would likely have been identified by the insurers builder and paid for by
Determination | Case number: 713478 Page 6 of 10
the insurer if the insurer had completed the repairs. In the circumstances the panel
determines it is fair that to add 15% or $30,654.29 to the insurers builder A’s quote to
cover the possible contingencies.
Other damage
The complainant requested reimbursement for removal of debris and says delays
caused further damage to the roof due to deterioration.
The insurer settled the complainant for removal of debris in January 2020. It has
offered to review further invoices for removal of tenant’s contents. It says however
that the complainant’s quotes do not allow for a specific amount for this. The panel
accepts the insurer offer to review and reimburse the complainant upon presentation
of a separate invoice detailing the items to be removed is fair in the circumstances.
The repairs have not begun since the insurer settled the claim in January 2020. The
delay is not due to the conduct of the insurer. The complainant could have
commenced the repairs. The panel determines the insurer is not liable for
deterioration caused by delaying repairs.
2.2 Is the complainant entitled to settlement for loss of rent?
Policy covers loss of rent in certain circumstances
The complainant claimed for loss of rent from the date of loss until completion of
repairs saying the property could not be re tenanted in its damaged state.
The policy covers for loss of rent in certain circumstances. The policy terms are set
out under section 3.1 of this determination.
The insurer says the policy required the complainant to provide evidence the property
was to be leased at the time of the loss, that reasonable steps had been taken to find
a tenant. It also said the complainant had not provided the amount being sought.
The complainant agrees the tenant was being evicted as at the date of loss but says
the insurer’s failure to discharge its obligations under the claim prevented repairs from
being completed. Due to this, the property could not be re tenanted.
Loss of rent not payable under policy as no tenancy agreement in place
The lease agreement had ended at the election of the complainant. There was no
tenancy on foot. As there was no agreement in place at the time of the loss the panel
is satisfied the insurer is not liable under the terms of the policy for the claimed loss of
rent.
Determination | Case number: 713478 Page 7 of 10
Insurer is not liable for indirect loss
The complainant says had the insurer adequately assessed and settled the claim, it
would have been able to have all works completed and the premises returned to a
condition suitable to be leased.
AFCA may look at direct or in direct financial loss suffered due to the insurer’s actions
or delays. Given there was no tenancy agreement at the time of loss, and no
information has been provided to show the property was to be re let, any potential
loss of rent due to insurer delays would be categorised as indirect financial loss.
AFCA may award indirect financial loss to a maximum of $5,000 where it considers
an insurers actions have caused or contributed to that loss.
The insurer had settled the complainant for the damage in Januar y 2020. It had
offered to complete the repairs. Prior to the settlement the insurer had engaged with
the complainant and had investigated the claim. It did not unreasonably delay the
investigations. While there may have been some delays in the investigation and
assessment of damage the insurer ’ s conduct was not egregious.
The panel determines the insurer is not liable for the indirect loss claimed.
2.3 Is the insurer liable for further claims preparation costs?
Insurer liable for further professional fees
The policy says:
Professional fees
We will pay up to $50,000 for the reasonable cost of professional fees and other
expenses You necessarily incur with Our written consent in the preparation of a claim
under Section 1 and when applicable Sections 8, 10 and 11.
The complainant claimed for claims preparation costs due to the involvement of loss
adjusting firm L, environmental consultant E and builder S.
The insurer says it accepted these costs in good faith and, as at July 2020, had
settled the complainant for E and S as well as costs to date from L.
The complainant says the insurer incorrectly allocated settlement amounts for E and
S to claims preparation rather than professional fees, and ongoing claims preparation
costs are being incurred.
The panel accepts these costs would be more appropriately categorised as
professional fees and should not reduce any separate cover for claims preparation.
On careful examination of the policy however, no separate provision is made for
claims preparation costs.
Determination | Case number: 713478 Page 8 of 10
Based on the policy wording, the panel accepts amounts payable to E, S and L are
appropriately categorised under the heading Professional fees and are subject to the
policy limit of $50,000.
E and S’s costs have been paid. Given the ongoing service being provided by L, the
insurer is to continue reimbursing its reasonable professional fees up to the policy
limit in accordance with the terms set out in the policy.
Determination | Case number: 713478 Page 9 of 10
3 Supporting Information
3.1 Relevant Policy terms
Insured Property
(a) Building means:
building or buildings as defined by the Strata Schemes Management Act, Strata Titles
Act, Community Titles Act or similar legislation applying where Your Building is
situated, including:
(i) outbuildings;
(ii) Fixtures and Structural Improvements including fencing, gates, paths and
roadways, retaining walls, awnings, external blinds and signs;
(iii) tennis courts, in-ground swimming pools and spas;
(iv) fixed or built in plant, equipment and appliances;
(v) floor coverings but excluding carpets (whether fixed or un-fixed) and Floating
Floors;
(vi) ……
Loss of rent
1. (a) Rent
When the Common Area or a Lot has been leased out, or can be substantiated by
means of a signed agreement that the Common Area or Lot would have been leased
out, We will pay You and/or the Lot Owner for the Rent that is lost or would have been
lost if the Common Area or Lot is made unfit to be occupied for its intended purpose
by:
(i) Loss or Damage that is admitted as a claim under Section 1; or
(ii) reasonable access to or occupancy of the Common Area or Lot is prevented by
damage from an Event claimable under Section 1 happening to other property in the
immediate vicinity.
We will pay:
- under (a) (i) from the time of the Event until the time the Common Area or Lot is
relet following completion of rebuilding, repairs or Replacement provided You or
they demonstrate that all reasonable actions have been taken to obtain a new
Tenant (if applicable); or
- if Your Insured Property is not rebuilt or replaced, for the time it would have
reasonably taken to rebuild or replace Your Common Area or Lot up to a
maximum of twelve (12) months;
Determination | Case number: 713478 Page 10 of 10
- under (a) (ii) from the time of the Event until the time when access to the Common
Area or Lot is re-established.
3.2 Tenancy Agreement
GENERAL AGREEMENTS BETWEEN LANDLORD AND TENANT
5.1 When the term ends, the tenant must –
5.1.1 return the premises to the landlord clean and in the condition required by this
lease, and
5.1.2 remove the tenant's Installations and other tenant's property from the premises
and make good any damage caused in installing or removing them.
If the tenant leaves any tenant's installations or other tenant's property on the
premises after the end of the lease, unless the landlord and tenant agree otherwise –
5.1.3 all items of tenant's installations and tenant's property will be considered
abandoned and will become the property of the landlord, but the landlord may remove
any of the tenant’s installations or other property of the tenant and recover the costs of
removal and making good as a liquidated debt payable on demand; and
5.1.4 the parties intend that clause 5.1.3 operate in relation to tenant's installations
and tenant's property in place of any legislation that might otherwise apply to goods
remaining on the premises.